Tactical sUAS RFIs CAO 24JUN26.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Tactical sUAS Package
Solicitation number
W50S7X26Q0004
Issued by

About this file

This file is a Questions and Answers document that clarifies salient characteristics and contract requirements for a Tactical sUAS (small Unmanned Aircraft System) solicitation issued by the 184 Wing of the Department of the Army National Guard.

The document addresses four key inquiries regarding the tactical sUAS procurement. First, regarding the IP rating requirement listed as IP55 minimum, the government confirmed that an IP54 rating would be acceptable if all other salient characteristics are met. Second, concerning the controller specifications (1750 nits peak brightness, 120Hz refresh rate, and 2340x1080 resolution), the government clarified that these represent overall controller capability requirements rather than individual minimums that must all be simultaneously met. Third, the response due date is established as July 20, 2026, with a 60-day delivery timeline from award. Fourth, the government confirmed this is a single unit purchase with no anticipated follow-on orders. The sUAS must be tactical and multiband, engineered for operation in GPS-denied and highly contested environments, and NDAA-compliant. Delivery is required to Building 42, 57330 Mustang Drive, McConnell Air Force Base, Kansas 67221. All quotes and technical questions should be submitted to 184wg.msg.contracting@us.af.mil.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

QuestionAnswer
1The IP rating requirement is listed as at least IP55. Will the government consider a platform with an IP54 rating if it otherwise meets all other salient characteristics, or is IP55 a hard minimum?a. IP54 will be fine
2The controller specification lists 1750 nits peak brightness, 120Hz refresh, and 2340x1080 resolution. Are these individual minimums that must all be met simultaneously, or will the government evaluate overall controller capability?a. Affirm on the overall controller capability not all must be met simultaneously
3What is the anticipated response due date and expected delivery timeline?a. 20 July 2026 for response date. 60 days from award.
4Is this a single unit purchase or is there potential for follow-on orders under the same vehicle?a. This is a single purchase unit.