Mezzanine Questions and Answers.pdf

PDF 334 KB Posted

Attached to
Storage Mezzanine
Solicitation number
W50S6V20Q0022
Issued by

View the file

Other files

File Type Posted
Combo Synopsis-Solicitation W50S6V20Q0022 Amendment 1.pdf PDF
Combo Synopsis-Solicitation W50S6V20Q0022_1.pdf PDF
Installation Access Roster.pdf PDF
Price Schedule.xlsx XLSX spreadsheet
Reference Photos.pdf PDF
Statement of Need-1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mezzanine Questions

1. Will the electrical connections be terminated prior to contractor removal of equipment?

a. The Government will terminate the electrical connections that the week prior to removal as we will be using the current Kardex systems up until that point.

2. What is the required ceiling clearance?

a. Distance from fire suppression system to top of the mezzanine should be at least 24 inches.

3. Do you need 1 staircase per mezzanine?

a. Yes, there should be a dedicated staircase for each mezzanine, and the staircase should be fixed in place.

4. Can the vendor attach a temporary girder to the ceiling beam to aid in demo of the existing equipment?

a. No, the ceiling beams cannot support the projected additional weight of the Kardex system.

5. Is equipment necessary for the project (trailers, vehicles, equipment, dumpsters) able to be left on base overnight?

a. Yes, there will be a designated area in a secured yard for storage.

6. To aid in removal of the Kardex systems, is temporary anchoring to the girders (using a beam clamp) allowed?

a. No, the ceiling beams cannot support the projected additional weight of the Kardex system.

7. If a forklift is brought on site, are there any restrictions on fuel type used indoors (propane or electric)? In the event an electric forklift is required, is a 220V power outlet available for overnight charging?

a. It must be an electric forklift for use in the warehouse. We do not have a 220V power outlet, but can make our existing forklift charging station available for use. Please refer to the picture on the next page.

8. What is the required capacity of the new cantilever racks (Item #5)?

a. 60 LBS

Forklift charging area