This addendum modifies plans and specifications for the F-35 - ADAL Squadron Operations Building 1303 project. The addendum makes seven changes to drawings and adds one new drawing and one new specification section. Drawing revisions include changing the top of slab height, replacing site demolition and utilities plans with revised versions, adding a site details drawing, and updating note references. The added specification section covers sanitary sewerage systems and piping. Materials include ductile iron, ABS, PVC, concrete, precast concrete manholes, frames and covers, and gray iron cleanouts. Installation requirements address excavation, identification, applications, general procedures, joint construction, manhole and cleanout installation, connections, field quality control, and testing.

View the file

Other files

File Type Posted
OF_1419.pdf PDF
ADAL Squad Ops - Bid Opening Sign in.pdf PDF
W50S6N23B0003 AMEND 0002.pdf PDF
RFI Responses 001 SIGNED.pdf PDF
Amendment 1.pdf PDF
Site Visit Roster.pdf PDF
Pre Bid Slides_ ADAL OPS.ppt PPT presentation
EAL.pdf PDF
187th AccessDeterminationMatrix.pdf PDF
FAKZ189102 Addendum No. 1 SIGNED.pdf PDF
FAKZ189102 Type B3 Drawings SIGNED.pdf PDF
FAKZ189102 Type B3 Specifications VOLUME 1 SIGNED.pdf PDF
FAKZ189102 Type B3 Specifications VOLUME 2 SIGNED.pdf PDF
W50S6N23B0003.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 23 March 2023

To: Mr. Stephen Shanks

Subject: ADDENDUM NO. 2

Project: F-35 – ADAL SQUADRON OPERATIONS BUILDING 1303

Job #: ANG# FAKZ189102 / SSL# 10065.02

From: David Donovan

The plans and Specifications for the F-35 – ADAL Squadron Operations Building 1303, dated November 2022 are amended as follows. (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern).

Item No. 1: Change top of slab from 13’-10” to 13’-6” on details 1/S2.2, 2/S2.2, 7/S2.3, 6/S2.1.

Item No. 2: Delete page C1.1 “Site Demolition Plan” and replace it with the attached drawing sheet C1.1 “Site Demolition Plan” with a revised date of 3-14-2023.

Item No. 3: Delete page C4.1 “Site Utilities Plan” and replace it with the attached drawing sheet C4.1 “Site Utilities Plan” with a revised date of 3-14-2023.

Item No. 4: Delete page C8.1 “Site Details” and replace it with the attached drawing sheet

C8.1 “Site Details” with a revised date of 3-14-2023.

Item No. 5: Add the attached drawing sheet C10.1 “Site Details.”

Item No. 6: Add the attached specification section 33 3112 “Sanitary Sewerage.”

Item No. 7: Change 3 references to specific note 1 within rooms S24 and S25 on drawing sheet A1.1 to reference specific note 15. Add specific note 15 reading as follows “Refer to electrical. Remove existing concealed electrical and communications cabling from new secure wall assembly. Reinstall cabling in new surface mounted raceway once modifications to existing wall assembly are complete.”

Item No. 8: Refer to sheet A2.1. Change the reference in specific note 1 from 5/A2.5 to

4/A2.5.

End of Addendum #2

David Donovan

Digitally signed by David Donovan DN: cn=David Donovan, o=SS&L, ou=SS&L, email=ddonovan@sslarch.com, c=US Date: 2023.03.21 14:09:37 -04'00'

F-35 ADAL Squadron Operations Building FAKZ189102 November 2022 187th Fighter Wing, Dannelly Field, ANG Montgomery, AL

Type B3 (100%) Submittal Revised 14 March 2023

SANITARY SEWERAGE 333112 - 1

SECTION 333112 - SANITARY SEWERAGE

PART 1 GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including requirements of the Government's Solicitation and Division 1 Specification Sections, apply to this Section.

1.02 SUMMARY

A. This Section includes sanitary sewerage outside the building.

1.03 PERFORMANCE REQUIREMENTS

A. Gravity-Flow, Non-pressure-Piping Pressure Ratings: At least equal to system test pressure.

1.04 DELIVERY, STORAGE, AND HANDLING

A. Protect pipe, pipe fittings, and seals from dirt and damage.

1.05 PROJECT CONDITIONS

A. Site Information: Verify existing utility locations.

B. Locate existing structures and piping to be closed and abandoned.

C. Comply with requirements of the Montgomery Water Works and Sanitary Sewer Board; obtain required permits and inspections. Pipe materials specified shall comply with the above agency. Should there be no material requirements from that agency, the general contractor may use any of the materials specified herein.

1.06 SUBMITTALS

A. Project Data: Submit manufacturer's technical product data and installation instructions for proposed materials and products.

B. Record Drawings: At project closeout, submit record drawings of installed systems piping and products, in arccordance with requirements of Division 01.

C. Sustainability Submittals, Product data for HPSB Compliance:

1. For products having recycled content, provide documentation indicating percentages by weight of postconsumer and pre-consumer recycled content.

Montgomery, AL

Type B3 (100%) Submittal Revised 14 March 2023

SANITARY SEWERAGE 333112 - 2

a. Include statement indicating costs (sell price for each product having recycled content)

b. Include the total weight of products provided

c. If fly ash, ground granulated blast furnace slag, silica fume, rice hull ash, or other waste materials is used in mix designs to replace Portland cement, submit the total volume of concrete cast in place, mix design(s) used showing the quantity of portland cement replaced, reports showing successful cylinder testing, and temperature on day of pour if cold weather mix is used.

PART 2 PRODUCTS

2.01 MANUFACTURERS

2.02 PIPES AND FITTINGS

A. Ductile-Iron Sewer Pipe: ASTM A 746, for push-on joints.

1. Standard-Pattern, Ductile-Iron Fittings: AWWA C110, ductile or gray iron, for push-on joints.

2. Gaskets: AWWA C111, rubber.

3. ABS Sewer Pipe and Fittings: ASTM D 2751, for solvent-cemented or gasketed joints.

a. Wall Thickness for NPS 8 to NPS 12 (DN200 to DN300): SDR 42.

b. Gaskets: ASTM F 477, elastomeric seals

4. PVC Sewer Pipe and Fittings: According to the following:

a. PVC Sewer Pipe and Fittings, NPS 15 and Smaller: ASTM D 3034, SDR 35.

for solvent-cemented or gasketed joints.

1) Gaskets: ASTM F 477, elastomeric seals.

2.03 CONCRETE

A. General: Cast-in-place concrete according to ACI 318, ACI 350R, and the following:

1. Cement: ASTM C 150, type II.

2. Fine Aggregate: ASTM C 33, sand.

3. Coarse Aggregate: ASTM C 33, crushed gravel.

Montgomery, AL

Type B3 (100%) Submittal Revised 14 March 2023

SANITARY SEWERAGE 333112 - 3

4. Water: Potable.

B. Portland Cement Design Mix: 3000-psi minimum, with 0.45 maximum water-cementitious materials ratio.

2.04 MANHOLES

A. Heavy-Traffic Precast Concrete Manholes: ASTM C 913; designed according to ASTM C 890 for A-16, heavy-traffic, structural loading; of depth, shape, and dimensions indicated, with provision for rubber gasketed joints.

1. Gaskets: Rubber.

2. Grade Rings: Include two or three reinforced-concrete rings, of 6- to 9-inch total thickness, that match 24-inch- diameter frame and cover.

3. Pipe Connectors: ASTM C 923 (ASTM C 923M), resilient, of size required, for each pipe connecting to base section.

B. Manhole Frames and Covers: ASTM A 536, Grade 60-40-18, ductile-iron castings designed for heavy-duty service. Include 24-inch ID by 7- to 9-inch riser with 4-inch minimum width flange, and 26-inch- diameter cover. Include indented top design with lettering "SANITARY" cast into cover.

2.05 CLEANOUTS

A. Gray-Iron Cleanouts: ASME A112.36.2M, round, gray-iron housing with clamping device and round, secured, scoriated, gray-iron cover. Include gray-iron ferrule with inside calk or spigot connection and countersunk, tapered-thread, brass closure plug.

Use units with top-loading classifications according to the following applications:

1. Light Duty: In earth or grass foot-traffic areas.

2. Medium Duty: In paved foot-traffic areas.

3. Sewer Pipe Fitting and Riser to Cleanout: ASTM A 74, Service class, cast-iron soil pipe and fittings.

PART 3 EXECUTION

3.01 EARTHWORK

A. Excavating, trenching, and backfilling are specified in Division 2 Section “Earthwork”.

Montgomery, AL

Type B3 (100%) Submittal Revised 14 March 2023

SANITARY SEWERAGE 333112 - 4

3.02 IDENTIFICATION

A. Materials and their installation are specified in Division 2 Section “Earthwork.”

Arrange for installing green warning tapes directly over piping.

1. Use warning tape or detectable warning tape over ferrous piping.

2. Use detectable warning tape over nonferrous piping.

3.03 PIPING APPLICATIONS

A. General: Include watertight joints.

3.04 INSTALLTION, GENERAL

A. General Locations and Arrangements: Drawings plans and details indicate general location and arrangement of underground sanitary sewerage piping. Location and arrangement of piping layout take design considerations into account. Install piping as indicated, to extent practical.

B. Install piping beginning at low point, true to grades and alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream. Install gaskets, seals, sleeves, and couplings according to manufacturer’s written instructions for using lubricants, cements, and other installation requirements. Maintain swab or drag in line, and pull past each joint as it is completed.

C. Extend sanitary sewerage piping and connect to building’s sanitary drains, of sizes and in locations indicated. Terminate piping as indicated.

3.05 PIPE JOINT CONSTRUCTION AND INSTALLATION

A. General: Join and install pipe fittings according to installations indicated.

B. Ductile-Iron Sewer Pipe with Ductile-Iron Fittings: According to AWWA C600.

C. ABS Pipe and Fittings: As follows:

1. Join pipe and gasketed fittings with gaskets according to ASTM D 2321.

2. Install according to ASTM D 2321.

D. PVC Sewer Pipe and Fittings: As follows:

1. Join pipe and gasketed fittings with gaskets according to ASTM D 2321.

2. Install according to ASTM D 2321.

Montgomery, AL

Type B3 (100%) Submittal Revised 14 March 2023

SANITARY SEWERAGE 333112 - 5

E. System Piping Joints: Make joints using system manufacturer’s couplings, unless otherwise indicated.

F. Join piping made of different materials or dimensions with couplings made for this application. Use couplings that are compatible with and that fit both systems’ materials and dimensions.

G. Install with top surfaces of components, except piping, flush with finished surface.

3.06 MANHOLE INSTALLATION

A. General: Install manholes, complete with appurtenances and accessories indicated.

B. Form continuous concrete channels and benches between inlets & outlet.

C. Set tops of frames and covers flush with finished surface of manholes that occur in pavements. Set tops 3 inches above finished surfaces elsewhere, unless otherwise indicated.

D. Install precast concrete manhole sections with gaskets according to ASTM C 891.

3.07 CONCRETE PLACEMENT

A. Place cast-in-place concrete according to ACI 318 and ACI 350R.

3.08 CLEANOUT INSTALLATION

A. Set cleanout frames and covers in earth in cast-in-place concrete block, 18 by 18 by 12 inches deep. Set with tops 1 inch above surrounding grade.

3.09 TAP CONNECTIONS

A. Make connections to existing manhole so finished Work complies as nearly as practical with requirements specified for new Work.

B. Protect existing piping and structures to prevent concrete or debris from entering while making tap connections. Remove debris or other extraneous material that may accumulate.

3.10 FIELD QUALITY CONTROL

A. Clear interior of piping and structures of dirt and superfluous material as work progresses. Maintain swab or drag in piping, and pull past each joint as it is completed.

1. Place plug in end of incomplete piping at end of day when work stops.

Montgomery, AL

Type B3 (100%) Submittal Revised 14 March 2023

SANITARY SEWERAGE 333112 - 6

2. Flush piping between manholes and other structures to remove collected debris, if required by authorities having jurisdiction.

B. Test new piping systems, and parts of existing systems that have been altered, extended, or repaired, for leaks and defects.

1. Do not enclose, cover, or put into service before inspection and approval.

2. Test completed piping systems according to authorities having jurisdiction.

3. Schedule tests and inspections by authorities having jurisdiction with at least 24 hours’ advance notice.

4. Submit separate reports for each test.

5. If authorities having jurisdiction do not have published procedures, perform tests as follows:

a. Sanitary Sewerage: Perform hydrostatic test.

1) Allowable leakage is maximum of 50 gal. Per inch of nominal pipe size per mile (4.6 L per millimeter of nominal pipe size per kilometer) of pipe, during 24-hour period.

2) Close openings in system and fill with water.

3) Purge air and refill with water.

4) Disconnect water supply.

5) Test and inspect joints for leaks.

6) Option: Test ductile-iron piping according to AWWA C600, Section “Hydrostatic Testing.” Use test pressure of at least 10 psig (69 kPa).

(a) Sanitary Sewerage: Perform air test according to UNI-B-6.

7) Manholes: Perform hydraulic test according to ASTM C 969 (ASTM C 969M).

8) Leaks and loss in test pressure constitute defects that must be repaired.

9) Replace leaking piping using new materials, and repeat testing until leakage is within allowances specified.

END OF SECTION 02530