Requirements_Specification_Matrix_for_Pneumatic_Pressure_Controller.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Pneumatic Pressure Controllers
Solicitation number
W31P4Q-16-R-0156
Issued by

About this file

REQUIREMENTS SPECIFICATION MATRIX FOR PNEUMATIC PRESSURE CONTROLLER

View the file

Other files

File Type Posted
W31P4Q-16-R-0156_Amendment_0004.pdf PDF
QUESTIONS_AND_ANSWERS.pdf PDF
QUESTIONS_AND_ANSWERS.pdf PDF
W31P4Q16R0156-0001.pdf PDF
QUESTIONS_AND_ANSWERS.pdf PDF
W31P4Q-16-R-0156.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SectionTitleGOVERNMENT'S REQUIREMENTSPROPOSAL
2.1.1Configuration #1 AccuracyThe Combined Uncertainty of the pressure measurement shall maintain a 4 to 1 Test Uncertainty Ratio (TUR) when calibrating absolute and gauge type Accuracy Grade 2A (ASME B40.100-2013) and below gauges, from 5 to 2500 psig.

Combined Uncertainty shall include reference calibration standard (0.000145 psia + 20 ppm), linearity, hysteresis, repeatability, and 1-year stability.

2.2.2 Configuration #2 Accuracy The Combined Uncertainty of the pressure measurement shall maintain a 4 to 1 Test Uncertainty Ratio (TUR) when calibrating absolute and gauge type Accuracy Grade 1A (ASME B40.100-2013) and below gauges, from 5 to 2500 psig.

Combined Uncertainty shall include reference calibration standard (0.000145 psia + 20 ppm), linearity, hysteresis, repeatability, and 1-year stability.

2.3Control Stability0.003% of transducer range or better.
2.4Operational Pressure RangeShall control pressure from -15 to 2500 psig
2.5UnitsShall display pressure in the following units: psig, psia, Pa, kPa, MPa, inH20, inHg, mmHg, bar, and mbar.
2.6Operational ModesPPC shall have a control mode and measurement mode.
2.7Warm-Up Time30 minutes or less.
2.8.1Operating Temp60 to 90 ºF
2.8.2Storage Temp0 ºF to 140 ºF
2.8.3Humidity20% to 90% RH, non-condensing
2.8.4ShippingStandard commercial shipping conditions.
3.1InteroperabilityThe PPC/Chassis shall be capable of accepting and operating with the transducers in Configuration #1 (Section 2.1) and Configuration #2 (Section 2.2).
3.2Functional RangeShall function as defined in Configuration #1 (Section 2.1) and Configuration #2 (Section 2.2) without removing and replacing modules with measurement transducers during operation.
3.3Coefficient StorageModules with measurement transducers shall maintain calibration coefficients, independent of any PPC/Chassis.
3.4DisplayLED, LCD, or Plasma screen with alpha numeric characters. All necessary test information shall be displayed on screen.
3.5User InterfaceAll functions of the PPC shall be accessible through the front panel display and front user interface.
3.6Remote InterfacePPC shall have remote interfaces through USB, RS-232C and/or IEEE 488.2, and contractor shall provide programming command set for the PPC. All functions of the PPC shall be accessible through the remote interface.
3.7Zero CorrectionPPC shall have a zeroing function.
3.8Head CorrectionPPC shall correct for head pressure.
3.9.1CalibrationPPC and modules with measurement transducers shall meet all performance requirements, without recalibration, for a period of at least 1 year.
3.9.2CalibrationA means to store COMPASS for Pressure Calibration Software (COMPASS) derived calibration coefficients in the modules with transducers shall be provided.
3.9.3CalibrationModules with measurement transducers shall have the capability to be transported and calibrated independent of the original PPC/Chassis with COMPASS software, dead weight system and connect to a SS-QC4-S-400 Swagelok quick connect stem.
3.9.4CalibrationHardware and software beyond Army Secondary Reference calibration/repair capability, shall be provided to support calibration/repair of modules with measurement transducers independent of the original PPC/Chassis, as mentioned in section 3.9.3.
3.9.5CalibrationIf PPC/Chassis calibration is required, hardware and software for calibration and adjustments beyond Army Secondary transfer calibration capability (capability information provided on request) shall be provided.
3.9.6CalibrationRepair parts shall be available for repair of PPC/Chassis and modules with measurement transducers (see 5.2.4 below). Any repairs deemed manufacture only shall be specified and justified.
4.1Dimensions17.8125” Width and 20.5” Depth Maximum
4.2WeightPPC shall not exceed 44 pounds (1 Person Lift Limit).
4.3Rack MountingA standard 19” rack mounting kit shall be an available option.
4.4PowerPPC shall operate on 120VAC 60Hz, 15A single phase, standard U.S. electrical power, and come equipped with standard U.S. plug type.
4.5Connection PortsPPC shall have easily accessible ports for pressure and vacuum connections. Connections shall be or adapt to 1/8” NPT. Any necessary adapters shall be provided. Source pressure ports shall clearly be labeled with maximum input pressure. All ports shall be labeled with size and thread type.
4.6Pressure MediaPPC shall operate with Nitrogen as the working gas.
5.1Operators ManualEach system shall include an Operators Manual for the PPC and proposed modules with measurement transducers shall be provided with the following information at a minimum: 5.1.1 Setup/installation and operating instructions. 5.1.2 Safety information to prevent injury to personnel and damage to the PPC/Chassis, transducers and associated hardware. Shall contain appropriate warnings, cautions and notes.
5.2Maintenance ManualEach system shall include a Maintenance Manual for the PPC and proposed modules with measurement transducers shall be provided with the following information at a minimum: 5.2.1 Instructions for conducting performance checks and adjustments during recalibration. 5.2.2 Complete peripheral automation command set (see 3.5). 5.2.3 Troubleshooting, maintenance and repair instructions (see 5.2.4 below). 5.2.4 Parts breakdown of PPC/Chassis and Modules with measurement transducers with part number, CAGE code, and OEM listed for replaceable/repairable parts such as circuit cards, switches, displays, fuses, power supply, etc.
5.3ProvisioningFor parts ordered for maintenance or repair, a data sheet consisting of picture/drawing, dimensions, weight, CAGE code, OEM and cost shall be provided.
6.1TrainingInstructor and Key Personnel Training: One time training at Redstone Arsenal for up to 10 personnel consisting of general concepts of operation, safety, setup, operation, calibration, adjustment, maintenance, fault isolation and repair.
7.1WarrantyEach system shall include a warranty of no less than 2 years.

Requirements Specifications Matrix for Pneumatic Pressure Controller 01 February 2016