A07_17T0323-0001_Amendment.pdf

PDF 80 KB Posted

Attached to
Turnkey for Liquid Nitrogen Dist System
Solicitation number
W25G1V17T0323
Issued by

About this file

Amendment to extend closing & add to SOW

View the file

Other files

File Type Posted
A07_17T0323.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W25G1V7080014V

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE CLOSING DATE TO JULY 28, 2017, 4:30PM Eastern AND ADD THE FOLLOWING TO

THE SOW: - See summary of changes Page 2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W25G1V-17-T-0323

X 9B. DATED (SEE ITEM 11)

20-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Jul-2017

CODE

ACC-APG TOBYHANNA BRANCH

11 HAP ARNOLD BLVD

TOBYHANNA PA 18466-5100

W25G1V 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W25G1V-17-T-0323

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 30-Jun-2017 04:30 PM to 28-Jul-2017 04:30 PM.

The following have been added by full text:

ADDITIONS TO STATEMENT OF WORK

1) The original SOW called for two cryovents with heaters. Need to change the cryovent requirement to 3 units. In addition to the two locations on the building parapets a third vent shall be install where pipe system penetrates roof to feed equipment in 1B5.

2) A new 2 inch inside diameter vacuum jacketed (VJ) supply pipe shall be installed to feed LN2 from the bulk tank to new 1B5 LN2 piping system. The 2” pipe will include a VJ tee fitted with 2 inch ID VJ in-line valves on each branch. One branch will be used to feed the existing LN2 VJ piping system and the second branch will feed the new 1B5 LN2 piping system.

3) Pipe system shall terminate in 1B5 with a tee fitted with VJ in-line bayonet style valves on each branch of the tee.

4) Contractor shall be responsible make electrical connection from TYAD supplied power source to cryovent heater. TYAD to provide source within 20 feet of heater location. All wiring to be in conduit with an allowance of up to 6 feet of seal tight or weather resistant cord.

5) To insure roof warrantee is not voided contractor awarded LN2 Distribution Piping System shall use the service of TYAD roof contractor to make penetration through roof and to seal.

6) Contractor personnel are required to take in OPSEC training.

7) Electrical Contractor:

Whitehead Electrical: POC Mark Whitehead 570-237-1654

Metschulat Electrical: Eugene Metschulat 570-840-6692

8) Piping system needs to be bonded to Lightening protection system at a minimum every 100 ft.

(End of Summary of Changes)