16T0245-03.pdf
PDF 570 KB Posted
- Attached to
- ICIDS SERVICE
- Solicitation number
- W25G1V-16-T-0245
About this file
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 16T0245.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE BELOW FOR SEPARATE SHIPPING INSTRUCT
XXX
XXX PA 00000
TEL: FAX:
W25G1V612501F0
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
W25G1V-16-T-0245 09-Jun-2016
5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPO RTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NO TE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) ( Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA
FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
ACC-APG TOBYHANNA DIVISION
11 HAP ARNOLD BLVD
TOBYHANNA PA 18466-5100
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
04-Aug-2016(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
570-615-9536JANEEN L DAMIANO
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
W25G1V-16-T-0245
Section Supplies or Services and Price
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot
BASE YEAR ICIDS YEARLY SERVICE
FFP
SERVICES:ICIDS III BASE YEAR PLUS TWO OPTION YEARS
PERIOD OF PERFORMANCE : 1 YEAR AFTER DATE OF AWARD
POC:VIC VILLANI X5913
PLEASE PROVIDE PRICING IN SECTION 5.8 OF STATEMENT OF WORK
FOR BASE YEAR AND TWO OPTION YEARS.
TOTAL PRICE WILL BE DETERMINED BY COMBINING THE TOTAL
COST PER YEAR FOR FOUR QUARTERLY VISITS AND ONE
EMERGENCY VISIT FOR BASE YEAR AND TWO OPTION YEARS.
THE AWARD WILL BE BASED ON THE BEST VALUE TO THE
GOVERNMENT, CONSIDERING PRICE AND PAST PERFORMANCE.
SEE ATTACHED SOW
SITE VISIT IAVAILAILABLE UPON REQUEST
LOCATION OF SITE VISIT :
TOBYHANNA ARMY DEPOT
11 HAP ARNOLD BLVD
TOBYHANNA PA 18466
BLDG 20
PLEASE CONTACT JANEEN DAMIANO AT
JANEEEN.L.DAMIANO.CIV@MAIL.MIL IF YOU PLAN TO ATTEND THE
SITE VISIT.
Wage rates can be found at www.wdol.gov
If applicable rate cannot be located please submit E-98 to DOL. If vendor is still unclear have them submit SF1444 to DOL
FOB: Destination
NSN: AASSVC612501F0
MILSTRIP: W25G1V612501F0
PURCHASE REQUEST NUMBER: W25G1V612501F0
NET AMT
Section Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
Section Deliveries and Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 1 yr. ADC 1 SEE BELOW FOR SEPARATE SHIPPING
INSTRUCT
XXX
XXX PA 00000
FOB: Destination
W25G1V
0002 N/A N/A N/A N/A
0003 2 yrs. ADC 1 SEE BELOW FOR SEPARATE SHIPPING
XXX
XXX PA 00000
0004 3 yrs. ADC 1 (SAME AS PREVIOUS LOCATION)
Section B - Supples or Services and Prices
0002 1 Lot
MANPOWER REPORTING
FFP
See clause 5152.237-4900 Accounting for Contract Services Requirement
0003 1 Lot
OPTION OPTION YEAR 1
FFP
PERIOD OF PERFORMANCE : 2 YEARS AFTER DATE OF AWARD
0004 1 Lot
OPTION OPTION YEAR 2
FFP
PERIOD OF PERFORMANCE : 3 YEAR AFTER DATE OF AWARD
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 1 yr. ADC 1 SEE BELOW FOR SEPARATE SHIPPING
XXX
XXX PA 00000
0002 N/A N/A N/A N/A
0003 2 yrs. ADC 1 SEE BELOW FOR SEPARATE SHIPPING
XXX
XXX PA 00000
0004 3 yrs. ADC 1 (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY FULL TEXT
AMC-LEVEL PROTEST PROGRAM (JUL 2012) ACC-APG TYD 5152.233-4001
If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible Contracting Officer. However, you can also protest to Headquarters, AMC. The HQ, AMC-Level
Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an
Alternative Dispute Resolution forum, rather than filing a protest with the General Accounting Office (GAO) or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. Send protests (other than protests to the Contracting Officer) to:
Headquarters U.S. Army Materiel Command
Office of Command Counsel
4400 Martin Road
Rm: A6SE040.001
Redstone Arsenal, AL 35898-5000
Fax: (256) 450-8840
E-mail: amcprotests@conus.army.mil
The AMC-Level Protest Procedures are accessible via the Internet at:
www.amc.army.mil/amc/commandcounsel.html. If Internet access is not available, contact the Contracting Officer or HQ, AMC, to obtain the AMC-Level Protest Procedures.
(End of clause)
TOBYHANNA ARMY DEPOT ON-SITE CONTRACTOR WORKFORCE AND VISITOR RESTRICTIONS
(JAN 2012) ACC-APG TYD 5152.237-4008
TOBYHANNA ARMY DEPOT ON-SITE CONTRACTOR WORKFORCE AND VISITOR
RESTRICTIONS
1. NON-RESIDENT/NON-IMMIGRANT ALIENS
a. All non-resident/non-immigrant aliens must have approval prior to being permitted access to Tobyhanna Army Depot
(TYAD). Such approval must be obtained by requesting access through the following: apply at the alien-resident’s embassy;
proceed to the U.S. Embassy; proceed to the Department of the Army; proceed to Army Materiel Command; proceed to U.S.
Communications-Electronics Command; proceed to TYAD.
b. All non-resident/non-immigrant aliens granted access to TYAD are required to be escorted by Government personnel. One
Government escort can accommodate a maximum of two non-resident/non-immigrant aliens.
c. Due to limited availability of Government personnel, contractors shall not be permitted to employ non-resident/non-immigrant aliens as part of the contractor’s on-site workforce. Limited exceptions to this restriction may be considered on a case-by-case basis. Such exceptions shall only be considered where a specialized skill or trade is not otherwise available, and even under such circumstances would only be considered for very limited duration, e.g., a few hours/days. However, even if limited exception is considered, access may still be denied. Contractors whose personnel are either denied entry to TYAD or permitted limited entry to TYAD due to the security requirements pertaining to non-resident aliens/non-immigrants are not relieved of their obligation to provide the required contract performance and must do so at no additional cost to the Government. Any contractor failing to perform or that fails to perform in a timely manner under such circumstances may be terminated for default or other contractual remedies as appropriate.
d. Due to limited availability of Government personnel, visitors requiring escort may not be permitted access, or access may be limited to a certain time and duration.
2. FOR THE PURPOSE OF FORMAL ESCORTED SITE VISITS
Resident aliens (immigrants) in possession of a valid Form I-551, Alien Registration Receipt Card (“Green Card”), are not required to obtain approval as set forth in paragraph 1.a. above (but see paragraph 5, below). Such individuals must have proper identification in addition to a valid form I-551 in their physical possession at all times while at TYAD. Individuals lacking proper identification and valid form I-555 will be denied access to TYAD.
3. SECURITY SEARCHES, IN-PROCESSING, AND SECURITY SCREENING
mailto:amcprotests@conus.army.mil http://www.amc.army.mil/amc/commandcounsel.html
All persons seeking entrance to TYAD must submit to and comply with all security standards and requirements in force at the time such persons are seeking entry. All visitors and contractors, regardless of resident status or citizenship, will be subject to vehicle search and intense in-processing by TYAD Security personnel prior to being granted access to TYAD. This security screening process may be time consuming and access may be delayed or denied.
Any Contractors who will be working on site, company representatives who will be visiting periodically, and any companies or contractors requesting or requiring TYAD badges for other business reasons must submit a completed TYAD form 648-C to their contract or depot point of contact. The completed form must be submitted at least five (5) workdays in advance of on-site performance for each employee intended for onsite performance or five (5) workdays in advance of visits or other business at the depot. Any contractor employee (s) already on site who have not been screened, will be subject to security screening. This requirement is inclusive of on-site supervisory or managerial personnel and sub-contractor personnel that the Contractor anticipates will be performing work or visiting on-site. This security screening does not relieve the contractor of any responsibilities to conduct thorough pre-employment background checks and drug screening. Contractor workers will not be granted access to the work site until security screening is completed and access is approved. Any contractor personnel on site who fail screening will not be permitted further access to TYAD.
4. SUBMISSION OF BIDS OR PROPOSALS
Bidders/offerors who hand carry bids or quotes do so at their own risk. Bidders/offerors are solely responsible for the timely submission of bids /proposals/quotations, any delays security measures notwithstanding.
5. CONTRACTOR ON-SITE WORKFORCE – ADDITIONAL SECURITY REQUIREMENTS
A. This section is in addition to the requirements above regarding non-resident aliens (non-immigrants) for on-site performance. Prior to the commencement of performance under the contract and within seven (7) workdays of contract award, the Contractor shall submit to the Chief, Security Division, Tobyhanna Army Depot, a roster of all contractor personnel, inclusive of on-site supervisory or managerial personnel and sub-contractor personnel, that the Contractor anticipates will be performing work on-site. The roster shall indicate which individuals are U.S. citizens and which are resident aliens
(immigrants). The following documentation shall accompany the roster for each individual named on the roster as a resident alien (immigrant):
a) A copy of a verifiable form of identification, such as a driver’s license or a passport; and
b) A copy of a valid Department of Justice Immigration and Naturalization Service Form I-551, Alien Registration Receipt
Card (“Green Card”).
Contractors who fail to identify any and all resident aliens (immigrants) who will be used for on-site performance and who will seek access to Tobyhanna Army Depot as a worker for or through the contractor, inclusive of managerial and subcontractor personnel, may be subject to civil and criminal penalties and sanctions as well as contract remedies
B. Within five (5) workdays of the submission of the roster, documentation, and TYAD form 648-C, the Government will have completed the security check and the Contractor shall be notified whether all listed personnel will be permitted to work on-site.
However, actual access to Tobyhanna Army Depot by the roster personnel will remain contingent upon such resident alien
(immigrant) individuals presenting two (2) forms of identification as they process into the Depot through the Security building: a valid Form I-551, Alien Registration Receipt Card (“Green Card”) in addition to at least one other verifiable form of identification
C. The roster that the Contractor submits is amendable. However, up to five (5) workdays will be required to perform a security check on any personnel added to the roster. The Contractor is urged to include contingency or “back-up” personnel in the original roster in order to avoid delays due to roster amendment
D. Contractors whose personnel are denied entry to TYAD due to the security requirements are not relieved of their obligation to provide the required contract performance and must do so at no additional cost to the Government. Any contractor failing to perform or that fails to perform in a timely manner under such circumstances may be terminated for default or be subject to other contractual remedies as appropriate.
ACCOUNTING FOR CONTRACT SERVICES REQUIREMENT (Oct 2012)
ACC-APG TYD 5152.237-4900
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the YEARLY ICIDS SERVICE via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/, and then click on “Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from the contracted services.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year
(FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s Contractor Manpower Reporting website.
-----------END OF CLAUSE-----------
CONTRACTOR VEHICLES, TRAILERS AND EQUIPMENT (JAN 2012) ACC-APG TYD 5152.246-4000
All contractor owned, rented or leased vehicles, trailers and/or equipment for use on site, shall be identified with the contractor’s company name, job site description, point of contact and phone number where the contractor can be reached 24 hours a day. The contractor shall ensure all referenced items are to be checked for proper operation, leaks, etc. prior to delivery to Tobyhanna Army Depot. The contractor shall coordinate with the Contracting
Officer’s Representative or assigned Government point of contact prior to leaving any of the referenced items unattended at the site.
http://www.ecmra.mil/
Section C - Description and Specificiations
1ST SET OF QUESTIONS AND ANSWE
*The Statement of work has been revised to include pertinent information addressed in the following questions:
Subject: Request for Information on Solicitation #W25G1V-16-T-0245-01
ICIDS YEARLY SERVICE
The following questions are being submitted based on the review of the documents provided by the Government.
1. On page 6 of the solicitation items 3.1.10 and 3.1.13 refer to replacement of batteries or other equipment. Is the contractor responsible to maintain an inventory of spares for this purpose or will the Government maintain a pool of spares that for this purpose? If it is a contractor responsibility please provide a published list of spares you expect the contractor to maintain. Contractor will be responsible to supply all replacement parts to include batteries.
A historical list of previously replaced parts will be added to the statement of work.
2. As a follow up to question #1, can the Government please clarify the procedure to replenish spares that are used as part of maintenance? Contractor is not expected to maintain a stock of spare parts, contractor shall replace parts as necessary to maintain ICIDS III system.
3. On page 7, item 3.1.18 states that all discrepancies must be photographed and documented. Does the Government have a camera that wish to be used for this or can the contractor provide their own? Item 3.1.18 will be removed from the statement of work.
4. Can you please clarify item 4.1 that states “An all new IDS system is installed on the installation”. Does this mean your system is now running Starwatch SMS or are you still using PC Starwatch?
The depot is still using PC Starwatch, information has been added to SOW in section 4.1.
5. Can you please define what type of event would qualify as an emergency and require immediate response? Typically this is defined as 1/16th or more of the entire system being in a failed state.
Any loss of coverage for certain areas with higher security levels to include all software failures and/or hardware failures are associated with the server or MCU.
6. Do you have reports or historical records showing with panel batteries or PMC UPS batteries were last replaced? Yes, a revised SOW will cover an average of batteries replaced per year, on a historical basis only.
7. Are there any SCIF’s as part this system and do you have maintenance records or testing reports from those areas? No There are no SCIFs as part of this system.
8. Are there zones currently non-functional that would require immediate attention upon award?
None at this time.
9. Is there any CCTV that would be part of this maintenance contract? If so, can you please provide details about the type of system and the number of devices in operation? No, there are no CCTV that would be part of this maintenance contract.
10. Is there any access control that would be included in this contract? If so, please state how many portals are on the system and if they are integrated with the ICIDS system or using another brand. If it is non-ICIDS, please provide the brand name and approximate age of the hardware. No. there are no access controls that would be included in this contract.
5.7. The contractor will maintain the systems in satisfactory continuous operation. When replacement parts are required the contractor will use (government approved) “State of the Art” components that are compatible with the damaged equipment. This is in solicitation- can you please define State of the Art” components
5.7 SOW WILL BE REVISED TO READ: The contractor will maintain the systems in satisfactory continuous operation. When replacement parts are required the contractor will use
ICIDS III Compatible parts.
2ND SET QUESTIONS AND ANSWERS
*The Statement of work has been revised to include pertinent information addressed in the following questions:
Subject: Request for Information on Solicitation #W25G1V-16-T-0245-01
ICIDS YEARLY SERVICE
The following questions are being submitted based on the review of the documents and the information provided by the Government during the site visit.
1. Can the Government please specify either a dollar value to be included in the bid or specific list of mandatory spares that each bidder must include? This would ensure that each bidder is working from a common baseline so that all proposals are evaluated fairly.
We do not have a mandatory list of parts that have to be kept on hand.
2. Please specify how equipment in the spares pool would be replenished, or would this be a fixed quantity and anything beyond that total would be purchased by the
Government. It is our experience that not defining this explicitly allows for wide variations in the bid price.
There is no mandatory list of parts to be kept on hand. Parts will be replaced as necessary to maintain system functionality.
3. How many outdoor RADC’s are installed?
There are no RADC’s located outdoors, however, there are four exterior RADC’s located on the interior of the buildings. This information has been added to 3.1.9 in SOW.
4. Can you please specify the type and number of fence sensors installed?
Infinity 2020 Perimeter IDS, 36 sensors. (Added to SOW 3.1.18)
5. At the site visit is was discussed that regular maintenance visits may be reduced from quarterly (4 visits) to tri-annually (3 visits). Can you please clarify which one we should be bidding?
There are to be quarterly (4) regular maintenance visits per year for a duration of five consecutive days. (Please reference section 3.1)
6. Please define what type of failure would be classified as an emergency call.
Emergency calls will be determined by the TYAD Security POC.
7. Have there been an emergency or weekend/holiday calls made for service in the last three years?
Yes
8. Can you please provide the contract number for your most recent ICIDS maintenance contract?
Currently services are being performed under W25G1V-15-P-1421. However the government does not consider the current contract a predecessor to the requirement.
Although similar, the statement of work will have different scopes.
REVISED SOW
STATEMENT OF WORK
1. CONTRACT SERVICES: Furnish all supervision, labor, equipment and material in performing all operations in connection with the quarterly Inspection/Preventative
Maintenance (PM), including on-call remedial maintenance.
Also, provide emergency service (24 hours a day, seven days a week, including holidays) on the ICIDS III System.
2. SYSTEM: Integrated Commercial Intrusion Detection
Systems – III (ICIDS-III)
3. SCOPE OF WORK:
3.1. The contractor will perform quarterly Inspection/Preventive
Maintenance (PM) on all equipment listed for a 5 day duration.
The inspections will include but are not limited to:
3.1.1 Perform system backup and make a back up disk.
3.1.2 Copy Windows error logs.
3.1.3 Verify network timing.
3.1.4 Check Callistoview version
3.1.5 Defrag all hard drives
3.1.6 Export event log
3.1.7 Perform Preventative Maintenance Checks and Services
(PMCS) of the Operators Work Station and the remote Status
Monitor.
3.1.8 Conduct zone inspection of each zone (currently 40 zones including Primary Monitoring Cabinet).
3.1.9 Check Remote Area Data Collector (RADC) for accuracy
and cleanliness. (There are a total of five (5) exterior RADC’s utilized for system, of which none are located outdoors)
3.1.10 Check all batteries in RDAC’s and replace as necessary.
*The following is not a guarantee for future failures: In the past year, 10 batteries have been replaced.
Below is a list of some parts included in the ICIDS System are as follows:
Item MFG Part #
RADC, Interior W/Keypad DAQ ACU-07581-002
STARGATE III DAQ ACB-07583
Power Line Filter DAQ ACB-08510
Keypad, Remote Access/Secure DAQ ACU-08314
RADC, Input EXP. Module DAQ ACB-07637
BMS, Low Profile Sentrol 2727A
BMS Sentrol 2707A
PIMS, Omni Sentrol AP669
PIMS, Volume Sentrol 6155-N
Duress Switch ADEMCO 269R
3.1.11 Check all devices for proper mounting and repair as
necessary.
*The following is historical information only:
One passive infrared motion sensor and three balanced magnetic switches have been replaced within the last year.
3.1.12 Conduct a walk test of the area.
3.1.13 Check functionality of equipment, replace if defective/not working properly to include all software failures and/or hardware failures associated with the server or MCU.
3.1.14 Check all keypads for proper function and keypad duress capabilities.
3.1.15 Check all duress alarm switches for proper function (61 total, 33 hardwired devices, 28 remote frequency devices).
3.1.16 Check RF Global Fault for proper functionality (8 zones).
3.1.17 Check uninterrupted power supply (UPS) for proper
operation.
3.1.18 Check the following Fence Sensors: Infinity 2020
Perimeter IDS, 36 sensors.
3.2. Normal Inspection/PM and testing will be performed
between the hours of 0800 and 1630 hours, excluding Saturday, Sunday, and Holidays except when special security requirements are a concern.
3.3. The contractor will provide an ICIDS-III qualified service technician to respond to all emergencies within 4 hours of notification.
3.3.1. All work will be performed by an ICIDS-III qualified
contractor regularly engaged in the installation, servicing and testing of ICIDS III equipment.
3.4. During Inspection/PM, if any test reveals a weakness in the degree of security provided by the system, or should there be evidence of tampering, movement or removal of the equipment, contractor shall report findings immediately to PSS.
3.4.1. All batteries will be tested under load to determine the expected useful life remaining in the cells for the effectiveness of the auxiliary power system.
3.4.2. If adjustments are necessary on the equipment, they will be performed at the time of service, and will be reported to the
POC.
3.4.3. Upon completions of each scheduled PM the contractor
will have the POC or the PSS sign the Inspection/PM work sheet with the condition of all equipment noted.
3.4.4. Additional work if required will be submitted as a
proposal and scheduled with the POC once approved.
3.5. The contractor will provide proof of manufacturer’s
certification prior to solicitation closing date and be geographically located to the Depot, to provide prompt emergency service.
4. INTRUSION DETECION SYSTEM (IDS):
4.1. ICIDS III IDS system is installed on the installation and is currently operating on PC Starwatch.
Bldg Reg Location Notes:
190-
13 EOC
Outer area of
EOC
380-
EOC, SIPRNET
Vault
Open Storage Area
190- 13 Computer Room
190- 13 Frame Room
380- 5 Mail Room
Open Storage Area
190- 13 MER Duress Only
190- 13 Legal Office Duress Only
190- 13 Command Group Duress Only
190- 13 Payroll Duress Only
190- 13 Credit Union
1A
13 ASE/Transponder
Open Storage Area
1B1
13 EO/NV - Bradley
1B2 190- 13 Missile Area
Note: Not an Arms Room
1B2-ASE
380- 5 ASE (New Area)
Open Storage Area
1B3 190- 13 Missile Area
NOTE: Not an Arms Room
190- 11 Arms Room
190- 11 Arms Room
190-
13 PX
190- 13 Commissary
2 Zones -816A Main Store -816B Cash Cage
190- 13 The Landing
190- 13 VA Clinic
No class Q or R items in this pharmacy
190- 13 CDC Duress Only
380-
5 SATCOM
2 Zones – 72A Open Storage
13 TMDE Test Equipment
Family Advocate Center Duress only
215/216/217 190-
Pumping Station #1
190-
Pumping Station, Well #6
818/819 190-
Pumping Station #3
190-
Pumping Station #4
190-
Pumping Station #5
12 LMR Tower
380-
New location for SIPR Servers
DOIM – Open Storage Area
190- 13 PMC Cabinet Ref: 380-5, also
190-
Physical Security Office Ref: 380-5, also
190-
Counseling Center Duress Only
190- 13 Water Towers
BCSC-T
Compound
190-
Fenced Compound
Fence Sensors Only
1C Bay 1 Mezz
13 Union Office Duress Only
5. REMEDIAL REPAIRS and EMERGENCY SERVICE
CALL:
5.1. The Contractor agrees to provide Emergency Service 24
hours a day, seven days a week, and all government holidays inclusive.
5.2. Remedial repairs will be performed between the hours of
0730 and 1600 hours, excluding Saturday, Sunday, and
Holidays.
5.3. Emergency repairs will require an on-site response within 4 hours of notification of an emergency.
5.3.1 Emergency calls will be determined by the TYAD PSS
(Physical Security Specialist)
5.4. The contractor will furnish names, security clearance, and telephone number of the service technician to be contacted in case of malfunctioning or non-functioning of the equipment listed.
5.5. The Contractor will make every effort to restore the
equipment to its normal operation in the shortest possible time. The POC shall be notified of the estimated time required to restore service after an initial inspection has been made by the Contractors’ Service Technician.
5.6. The Contractor will prepare an Emergency Service Report
and will indicate the nature of their service call, response time, and detailed correction applied and amount of time required to restore the equipment.
5.7. The contractor will maintain the systems in satisfactory continuous operation. When replacement parts are required the contractor will use ICIDS III Compatible parts.
5.8. The contractor will furnish the quarterly cost per year to conduct an inspection/testing of the ICIDS III System of the above listed zones.
*Total amount of vendor bid will be determined by adding
0001A though 0003B listed below:
BASE YEAR :
0001A. Quarterly Visit ($______ x 4) = $_______ Total cost per year
0001B. Emergency Visit per call $_________________
OPTION YEAR 1
0002A Quarterly Visit ($______ x 4) = $_______ Total cost per year
0002B. Emergency Visit per call $_________________
OPTION YEAR 2
0003A. Quarterly Visit ($______ x 4) = $_______ Total cost per year
0003B. Emergency Visit per call $_________________
6. SECURITY REQUIREMENTS:
6.1. The Contractor will be escorted whether conducting PM’s, remedial service, or called for an emergency, as required by the
PSS (Physical Security Specialist) or the POC (Point Of
Contact).
6.2. The Contractor/Employees will check-in with the PSS or
POC upon arrival on the Installation.
a. PSS:Mr. Greg Hale: 570-615-5765 BB: 570-517-1067
b. POC: Vic Villani. 570-615-5913 or Cell: 570-856-0432.
6.3. The Contractor/Employee must submit to a background
investigation utilizing ELTY form 648-C which will be provided by the contract POC.
6.4. The government will provide the Contractor/Employees
with an identification badge and a vehicle pass at no cost to the contractor. All badges must be turned into TYAD security upon expiration, employee removal and/or completion of contract.
6.5. The Contractor/Employees will be required to display the badges and vehicle passes at all times while on the installation or as otherwise directed.
6.6. The Contractor/Employees will remove badges or passes
when off the installation.
6.7. The Contractor/Employees will have a Service Ticket
(Work Order) stating all work performed signed by the
PSS or the POC before leaving the Depot.
6.8. A written report Inspection/PM Work Sheet will be
furnished to the PPS or POC within 5 days after each visit, including all work performed and a proposal (if required) stating material and labor costs.
7. MISCELLANEOUS:
7.1. The contractor is liable for any damage to government /
personal property, equipment, building and/or building contents.
7.1.1. If equipment is not repaired in 48 hours the government will replace, repair or otherwise remedy such failure or damage at the contractor’s expense.
7.2. In the event the ICIDS System is not made operable on the day of service, the contractor will return the following duty day thereafter, until the system is in operable condition.
7.3. Final invoices must be received no later than 30 days after completion of the contract, or they will not be honored.
GENERAL REQUIREMENTS
1. The workmanship shall be in accordance with the best standard practice for this type of work. The work will be conducted under the general direction of the Chief Facilities
Engineer and is subject to inspection by his appointed inspector to ensure strict compliance with the terms of the contract.
2. The contractor will schedule all work with the POC and as needed for service calls.
3. The contractor shall visit the site of the work, check all dimensions and otherwise acquaint themselves with all details and conditions affecting the work, quantities and type of materials and all factors to meet the purpose and intent of these specifications and the terms of the contract.
3.1. It shall be the responsibility of the prospective bidders to visit the site of the proposed work at Tobyhanna Army Depot, Tobyhanna, Pa.
3.2. If any departure from the specifications or drawing(s) is deemed necessary by the prospective bidder(s), details of such departure and reason therefore shall be discussed and resolved during the conducted tour.
3.3. At no time prior to the openings of the bids, either during the course of the conducted tour or at any time during which contact is made between Contracting Officer and/or employee of the government and prospective bidder(s) will deviation be made in the date, specifications, drawing(s) and conditions of the invitation of bids without the written concurrence of the
Contracting Officer. Any deviation will be reported to the
POC/PSS for final approval not later than 72 hours of closing date.
4. QUALITY CONTROL:
4.1. Quality control will be responsibility of the successful contractor.
4.2. The contractor must meet all Federal Safety Standards
(OSHA).
4.3. The contractor must meet all U.S. Army and all Federal
quality and workmanship standards.
4.4. The contractor will follow all manufacturers’ installation recommendations for installation of materials.
4.5. Rejection of work: Indication of lack of quality
workmanship on the part of the contractor shall be sufficient grounds for government to reject installed work and to require its immediate removal and complete reinstallation at no additional cost to the government.
5. COORDINATION:
5.1. All work will be scheduled so as to provide minimum
interference with Depot operations. The Contractor will coordinate the schedule with the Contracting Officer, prior to commencement of work.
6. SAFETY:
6.1. The contractor will be responsible for the furnishing and placing the necessary guards and signage for the prevention of accidents.
6.2. Contractors must comply with all Department of Labor
and OSHA Rules and Regulations, 29 CFR-1910 (General
Industries) or 1926 (Construction), whichever is applicable, and all applicable sections of the National Fire Protection
Association (NEPA).
7. CONTRACTORS USE OF PREMISES:
7.1. General: During the construction period the contractor shall have limited use of the premises for the performance of his construction operations, including use of the site. The contractor’s use of the premises is confined to those areas where work is to be performed.
7.2. Keep driveways and entrances serving the premises clear
and available to occupants at all times. Do not use these areas for parking or the storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on site.
7.3. The contractor will maintain the building (job site) in a weather tight condition, repair any damage caused by Service operations.
7.4. Take all precautions necessary to protest the building and its occupants during the Service period.
8. OWNER OCCUPANCY:
8.1. Full depot occupancy: The employees of each building will occupy the area during the entire construction period. The contractor shall cooperate with the occupants during construction operations to minimize conflicts and facilitate usage. Perform the work so as not to interfere with the occupant’s use.
9. ATTACHMENTS: Technical Specifications, requirements and locations of work.
10. ENVIRONMENTAL COSIDERATION: Standard
Specifications for Projects under the National Environmental
Policy Act (NEPA) in Accordance with 32 CFR 651 Proponent
ELTY-ERK
10.1. Contractor personnel utilizing hazardous materials shall be required to initiate a spill response by dialing 911 on any local
615 administrative phones or 615-7117.
10.2. Ensure no asbestos containing material will be used. Also, asbestos containing material shall not be disturbed or damaged as a result of this contract.
10.3. Do not use any ozone depleting substance.
10.4. Polyurethane materials containing Trichloroflourethane, Dichloromethane, or Chlorofluoromethane shall not be used.
MSDS sheets shall be provided to the POC/PSS for each component used.
10.5. Title to all removed, dismantled or demolished material and/or equipment including rubble scrap and debris not specified or indicated to be Government salvaged, reinstalled under this contract, or hazardous waste shall be vested in the contractor upon receipt of notice to proceed.
11. RECYCLE/DISPOSAL:
11.1. Disposal of such material and/or equipment shall be at the
Contractor’s expense and responsibility at an authorized facility that has been permitted by the Pennsylvania Department of
Environmental Protection and the Monroe Country, Municipal
Waste Management Authority. The Contractor shall comply with the Monroe Country Solid Waste Management Plan and all local regulations and licensing requirements regarding hauling.
11.2. The contractor shall comply with the Depot’s buy recycled plan in the acquisition of construction material.
11.3. The Contractor shall not spill, emit, dump, or otherwise discharge any hazardous, toxic, or harmful material or pollutant into any sink, drain, toilet, utility, or receptacle, without prior authorization from the Contracting Officer. The contractor shall protect streams, lakes, and wetlands from sediment discharges caused by the Contractors activities.
11.4. Paint containing zinc chromate or strontium chromate
pigments shall not be used in the performance of this contract.
11.5. Paints containing lead in excess of 0.06 percent by weight of total nonvolatile content (calculated as lead metal) shall not be used.
12. FALL PROTECTION:
12.1. Particular attention is directed to the OSHA Fall Protection
Requirements. Personnel performing any type of work on elevated surfaces, over 6 feet, must adhere strictly to
Occupational and Health Standards, specifically 29 Code of
Federal Regulations, Part 1926, Sections 500, 501, and 502.
12.2. Safety Monitoring Systems. OSHA has informed TYAD
the Fall Protection Requirement will be fully enforced at TYAD with no exceptions.
13. STANDARDS FOR ELECRICAL SAFETY:
13.1. Particular attention is directed to NFPA 70E, Standard for
Electrical Safety Requirements for Employee Workplace.
Contractor shall fully comply with all sections of this standard, including but not limited to; PART I, Chapter 2-2.4.3 – Ground
Fault Protection for Personnel on Construction Sites, PART I, Chapter 3-7.1 – Use of Flexible Cords and Cables, PART II, Chapter 2- 3 – Working on or near Electrical conductors or
Circuit Parts, PART II, Chapter 5 – Lockout/Tag out
Practices and Devices.
14. VOLUNTARY PROTECTION PROGRAM (VPP):
14.1. In addition to compliance with standard OSHA Safety
Requirements, Tobyhanna Army Depot participates in the
OSHA Voluntary Protection Program. The contractor will comply with all aspects of this program.
15. JOB HAZARD ANALYSIS: (JHA)
15.1. The contractor shall, prior to the start of work, prepare a
Job Hazard Analysis (JHA) for each phase of work involved in the contract. The Job Hazard Analysis requirements are defined in the OSHA, VPP Program.
15.2. The JHA will list the sequence of job steps; the potential hazard associated with those step; and the procedures, safeguards, and/or training necessary to eliminate the hazards or reduce the risk to an acceptable level. Tobyhanna Army Depot
Form ELTY-FORM-0180, DEC 2009, or an equivalent format may be used.
15.3. JHAs will be made available for review by POC/PSS upon
request.
16. Contractor will be responsible for all damage during the length of the contract.
17. We strongly recommend that all respective bidders attend site tour. Through site tour is not a consideration for award, the contractor will gain a better understanding of existing site conditions and accessibility to work area.
*See clause 52.237-1.
Section I - Contract Clause
CLAUSES INCORPORATED BY REFERENCE
52.209-2 Prohibition on Contracting with Inverted Domestic
Corporations--Representation
NOV 2015
52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.209-11 Representation by Corporations Regarding Delinquent Tax
Liability or a Felony Conviction under and Federal Law
FEB 2016
52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015
52.217-5 Evaluation Of Options JUL 1990
52.222-41 Service Contract Labor Standards MAY 2014
52.222-50 Combating Trafficking in Persons MAR 2015
52.236-27 Site Visit (Construction) FEB 1995
52.237-1 Site Visit APR 1984
52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.237-3 Continuity Of Services JAN 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
DEC 2015
252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting.
DEC 2015
252.213-7000 Notice to Prospective Suppliers on Use of Past Performance
Information Retrieval System--Statistical Reporting in Past
Performance Evaluations
JUN 2015
252.225-7048 Export-Controlled Items JUN 2013
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL ITEMS (MAR 2016)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19
U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995)
(41 U.S.C. 4704 and 10 U.S.C. 2402).
____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June
2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment
Act of 2009.)
___ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2015) (Pub. L. 109-
282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (JAN 2014) (Pub. L.
111-117, section 743 of Div. C).
___ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41
U.S.C. 2313).
____ (10) [Reserved]
____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
____ (ii) Alternate I (NOV 2011) of 52.219-3.
____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014)
(if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (ii) Alternate I (JAN 2011) of 52.219-4.
____ (13) [Reserved]
X (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
____ (ii) Alternate I (NOV 2011).
____ (iii) Alternate II (NOV 2011).
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
____ (ii) Alternate I (Oct 1995) of 52.219-7.
____ (iii) Alternate II (Mar 2004) of 52.219-7.
____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)).
____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Oct 2015) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (Oct 2001) of 52.219-9.
____ (iii) Alternate II (Oct 2001) of 52.219-9.
____ (iv) Alternate III (Oct 2015) of 52.219-9.
____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).
____ (19) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).
____ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C.
657f).
____ (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).
____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-
Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
____(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns
Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
____ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
____(26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (FEB 2016) (E.O. 13126).
____ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
____ (28) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).
____ (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
____ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).
____ (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
____ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.
13496).
X (33)(i) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
____ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in
22.1803.)
____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May
2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (36) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and
13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (37)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-14.
____ (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
____ (39)(i) 52.223-16, Acquisition of EPEAT[supreg]-Registered Personal Computer Products (OCT 2015) (E.O.s
13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-16.
____ (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O.
13513).
____ (41) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).
____(42) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter
83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.
103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I (May 2014) of 52.225-3.
____ (iii) Alternate II (May 2014) of 52.225-3.
____ (iv) Alternate III (May 2014) of 52.225-3.
____ (43) 52.225-5, Trade Agreements (FEB 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
____ (44) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013)
(Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
____ (46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150
____ (47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C.
5150).
____ (48) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10
U.S.C. 2307(f)).
____ (49) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
X (50) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (July 2013) (31
U.S.C. 3332).
____ (51) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July
2013) (31 U.S.C. 3332).
____ (52) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
____ (53) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
____ (54)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.
Appx. 1241(b) and 10 U.S.C. 2631).
____ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
_____(1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).
_____ (2) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).
_____ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.
chapter 67).
_____ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple
Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY
2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
_____ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for
Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (7) 52.222-53, Exemption from Application of the Service Contract…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .