Project Manager Soldier WeaponsProject Manager Soldier Weapons
Our Strength and PurposeOur Strength and Purpose
FOUO/Distro F/Export Control
Next Generation Squad Weapons
(NGSW)
Industry Day
14 November 2018
NGSW Industry Day Agenda 14 Nov 2018
Time Topic Speaker
0830 Registration, Building 121 Cannon Gates Conference Center All
0900 Opening Remarks BG Anthony Potts
0910 Administrative Remarks and Ground Rules Mr. Corey Woodson
0920 Next Generation Squad Weapons Program Approach LTC Jason Bohannon
Other Transaction Authorities/Agreements, Prototype Opportunity Notice Proposal and Follow-on Production Overviews
Mr. Travis James
1000 Break All
Statement of Work, Weapon and Ammunition Prototyping, and Test & Evaluation Overviews
Mr. Rob Greenfield Mr. Todd Townsend
1150 Closing Remarks COL Elliott Caggins
1200 END: Depart Cannon Gates All
One-on-Ones between USG & Industry Partners, Building 151 By Appointment
FOUO
Opening Remarks
BG Anthony W. Potts Program Executive Office, Soldier
Program Executive Office Soldier
PEO Sergeant Major Executive Officer
TRADOC
Rapid Equipping Force
Project Director
Program Executive Officer
Resource ManagementAcquisition
Chief of Staff
Rapid Equipping Force
Project DirectorProgram Manager
Integrated Visual Augmentation System
Soldier Sensors & Lasers
Project Manager
Soldier Warrior
Project Manager Project Manager
Soldier Weapons Soldier Protection &
Individual Equipment
Project Manager
Ops & Comms Product Support Manager
• Soldier Clothing & Individual Equipment
• Soldier Protective Systems
• Air Warrior
• Ground Soldier System
• Soldier Maneuver Sensors
• Soldier Precision Targeting Devices
• Individual Weapons
• Crew Served Weapons
Deputy PEO ASA(ALT) Soldier & Maneuver Systems (S&MS) Directorate
Assistant PEO Futures & Integration
FOUO 4
http://upload.wikimedia.org/wikipedia/commons/c/c5/US-O6_insignia.svg http://upload.wikimedia.org/wikipedia/commons/c/c5/US-O6_insignia.svg http://upload.wikimedia.org/wikipedia/commons/c/c5/US-O6_insignia.svg http://upload.wikimedia.org/wikipedia/commons/c/c5/US-O6_insignia.svg http://upload.wikimedia.org/wikipedia/commons/c/c5/US-O6_insignia.svg http://upload.wikimedia.org/wikipedia/commons/c/c5/US-O6_insignia.svg http://upload.wikimedia.org/wikipedia/commons/c/c5/US-O6_insignia.svg http://upload.wikimedia.org/wikipedia/commons/c/c5/US-O6_insignia.svg http://upload.wikimedia.org/wikipedia/commons/c/c5/US-O6_insignia.svg http://upload.wikimedia.org/wikipedia/commons/c/c5/US-O6_insignia.svg http://upload.wikimedia.org/wikipedia/commons/c/c5/US-O6_insignia.svg http://upload.wikimedia.org/wikipedia/commons/c/c5/US-O6_insignia.svg
Picatinny Arsenal, New Jersey
Afghanistan
Bagram Main Base of
CROWS
Operation
Product Manager Crew Served Weapons
LTC J. Bohannon
PM Soldier Weapons COL E. Caggins Jr
Dir of Sys Engineering Mr. Doug Cohen (Acting)
Acquisition Operations Director
Mark Keck
Product Manager Individual Weapons
LTC S. Power
Director, Business Mgt Ms. Cynthia Alesandro (Acting)
Director of Logistics/PSM Mr. Mike Friedman
APMs
CPT. W. Goodrich
CPT S. McIntosh
Deputy Mr. Pete Errante
Project Manager Soldier Weapons
South Korea
Regional Fielding Support
Center-West Joint Base
Lewis- McChord
Regional Fielding Support Centers - Ft Hood/Ft Bliss
TACOM, Warren, MI TPF/NET (Mobile Teams)
CONUS
OCONUS
Asset Mgmt
PEO
Soldier
Anniston Army Depot
Rock Island Arsenal Tobyhanna
Army Depot
Senior Enlisted Advisor
MSG Richardson
Army and Other Services and Agencies
Deputy Mr. Fred Coppola
Deputy Ms. Barbara Muldowney
APMs
MAJ N. Holman
CPT S. Leslie
FOUO
PM Soldier Weapons http://www.world-guides.com/images/south_korea/south_korea_map.jpg http://www.world-guides.com/images/south_korea/south_korea_map.jpg
Administrative Remarks and Ground Rules
Mr. Corey Woodson
Agreements Specialist
Army Contracting Command - NJ
Ground Rules
• Any Material presented today will not be provided in a handout. All responses to inquiries will be posted to FBO after conclusion of this Industry Day.
• A lack of attendance to this Industry Day does not preclude participation in any future solicitations, if any are issued.
• Reminder to all Foreign Visitors – While on the Arsenal you must be escorted at all times. If you have to leave this room to go outside to stretch your legs or make a phone call, etc., a Government employee will accompany you until you are back inside the briefing area.
• General Reminder to all here today – The use of cameras, tape recorders, or other recording devices will not be allowed at any time during the Industry Day. Vendor hardware is prohibited.
7FOUO
What this IS
• This Industry Day is for the purpose of informing Industry of the NGSW planned acquisition approach.
• The Government is seeking Industry questions and comments to assist in shaping the NGSW program strategy to rapidly develop and deliver prototype weapons and ammunition.
• The Intent is to engage industry in order to provide the best material solution for the NGSW program.
• All vendor information will be treated confidentially.
• It is an opportunity for industry to gain a better understanding of the Prototype Opportunity Notice (PON) and to ask questions for clarification of anything that seems unclear.
FOUO 8
What this is NOT
• The Industry Day is not the Vendors opportunity to provide sales pitches or giveaways.
• No award is intended as a result of this Industry Day
• This is not the Offerors opportunity to try and leverage more information from the Government. It is to gain further clarification.
FOUO 9
Next Generation Squad Weapons Program
Approach
LTC Jason D. Bohannon
PdM Crew Served Weapons
NGSW Program Background
• The Small Arms Ammunition Configuration (SAAC) study, completed in 2017, identified potential weapon system approaches that can address operational needs
• NGSW-R is the planned replacement for the M4/M4A1 Carbine in the close combat force
• NGSW-AR is the planned replacement for the M249 Squad Automatic Weapon (SAW) in the Automatic Rifleman Role in the close combat force
• Both weapons will leverage a common cartridge. The Government will be providing Vendors with 6.8mm Surrogate, and General Purpose (GP) projectiles
• Next Generation Squad Weapon – Fire Control is a separate acquisition effort
11FOUO
FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26
Section 804 Authority
First Unit EquippedPrototyping
Proposal Request
Bid Sample Testing
Prototype Awards
(up to three KTRs)
Prototype Test #1
AR
Rifle
Per KTR
Prototype Test #2
AR
Rifle
Per KTR
TM Development
USG
Log
Demo
Production Proposal Request
Production Award
(One KTR)
Fielding
Potential Transition
Traditional Production & Deployment
Rapid Prototyping Rapid Fielding
Prototype Build #1
Prototype Build #2
DRAFT
Proposal Request
– Soldier Touch Point PON – Prototype Opportunity Notice AR – Next Generation Squad Automatic Rifle Rifle – Next Generation Squad Rifle KP – Knowledge Points KTR – Contractor/Vendor GFE – Government Furnished Equipment
LFT&E
Rifles – 15 weapons AR – 15 weapons Cartridges – 325K
Rifles – 35 weapons AR – 35 weapons Cartridges – 525K
MR
OT
Delivery Order 1
Delivery Order 2
Delivery Order 3
Delivery Order 4
Lead Time Production
Lead Time Production
Lead Time Production
Lead Time Production
Delivery Order 4
Lead Time
1 2 3 4 5 6
Surrogate & General Purpose Projectile
Deliveries
NGSW Notional Schedule
Delivery Date GP Surrogate
8/1/2019 - 60,000
10/31/2019 100,000 100,000
12/15/2019 230,000 210,000
2/1/2020 150,000 -
4/1/2020 170,000 -
6/1/2020 700,000 65,000
Total 1,350,000 435,000
Notional Schedule: Represents most aggressive schedule
FOUO 12
Other Transaction Authorities/Agreements (OTA), Prototype Opportunity Notice (PON) Proposal and Follow-on Production Overviews
Mr. Travis James
Agreements Officer
Army Contracting Command - NJ
OTA Background
• What are they?
• How do they work?
• Why do we use them?
Want more?
• Refer to the Department of Defense (DoD), Other Transactions Guide, dated January 2017
OTA Overview
Notional Proposal Timeline
1. PON OTA Released
2. Bid Sample Safety Assessment Due 15 calendar days after PON OTA issue date
3. Government Notification of Safety Assessment 45 calendar days after PON issue date
4. Proposal and Bid Samples due 60 calendar days after PON issue date
Notional Timeline: Represents most aggressive schedule
NGSW PON Proposal Timeline
Note: Government exploring potential to change Safety Assessment delivery date to allow more time without impacting evaluation timeframe
Proposal Content: Each Proposal shall consist of the following separate sections:
• Written Sections:
• Section 1 – Introduction (no page limit)
• Section 2 – Factor 1 – NGSW-R (counts toward combined 100 page limit)
• Section 3 – Factor 2 – NGSW-AR (counts toward combined 100 page limit)
• Section 4 – Factor 3 – Special License Agreements (no page limit)
• Section 5 – Factor 4 – Price (no page limit)
• Section 6 – Data Rights Assertions (no page limit)
• Section 7 – Significant Non-Traditional Participation Or Cost Share (no page limit)
• Bid Sample Section:
• Section 8 – Bid Samples (not part of the written proposal)
• Oral Presentation Section:
• Section 9 – Oral Presentation (not part of the written proposal; 3hr max)
NGSW PON Proposal Overview
Vendor must complete
• Capability Matrix
• Price Spreadsheet
Factors:
NGSW-R and NGSW-AR Sub-factors:
NGSW-R NGSW-AR
Special License
Agreements
Price Slightly More
Important Than
More Important than
More Important than
User Acceptance
Risk
Proposed Threshold
Requirements
Design Maturity
Integrated Master
Schedule
Equal to
Equal to
Equal to
Tier 1 Tier 2 Tier 3 More
Desirable than
More Desirable than Note: The combination of all factors, other than Price, are more important than Price.
NGSW PON Proposal Selection Criteria
• Potential Quantities
• 250,000 total weapon systems (NGSW-R, NGSW-AR, or both)
• 150,000,000 rounds of ammunition
• Spare parts, tools/gauges/accessories, and engineering support
• Potential Production Rates
• Within the first 6 months
• 200 or more total weapons (NGSW-R, NGSW-AR, or both) per month
• 500,000 or more rounds of ammunition per month
• Within 3 years, plans to ramp up to:
• 2,000 or more total weapons (NGSW-R, NGSW-AR, or both) per month
• 5,000,000 or more rounds of ammunition per month
• Spare parts production is in addition to the above quantities
NGSW Follow-on Production Overview
Statement of Work (SOW) Weapon and Ammunition Prototyping and Test & Evaluation Overviews
Mr. Robert J. Greenfield
Mr. Todd N. Townsend
• “NGSW-R” refers to a prototype 6.8 millimeter rifle with sling, flash hider, suppressor, cleaning kit, flash hider/suppressor removal tool, and quantities of magazines required to provide a minimum of 210 stowed rounds.
• “NGSW-AR” refers to a prototype 6.8 millimeter automatic rifle with bi-pod, sling, flash hider, suppressor, cleaning kit, flash hider/suppressor removal tool, and quantities of magazines/drums/belts/other required to provide a minimum of 210 stowed rounds
• “Ammunition” includes an assembled cartridge case with propellant, primer, and a 6.8 millimeter projectile. The Ammunition includes the Load, Assemble and Pack (LAP) of Government provided projectiles, Surrogate or General Purpose (GP), and Contractor developed Drill Dummy Inert (DDI) and High Pressure Test (HPT) cartridges
• ”Common Ammunition” refers to the same ammunition designed to work in both the NGSW-R and NGSW-AR
• Prototypes delivered for PT#2, shall be production representative
Prototype Definitions
Part A – Prototype Hardware and Government Testing
• Prototype Hardware
• NGSW-R
• NGSW-AR
• Ammunition
• Surrogate
• General Purpose
• Drill Dummy Inert
• High Pressure Test Round
• Primed Case
• Test Barrels
• Electronic Pressure, Velocity, Action Time (EPVAT) Barrels
• Mann Barrels
• Government Testing
• Prototype Test #1 (PT#1)
• Technical Test
• Soldier Touch Point A: User Acceptance and Mobility
• Prototype Test #2 (PT#2)
• Technical Test
• Soldier Touch Point B: User Acceptance, Mobility, and Controllability
• Soldier Touch Point C: Operational Evaluation
• Live Fire Test and Evaluation (LFT&E)
SOW Overview – Part A
• Engineering Support
• Configuration Management and Control
• Technical Data Packages
• Computer Software Data Delivery
(if applicable)
• Program Management
• Data Deliveries Method
• Information Exchange
• Meetings and Reviews
• Meetings and Review Support
• Subcontractor Meetings and Review
• Program Start-Up Meeting
• PT#1 Pre-Ship Meeting
• Design Completion Review
• PT#2 Pre-Ship Meeting
• Security
• Integrated Master Schedule
• Contractor Work Breakdown Structure
• Copyright and Data Rights
• Export Control Requirement
• Reliability Growth Plan
• System safety
• System Safety Program
• System Safety Hazard Analysis Report
• Accident/Incident Report
SOW Overview – Part B
Part B – Prototype Program Management and Engineering Support
• Ammunition Hazard Classification
• Energetic Material Qualification (If
Applicable)
• EOD Procedures
• Contractor Test Ammunition
• Test and Evaluation prior to delivery
• Responsibility for Tests
• System Level Contractor Test
Documentation
• Environmental Life Cycle Activities
• Pollution Prevention Program/Plan
• Hazardous Materials Management
Program/Plan (HMMP)
• HMMP Report
• Hazardous Materials
• Hazardous Waste Report
• Control of Government Furnished Property
• Integrated Logistics Support
• Technical manuals
• Instructor and Key Personnel Training
(I&KPT)
• Marking
• Item Unique Identification (IUID)
• Ammunition Packaging and marking
• Manufacturing Readiness
FOUO 22
NGSW-R and NGSW-AR Prototype Characteristics
• Ambidextrous
• Removable flash hider, suppressor, and tool for removal
• Sling with quick release attachments
• Safe, Semi-Automatic and Automatic Firing modes
• Systems Survivability
• Non-reflective/non-black color
• Capable in Mission Environments
• Combat Clothing Compatible
• Interchangeable magazines (If NGSW-AR utilizes a magazine)
• Capable of mounting legacy and emerging enablers
Weapon Prototypes
• Surrogate and General Purpose Ammunition Prototypes
• The Contractor will LAP cartridges with the following Government provided projectiles
• Surrogate
• General Purpose
• Test and Training Ammunition Prototypes
• The Contractor shall develop, build and deliver the following cartridges
• High Pressure Test (HPT)
• Drill Dummy Inert (DDI)
• The contractor shall also deliver Primed Cases (Case and Primer)
Ammunition Prototypes
Bullet + Case + Powder + Primer = Cartridge
Bullet - designed for maximum terminal performance on target or highest level of accuracy
Case - holds all of components together, but also seals the chamber so that the pressure and gas from the burning powder drives the bullet forward down the barrel
Powder - an explosive mixture of potassium nitrate, charcoal and sulfur used for propelling the projectile
Primer - is what ignites the powder charge, thereby firing the cartridge
A Cartridge is made up of four main components: Bullet, Case, Powder and Primer
Can be:
• Brass
• Stainless Steel
• Polymer
• Hybrid
• Other Lightweight
Cartridge Description
FOUO 25
Ammunition Data
FOUO/Distro F/Export Control
REDACTED
Ammunition Data
FOUO/Distro F/Export Control
REDACTED
Delivery Date General Purpose Surrogate General Purpose Surrogate
8/1/2019 - 60,000
10/31/2019 100,000 100,000
12/15/2019 100,000 100,000 130,000 110,000
2/1/2020 150,000
4/1/2020 170,000
6/1/2020 155,000 545,000 65,000
Total 675,000 260,000 675,000 175,000
Contractor Testing Government Testing
Attachment 3 - Government Furnished Property
Projectile Delivery Schedule
Projectile Delivery Schedule Notional
* Requesting Contractor feedback on quantity and schedule of projectile deliveries to support Contractor testing
Government Delivery to Vendor
Ammunition Transition into Production
• Intent is that selected vendor would transition the following cartridges into production:
• General Purpose
• Drill Dummy Inert
• High Pressure Test
• Other cartridges that may be introduced in the future during production:
• Special Purpose
• Reduced Range
• Others
• LAP of future cartridges may require access to a classified manufacturing environment
• Testing in production may require access to a classified range
29FOUO
Tier 1 is more desired than Tier 2 which is more desired than Tier 3 Capabilities are Tradeable
Tier 1
• Dispersion
• Weapon Weight
• Ammunition Weight
• Length
• Weapon Signature (Flash and Acoustic)
Tier 2
• Muzzle Velocity (using Surrogate Projectile)
• Sustained Rate of Fire
• Reliability
• Suppressor Point of Shift (with and without suppressor)
• Power and Data Rail
Tier 3
• Back-Up Iron Sight
• Shot Counter
• Field Stripping (without use of special tools)
• Mean Time to Repair (Field Level)
• Special Tools (lack of)
• Magazine (visual indicators for rounds remaining and wear, and/or rapid reload tool)
Capability Matrix
FOUO 30
Bid Sample Testing
• Technical Testing
• Soldier Touch Point: User Acceptance
• Hardware Required
• 1 functional Rifle with 600 rounds of ammunition
• 1 functional Automatic Rifle with 600 rounds of ammunition
Prototype Test #1
• Technical Testing
• Soldier Touch Point A: User Acceptance and Mobility
• Hardware Required:
• Weapons: (15) NGSW-R and (15) NGSW-AR
• Ammunition: (130K) General Purpose and (106K) Surrogate
Prototype Test #2
• Technical Testing:
• Soldier Touch Point B: User Acceptance, Mobility, and Controllability
• Soldier Touch Point C: Operational Evaluation
• Live Fire Test and Evaluation
• Hardware Required:
• Weapons: (35) NGSW-R and (35) NGSW-AR
• Ammunition: (545K) General Purpose and (60K) Surrogate
Government Testing
Duration: ~30 days
Technical Testing
• Tests are conducted with Vendor Rifle, Automatic Rifle and ammunition
• Subtests may include, but are not limited too: Initial Inspection, Weapon Weight, Ammunition Weight, Weapon Length, Buttstock Adjustability, Functioning, Firing Modes, Safety Selector, Dispersion (Semi-Auto), Dispersion (Full Auto), Cyclic Rate of Fire, Muzzle Velocity, Weapon Signature (Flash), Acoustic Signature, and Enabler Compatibility
User Acceptance
• User feedback on human factors and ergonomics from representative Soldiers with relevant experience
Bid Sample Testing
Durations:
• Prototype Test #1: ~3 months
• Prototype Test #2: ~6 months
Prototype Test #1 Technical Tests
• Purpose: To inform the Contractor of current design compliance to select requirements
• Tests are conducted with NGSW-R, NGSW-AR, and common ammunition
Prototype Test #2 Technical Tests
• Purpose: To assess compliance to safety and Vendor proposed threshold requirements
• Results will characterize system performance for follow-on production proposal
• Tests conducted with production representative NGSW-R, NGSW-AR, and common ammunition
Prototype Technical Testing
Soldier Touch Points (STP)
NGSW Soldier-Systems Testing Strategy:
• User Acceptance
• Technical human-in-the-loop performance
• Mobility
• Controllability
• Operational Evaluation
STP A: User Acceptance and Mobility
STP B: User Acceptance, Mobility, and Controllability
STP C: Operational Evaluation
FOUO 34
Ensure Soldiers get the capabilities they need and expect
• More holistic approach to Soldier-system effectiveness:
• Controllability
• Suppression (AR)
• Human Factors & Ergonomics
• Maneuverability & Mobility
• Operationally relevant scenarios to ensure Users experience the use of the system in the context of the important Soldier-system characteristics
• Methodology used to avoid comparison bias (Soldier acceptance vs. Soldier preference)
• Determine risk to Soldier Acceptance of fielded system
User Acceptance (STP A & B)
FOUO 35
Maneuverability and portability of weapon system
LEAP-A
Load Effects Assessment Program -
Army
• Demographically matched groups of Soldiers for each candidate
• Each group will run through course with candidate and baseline (M249 or M4A1)
• full kit
• counterbalanced
• Course familiarization with and without kit
Mobility (STP A & B)
FOUO 36
Human in the loop dispersion and accuracy
Controllability (STP B)
FOUO 37
Operational Evaluation (STP C)
System suitability for airborne and ground combat operations
Duration: 4 weeks
Resources:
a) NGSW-AR Weapons
b) Fire Control
c) Magazines
d) NGSW Ammo GP
Scope:
1) New Equipment Training
2) Human System Integration
3) React to Contact (MOUT)
4) React to Contact (Woodland)
5) Static Line Drops
6) Military Free Fall Drops
FOUO 38
Closing Remarks
COL Elliott R. Caggins
Project Manager Soldier Weapons