QUESTIONS_AND_ANSWERS_3.docx
DOCX document 14 KB Posted
- Attached to
- SECURITY REPLACEMNT CAMERA SYSTEM, BARNES BUILDING, BOSTON, MA Federal contract opportunity
- Solicitation number
- W15QKN-19-R-1050
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QUESTIONS_AND_ANSWERS__4.doc.docx | DOCX document | |
| 19-R-1050-0001.pdf | ||
| Questions_and_Answers_2.docx | DOCX document | |
| QUESTIONS_AND_ANSWERS_1_SECURITY_CAMERAS.docx | DOCX document | |
| Drawing_1.pdf | ||
| SOLICITATION_W15QKN-19-R-1050_SECURITY_SYSTEM,_BOSTON.docx | DOCX document | |
| Drawing_3.pdf | ||
| Drawing_4.pdf | ||
| Drawing_2.pdf | ||
| PRICE_WORKSHEET_16409_Security_Replacement.xlsx | XLSX spreadsheet | |
| SOW_MA004-Boston-A04-CSS-16409-SOW-Emergency_Security_Replacement_without_tracked_changes_-_5.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS #3
QUESTION 1: 11.5.21 states to provide galvanized steel cable tray. Why - where is it be utilized?
ANSWER: It is our understanding that the CBT is existing within the facility and the additional 500 LF of CBL called for in documentation is intended for new runs (stairwells) supplemental infrastructure.
QUESTION 2: 11.5.17 states that long term storage is required for 30 days at 15 frames a second. This is not enough information to estimate the storage needed to properly respond/bid. Please provide the following information; what resolution is required for each camera type, is motion based recording being used, and what percentage motion should be the basis of compression.
Without this information or if this information cannot be provided - state the amount of storage in TBs should be provided across all NVRs. This paragraph also does not state the type of storage - RAID what is required?
ANSWER: Memory: This is a grey area for us and we were under the impression that as we provided the specifications for the cameras such as capabilities and record time; this would initiate a "formula" a company proficient in in this field to come up with storage (memory) capable of sustaining the requirements we set forth. We expect the motion activated cameras to be recording 80 hrs every 30 days.
QUESTION 3: Side rail height on the tray
ANSWER: 3”
QUESTION 4: Rung spacing requirements ANSWER: Rung spacing must be recommended by offeror
QUESTION 5: Aluminum, Pregalv, HDG tray ANSWER: Galvanized Steel
QUESTION 6: Nema requirements ANSWER: Grounding of the system is required
QUESTION 7: 11.4.1 states to remove five NVRs and Switches. We only found one NVR and three switches – where are the remaining network switches and NVRs?
ANSWER:
There are five rooms with switches:
7th floor = 2 rooms 2nd floor = 2 rooms 1st floor = 1 room Only the first floor room has both NVR and switches. The other rooms on 7 and 2 only have switches.
File details come from the government source that posted it.