QUESTIONS_AND_ANSWERS_1_SECURITY_CAMERAS.docx

DOCX document 13 KB Posted

Attached to
SECURITY REPLACEMNT CAMERA SYSTEM, BARNES BUILDING, BOSTON, MA Federal contract opportunity
Solicitation number
W15QKN-19-R-1050
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

QUESTIONS AND ANSWERS 1 ARE NOW ATTACHED

View the file

Other files for this federal contract opportunity

Other files attached to SECURITY REPLACEMNT CAMERA SYSTEM, BARNES BUILDING, BOSTON, MA, newest first.
File Type Posted
QUESTIONS_AND_ANSWERS__4.doc.docx DOCX document
QUESTIONS_AND_ANSWERS_3.docx DOCX document
19-R-1050-0001.pdf PDF
Questions_and_Answers_2.docx DOCX document
PRICE_WORKSHEET_16409_Security_Replacement.xlsx XLSX spreadsheet
Drawing_1.pdf PDF
SOLICITATION_W15QKN-19-R-1050_SECURITY_SYSTEM,_BOSTON.docx DOCX document
Drawing_3.pdf PDF
Drawing_2.pdf PDF
Drawing_4.pdf PDF
SOW_MA004-Boston-A04-CSS-16409-SOW-Emergency_Security_Replacement_without_tracked_changes_-_5.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS #1 FOR SECURITY CAMERAS

Q: Do you plan to record continuously or on motion for storage sizing?

A: Please refer to Para. 11.2.2, 11.5.6, and 11.5.7. of SOW.

Q: Can we collocate all the NVRs?

A: Please refer to Para. 11.5.2. of SOW

Q: The outdoor cameras on the drawing and SOW conflict. The SOW says the outdoor cameras must have digital PTZ which would indicate they are not actually PTZ.

A: The 99th RD is of the position it is possible to have digital PTZ cameras.

Q: The pole mount cameras do not specify fixed or PTZ, but later it does say “All exterior cameras (PTZ and Pole Mounted) shall be placed…” Could you explain your preference?

A: All PTZ cameras have the acronym "PTZ" in the drawing label. Any drawing label without "PTZ" is not a PTZ camera.

Q: Do we need to install Galvanized Steel Cable Tray Trough or can we use existing?

A: Please refer to Para. 11.5.21.

Q: Do you have a budget range?

A: The magnitude of project is in the solicitation

Q: Does this need to be sold with Union Labor?

A: All labor must in in accordance with the Davis Bacon Act.

Q: What are the ceilings composed of (ex. drop, hard, acoustical, ect) on each floor A: Drop

Q: What heights are the exterior cameras current at and will they be mounted at the same height A: Unable to provide a definitive answer regarding current height. Recommend offeror go on site visit. The Second Site Visit is Thursday, July 18 at 10AM Eastern Std Time. Please contact Josh Shumate if you are planning on attending. New cameras shall be mounted at same height as current cameras. POC for site visit:

Joshua Shumate Office: 617.753.4860 Mobile: 334.790.8323 Email: joshua.d.shumate.civ@mail.mil

Q: Are there currently cable trays in place? If so are we able to utilize them? (Spec calls for 500 lf to be installed) A: Please refer to Para. 11.5.21.

Q: Are there existing routes that can be used floor to floor?

A: Unable to provide a definitive answer. Recommend offeror go on site visit.