Attachment_12_-_Annex_K_-_Heating_and_Cooling.pdf

PDF 143 KB Posted

Attached to
Base Operations Support Services Federal contract opportunity
Solicitation number
W15QKN-19-R-1004
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

This attachment to a federal solicitation outlines the heating and cooling services required at an Army base, including operating steam boilers and chilled water plants, purchasing fuels, and maintaining equipment. The contractor must provide certified boiler operators and perform daily inspections and maintenance according to standard procedures. Responsibilities include preparing boilers for inspection, taking monthly water samples, and addressing any non-compliance or emergency issues. The related solicitation provides details for base operations support services at Fort Hamilton in New York, with a site visit scheduled for January 24, 2019, questions due by January 30, 2019, and proposals due February 13, 2019. The Department of the Army Materiel Command Contracting Command at Picatinny Arsenal is the contracting agency.

Attachment 12

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support Services, newest first.
File Type Posted
Tech_Exhibit_0001_Performance_Locations_Revised.docx DOCX document
Attachment_5_-_Personnel_Licensing_and_Certs_Revised.pdf PDF
Tech_Exhibit_0601_IBE_list_per_building_GFEBS_2019_Revised.XLSX XLSX spreadsheet
Tech_Exhibit_0202_Bioretention_Areas.pdf PDF
Attachment_7_-_Annex_E_-_Solid_Waste_Management_Revised.pdf PDF
Attachment_4_-_Pricing_Matrix_Revised.xlsx XLSX spreadsheet
W15QKN-19-R-1004-0007.pdf PDF
W15QKN-19-R-1004-0006.pdf PDF
W15QKN-19-R-1004-0005.pdf PDF
W15QKN-19-R-1004_0003.pdf PDF
W15QKN-19-R-1004_0002.pdf PDF
W15QKN-19-R-1004_0001.pdf PDF
BASOPS_CDRL_A057.pdf PDF
Tech_Exhibit_0403_Automatic_Doors.docx DOCX document
Tech_Exhibit_0411_Non-Heated_Facilities.docx DOCX document
Tech_Exhibit_0604_Chiller_Units_Listed.docx DOCX document
BASOPS_CDRLs_A037_A040.pdf PDF
BASOPS_CDRLs_A045_A048.pdf PDF
Tech_Exhibit_0101_Estimated_Container_Sizes_and_Frequencies.docx DOCX document
Tech_Exhibit_0419_Elevators,_dumbwaiters,_wheelchair_lifts.docx DOCX document
BASOPS_CDRLs_A053_A056.pdf PDF
Tech_Exhibit_0003_detail_on_historic_family_housing_properties.docx DOCX document
Tech_Exhibit_0405_Gates_and_Dock_Levelers.docx DOCX document
Tech_Exhibit_0502_Publications_and_Forms_-_Copy.docx DOCX document
BASOPS_CDRLs_A049_A052.pdf PDF
Tech_Exhibit_0415_Sprinkler_Systems.docx DOCX document
Tech_Exhibit_0506_Stormwater_Management_Plan.pdf PDF
Tech_Exhibit_0601_All_IBE_from_GFEBS.XLSX XLSX spreadsheet
Tech_Exhibit_0414_Fire_Alarm_Systems.docx DOCX document
Tech_Exhibit_0802_Stray_Animal_Intake.docx DOCX document
Tech_Exhibit_0505_Water_Distribution_Systems.pdf PDF
Technical_Exhibit_Index.pdf PDF
BASOPS_CDRLs_A029_A032.pdf PDF
Tech_Exhibit_0413_Grounding_Points.docx DOCX document
Tech_Exhibit_0205_Irrigation_Systems.docx DOCX document
Tech_Exhibit_0401_pubs_and_forms.docx DOCX document
Tech_Exhibit_0201_Grass_Areas_for_Grounds_Maintenance.pdf PDF
BASOPS_CDRLs_A005_A008.pdf PDF
BASOPS_CDRLs_A001_A004.pdf PDF
Attachment_1_-_Overarching_Standardized_PWS.pdf PDF
W15QKN-19-R-1004.pdf PDF
Attachment_18_GFP-3.xlsx XLSX spreadsheet
Attachment_10_-_Annex_H_-_Facilities_Maintenance_Vertical.pdf PDF
Attachment_16_GFP-1.xlsx XLSX spreadsheet
Attachment_3_-_QASP.pdf PDF
Attachment_20_GFP-5.xlsx XLSX spreadsheet
Attachment_11_-_Annex_J_-_Facilities_Maintenance_Horizontal.pdf PDF
Attachment_17_GFP-2.xlsx XLSX spreadsheet
Attachment_14_-_Annex_M_-_Pest_Management_Services.pdf PDF
Attachment_9_-_Annex_G_-_Pavement_Clearance.pdf PDF
Show all 50

Base Operations Support Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Heating and Cooling Services

27 November 2018

Table of Contents

1.0 GENERAL INFORMATION

1.1 Overview

1.2 Air Pollution Regulations

2.0 DESCRIPTION OF SERVICES

2.1 Scope

2.2 Heating and Boiler Plant Staffing

2.3 Unattended Heating Boilers…………………………………………………………………..2

2.4 Central Boiler Plants

2.5 Summer Overhaul

2.6 Idle Standby Boilers

2.7 Monthly Inspections

2.8 Boiler/Heat Plant Shutdowns

2.9 Boiler Water Treatment Chemicals

2.10 Boiler Water Test Samples

2.11 Prepare Boilers and Coordinate Boiler Inspections

2.12 Boiler Plant Calibration

2.13 Emergencies

2.14 Operational Considerations

3.0 PURCHASE OF FUELS

3.1 Fuel Oil

3.2 Natural Gas Distribution System

3.3 Other Fuels

4.0 AC AND REFRIGERATION PLANTS AND SYSTEMS

4.1 Scope

4.2 Daily Inspection of Chillers

4.2.1 Daily Log

1.0 General Information.

1.1 Overview. Heating and Cooling Services provide steam, hot water, chilled water for heating, cooling, domestic hot water, and facility processes using Government-owned heating and cooling equipment, and distribution systems. Operating Government- owned heating and cooling equipment; and distribution systems includes all contract costs associated with full operation and maintenance (O&M) staff, oversight of contracted plant (other than a Utilities Privatization Contractor), O&M, periodic regulatory inspections and certifications, purchase of fuels (coal, natural gas, fuel oil, etc.), storage of fuels;

maintenance, inspection, and certification of fuel storage facilities; periodic operators training and certification, supervision and administration tasks, and purchase of chemicals and supplies.

1.2 Air Pollution Regulations. The Contractor shall operate all heating boilers in compliance with all Federal, State, and local air pollution regulations. The Contractor shall address all non-compliance issues immediately to the Contracting Officer’s Representative (COR) or Alternate Contracting Officer’s Representative (ACOR).

2.0 Description of Services.

2.1 Scope. The Contractor shall operate all heating equipment and systems (steam meters, automatic tank monitoring system, boilers, and furnaces) used in the production of domestic heat (including the provision of unscheduled services) as directed by the COR/ACOR. Major components and all other heating equipment (including Geothermal and domestic hot water heaters) are listed amongst all IBE in Technical Exhibit (TE) 0601 All IBE from GFEBS.

2.2 Heating and Boiler Staffing. The Contractor shall provide boiler operators who are properly certified in conformance with all applicable Federal, State, and local laws and regulations.

2.3 Unattended Heating Boilers. The contractor shall operate all unattended heating boilers, furnaces, and any other heating equipment. Operation shall include seasonal start-up and shut down of heating equipment.

2.4 Central Boiler Plants. N/A

2.5 Summer Overhaul. The Contractor shall schedule summer overhauls for boilers that cannot be overhauled during the heating season because of operational requirements.

The Contractor shall perform shutdowns over weekends and holidays when required by the COR/ACOR. The Contractor shall submit a written schedule of boiler shutdowns to the COR/ACOR for approval at least thirty (30) calendar days prior to the beginning of the proposed shutdown period. The approved shutdown schedule shall have minimal disruptions.

2.6 Idle Standby Boilers. All boilers not in use shall be maintained in a fully operational condition, except when deactivated. In the event that any boiler cannot be placed on-line within two (2) hours, a notification that includes the probable cause shall be submitted to the COR/ACOR. Proper lay-up procedures shall be used IAW Technical Manual (TM) 5- 650, Repairs and Utilities: Central Boiler Plants, when deactivating boilers.

2.7 Monthly Inspections. The Contractor shall perform monthly visual inspections of the central steam and hot water distribution and condensation systems. The inspection shall include, but not be limited to, general condition and cleanliness of all exterior and working parts, and evidences of large or small leaks from steam or hot water equipment, emissions, pipes, valves, and covers. The Contractor shall submit a report outlining the results of the inspection to the COR/ACOR within three (3) working days. However, any defects identified by the Contractor shall be submitted in writing to the COR/ACOR on the same work day.

2.8 Boiler/Heat Plant Shutdowns. The Contractor shall inform the COR/ACOR within thirty (30) minutes of shutting down any boiler or heating equipment for unplanned repairs.

The Contractor shall provide written notice thirty (30) days in advance of planned repairs that require the shutdown of any boiler or heat plant, unless shutdown is otherwise requested by the COR/ACOR.

2.9 Boiler Water Treatment Chemicals. The Contractor shall supply the chemicals necessary to maintain all boiler water chemistry IAW TM 5-650.

2.10 Boiler Water Test Samples. In addition to the required boiler and distribution system water testing and treatment, the Contractor shall submit monthly, a series of boiler water samples to a Government designated lab as directed by the COR/ACOR. Analysis, results, and comments will be sent to the Contractor. The Contractor shall pay the costs for submission and lab analysis of these samples. The Contractor shall pay lab analysis costs directly to the Government designated lab. The water samples submitted shall include a boiler water sample, a condensate sample, and the Contractor test results for these samples. Test results and water samples from one (1) boiler/condensate system are required from each of the high-pressure boiler plants operated for the Government.

Additional tests may be required if the Contractor's test results and the lab's test results vary by ten (10) percent. Additional tests shall be at the Contractor’s expense. The Contractor shall provide copies of Lab Water Analysis Reports to the COR/ACOR within five (5) days after receipt. Water sample bottles and shipping containers are available from the Government designated lab. The Contractor shall furnish required boiler plant water test kits and test material.

2.11 Prepare Boilers and Coordinate Boiler Inspections. The Contractor shall schedule and prepare high-pressure boilers for the boiler inspections required by AR 420-49, Section VII. Preparation of boilers for inspection shall be IAW TM 5-650, Chapter 3, paragraph 65. The Contractor shall provide to the COR/ACOR in writing, a proposed schedule of high-pressure boiler inspections. The Contractor shall post a copy of the most recent Boiler Inspection Report in the plant where each inspected boiler is located.

2.12 Boiler Plant Calibration. Prior to annual boiler inspections, the Contractor shall calibrate all pressure and temperature gauges. A self-adhesive seal shall be attached on each gauge certifying that it has been calibrated. The date of the calibration and the initials of the person performing the calibration shall be noted on the sticker. The gauges shall be calibrated over the full operational range and accuracy tested for compliance with the manufacturer's published data. The gauges shall be calibrated against standard dead weight tester or a calibrated master gauge. In addition to the normal annual calibration, the Contractor shall at all times recalibrate any gauge that is suspected of being in error.

All tests shall be IAW the applicable provisions of the American Society of Mechanical

Engineers (ASME).

2.13 Emergencies. Operational emergencies which reduce the steam rate by ten (10) percent or boiler pressure by twenty (20) percent, for a period exceeding thirty (30) minutes, shall be reported by the Contractor within thirty (30) minutes of occurrence to the COR/ACOR. Such emergencies include, but are not limited to, ruptured tubes, loss of boilers, and loss of power. The Contractor shall report operational emergencies together with identification of the probable cause and the estimated time required before full pressure and steam rate can be restored.

2.14 Operational Considerations. N/A

3.0 Purchase of Fuels.

3.1 Fuel Oil. N/A

3.2 Natural Gas Distribution System. N/A

3.3 Other Fuels. N/A

4.0 AC and Refrigeration Plants and Systems.

4.1 Scope. The AC plants and systems include central systems for multi-building cooling as well as independent systems for single building or partial building cooling. TE 0601 lists the AC inventory.

4.2 Daily Inspection of Chillers. The Contractor shall perform daily inspections during cooling season of all chiller units listed in TE 0604.

4.2.1 Daily Log. During chiller operating season, the Contractor shall observe the complete cycle of the mechanical operation of the chiller plant and cooling tower, and report any problems to the COR/ACOR immediately. The Contractor shall provide and maintain a daily log that includes, but is not limited to, the data listed below.

a. Chiller MCD number,

b. Purifier purge monitor and start-up number,

c. Chiller supply and return water temperature,

d. Compressor suction and discharge pressure and MCD number,

e. Refrigerant temperature in the evaporator,

f. Branch line control pressure,

g. Evaporator pressure,

h. Measure and record pressure drop through the condenser,

i. Oil pressure,

j. Condenser in and out water temperature,

k. Oil temperature in bearings,

l. Oil temperature in sump,

m. Oil pump motor amperage,

n. Outdoor temperature and relative humidity,

o. Any abnormalities occurring in the operation of the unit.

1.0 General Information.
2.0 Description of Services.
3.0 Purchase of Fuels.
4.0 AC and Refrigeration Plants and Systems.