Attachment 0010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W15QKN19R0033-0002.pdf | ||
| W15QKN19R0033-0001.pdf | ||
| Attachment_0007_FFP_Requirements_v2.0.xlsx | XLSX spreadsheet | |
| Attachment_0006_AMSTA-AR_1350_Tech_Data_Request_Questionnaire.pdf | ||
| Attachment_0004_Clearance_of_Tech_Info_for_Public_Release.pdf | ||
| Attachment_0007_FFP_Requirements.xlsx | XLSX spreadsheet | |
| Exhibit_A_CDRL_A001_to_A020_DD1423.pdf | ||
| Attachment_0008_CPFF_Requirements.xlsx | XLSX spreadsheet | |
| Attachment_0003_Disclosure_of_Lobbying_Activities.pdf | ||
| Attachment_0002_-_Non-Disclosure_and_Non-Use_Agreement_NRE.DOC | DOC document | |
| W15QKN19R0033.pdf | ||
| Attachment_0001_Past_Performance_Questionnaire.docx | DOCX document | |
| Attachment_0009_Additional_Solicitation_and_Contract_Requirements.docx | DOCX document | |
| Attachment_0005_DD2345_Military_Critical_Technical_Data_Agreement.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT QUALITY REQUIREMENTS
PICA ADDENDUM QUICK REFERENCE
(Delete this page for actual addendum)
1. GOVERNMENT PROCUREMENT QUALITY ASSURANCE ACTIONS: INSPECTION
2. GOVERNMENT PROCUREMENT QA ACTIONS: ACCEPTANCE
14. MEASUREMENT SYSTEM EVALUATION (MSE)
25. USE OF MIL-STD 1916
29. CRITICAL CHARACTERISTICS (SIX SIGMA)
32. AMMUNITION DATA CARDS (ADC)
CONTRACT ADDENDUM
QUALITY ASSURANCE REQUIREMENTS
1.) GOVERNMENT PROCUREMENT QA ACTIONS: INSPECTION
Government Procurement Quality Assurance (PQA) actions will be accomplished by the Government Quality Assurance Representative (QAR) at: Contractor's Facility
2.) GOVERNMENT PROCUREMENT QA ACTIONS: ACCEPTANCE
Acceptance of supplies will be at: Destination The Government's acceptance of FATR (if required) will be at: Contractor's Facility
14.) MEASUREMENT SYSTEM EVALUATION (MSE)
(a) Definitions. This paragraph defines specific terms utilized throughout the rest of the addendum and in the accompanying Contract Data Requirements List (CDRL) and Data Item Description (DID) (DI-QCIC-81960). This aids in clarifying the MSE requirements to Government and contractor personnel.
(1) Acceptance Inspection Equipment (AIE). All equipment (includes AAIE defined below), special and standard, including dimensional gages, measuring equipment, test fixtures, electronic and physical test equipment, and other test equipment used for examination and test of a product to determine conformance to the Technical Data Package (TDP) which may include drawings and specifications (e.g., Detail, Performance, Weapon specifications, and QAPs).
(2) Automated Acceptance Inspection Equipment (AAIE). AIE in which the inspection and acceptance determination of the product is performed, in whole or in part, in an automatic manner.
(3) Contractor Inspection Equipment. Government-approved equipment utilized by the contractor to perform examination and tests to assure conformance to contract requirements.
(4) Commercial Inspection Equipment. Industry-developed inspection equipment of universal application, without limitations to a specific part or item, which is advertised or cataloged as available to the trade or to the public on an unrestricted basis at an established price. Examples follow:
(i) Standard Test Equipment. Multi-usage equipment that is specific to a function rather than to an item. It includes such items as hardness testers, tensile strength testers, meters, weighing devices, standard gear testers, ohmmeters, voltmeters, and oscilloscopes.
(ii) Standard Measuring Equipment (SME). Multipurpose equipment and standards used for performing measurements. It includes such items as micrometers, rulers, tapes, height gages, and protractors, etc. Standards include visual inspection equipment such as scratch and dig standards, surface finish comparator, color standards (FED-STD-595), etc.
(5) Nondestructive Testing. The development and application of technical methods to examine materials or components in ways that do not impair future usefulness and serviceability in order to detect, locate, measure and evaluate flaws; to assess integrity, properties and composition; and to measure geometrical characteristics. NDT includes Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic Particle, and Liquid Penetrant.
(6) Measurement System Analysis (MSA). Per ASTM E2782 (Standard Guide for MSA), paragraph 3.1.7, MSA is any of a number of specialized methods useful for studying a measurement system and its properties.
(b) Scope. This addendum establishes requirements for design, supply, performance, and maintenance of AIE used for product inspection and acceptance. In addition, this addendum establishes requirements for the preparation, submission, and approval of AIE documentation.
(c) AIE. The contractor shall provide all AIE necessary to ensure conformance of components and end-items to contract requirements. AIE shall include inspection, measuring, and test equipment whether Government furnished or contractor furnished (including commercially acquired) along with the necessary specifications and procedures for their use (see ISO 10012, paragraph 6.2.1). The AIE shall not create or conceal defects on the product being inspected. All AIE documentation shall contain sufficient information to permit evaluation of the AIE’s ability to test, verify, and/or measure the applicable characteristics or parameters (see DI-QCIC-81960).
(d) AIE Designs & Government Furnished Gages. AIE designs are of two types – Government designs (see d.1) and contractor designs (see d.2). When applicable, Government designs or Government furnished gages are designated in the TDP/contract; responsibility for all other AIE is assigned to the contractor. The designs, associated inspection procedures, and theory of operation shall have the level of detail to demonstrate capability of the proposed AIE to perform the required inspection.
(1) Government AIE Designs. Government AIE designs may consist of detailed drawings necessary for the fabrication and use of the AIE. Unless otherwise specified, the contractor may submit alternate or modified contractor designs of Government AIE designs.
(2) Contractor AIE Designs. Contractor AIE design drawings shall meet the requirements of ASME Y14.100, ASME Y14.5 and ASME Y14.43 and may include commercial inspection equipment. [“Commercial inspection equipment” is defined as shown in paragraph a.4 above. It shall be fully described by catalog listings or other means which provide sufficient information to permit identification and evaluation by the Government and may include illustrations and engineering data.] Designs shall be submitted for any special fixture(s) to be used. Unless otherwise specified, Gage Tolerancing Policy shall be in accordance with ASME Y14.43, “Absolute Tolerancing (Pessimistic Tolerancing).”
(3) Visual Inspection. Visual inspection standards used for the acceptance/rejection of product shall be submitted for approval.
(e) AIE Package Submittals. The contractor shall prepare the AIE package submittal in accordance with DI-QCIC-81960 in the applicable Contract Data Requirements List (CDRL – DD Form 1423). In addition, the contractor shall adhere to the following requirements:
(1) Designs for Approval. Contractor designs and/or the submission for the use of Government designs shall be approved by the Government. Partial submission of AIE designs is permissible in order to expedite the approval process; however, the response date for design review will be based on the date of the final complete submission of designs.
(2) Correspondence in English. The contractor shall ensure all AIE correspondence and documentation are submitted in English.
(3) Units of Measurement. The units of measurement within the AIE package submittal shall be consistent with the requirements of the Technical Data Package (TDP).
(4) AIE Flow Down. The contractor shall flow down AIE requirements to sub-contractors at any tier who are performing acceptance inspections.
(f) Characteristics for Inspection. AIE documentation for Critical, Special, and Major characteristic inspections shall be submitted to the Government for approval in accordance with (IAW) the CDRL (DI-QCIC-81960). AIE for Minor characteristic inspections shall be submitted to the Government for approval IAW CDRL (DI-QCIC-81960) and as required below:
☒ (1) Listed Minor (characteristics displayed on specifications and/or drawings
☐ (2) Government selected list (as attached or as provided herein)
☐ (3) Not submitted
(g) Automated Acceptance Inspection Equipment. The AAIE shall accept only conforming material. All characteristics requiring AAIE per the TDP shall utilize inspection equipment with a minimum demonstrated reliability of 99.8% at a 90% confidence level to detect non-conforming material unless otherwise specified below.
(1) Reliability of 99.8% at a 90% Confidence Level for Critical/Special Characteristics
(2) Reliability of 99.5% at a 90 % Confidence Level for Major Characteristics
(3) For inspection of major and minor characteristics where contractor utilizes AAIE when it is not required by the TDP, the AAIE package shall be submitted to the Government for approval. If the Minor characteristic is not listed in paragraph f.2 or not required for submittal in paragraph f.3, then the AAIE requirements (e.g., verification, calibration, prove-out, etc.) of the inspection shall still be performed.
(4) All AAIE packages submitted to the Government for approval shall be in accordance with MIL-A-70625 (Automated Acceptance Inspection Equipment Design, Testing and Approval of). Furthermore, the contractor shall be responsible for producing the acceptance and rejection verification standards/masters representative of the characteristics the AAIE is designed to inspect. The verification standards and frequency of use require Government approval prior to use. When verification standards are used for the VL-VII “sampling plan” per MIL-STD-1916 paragraph 4.4, verification standards and frequency of use shall require Government approval prior to use.
(5) If the AAIE accepts a critical characteristic “reject” standard the contractor shall notify the Government and act in accordance with paragraph f of the Critical Characteristic Control Addendum. In addition, if the AAIE accepts a major and/or minor characteristic “reject” standard the contractor shall act in accordance with paragraph 8.3 of ISO 10012 or paragraph 5.2.3 of ANSI/NCSL Z540.3.
(6) All AAIE shall be required to pass a Government-approved Acceptance (Prove-Out) Test. The contractor shall conduct this test per the approved test plan and shall submit a test analysis report for approval. See applicable CDRL (DI-QCIC-81960). This test shall be performed at the contractor’s facilities who’s manufacturing system has had the AAIE fully integrated and calibrated as per paragraph (j) of this addendum. The contractor shall allow Government personnel access to this facility and unobstructed monitoring of this test.
(7) The contractor shall notify the Government prior to a modification and/or relocation of the Government-approved AAIE. The modified AAIE designs shall be submitted for approval. The modified and/or relocated AAIE shall require submission of the acceptance test plan (prove-out) and results for review and approval prior to use. The modified and/or relocated AAIE shall be in accordance with paragraphs (g)(1) – (g)(6).
(h) Robust AIE System. The contractor shall ensure the AIE and its use is not negatively affected by any manufacturing/inspection environmental stimuli including, but not limited to production rate, noise, temperature, humidity, and vibration.
(i) AIE Calibration and Verification. The calibration system shall be in accordance with ISO 10012 or ANSI/NCSL Z540.3. All AIE shall be subjected to scheduled calibration intervals to ensure that the equipment will accept only conforming product and reject all non-conforming product for the duration of the approved calibration period. AIE shall be subjected to periodic verification to ensure that the equipment will continue to accept and reject product with the same consistency as it did at the time of its previous calibration.
(j) Nondestructive Testing (NDT). Contractor shall submit detailed plans for qualifying and certifying NDT personnel and plans for qualification and ongoing use of NDT methods used for inspecting product. If re-qualification of NDT personnel and/or NDT methods is required, then the applicable plans shall be submitted.
(1) Personnel performing NDT examinations shall be qualified and certified in accordance with the standard practices prescribed by NAS 410 (NAS Certification & Qualification of NDT Personnel), ANSI/ASNT-CP-189 (ASNT Standard for Qualification and Certification of NDT Personnel), or SNT-TC-1A (Recommended Practice for Personnel Qualification and Certification in NDT), and additional procedures that may be identified by the Government. Acceptance of product using NDT shall be performed by personnel at a level of qualification consistent with that defined in the applicable standard.
(2) The NDT method(s) shall be applied in accordance with ASTM E 543 (Standard Specification for Agencies Performing Nondestructive Testing) and the current nationally recognized standard practices appropriate to the NDT method(s) employed, such as ASTM E-1742 (Standard Practice for Radiographic Examination) and SAE-AMS-STD-2154 (Inspection, Ultrasonic, Wrought Metals, Process For). Each application technique shall identify the standard(s) utilized. Non-destructive testing includes, but is not limited to, the following types of testing: Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic Particle, and Liquid Penetrant.
(k) Contractor Alternate Inspection Method(s), Modifications and/or Relocation of AIE (Non-Automated) After Government Approval. If the contractor proposes an alternate inspection method and/or modifies the AIE design(s) affecting hardware, software, or procedures after Government approval the intended change(s) shall be submitted to and approved by the Government prior to implementation. If an AIE is relocated and the relocation risks the integrity of the inspection system, notify the Government to determine information needed to assess impact to AIE. See CDRL (DI-QCIC-81960).
(l) Responsibility for AIE Package Submittal. The contractor shall submit the AIE design documentation package within contractual timeframes per CDRL (DI-QCIC-81960). The Government will provide approval or disapproval within the timeframe specified in the CDRL. Disapproval of the AIE package will require re-submittal and subsequent Government review in accordance with the CDRL requirements. The AIE package and any required prove-outs must be approved prior to First Article (FA) (if required) or production start-up if FA is not required.
(m) Government’s Right to Disapprove AIE. The Government reserves the right to revoke approval of any AIE that is not satisfying the required acceptance criteria at any time during the performance of this contract. See CDRL (DI-QCIC-81960).
25.) USE OF MIL-STD 1916
a. The Government will not accept lots whose samples submitted for acceptance contain nonconformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The Verification Level (VL) shall be:
VL IV for major characteristics and
VL II for minor characteristics.
Unless otherwise noted in product specifications.
b. MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.
29.) CRITICAL CHARACTERISTICS (SIX SIGMA)
a. The contractor’s processes shall be designed with the objective of preventing the creation or occurrence of nonconforming critical characteristics (see paragraphs d & e).
b. The contractor shall assure its critical processes are robust in design, capable and under control, with the objective of not generating any critical non-conformances.
c. An inspection and verification system shall be employed that will verify the robustness of all critical processes.
The contractor shall calculate, document, clearly identify, and have a schedule that routinely assess the reliability and effectiveness of its inspection and verification system to detect and prevent critical non-conformance escapes. The Government expects that a contractor will allow zero critical escapes. To demonstrate its critical escape risk the contractor will utilize the non-conformance escape risk goal provided below.
(1) Unless otherwise specified immediately below, the calculated critical non-conformance escape risk is 1 in a million (.000001) items delivered. Or: Alternate calculated Critical Non-conformance Escape risk (fill-in -1-): Unless otherwise approved by the PCO, the non-conformance escape risk is the sum of the individual characteristic escape rates. The probability of escape for a single characteristic shall be calculated by multiplying the non-conformance rate(s) entering the inspection system(s) by the error rate of the inspection system(s). These escape rates are then summed and shall not exceed the tolerable critical non-conformance escape risk.
(2) Based on the maximum error rate defined for the inspection system, the contractor shall develop a test procedure to demonstrate the error rate. As part of the test plan the contractor shall include sufficient test quantities to assure 90% statistical confidence in the resultant rates unless otherwise approved by the PCO. Once established, the contractor shall have a documented schedule to routinely monitor the non-conformance and inspection system error rates to assure they do not exceed the maximum rates allotted.
d. As a result of previous practices, the government’s technical data may refer to “Critical I”, “Critical II”, and “Special” characteristics. The use of the term "critical characteristics" within this addendum includes Critical I, Critical II and Special characteristics and the use of the term "critical nonconformances" includes those nonconformances pertaining to Critical I, Critical II and Special characteristics. Unless otherwise stated in Section C, these characteristics shall be subject to all requirements of this addendum.
e. In addition to critical characteristics defined in the government’s technical data (drawings, specifications, etc.), the contractor shall also identify and document in their contractor developed technical data all known material, component, subassembly and assembly characteristics whose non-conformances would likely result in hazardous or unsafe conditions for individuals using, maintaining or depending upon the product. All additional critical characteristics identified by the contractor shall comply with the critical characteristic requirements of the technical data package, supplemented herein. The contractor's additional critical characteristics shall be classified in accordance with guidance located at http://www.pica.army.mil/PicatinnyPublic/organizations/ardec/orgchart/quality.shtml and shall be submitted to and approved by the PCO prior to production (DI-SAFT-80970A).
f. In the event that a critical non-conformance is found anywhere in the production process, the contractor, as part of its CCC Plan, shall have procedures in place to ensure:
(1) The non-conformance is positively identified and segregated to ensure that nonconforming product does not inadvertently remain in or reenter the production process. This control shall be accomplished without affecting or impairing subsequent non-conformance analysis. Final disposition of non-conforming product shall be documented and audited for traceability.
(2) The operation that produced the non-conforming component or assembly and any other operations incorporating suspect components or assemblies are immediately stopped. (See para h. for exceptions)
(3) The government (PCO) is immediately notified of the critical non-conformance (electronic mail)(DI-SAFT-80970A).
(4) Any suspect material is identified, segregated and suspended from any further processing and shipment.
(5) An investigation is conducted to determine the root cause of the non-conformance and the required corrective actions. An evaluation shall also be conducted with regard to suspect material to ensure that no additional critical non-conformances are present. A report of this investigation shall be submitted to the government (DISAFT- 80970A). The use of the DID report shall not delay notification to the government as required in f(3) above.
(6) A request to restart manufacturing or to use any suspect material associated with the critical nonconformance is submitted to the government (DI-SAFT-80970A). Restart of production shall not occur until authorized by the PCO, unless previously addressed in the approved CCC Plan. The Government will respond to a restart request within 3 working days. All objective evidence of the investigations to date shall be available for review at the time of restart. Suspect material shall not be used without PCO approval.
(7) The procuring activity reserves the right to refuse acceptance of any suspect material until the root cause or reasonably likely cause of the critical non-conformance has been identified, corrective action has been fully implemented and sufficient evidence has been provided to exclude non-conforming material from the conforming population.
g. If a critical non-conformance is discovered beyond its designated inspection point and prior to Government acceptance the contractor shall take actions specified in paragraph f above. If a critical non-conformance is discovered after Government acceptance the Government has the right to invoke the requirements of paragraph f with respect to the contractor’s remaining production under this contract.
32.) AMMUNITION DATA CARDS (ADC)
Detailed requirements and guidance for the preparation of Ammunition Data Cards (ADCs) and Ammunition Lot Numbers are contained in MIL-STD-1168, DI-MISC-80043 and the Worldwide Ammunition-data Repository Program (WARP) online user's manual. Detailed requirements for obtaining and using a manufacturer's identification symbol, which is an integral component of the ammunition lot number, can be found in MIL-STD-1168 and the WARP user’s manual. Information provided in paragraphs 6.7 through 6.16 of MIL-STD-1168 shall be considered mandatory requirements where all instances of the term "should" are considered to be replaced with the word "shall."
(a) The contractor shall develop and submit ADCs in accordance with the requirements of this addendum, MIL-STD-1168, and the user's manual located on the WARP database. The WARP application is accessed through the Munitions History Program (MHP) website. The ADC requirement is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(b) The contractor shall prepare an ADC for each lot of item(s) being produced under this contract, regardless of whether or not those lots are accepted or rejected by the Government. The ADC shall comply with MIL-STD-1168 and WARP requirements.
(c) Unless otherwise authorized by the Procuring Contracting Officer, the contractor shall include, in the components sections on the ADC representing the deliverable item, as a minimum; all assemblies, sub-assemblies, components, explosives, and propellants listed below for the item being procured.
End Item Component Listing:
Drawing Number Nomenclature
(d) The component items identified below are from paragraph (c) above and will require their own component ADC in addition to being listed on the end item ADC. The component ADCs shall also comply with MIL-STD-1168 and WARP requirements.
Drawing Number from paragraph (c) above , components as follows:
Component Drawing Number Nomenclature Drawing Number from paragraph (c) above , components as follows:
Component Drawing Number Nomenclature Drawing Number from paragraph (c) above , components as follows:
Component Drawing Number Nomenclature
(e) Lot numbers shall be in accordance with MIL-STD-1168 lot number convention and the technical data package requirements. Lot numbers shall be used for all ammunition end items and their major components, including inert, dummy, or non-energetic items and components. When not required by technical data package and not considered an end item or major component, the component lot number may be constructed through contractor lot number convention.
(f) The flowdown of the requirement for component ADCs generated via WARP is highly encouraged for other items not identified in paragraph (d) above when the prime contractor is purchasing components, assemblies, and subassemblies from subcontractors or vendors.
(g) All component RFD/ECPs shall be listed on the ADC for the deliverable item, as well as on the component ADC, when that component is identified in paragraph (d) above. The WARP user's manual provides information on the level of detail required.
(h) A sample ADC shall be developed and submitted to the WARP system 30 days prior to First Article testing or 30 days prior to production in the event a first article is not required. The WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system.
PERFORMANCE VERIFICATION TESTING
a. Subsequent to completion of both contractor and Government inspection/ verification actions, a test sample consisting of [TBD on each individual task order/delivery order] from [TBD on each individual task order/delivery order] shall be selected by the Government Quality Assurance Representative (QAR) for [TBD on each individual task order/delivery order].
b. The test sample(s), to include all basic issue items (and, if applicable, any repair parts listed in Appendix II of this contract), shall be packaged and packed in accordance with contract requirements. The test sample(s) shall be appropriately marked, to include the drawing/part number, the contract number, the name of the contractor, and the Contract Administration Office. The test sample(s) shall be shipped Free on Board (FOB) Destination to the location designated below unless transportation protective service or transportation security is required (by other provision of this contract); if transportation protective service and/or transportation security is required, the test sample(s) shall be shipped FOB Origin on a Government Bill of Lading (GBL). A copy of the contractor inspection/test results shall be provided with the test sample(s). The test sample(s) and accompanying Material Inspection and Receiving Report (DD Form 250) shall be marked FOR INITIAL PRODUCTION TESTING or FOR COMPARISON TESTING as applicable. Two copies of the DD Form 250 shall be forwarded to the Contracting Officer and one copy of the DD Form 250 shall be forwarded to the COR.
Shipping Destination: [TBD on each individual task order/delivery order]
c. The test sample shall be examined and/or tested by the Government in accordance with [TBD on each individual task order/delivery order]
d. Within [TBD on each individual task order/delivery order] days after receipt of the test sample at the Government facility, the Contracting Officer shall provide written notification to the Contractor as to the approval, disapproval, or conditional approval of the performance verification test. Unless authorized by the Contracting Officer, the lot from which the test sample was taken (and any subsequent lots) shall not be shipped from the Contractors facility, nor shall final acceptance of the lot be made, until such time as notification has been provided by the Contracting Officer that the Performance Verification Test samples have been approved/conditionally approved.
e. If the Contracting Officer does not provide notification of the approval, conditional approval, or disapproval of the Performance Verification Test sample within the time specified above, the Contracting Officer shall, if applicable, equitably adjust the delivery/performance dates and/or contract price (and any other contractual provision affected by such delay) in accordance with the procedures provided in the Changes clause of this contract.
f. If any test sample fails to meet any applicable contractual requirements, the lot or batch from which the test sample was drawn shall be considered to be rejected. The contractor shall take immediate corrective action, both to correct the deficiency/nonconformance and to prevent recurrence of such deficiency/nonconformance. Such corrective action shall be taken by the contractor at no increase in contract price. Such corrective action shall apply to all items (to include basic issue items and/or repair parts) either in-process or final assembly, which have been produced or are in production since the last successful Performance Verification Test. In addition, the provisions of any warranty clause contained in the contract shall apply. Upon completion of the corrective action, the Contractor shall resubmit a sample for Performance Verification testing. Any and all costs associated with testing the additional Performance Verification Test sample shall be borne by the Contractor. The Contracting Officer shall equitably adjust the contract price as applicable for the costs associated with the additional testing resulting from failure of the test sample to meet the applicable contractual requirements.
g. If the Contractor fails to deliver any Performance Verification Test sample within the time specified, or if the test sample is disapproved and an acceptable replacement is not provided within the time specified, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
h. Unless otherwise specified, the initial production/confirmatory test units shall be considered to be destructively tested. At the Contracting Officers discretion, the initial production/confirmatory test units, and any unused repair parts, may be returned to the contractor for refurbishing, and may subsequently shipped as deliverable items under the terms of the contract. Any refurbished test units shall meet all contract requirements; inspection and acceptance of any refurbished test units shall be conducted in accordance with contract requirements. Any costs to refurbish the test units shall be subject to negotiation between the Contracting Officer and the contractor.
MATERIAL SAFETY DATA SHEETS
1. The contractor shall send the Material Safety Data Sheets (MSDS) prior to award to the Contracting Officer and a copy with the first delivery of supplies to Commander, U.S. Army ARDEC, ATTN: Safety Division, IMPI-SO, Bldg. 351 S., Picatinny Arsenal, NJ 07806-5000, required by FAR 52.223-3, Hazardous Material Identification and Material Safety Data.
2. Deliveries of any hazardous chemicals/materials will not be accepted when:
a. The applicable MSDS is not delivered with the first delivery of the supplies; and/or
b. The container label on the supplies is inadequate, unreadable, missing, or does not agree with the accompanying MSDS.
END OF CONTRACT ADDENDUM, QUALITY ASSURANCE REQUIREMENTS.