Exhibit_A_CDRLs.pdf

PDF 11 MB Posted

Attached to
Test Set, Telecommunication System: TS-4544( )/U Federal contract opportunity
Solicitation number
W15QKN-19-B-0002
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

This is a summary of a special notice for an invitation for bid for a Test Set, Telecommunication System: TS-4544( )/U. The notice replaces a previous IFB and intends to move forward with step two bidding to all acceptable technical solutions received in response to step one. The U.S. Army Contracting Command - New Jersey intends to issue a new IFB on October 26, 2018 for a five-year indefinite-delivery/indefinite-quantity firm fixed-price contract for a commercial item test set system. The contract is anticipated to be awarded using two-step sealed bidding procedures in accordance with FAR 14.5.

CDRLs Exhibit A

View the file

Other files for this federal contract opportunity

Other files attached to Test Set, Telecommunication System: TS-4544( )/U, newest first.
File Type Posted
W15QKN-19-B-0002_TS-4544_IFB.pdf PDF
Attachment_0007_Testing_and_FOU_Resolution.pdf PDF
Attachment_0001_Document_Summary_List.docx DOCX document
Attachment_0006_TK-17_Supply_Catalog.pdf PDF
Attachment_0004_Transfer_Set_Standards,_AN_GSM-287_Hand_Receipt.xlsx XLSX spreadsheet
W15QKN-19-B-0002_TS-4544_IFB.pdf PDF
Attachment_0008_Spare_Parts_List.docx DOCX document
Attachment_0009_Section_B_Matrix.xlsx XLSX spreadsheet
Attachment_0005,_AN_GSM-287_Reference_Catalog.xlsx XLSX spreadsheet
Attachment_0002_-Performance_Specification_TS-4544.pdf PDF
Attachment_0003_Safety_Inspection.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

Adobe Professional 7.0

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form

OMB

Approved No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Telecommunications Test Set TS-4544U

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Contract Data Status and Schedule Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A

5. CONTRACT REFERENCE

SOW 3.1

6. REQUIRING OFFICE

SFAE-CSS-FP-TM-TEMOD

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

MTHLY

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

Draft

Final

Reg Repro

16. REMARKS

Blocks 8, 11, 12, 13:

A draft Contract Data Status and Schedule Report (CDSSR) shall be provided to the Government no later than 5 days prior to the Start of Work Meeting. After receiving the submission, allow 5 days for the Government to review/approve the CDSSR. If the CDSSR is not approved, the re-submission is due 5 days after receiving notification of Government disapproval. Notification of Government disapproval of the Draft CDSSR will either be by letter of transmittal or electronically. Allow 5 days for the Government to review/approve the resubmitted Draft CDSSR. If the resubmitted Draft CDSSR is not approved, the disapproval path as outlined above will be followed until the Draft CDSSR is approved.

The first submission of the CDSSR shall be provided to the Government 5 days after the Draft CDSSR is approved. Subsequent submissions of the CDSSR are due no later than the 10th of each month. The report shall cover the preceding month. Each monthly submission shall make changes and updates easily noticeable.

If a submission date occurs on a Saturday, the contractor shall submit the CDSSR the previous Friday. If the submission date occurs on a Sunday, the contractor shall submit the CDSSR the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the CDSSR the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the CDSSR on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.

Block 9:

Distribution Statement A. Approved for public release; distribution is unlimited.

Block 14:

Electronic submissions are preferred.

Email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil

Export - Control Act Warning - Not required.

SFAE-CSS-FP-TM-

TEMOD 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY

Dennis A. Buckmeir

H. DATE

7 Mar 2018

I. APPROVED BY

Norm Matice Kevin J. Gould for

J. DATE

7 MAR 2018

18. ESTIMATED

TOTAL PRICE

17. PRICE GROUP

Reset mailto:usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: MGMT

TDP TM OTHER

D. SYSTEM/ITEM

Telecommunications Test Set TS-4544U

E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of 1 Pages

DD FORM 1423-1 (BACK), FEB 2001

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM

- Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data.

The Government's right to use the data shall be governed by the pertinent provisions of the contract.

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form

OMB

Approved No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

TDP TM OTHER ADMN

A002

Conference Minutes

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81250B

5. CONTRACT REFERENCE

SOW 3.2

6. REQUIRING OFFICE

SFAE-CSS-FP-TM-TEMOD

7. DD 250 REQ

DD

AS REQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Blocks 8, 10, 11, 12, 13:

The first submission shall be for the Start of Work Meeting held at the Government’s facility.

A copy of the Draft Conference Minutes shall be submitted to the Government before each occurrence of the Start of Work Meeting, In-Process Review, and other conferences have been adjourned.

The Final Conference Minutes are due no later than 5 days after the conclusion of each occurrence of the Start of Work Meeting, In-Process Review, or conference. After receiving the submission, the Government has 5 days to provide review/approval of the Final. If the Final Conference Minutes are not approved, the re-submission of the Final is due 5 days after receiving notification of Government disapproval. Notification of Government disapproval of the Conference Minutes will either be by letter of transmittal or electronically. Allow 5 days for the Government to review/approve the resubmitted Final Conference Minutes. If the resubmitted Final is not approved, the disapproval path as outlined above will be followed until the Final Conference Minutes are approved.

If a submission date occurs on a Saturday, the contractor shall submit the minutes the previous Friday. If the submission date occurs on a Sunday, the contractor shall submit the minutes the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the minutes the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the minutes on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.

Email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil

Export - Control Act Warning - Not required.

Dennis Buckmeir

15JUN18

I. APPROVED BY

Norman Matice for

Kevin J. Gould

15JUN18

17. PRICE GROUP

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form

OMB

Approved No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

TDP TM OTHER SAFT

A003

Safety Assessment Report (SAR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80102C

5. CONTRACT REFERENCE

SOW 3.4.1

6. REQUIRING OFFICE

SFAE-CSS-FP-TM-TEMOD

7. DD 250 REQ

DD

SEE BLK 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Blocks 8, 10, 12, 13:

The Draft Safety Assessment Report (SAR) is due no later than 30 days after the Start of Work Meeting. After receiving the submission, allow 30 days for the Government to review/approve the Draft. If the Draft SAR is not approved, the re-submission of the Draft is due 15 days after receiving notification of Government disapproval. Allow 15 days for the Government to review/approve the resubmitted Draft SAR. If the resubmitted Draft is not approved, the disapproval path as outlined above will be followed until the Draft SAR is approved.

The Final SAR is due 15 days after the Technical Manual Verification is complete. The Final shall incorporate all Government comments. After receiving the submission, the Government has 30 days to provide review/approval of the Final. If the Final SAR is not approved, the re-submission of the Final is due 10 days after receiving notification of Government disapproval. Allow 10 days for the Government to review/approve the resubmitted Final SAR. If the resubmitted Final is not approved, the disapproval path as outlined above will be followed until the Final SAR is approved.

If there are design changes during the acquisition process, the updated SAR is due no later than 30 days after the Government is notified of the design changes. After receiving the submission, the Government has 30 days to review/approve the updated SAR. If the updated SAR is not approved, the re-submission of the updated SAR is due 15 days after receiving notification of Government disapproval. Allow 15 days for the Government to review/approve the re-submitted updated SAR. If the re-submitted update is not approved, the disapproval path as outlined above will be followed until the updated SAR is approved.

If a submission date occurs on a Saturday, the contractor shall submit the SAR the previous Friday. If the submission date occurs on a Sunday, the contractor shall submit the SAR the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the SAR the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the SAR on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.

7 MAR 2018

I. APPROVED BY

Norm Matice Kevin J. Gould for

17. PRICE

GROUP

Rese

R

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: SAFT

TDP TM OTHER

D. SYSTEM/ITEM

Telecommunications Test Set TS-4544U

E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued) email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil

Export - Control Act Warning - Not required.

DD FORM 1423-1, FEB 2001 Page of 2 Pages

(See DoD 5010.12-M for detailed instructions.)

FOR TH

Item 17. Specify appropriate groups of effort in developi

a. Group I. Definition to the contractor's perform (production, development, t

Estimated Price - C those applicable to prepar conformance with Governme and other expenses related

b. Group II. Definit performance of the primary required to perform additio requirements with regard to submittal, preparation, contr those incurred over and ab without conforming to administrative and other e delivering such data item to

c. Group III. Definit develop for his internal use i effort and does not require Government requirements w frequency of submittal, prep

Estimated Price -the administrative and othe

d. Group IV. Definitio contractor as part of his nor

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form

OMB

Approved No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

TDP TM OTHER MISC

A004

Hazardous Materials Management Program (HMMP) Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81397C

5. CONTRACT REFERENCE

SOW 3.4.2

6. REQUIRING OFFICE

SFAE-CSS-FP-TM-TEMOD

7. DD 250 REQ

DD

ANNLY

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Blocks 8, 12, 13:

The Initial Hazardous Materials Management Program (HMMP) Report is due no later than 90 days after the Start of Work Meeting. After receiving the submission, allow 30 days for the Government to review/approve the Initial Report. If the Initial HMMP report is not approved, the re-submission of the Initial Report is due 15 days after receiving notification of Government non-approval. Allow 15 days for the Government to review/approve the resubmitted Initial HMMP Report. If the resubmitted Report is not approved, the disapproval path as outlined above will be followed until the Initial HMMP Report is

Each subsequent HMMP Report shall be submitted on the same day annually and shall follow the process outlined in the above paragraph.

If a submission date occurs on a Saturday, the contractor shall submit the HMMP Report the previous Friday. If the submission date occurs on a Sunday, the contractor shall submit the HMMP Report the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the HMMP Report the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the HMMP Report on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.

email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil

Export - Control Act Warning - Not required.

TEMOD 0 1 0

15. TOTAL 0 1 0

7 MAR 2018

I. APPROVED BY

Norm Matice Kevin J. Gould for

17. PRICE

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: MISC

TDP TM OTHER

D. SYSTEM/ITEM

Telecommunications Test Set TS-4544U

E. CONTRACT/PR NO. F. CONTRACTOR

(See DoD 5010.12-M for detailed instructions.)

conformance with Governme required to perform additio without conforming to effort and does not require Government requirements w

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER QCIC

D. SYSTEM/ITEM

Telecommunications Test Set TS-4544U

A005

Calibration and Measurement Requirements Summary (CMRS)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-QCIC-80278C

5. CONTRACT REFERENCE

SOW 3.5.1

6. REQUIRING OFFICE

SFAE-CSS-FP-TM-TEMOD

7. DD 250 REQ

DD

SEE BLK 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Blocks 8, 10, 12, 13:

The Calibration and Measurement Requirements Summary (CMRS) data item requirement is not intended to be a separate submittal by the contractor. The required documentation shall be included in CDRL A006 (MTSERL) submission.

See CDRL A006 (MTSERL).

email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil

Export - Control Act Warning - Not Required.

7 MAR 2018

I. APPROVED BY

Norm Matice for Kevin J. Gould

17. PRICE GROUP

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: QCIC

TDP TM OTHER

D. SYSTEM/ITEM

Telecommunications Test Set TS-4544U

E. CONTRACT/PR NO. F. CONTRACTOR

(See DoD 5010.12-M for detailed instructions.)

submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the administration required to perform additional work to conform to Government without conforming to Government requirements, and the effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data.

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form

OMB

Approved No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

TDP TM OTHER SESS

A006

Maintenance Test & Support Equipment List (MTSEL)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80294B

5. CONTRACT REFERENCE

SOW 3.5.1, 3.5.2.2, 3.5.3

6. REQUIRING OFFICE

SFAE-CSS-FP-TM-TEMOD

7. DD 250 REQ

DD

ONE/R

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Blocks 8, 12, 13:

A list of tools and test equipment not contained within the sources listed in SOW paragraph

3.5.2 is due no later than 15 days after the Start of Work Meeting.

The Draft Calibration and Measurements Requirements Summary (CMRS) (CDRL A005) and Maintenance, Test, and Support Equipment Requirements List (MTSERL) submissions are due 45 days after Start of Work Meeting. After receiving the submissions, allow 30 days for the Government to review/approve the Drafts. If the Draft CMRS and MTSERL are not approved, the re-submission of the Drafts are due 10 days after receiving notification of the Government disapproval. Allow 10 days for the Government to review/approve the resubmitted Draft CMRS and MTSERL. If the resubmitted Drafts are not approved, the disapproval path as outlined above will be followed until Draft CMRS and MTSERL are

The Final CMRS and MTSERL submissions are due no later than 15 days after the successful completion of all Technical Manual Verifications and Logistics Demonstration.

The Finals shall incorporate all Government comments that were provided during Verification and Logistics Demonstration. After receiving the submission, allow 15 days for the Government to review/approve the Finals. If the Final CMRS and MTSERL are not approved, the re-submissions of the Finals are due 10 days after receiving notification of Government disapproval. Allow 10 days for the Government to review/approve the resubmitted Final CMRS and MTSERL. If the resubmitted Finals are not approved, the disapproval path as outlined above will be followed until the Final CMRS and MTSERL are

The Reproducible CMRS and MTSERL are due no later than 5 days after Government approval of the Final CMRS and MTSERL.

If a submission date occurs on a Saturday, the contractor shall submit the CMRS and MTSERL the previous Friday. If the submission date occurs on a Sunday, the contractor shall submit the CMRS and MTSERL the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the CMRS and MTSERL the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the CMRS and MTSERL on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all

7 MAR 2018

I. APPROVED BY

Norm Matice Kevin J. Gould for

17. PRICE GROUP

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: SESS

TDP TM OTHER

D. SYSTEM/ITEM

Telecommunications Test Set TS-4544U

E. CONTRACT/PR NO. F. CONTRACTOR

other submission dates as written.

Distribution A. Approved for public release; distribution is unlimited.

email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil

Export - Control Act Warning - Not Required.

Reset DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages

(See DoD 5010.12-M for detailed instructions.)

submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the administration required to perform additional work to conform to Government without conforming to Government requirements, and the effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data.

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form

OMB

Approved No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER IPSC

D. SYSTEM/ITEM

Telecommunications Test Set TS-4544U

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Software Product Specification (SPS)

3. SUBTITLE

Computer Software Product End Items

4. AUTHORITY (Data Acquisition Document

No.) DI-AVCS-80700A

5. CONTRACT REFERENCE

SOW 3.5.6

6. REQUIRING OFFICE

SFAE-CSS-FP-TM-TEMOD

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

SEE BLK 16

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16 Draft

Final

Reg Repro

16. REMARKS

Blocks 8, 10, 12, 13:

The 100% Draft Computer Software Product End Items (CSPEI) submission is due no later than 30 days after the conclusion of the Product Verification Testing. After receiving the submission, allow 10 days for the Government to review the Draft CSPEI. An on-site review will start the week following the completion of the Government review of the Draft CSPEI. The contractor shall allow 5 days for the on-site review by Government representatives. Government comments on the Draft CSPEI will be provided to the contractor at the on-site review.

The Final CSPEI submission is due no later than 15 days after the on-site review has concluded. Changes shall be incorporated into the Final CSPEI as agreed upon at the on-site review. After receiving the submission, the Government has 5 days to provide review/approval of the Final. If the Final CSPEI is not approved, the re-submission of the Final is due 5 days after receiving notification of Government disapproval. Allow 5 days for the Government to review/approve the resubmitted Final CSPEI. If the resubmitted Final CSPEI is not approved, the disapproval path as outlined above will be followed until the Final CSPEI is approved.

If a submission date occurs on a Saturday, the contractor shall submit the CSPEI the previous Friday. If the submission date occurs on a Sunday, the contractor shall submit the CSPEI the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the CSPEI the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the CSPEI on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.

If the on-site review occurs on a weekend, the contractor shall plan to attend the event the following week. For any holiday, other than Thanksgiving and Christmas, the contractor shall plan to attend the on-site review the following business day. If a on-site review occurs the week of Thanksgiving or Christmas, the contractor shall plan to attend the event within the following two weeks, at the Government’s discretion. The on-site review that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other meeting, IPR, and conference dates as written.

SFAE-CSS-FP-TM-

TEMOD 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY

Dennis A. Buckmeir

H. DATE

7 MAR 2018

I. APPROVED BY

Norm Matice Kevin J. Gould for

J. DATE

7 MAR 2018

18. ESTIMATED

TOTAL PRICE

17. PRICE

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: IPSC

TDP TM OTHER

D. SYSTEM/ITEM

Telecommunications Test Set TS-4544U

E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

Mail to:

Product Director, Test Measurement & Diagnostic Equipment ATTN: SFAE-CSS-JC-TM-TEMOD (TS-4544/U Project) Building #3651 Army TACMS Drive Redstone Arsenal, AL 35898-5000

Export - Control Act Warning - Not required.

DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages

(See DoD 5010.12-M for detailed instructions.)

conformance with Governme required to perform additio without conforming to effort and does not require Government requirements w

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form

OMB

Approved No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A009

Logistics Product Data Summaries

3. SUBTITLE

Maintenance Allocation Chart

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81759A

5. CONTRACT REFERENCE

SOW 3.6.1

6. REQUIRING OFFICE

SFAE-CSS-FP-TM-TEMOD

7. DD 250 REQ

DD

D

SEE BLK 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Blocks: 8, 10, 12, 13:

The Logistics Support Analysis (LSA)-004 (Maintenance Allocation Chart) report is due 30 days after the Start of Work Meeting. After receiving the submission, allow 20 days for the Government to review/approve the LSA-004 report. If the LSA-004 report is not approved, the re-submission of the LSA-004 is due 15 days after receiving notification of Government disapproval. Allow 15 days for the Government to review/approve the resubmitted LSA-004. If the resubmitted LSA-004 is not approved, the disapproval path as outlined above will be followed until the LSA-004 is approved.

The Draft MAC is due 100 days after the Start of Work Meeting. After receiving the submission, allow 10 days for the Government to review/approve the Draft. If the Draft MAC is not approved, the re-submission of the Draft is due 10 days after receiving notification of Government disapproval. Allow 10 days for the Government to review/approve the resubmitted Draft MAC. If the resubmitted Draft is not approved, the disapproval path as outlined above will be followed until the Final Draft MAC is approved.

The Final Draft MAC submission is due 150 days after the Start of Work Meeting. After receiving the submission, allow 10 days for the Government to review/approve the Final Draft. If the Final Draft MAC is not approved, the re-submission of the Final Draft is due 10 days after receiving notification of Government disapproval. Allow 10 days for the Government to review/approve the resubmitted Final Draft MAC. If the resubmitted Final Draft is not approved, the disapproval path as outlined above will be followed until the Final Draft MAC is approved.

The Final MAC submission is due no later than 20 days after the successful completion of all Technical Manual Verifications and Logistics Demonstration. The Final MAC shall incorporate all Government comments that were provided during Technical Manual Verification and Logistics Demonstration. After receiving the submission, allow 15 days for the Government to review/approve the Final MAC. If the Final MAC is not approved, the re-submissions of the Final is due 10 days after receiving notification of Government disapproval. Allow 10 days for the Government to review/approve the resubmitted Final MAC. If the resubmitted Final is not approved, the disapproval path as outlined above will be followed until the Final MAC is approved.

SFAE-CSS-FP-TM-

TEMOD 0

LSA-004 1 1 0

MAC 1 1 0

15. TOTAL 2 2 0

7 MAR 2018

I. APPROVED BY

Norm Matice Kevin J. Gould for

17. PRICE

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: SESS

TDP TM OTHER

D. SYSTEM/ITEM

Telecommunications Test Set TS-4544U

E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

If a submission date occurs on a Saturday, the contractor shall submit the MAC the previous Friday. If the submission date occurs on a Sunday, the contractor shall submit the MAC the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the MAC the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the MAC on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only to protect critical technical data on systems or hardware. This determination was made on 14Feb2018. Other requests for this document shall be referred to Commander, U.S. Army Aviation and Missile Command, ATTN: AMSAM-TMDE-A, Redstone Arsenal, AL 35898-5000.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et. seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages

(See DoD 5010.12-M for detailed instructions.)

conformance with Governme required to perform additio without conforming to effort and does not require Government requirements w

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form

OMB

Approved No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A010

Product Drawings/Models and Associated Lists

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81000E

5. CONTRACT REFERENCE

SOW 3.12.6.1

6. REQUIRING OFFICE

SFAE-CSS-FP-TM-TEMOD

7. DD 250 REQ

DD

C

SEE BLK 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Blocks 8, 10, 12, 13:

The Initial Draft Product Drawings/Models and Associated Lists are due 90 days after the Start of Work Meeting. After receiving the submission, allow 45 days for the Government to review/comment on the Product Drawings/Models and Associated Lists.

The Final Draft Product Drawings/Models and Associated Lists that incorporates the Government's comments are due 45 days after receiving the Government's comments on the Initial Draft. The Government's comments will be provided at the Physical Configuration Audit.

The Provisioning Conference and Physical Configuration Audit starts no later than 90 days after the Preliminary Technical Manual (CDRL A011) is submitted. Product Drawings/Models and Associated Lists changes shall be incorporated as agreed to at the Provisioning Conference.

The Final Product Drawings/Models and Associated List are due 30 days after Provisioning Conference has concluded. Product Drawings/Models and Associated Lists are required for each item that is a non-commercial off-the-shelf part. After receiving the submission, the Government has 30 days to provide review/approval of the Final. If the final Product Drawings/Models and Associated Lists are not approved, the resubmitted Final is due 30 days after receiving notification of Government disapproval. Allow 30 days for the Government to review/approval the resubmitted Final Product Drawings/Models and Associated Lists. If the resubmitted Final is not approved, the disapproval path as outlined above will be followed until the Final Product Drawings/Models and Associated Lists are

Submissions shall be accompanied by Letter of Transmittal (LT).

If a submission date occurs on a Saturday, the contractor shall submit the Product Drawings/Models and Associated Lists the previous Friday. If the submission date occurs on a Sunday, the contractor shall submit the Product Drawings/Models and Associated Lists the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the Product Drawings/Models and Associated Lists the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the Product Drawings/Models and Associated Lists on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.

TEMOD 2 2 0

15. TOTAL 2 2 0

7 MAR 2018

I. APPROVED BY

Norm Matice Kevin J. Gould for

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: SESS

TDP TM OTHER

D. SYSTEM/ITEM

Telecommunications Test Set TS-4544U

E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

If the conference occurs on a weekend, the contractor shall plan to attend the event the following week. For any holiday, other than Thanksgiving and Christmas, the contractor shall plan to attend the conference the following business day. If the conference occurs the week of Thanksgiving or Christmas, the contractor shall plan to attend the event within the following two weeks, at the Government’s discretion. The conference that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other meeting, IPR, and conference dates as written.

Distribution Statement C. Distribution authorized to U.S. Government agencies and their contractors. 10 July 2017. Other requests for this document shall be referred to: PEO, Combat support & Combat Service Support (CS&CSS), Product Director, Test, Measurement & Diagnostic Equipment (PD TMDE), ATTN: SFAE-CSS-JC-TM-TEMOD Redstone Arsenal, AL 35898-5000.

Export – Control Act Warning – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Submit 1 each hard copy and 1 each electronic copy for each drawing. See Associated TDP Option Selection Worksheet For Additional Details.

Product Director, Test Measurement & Diagnostic Equipment ATTN: SFAE-CSS-FP-TM-TEMOD (TS-4544/U Project) Building #3651 Army TACMS Drive

SFAE-CSS-FP-TM-TEMOD

Reset DD FORM 1423-1, FEB 2001 Page 2 of 1 Pages

(See DoD 5010.12-M for detailed instructions.)

submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the administration required to perform additional work to conform to Government without conforming to Government requirements, and the effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data.

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

Telecommunications Test Set TS-4544U

A011

Preparation of Digital Technical Information for Page-Based Technical Manuals (TMs)

3. SUBTITLE

Operator's Technical Manual (TM)

4. AUTHORITY (Data Acquisition Document No.)

MIL-STD-40051-2C

5. CONTRACT REFERENCE

SEE BLK 16

6. REQUIRING OFFICE

SFAE-CSS-FP-TM-TEMOD

7. DD 250 REQ

DD

SEE BLK 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Block B:

Refer to Exhibit A (Table A-II. TM Requirements Matrix for TS-4544/U)

Block 5:

SOW 3.7.1.1, 3.7.1.3, 3.7.1.5, 3.7.1.6.1, 3.7.1.8.3, 3.7.1.8.4, 3.9.5

Blocks 8, 10, 11, 12, 13:

The 30% draft Operator's Manual containing Extensible Markup Language (XML)-tagged files and related illustrations is due 45 days after the Start of Work Meeting. After receiving the submission, allow 15 days for the Government to review/comment on the 30% Manual. The contractor shall incorporate all provided Government comments into the Manual before the 70% Operator's Manual is submitted.

The 70% draft Operator's Manual containing XML-tagged files and related illustrations is due 95 days after the Start of Work Meeting. After receiving the submission, allow 20 days for the Government to review/comment on the 70% Manual. The contractor shall incorporate all provided Government comments into the Manual before contractor validation begins.

The contractor shall notify the Government 15 days prior to the start of the validation of the Operator's Manual, and shall submit a 100% draft Operator's Manual containing XML-tagged files and related illustrations to the Government. The Contractor shall complete the validation no later than 180 days after the Start of Work Meeting.

The Preliminary Technical Manual (PTM) is due 15 days after the validation is complete, and shall be accompanied by a separate list of all validated proposed faults that are identified in the PTM. Government Verification of the PTM starts no later than 90 days after the PTM is submitted.

Five days after completing the Verification, a detailed report of deficiencies addressed and comments incorporated resulting from the verification shall be submitted.

The Final Reproducible Copy (FRC) is a 100% complete manual containing Government verified content, XML-tagged files, and related illustrations. The FRC is due 30 days after Government verification is complete. After receiving the submission, allow 30 days for the Government to review/approve the FRC. If errors are found in the FRC, it will be considered a PTM until all the errors are corrected. After receiving the Government's comments, the contractor shall correct all errors found in the FRC and resubmit the

SFAE-CSS-FP-TM-

TEMOD

30% Draft 1 0 0 70% Draft 1 0 0

PTM 1 0 0

FRC 0 1 0

100% Maintenance

Software CD-ROM 0 2 0 Master Source Code 0 2 0

Detailed Report 0 1 0

15. TOTAL 3 6 0

7 MAR 2018

I. APPROVED BY

Norm Matice for Kevin J. Gould

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

Telecommunications Test Set TS-4544U

E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued) corrected FRC to the Government within 10 days.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .