5418_Site_Map.pdf

PDF 1 MB Posted

Attached to
Snow Clearing
Solicitation number
W15QKN-18-Q-1013
Issued by

About this file

Site Map

View the file

Other files

File Type Posted
W15QKN-18-Q-1013.pdf PDF
W15QKN-18-Q-1013-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Approximate measurements: Offeror is responsible for verifying the below information.

All three entrances have 11 steps up and 8 steps down set back 50 feet from street. Distance connecting West to Center steps is 90 feet.

All three parking lot paths have 2 sets of 4 steps West Sidewalk: 145 feet long x 5 feet wide (including side clearance) West ramp: 90 feet long with 25 feet of steps Center and east ramps: 85 Feet long with 46 feet of steps

W e s t

E a s t

File details come from the government source that posted it.