Attachment_4_-__Environmental_Bulletin.pdf
PDF 884 KB Posted
- Attached to
- Closing Date Extension
- Solicitation number
- W15QKN-17-R-1074
About this file
Environmental Bulletin
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Maintenance_Questions_8-22-17.docx | DOCX document | |
| Attachment_5_-__Installation_Environmental_Policy.docx | DOCX document | |
| Attachment_2_-_Preventative_Maintenance_Pricing_Registry.xlsx | XLSX spreadsheet | |
| W15QKN-17-R-1074_31_July_2017.pdf | ||
| Attachment_3_-_DD_1423_Contract_Data_Requirements_List.pdf | ||
| Attachment_1_-__Repair_Order_Pricing_Registry.xlsx | XLSX spreadsheet | |
| Site_Visit_August_8.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HQS US Army Garrison Picatinny Arsenal Installation Environmental Bulletin
Environmental Quality
Environmental
Protection and
Enhancement
Environmental Affairs Division Directorate of Public Works Picatinny Arsenal, NJ 29 November 2012
Jason C. Mackay
L-r~.......,,,,"'"
CoMirntlrlH lication is an installation bulletin which incorporates all environmental requirements at icati Ar nal.
Summary. This bulletin incorporates laws, restrictions, and procedures for all installation activities which may affect the environment at Picatinny Arsenal.
Applicability. This bulletin applies to all personnel, to include contractors, Military and Civilians, who engage in activities on Picatinny Arsenal.
Proponent. The proponent is the Directorate of Public Works, Environmental Affairs Division.
Suggested improvements.
Users are invited to send comments and suggested improvements to Environmental Affairs Division
(DPW), Attn: IIVIPI-PWE, Bldg 319, Picatinny Arsenal, NJ 07806-5000.
Distribution. This publication is available in electronic media and is available to all persons engaged in activities on Picatinny Arsenal.
Restrictions. There are no restrictions.
Table of Contents Chapter 1 Introduction
Section I - General
1-1 Purpose
Section II
Chapter 1 Responsibilities
1-2 Garrison Commander
1-3 Installation Environmental Coordinator
1-4 Environmental Officers
1-5 Legal Office
1-6 Directorate of Logistics
1-7 Directorate of Public Works
1-8 Tenants
1-9 All Contracting Officer Representatives (CORs)
1-10 All Personnel
Chapter 2 Environmental Policy
2-1 Policy Statement
2-2 Legal Requirements
Chapter 3 Regulated Activities
Chapter 4 Prohibited Activities
Chapter 5 Picatinny Environmental Management System (PEMS)
Appendix A Abbreviations
Page4
Chapter 1 Introduction
Section I - General
1-1. Purpose
a. This policy implements Federal, State, and local environmental laws and DOD policies for preserving, protecting, conserving, and restoring the quality of the environment. This bulletin and appendix should be used in conjunction with Army Regulation 200-1 and 32 Code of Federal Regulations (CFR) Part 651 (32 CFR 651) , which provides Army policy on National Environmental Policy Act (NEPA, 42 USC 4321 4347) requirements.
b. This bulletin helps define the framework for the Picatinny Environmental Management System (EMS). Picatinny has implemented a mission focused EMS and must continue to conform with the International Organization for Standardization standard 14001 (ISO 14001) . The Picatinny Installation Environmental Management Plan provides detailed implementation guidance. This Management plan can be obtained on the Environmental Affairs Division Web site and is updated annually. The plan reflects inclusion of the five interconnected EMS areas which include:
(1) Policy. The Picatinny Arsenal Policy Statement reflects the Installation's commitment to environmental protection and enhancement, pollution prevention, and continual improvement.
(2) Planning and implementation. Identifying how operations impact the environment. It set objectives and targets for reducing impacts.
(3) Program management and operation. Assign roles and responsibilities for environmental management, provide required environmental training, establish procedures for communication, document environmental procedures, and provide for emergency preparedness and response.
(4) Checking and corrective action. Picatinny Arsenal will monitor and measure its progress in achieving stated goals, objectives, and targets, and will identify and implement corrective actions.
(5) Management review. Picatinny Arsenal will periodically review program performance and management system implementation and ensure continual improvement through our installation Environmental Quality Control Committee.
c. Abbreviations (See Appendix A)
Section II Responsibilities
1-2. Garrison Commander
.The Garrison Commander (GC) will
a. Ensure that Base Support activities support mission readiness operations, enhance mission accomplishment, and are conducted in a manner conducive to environmental stewardship.
b. Comply with applicable Federal, State, and local environmental laws, regulations, internal directives and goals and Executive Orders (EOs).
c. Investigate regulatory enforcement actions, complaints, and spills/releases, and correct systemic problems. Document investigation, negotiation, and resolution of enforcement actions and submit through the respective chain of command to the Office of Director Environmental Programs (ODEP), and through technical legal channels to the Army Environmental Law Division, (ELD).
d. Ensure environmental requirements that impact ranges and training land are identified and incorporated into the installation range complex master plan.
Ensure the Senior Mission Commander (SMC) is made aware of these impacts.
e. Ensure installation activities incorporate applicable environmental requirements into all procurement actions.
f. Apply for, sign, and maintain all applicable Federal, State and local environmental permits as facility owner. The GC may not delegate approval or signature authority for Hazardous Waste (HW) Permits.
g. Ensure appropriate environmental records are maintained as required by law.
h. Ensure enforcement actions are reported within 48 hours via the Army
Environmental Reporting Online (AERO).
I. Coordinate with ELD early on all environmental agreements, including but not limited to, fine and penalty settlement agreements, prior to signing them. The GC may not delegate approval or signature authority.
j. Ensure that compliance agreements and consent orders that are attributable to a tenant's mission and/or operations are coordinated through applicable legal and command channels to determine the appropriate funding activity.
k. Assess the long-term resource impacts of all environmental agreements.
Coordinate resource implications for agreements through command channels to IMCOM, ACOMs, or other commands as appropriate prior to approval.
I. Ensure that non-DOD Hazardous Materials (HM) (that is, HM owned and/or used by non-DOD entities) is not stored, treated, or disposed of on the installation unless approved by the Asst Secretary of the Army (I&E), his or her designee, or higher authority.
m. Ensure that the installation strategic planning office (or equivalent) incorporates sustainability principles into strategic and other installation management plans;
coordinate installation strategic plans with the SMC prior to finalization.
n. Maintain an installation-wide Hazardous Materials Management Program
(HMMP).
| o. | Promote recycling/reuse programs and Green Procurement policies. |
| p. | Chair the installation EQCC and Installation Restoration Advisory Board (RAB), |
as required.
q.. Implement and maintain a mission-focused EMS in accordance with the ISO
14001 standard.
r. Champion the installation EMS and designate an EMS representative in the appropriate organizational planning cell; ensure all planning incorporates the requirements of the EMS.
s. Participate fully in Environmental Performance Assessment System (EPAS), ensure annual internal environmental compliance assessments are conducted, and assessments are coordinated with all tenants.
t. Prepare and execute the Installation Corrective Action Plan (ICAP); coordinate and monitor completion of installation-wide corrective actions.
u. Ensure all environmental program plans are completed and implemented per Army Regulation 200-1.
v. Designate personnel who are responsible and accountable for executing major program requirements as prescribed in chapters {through 14 of Army Regulation 200-1.
w. Ensure all proceeds are deposited from Conservation Reimbursable Programs as outlined in Section 2665, Title 10, United States Code (10 USC 2665); Section 2667, Title 10, United States Code (10 USC 2667); and Sections 670a and 670b, Title 16, United States Code (16 USC 670a and 670b, Sikes Act).
x. Serve as the Federal Agency Official with responsibility for installation compliance with the Native American Graves Protection and Repatriation Act
(NAGPRA).
y. Establish government-to-government relations with federally recognized Indian Tribes.
z. Maintain a public affairs program that encourages public involvement.
aa. Ensure that the installation master plan incorporates environmental considerations.
bb.ldentify environmental requirements, forward through command channels, and maintain auditable records.
cc. Execute the environmental budget to meet critical requirements.
dd. Maintain an efficient and well-trained environmental staff.
ee. Ensure that Army law enforcement personnel are trained in conservation law enforcement where appropriate.
ff. Ensure that sufficient numbers of professionally trained natural resource
. management personnel and natural resources law enforcement personnel are available and assigned the responsibility to perform tasks necessary to comply with Section 670e, Title 16, United States Code (16 USC 670e).
gg.Approve record of decision (ROD)/decision documents (DDs) for environmental response actions within delegated approval authority.
hh.Approve integrated natural resource management plans (INRMPs).
ii. Hold tenant units accountable for complying with the policies and standards of the installation.
JJ. Approve annual reports of availability (ROA) for timber sales after review by higher headquarters and USAEC.
1-3. Installation Environmental Coordinator/Environmental Affairs Division.
The Installation Environmental Coordinator (IEC) will dual function as the Environmental Affairs Division (EAD) Chief. The IEC will represent the Garrison Commander with full authority to make decisions and commitments within the scope of the Environmental Protection Program. In addition the IEC will
a. Manage and advise on all Environmental Program areas on the installation to include, Cultural and Natural Resources, Compliance and Restoration (Clean-up & Military Munitions Response Program).
b. Develop local environmental policy and procedures.
c. .Monitor and evaluate environmental protection and compliance activities conducted at Picatinny Arsenal; provide technical and administrative guidance to operating organizations.
d. Obtain and maintain all environmental permits and help ensure installation-wide conformance with environmental permitting requirements.
e. Oversee inspections of mission and support activities to help ensure compliance with environmental protection requirements; coordinate action to correct program deficiencies..
f Coordinate environmental protection training and information programs for installation personnel.
g. Act as the main liaison with federal and state environmental protection agencies.
h. Oversee hazardous waste analysis, hazardous waste disposal and process hazardous waste turn-ins.
i. Maintain liaison with environmental staffs at higher headquarters within the
Army & DOD.
j. Respond to and oversee remediation of all hazardous spills and releases.
k. Ensure active hazardous waste minimization/pollution prevention program is in compliance with all Army and other guidelines.
I. Provide representatives on various Picatinny panels to identify and address environmental concerns with regards to implementation of the Comprehensive Environmental Response and Liability Act (CERCLA).
m. Nominate, manage and direct environmental restoration projects funded under/by the Defense Environmental Restoration Act (DERA) and Garrison Environmental Requirements Budget (GERB).
n. Review and provide guidance on installation environmental impact assessments and other NEPA documentation as it applies to total operations of the installation.
o. Conduct liaison with federal and state natural resource personnel in accordance with cooperative agreements in support of site restoration.
p. Review all construction, modification and alteration plans and specifications to assure the project meets current environmental regulations.
q. Provide soil and site clearances in regard to the Installation Restoration Program and the Military Munitions Response Program (MMRP) for construction and field activities on post.
r. Plan and manage the use of the land, surface water and all natural resources of the installation. .
s. Integrate land, forest, fish, and wildlife programs into a balanced land management program and maintain liaison with appropriate agencies in accordance with AR 200-1.
t. Prepare procedures and administer firewood programs.
1-4. Environmental Officers
An Environmental Affairs Officer is a representative assigned in writing, by their Director or organizational head to act as a liaison between the organization and the Environmental Affairs Division. This position is normally assigned to larger activities which have several environmental impacts from their operations. The Environmental Officers will
a. Represent their organization at various environmental meetings and committees to include but not limited to the EQCC and EMS committees.
b. Review and coordinate projects and permits with the Environmental Affairs Division that may have Environmental Impacts on their directorates/tenant operations.
c. Serve at times as an independent auditor (If certified) for internal Environmental Performance Assessment System (EPAS) and ISO audits.
d. Coordinate regulatory, and program specific inspections for their organizations, with the Environmental Affairs Division.
e. Attend annual Environmental Officer training given by the Environmental Affairs Division.
| f. | Attend as needed any regulatory required training, such as hazardous waste. |
| g. | Help insure their organization training and inspections are completed. |
| h. | Insure personnel responsible for regulated areas are updated as changes |
occur.
i. Insure new activities are placed into the PEMs system (Project Checklist) for
Environmental Affairs Division review.
1-5. Legal Office
The Legal office will provide legal advice to both the Garrison Commander and Environmental Affairs Division on environmental actions requested, or as mandated by
AR 200-1.
1-6. Directorate of Logistics (DOL)
The Picatinny Directorate of Logistics is the central point of contact for Hazardous Material (HAZMAT) management on the installation. The DOL will:
a. Manage the Hazardous Material Management Facility (HAZMART) which is located in Bldg 316 and all hazardous material that is not hazardous waste.
b. Keep and maintain an inventory of all hazardous materials stored and used on the installation.
1-7. Directorate of Public Works (DPW)
The Picatinny DPW is the central point of contact for public works on the installation.
The DPW Master Planning Division will also be the central point of contact for all Asbestos work on the installation.
. 1-8. Tenants
A tenant is an authorized activity located on an installation that is not part of the garrison organization. This includes, but is not limited to, Other Army and Navy Command organizations (RDECOM, MEDCOM, NEC, NAVSEA, etc.), both active duty and reserve military units, Corps of Engineers, the Army and Air Force Exchange Service (AAFES), and the Defense Commissary Agency (DECA). Tenants will-
a. Comply with installation policies, applicable Federal, State, and local environmental laws, regulations, and Management Plans.
b. Establish an Installation Services Support Agreement (ISSA) as required with the GC that addresses environmental oversight, to include funding responsibilities and facility access (this does not apply to military units).
c. Participate in the installation's planning, sustainability, and ISO 14001 Environmental Management System (note, the Enhanced Use Lease properties and RCI properties are exempted from the installation EMS).
d. Designate a representative to serve as an Environmental Officer (See Section 1-4 for applicability).
e. Ensure personnel receive required environmental training in accordance with Management Plans.
f. Participate in all installation internal and external assessments and audits, to include programming for corrective actions.
g. Fund environmental requirements not covered in the standard installation services or the ISSA (this does not apply to military units).
h. Identify and submit environmental requirements to the supporting higher headquarters (this does not apply to military units).
i. Identify and coordinate non mission-specific environmental requirements with the GC.
j. Pay environmental fines and penalties resulting from their mission activities.
k. Immediately report spills or releases of hazardous substances to the installation Police desk, x46666. Payor reimburse costs associated with cleanup and spill response if not covered in the standard installations services or the ISSA.
I. Report all instances of non-compliance to the Installation Environmental Affairs Division immediately.
m. Ensure that non-DOD hazardous material is not stored, treated, or disposed of in your facilities.
n. Ensure that no Solid Waste or hazardous waste is brought onto Picatinny Arsenal property for purposes of storing, treating or disposal.
o. Identify potentially regulated areas to the Environmental Affairs Division via the PEMs process (Project Checklist).
1-9. Acquisition Center/Contracting Officer Representatives (CORs)
The CORs will act as the liaison and responsible individual over the contractors which work on Picatinny Arsenal. The CORS will:
a. Ensure all contracts and contract modifications in coordination with the Acquisition Center specify that contractors are liable for any enforcement actions, fines, and/or penalties resulting from their failure to comply with applicable environmental requirements.
b. Ensure contractors get an environmental in-briefing on ISO 14001 prior to work commencing.
c. Ensure all construction projects are placed into the Picatinny Environmental Management System (PEMS) for review.
d. Ensure contractors bringing chemicals onto the installation remove the excess when work is completed, as long as they will not be stored on base at anytime.
If they will be storing the chemicals, they will not be exempt from the requirements of reporting them to the HAZIVIART.
e. Ensure compliance with Green Procurement provisions working with the contracting office to satisfy Affirmative Procurement requirements in a cost effective manner, taking into account the contract type.
1-10. All Personnel
All personnel referred to in this bulletin include, all military and civilian employees who physically perform their duties at Picatinny Arsenal. All personnel will:
a. Comply with Chapter 3 of this bulletin.
b. Refrain from Prohibited Activities in Chapter 4 of this bulletin.
c. Report any spills or chemical releases to the police desk, x6666 upon discovery.
d. Ensure approvals are obtained for any regulated unit from the Environmental Affairs Division, before operations commence in accordance with Chapter 5-1, paragraph e of this Appendix.
Chapter 2 Environmental Policy 2-1. Picatinny Environmental Policy Statement (Policy Statement)
a. Picatinny Arsenal will comply with applicable Federal, State, and local environmental laws, regulations, executive orders (EOs); develop and implement pollution prevention and control strategies; and establish environmental priorities in consideration of the benefits to the sustainment of missions and operations.
b. Picatinny will strive to achieve continual improvement in overall environmental performance and supporting management systems.
c. All Picatinny organizations will ensure that this bulletin is implemented, maintained, and communicated to all military and civilian employees and supporting contractors. In addition, this bulletin will be made readily available to the public upon request.
2-2. Legal Requirements
All references to legal requirements in this Appendix are intended to refer to laws, regulations, and executive orders that, in the opinion of legal counsel, are applicable to the Army. While most environmental laws apply to the Army, some include exemptions (or provisions for requesting exemptions) for military activities under certain conditions.
It is essential that Army counsel, including but not limited to the Office of the Judge Advocate General, Army Environmental Law Division, JALS-EL), be consulted on the applicability of all laws, regulations, initiatives, and executive orders. Similarly, all permits, agreements, notices of violations, enforcement actions, especially reports of potential liability, require early and close coordination with Army legal counsel that is responsible for direct support to the command or activity. The requirement to consult with legal counsel supporting a command or activity is considered an essential part of effectively using this Appendix. Additionally, this Appendix prescribes program requirements in terms of "will" and "must", which mean that the actions are mandatory.
All organizations will incorporate environmental considerations and requirements into all aspects of the organization's mission.
Chapter 3 Regulated Activities The following resources involve regulated activities at Picatinny Arsenal, and shall be coordinated by use of the Environmental Checklist referenced in Chapter 5-1, paragraph e. If you are unsure whether your project or piece of equipment requires this checklist contact the appropriate EAD Program Manager directly.
3-1. Air resources
a. Ensure a checklist is provided:
1. Before changing approved operating procedures for any air pollution emitting operation.
| 2. | Before altering any air pollution emitting equipment. |
| 3. | Before installing any new air pollution emitting equipment. |
| 4. | Before bringing any air pollution emitting equipment onto the facility. These |
include, but are not limited to; fuel burning equipment (such as boilers, hot water heaters, internal combustion engines, process heaters); tanks for storage or processing of materials (such as fuel oil, propane, chemical or waste materials); mixers, extruders, kettles, surface coating equipment (such as spray booths), degreasing units, air compressors, generators, or rock crushers. The Air Program Manager must be provided with specifications of the equipment.
5. Contractors must have state issued air permits for any equipment (which may require it) before bringing the equipment onto the facility.
3-2. Water resources
a. Ensure a checklist is provided prior to:
| 1. | Any activity that will require connecting to the installation sewer system. |
| 2. | Any activity that will require changes to what is currently being sent to the |
sewer system.
3. Any activity that will require connecting to any potable or non-potable water resources.
| 4. | Any activity requiring installation of wells. |
| 5. | Any activity requiring installation or removal of septic systems. |
| 6. | Any activity requiring water or waste water discharges to the ground, floor |
drains or body of water.
| 7. | Any activity requiring water or waste water treatment equipment. |
| 8. | Any activity requiring outdoor storage of materials such as metals, drums or |
cabinets.
9. Any activity which occurs within a defined wetland, transition zone or stream encroachment area.
3-3. Land resources
Land resources are the ranges, cantonment areas, and associated natural resources (to include soils and the biota they support).
a. Ensure a checklist is provided or Natural Resource Manager is contacted before:
| 1. | Any outdoor/exterior construction and/or additions are conducted. |
| 2. | Cutting of any trees or clearing of land is conducted. |
| 3. | Alteration or control of vegetation (unimproved areas). |
| 4. | New or post construction landscaping is conducted. |
| 5. | Any new outdoor testing or field training not covered by an SOP or NEPA |
documentation is conducted.
| 6. | Installation, repairs, alterations of storm drainage areas are conducted |
| 7. | Any ground disturbance work is conducted. |
| 8. | Any activity which occurs withina defined wetland, transition zone or |
stream encroachment area.
9. Any erection or installation of nest boxes or artificial roost structures.
b. Ensure coordination with the Natural Resource Manager for the following:
1. Any request for fuel wood or wood products such as wood chips, are needed.
2. Any changes to established hunting, fishing or trapping program or policies.
3-4. Pest Management
a. All pest management issues, to include application of pesticides, insecticides, fungicides and herbicides on Picatinny Arsenal must be coordinated with the Installation Pest Manager.
b. Only properly certified personnel on record in the Environmental Affairs Division are allowed to apply pesticides on Picatinny.
3-5. Cultural Resources
The Cultural Resources on Picatinny include all historical and archeological sites and area on Picatinny.
a. Ensure a checklist is provided before:
1. Any outdoor/exterior construction and/or additions are conducted.
| 2. | Any major interior construction and/or additions are conducted. |
| 3. | Any potential historical or archeological items are discovered. |
| 4. | Any building or structure demolition work is conducted. |
| 5. | Any ground disturbance work is conducted. |
3-6. Pollution Prevention
a. Comply with Section 6002 of the Resource Conservation and Recovery Act (RCRA) of 1976 for compliance with Green Procurement (GP) and Executive Orders 13423 and 13514.
b. Comply with the Installation Pollution Prevention (P2) Plan.
3-7. Hazardous materials
The Directorate of Logistics is the proponent for Management of Hazardous Materials.
The HAZMART Manager is the program manager for this program.
a. Ensure all chemicals being ordered, get sent through the HAZMART, Bldg 316.
b. All Hazardous Materials as defined under Department of Transportation (DOT) Regulations and or require an MSDS to accompany the product, will be processed through the Installation HAZMART (Bldg 316), prior to delivery to the user. The following Hazardous Materials are exempt from this requirement:
(a) Explosives (Ammunition, pyrotechnics)
(b) Radioactive Materials
(c) Office Supplies
(d) Fuels and re-refined motor oils
(e) Medical supplies
(f) Office supplies/Janitorial supplies
(g) Batteries
c. Contractors bringing chemicals onto the installation that are required as part of the work being performed, such as painting or lawn care are exempt from the requirements of reporting them to the HAZIVIART, as long as they will not be stored at anytime on the base, and the contractor removes the excess when work is completed.
3-8. Toxic substances
As used in this Appendix, toxic substances include asbestos, polychlorinated biphenyls (PCBs), and lead-based paints (LBP).
a. Ensure a checklist is provided before:
1. Any demolition or modifications to buildings or structures that have LBP painted surfaces or potential asbestos is performed.
| 2. | Any paint or asbestos abatement work being performed. |
| 3. | Any shipment for disposal of abatement debris is performed. |
3-9. Hazardous waste
Hazardous wastes are defined in 40 Code of Federal Regulations (CFR) Part 260 through 265 and the Resource Conservation and Recovery Act (RCRA).
a. Ensure the Program Manager for Hazardous Waste is contacted prior to:
| 1. | Any activity that may generate a hazardouswaste. |
| 2. | Any activity that will be treating a hazardous waste. |
| 3. | Any building demolition or renovation work. |
| 4. | Any new labs are established. |
| 5. | Any new tank systems are installed. |
| 6. | Any activity that may generate a Universal Waste (fluorescent lighting, |
mercury lamps, thermostats and switches, batteries).
3-10. Solid waste
Solid Wastes are defined in this Appendix as any soil, liquid or gas material which as a result of a process or activity cannot be reused, recycled or otherwise is to be disposed
of. This does not include office wastes, garbage
a. Ensure a checklist is provided before or Solid Waste ProgramlVlanager is contacted prior to:
| 1. | A new activity that may generate solid waste. |
| 2. | An activity which needs to transport solid waste for disposal. |
| 3. | Any demolition or renovation work. |
| 4. | Any rock crushing work. |
| 5. | Any activity generating concrete, asphalt or wood construction debris. |
3-11. Storage Tanks, Oils and Spill Response
Storage tanks, oils and spill response are all managed under the Picatinny Spill Prevention, Control and Countermeasure (SPCC) Plan.
a. Ensure a checklist is provided before:
1. An activity installing or utilizing a mobile or stationary tank equal greater than 55 gallons on the installation.
2. An activity or operation using greater than 55 gallons of any type of oils in one location.
3. An activity utilizing more than 55 gallons of any chemical liquid in one location. .
3-12. Site Restoration & Clean-up
Site restoration and cleanup for purposes of this Appendix; refer to the specific cleanup requirements on Picatinny Arsenal under the Comprehensive Environmental Response, Compensation & Liability Act (CERCLA). Under agreement with EPA and the State of New Jersey we must cleanup, monitor, sample, and restore numerous areas of the facility.
a. Ensure a checklist is provided and The Picatinny Program Manager for Site restoration must be noti'fied prior to:
| 1. | Any activity that involves removing, moving or disturbing soils on the base. |
| 2. | Any activity which requires installation of wells. . |
| 3. | Any activity which may be located near a current monitoring well. |
3-13. National Environmental Policy Act (NEPA) Documentation
a. Comply with Federal, State and Army regulations, to include but not limited to;
National Environmental Policy Act (NEPA, 42 USC 4321-4347) and 32 Code of Federal Regulations (CFR) Part 651 (32 CFR 651).
b. All Federal Actions conducted on Picatinny Arsenal are subject to NEPA requirements.
c. The Picatinny Program Manager for NEPA must be contacted prior to:
1. All construction and renovation work is performed.
2. All demolition work is performed.
3. Any new test ranges or labs are created.
4. Any new lease or other real estate agreements are made.
5. Any new test or research project is started.
Chapter 4
Prohibited Activities
The following Activities are strictly prohibited on Picatinny Arsenal:
1. No dumping of material(s) from activities being performed on the base unless specific approvals and/or permits are granted by the Environmental Affairs Division.
2. No solid or hazardous waste is to be brought onto the installation, for purposes of storage, treatment and/or disposal.
3. No chemicals are to be brought onto the installation unless they are to be used for
DOD purposes and approved by the HAZMART.
4. No application of pesticides, fungicides or insecticides is to be applied to the environment, unless approval is obtained from the Installation Pest Manager.
5. No removal or abatement of any asbestos or Lead Based Paint containing material without prior approval.
6. No hazardous waste or Asbestos is allowed to leave the installation, unless a hazardous waste manifest or Bill of Laden is approved by the designated officials in the
. Environmental Affairs Division.
7. No storage of ignitable or reactive wastes within 50 feet of installation boundary.
8. No outside storage of drums or containers holding chemicals unless prior approval is granted from the Environmental Affairs Division.
9. No chemicals are to be put into any drain, unless prior approval is granted by the
Environmental Affairs Division.
10. No disturbances in any wetland areas, unless prior approval is received from the
Environmental Affairs Division.
11. No wildlife is to be harmed, harassed or otherwise disturbed. This does not apply to hunters or wildlife biologists performing studies, provided each is properly licensed or authorized lAW federal and State laws.
12. No equipment which requires air pollution controls, such as generators, boilers, engines, etc. shall be brought onto the base without prior approval from the Environmental Affairs Division.
13. No looting of archaeological or historical articles or items.
Chapter 5 Picatinny Environmental Management System (PEMS) 5-1. Access to the PEMS system
8. General.
(1) The Environmental Affairs Division will maintain an environmental database on the Picatinny Intranet called PEMS. The link for PEMS is the following https://picac2w5/PEMS/ . This database and associated web pages provide the following information:
(a) Guidance documents to include Major Program Plans, individual management plans for regulated units and links for regulations and policies
(b) Inspection requirements and access to electronic inspection forms
(c) Environmental training
(d) EQCC Meeting charts and minutes
(e) Project/Permit environmental checklists
b. Inspections and audit compliance.
(1) The Environmental Affairs Division maintains an inventory of compliance sites and activities with potential to impact the environment. Operators, supervisors and environmental officers for regulated areas will only see their areas when they log into the system. Each unit contains a management plan which provides operators and supervisory responsibilities under federal and state regulations and permits. These responsibilities include training requirements, inspection requirements and reporting requirements.
(2) Depending on the regulated unit there may be a weekly, monthly or quarterly inspection required. When inspections come due, they are shown in red on the operator screen. By clicking on the unit an inspection form appears which when filled out will be sent electronically to the Environmental Affairs Division.
c. Internalassessments.
(1) Internal EPAS assessments will be conducted annually, at a minimum, by Environmental Affairs Division personnel as part of their regular management, checking, and corrective action functions, unless an external assessment is conducted that calendar year. The internal EPAS will be performed as three separate organizational audits; Garrison, ARDEC and Other Tenants. The Environmental Affairs Division will provide required internal assessment data into the Army approved application/database (AEDB-EPAS) to assist in producing the draft Installation Corrective Action Plan (ICAP).
The purpose of these inspections is to determine a compliance status with regulations and identify areas of improvement.
(2) During other times of the year, the Environmental Affairs Division will perform compliance assistance visits of regulated operations listed in PEMS, construction sites and new operational walkthroughs. Corrective Actions will be provided for any deficiencies noted, but these deficiencies will not be put into the Army EPAS database.
The purpose of these visits will be to conduct training and to ensure an understanding of the environmental requirements.
d. External Regulatory Inspections
(1) All External Environmental Regulatory inspections must be coordinated with the Environmental Affairs Division (EAD). In addition a member of the EAD staff must accompany the inspector at all times when on the installation.
(2) The EAD will enter enforcement actions (ENF) using official electronic Army Environmental Quality Reporting System ((for example, Army Environmental Data Base
- Environmental Quality (AEDB-EQ)) reporting mechanisms with verification/confirmation through proper Command channels (for example, ACCS, DRUs, MSCs, regional offices, ACOMS) to the AEC. Initial reports for ENFs must be reported in accordance with current Army environmental quality reporting policy requirements as published and updated by the HQDA. Initial reports will be entered via
. the Army Environmental Quality Reporting System within 48 hours (2 business days) for any ENF involving:
(a) Criminal enforcement;
(b) A fine, penalty, fee, or tax;
(c) Installation-wide (major mission restriction), Army-wide, or DOD-wide impact, media attention, or community (on/off post) impact; or,
(d) Third party fault (that is, a non-Army entity is responsible in whole or part for the alleged violation(s)).
(3) The aforementioned 48 hours (2 business days) reporting includes notification to HQDA (DAIM-ED (ODEP) & JALS-ELD (Army Legal Office) through proper Command channels. Additionally, coordinate with JALS-ELD (Army Legal Office) in writing, through technical legal channels, regarding litigation, administrative proceedings, and settlement negotiations.
d. Nonconformance and corrective and preventive action
(1) All regulated areas that have deficiencies requiring corrective actions will be notified either electronically or hard copy during EPAS out briefings, of any non conformances or deficiencies.
(2) All non-conformances and deficiencies found are briefed at the EQCC and tracked until corrective actions are completed.
e. Environmental Project/Permit checklist.
(1) When any employee has the potential to effect the environment through obtaining a piece of equipment, construction, demolition, testing, renovations or maintenance, the EAD needs to be involved. The EAD has provided on their website a Project/Permit Checklist which shall be filled out when there may be potential for impacting the environment.
(2) The checklist questions are designed to ensure the projects or equipment is seen by the appropriate Program Manager based upon the proponent's answers.
(3) Once the Checklist is filled out and submitted, the project or equipment can be tracked on the Project Checklist Tracking database from the EAD webpage.
(4) The checklist will be reviewed by the EAD Program Managers. The various Program Managers will do one of three things
(a) Comment and disapprove until the comments can be incorporated.
(b) Approve with comments that need incorporation.
(c) Approve with no comments.
(5) The project checklist allows an interactive comment dialogue box in the tracking system, so proponents can address comments directly back to the Program Manager.
(6) No project shall be allowed to move forward until the project is- totally approved by the EAD Program Managers.
Appendix A
Abbreviations
Abbreviations
ACHP
Advisory Council on Historic Preservation
ACOM
Army Command
ACSIM
Assistant Chief of Staff for Installation Management
ADUSD (E)
Assistant Deputy Undersecretary of Defense (Environment) - now ADUSD (ESOH)
ADUSD (ESOH)
Assistant Deputy Undersecretary of Defense (Environment, Safety, and Occupational Health)
AEDB
Army Environmental Data Base
AEDB-CC
Army Environmental Data Base - Compliance-Related Cleanup
AEDB-EQ
Army Environmental Data Base - Environmental Quality
AEDB-R
Army Environmental Data Base - Restoration
AERO
Army Environmental Reporting Online
AHERA
Asbestos Hazard Emergency Response Act
AHPA
Archeological and Historical Preservation Act
AMC
Army Materiel Command
APP
Affirmative Procurement Program
AR
Army regulation
ARNG
Army National Guard
ARPA
Archeological Resources Protection Act
ASA
Assistant Secretary of the Army
ASA (ALT)
Assistant Secretary of the Army (Acquisition, Logistics and Technology)
CC
ASA (FM&C)
Assistant Secretary of the Army (Financial Management & Comptroller)
ASA (I&E)
Assistant Secretary of the Army (Installations and Environment)
AST
aboveground storage tank
ATSDR
Agency for Toxic Substances and Disease Registry
BMP
best management practice
CAA
Clean Air Act compliance-related cleanup
CCR
Consumer Confidence Report
CERCLA
Comprehensive Environmental Response, Compensation, and Liability Act
CFR
Code of Federal Regulations
CG
Commanding General
CRM
Cultural Resources Manager
CWA
Clean Water Act
DA
Department of the Army
DAPAM
Department of the Army pamphlet
DASA (ESOH)
Deputy Assistant Secretary of the Army (Environment, Safety, and Occupational Health)
DENIX
Defense Environmental Network and Information Exchange
DERP
Defense Environmental Restoration Program
DOD
Department of Defense
DODD
Department of Defense Directive
DODI
Department of Defense Instruction
DPTMS
Directorate of Plans, Training, Mobilization, and Security
DPW
Directorate of Public Works
DRMS
Defense Reutilization and Marketing Service
DSMOA
Defense and State Memoranda of Agreement
DUSD
Deputy Under Secretary of Defense
EA
Environmental Assessment
EAD
Environmental Affairs Division
EIS
Environmental Impact Statement
ELD
Environmental Law Division
EMS
Environmental Management System
ENF
enforcement action
EO
executive order or environmental officer
EOD
explosive ordnance disposal
EPA
Environmental Protection Agency
EPAS
Environmental Performance Assessment System
EPCRA
Emergency Planning and Community Right-to-Know Act
EQCC
Environmental Quality Control Committee
ERP
Environmental Restoration Program
ESA
Endangered Species Act
FFCA
Federal Facilities Compliance Act
FIFRA
Federal Insecticide, Fungicide, and Rodenticide Act
GC
garrison commander
HAZMATor HM
Hazardous Material
HMMP
Hazardous Materials Management Program
HQ
Headquarters
HQDA
Headquarters, Department of the Army
HQIMCOM
Headquarters, Installation Management Command
HSMS
Hazardous Substance Management System
HW
hazardous waste
IC
Installation Commander
IEC
Installation Environmental Coordinator
ICAP
installation corrective action plan
ICRMP
integrated cultural resources management plan
IMCOM
Installation Management Command
INRMP
integrated natural resources management plan
IPM
integrated pest management
IPMC
integrated pest management coordinator
IPMP
integrated pest management plan
IRP
Installation Restoration Program
ISO
International Organization for Standardization
ISR
installation status report
ISSA
Installation Services Support Agreement
LBP
lead-based paint
LUC
land use control
MBTA
Migratory Bird Treaty Act
MCA
Military Construction, Army
MEDCOM
Army Medical Command
MMRP
Military Munitions Response Program
MOA
memorandum of agreement
MOM
measure of merit
MOU
memorandum of understanding
MPRSA
Marine Protection, Research, and Sanctuaries Act
NAGPRA
Native American Graves Protection and Repatriation Act
NEPA
National Environmental Policy Act
NESHAP
National Emissions Standards for Hazardous Air Pollutants
NHPA
National Historic Preservation Act
NPDES
National Pollutant Discharge Elimination System
NPL
National Priorities List
NRC
National Response Center
OACSIM
Office of the Assistant Chief of Staff for Installation Management
OASA (ALT)
Office of the Assistant Secretary of the Army (Acquisition, Logistics, and Technology)
OASA (I&E)
Office of the Assistant Secretary of the Army (Installations and Environment)
ODEP
Office of the Director of Environmental Programs
ODS
ozone depleting substances
OPORD
operation order
OSC
on-scene coordinator
OSD
Office of the Secretary of Defense
OSHA
Occupational Safety and Health Act or Occupational Safety and Health Administration
OTJAG
Office of the Judge Advocate General
PAO
Public Affairs Office
PCB
polychlorinated biphenyl
PEMS
Picatinny Environmental Management System
PL
public Law
POL
petroleum, oil, lubricants
PPA
Pollution Prevention Act
QA/QC
quality assurance/quality control
RAB
Restoration Advisory Board
RCRA
Resource Conservation and Recovery Act
REC
regional environmental coordinator
ROA
reports of availability
ROD
record of decision
RPMP
real property master plan
SA
Secreta ry of the Army
SARA
Sup~rfund Amendments and Reauthorization Act
SCP
spill contingency plan
SDWA
Safe Drinking Water Act
SDWAA
Safe Drinking Water Act Amendments
SHPO
State historic preservation officer
SMC
senior mission commander
SOFA
Status of Forces Agreement
SPCC
spill prevention, control and countermeasures
SWARS
Solid Waste Annual Reporting System
SWPPP
stormwater pollution prevention plan
T&E threatened and endangered
TAG
The Adjutant General
TB
technical bulletin
TBMED
technical bulletin, medical
TDA
tables of distribution and allowances
TJAG
The Judge Advocate General
TM
technical manual
TRC
Technical Review Committee
TRI
toxic release inventory
TSCA
Toxic Substances Control Act
USACE·
U.S. Army Corps of Engineers
USACHPPM
U.S. Army Center for Health Promotion and Preventive Medicine
USAEC
U.S. Army Environmental Command
USAES
U.S. Army Engineer School
USC
United States Code
USCG
U.S. Coast Guard
USDA
U.S. Department of Agriculture
USFWS
U.S. Fish and Wildlife Service
USGS
U.S. Geological Survey
UST
underground storage tank uxa unexploded ordnance vae volatile organic compound