Solicitation W15QKN-16-T-1107 for Inspection Annual Certification of Fire Protection Systems at Edgemont PA (PA022) is issued
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W15QKN-16-T-1107_Amendment_0001.pdf | ||
| QUESTIONS_w_Answers.docx | DOCX document | |
| Attachment_1_Technical_Exhibit_A_PRS.docx | DOCX document | |
| Attachment_3_Technical_Exhibit_C__Reqd_License__Certs_by_Facility_Location.docx | DOCX document | |
| Attachment_2_Technical_Exihibit_B_Requirements_by_Facility.docx | DOCX document | |
| Attachment_5_Technical_Exhibit_E_DD1423-1_Fire_Inspection_Reports.pdf | ||
| Attachment_4_Technical_Exhibit_D.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W15QKN-16-T-1107 13-May-2016
b. TELEPHONE NUMBER
609-562-2093
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 31 May 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W15QKN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
DEBORAH TERRELL
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0010809435
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY CONTRACTING COMMAND
5418 S. SCOTT PLAZA
JOINT BASE MDL NJ 08640
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$20,500,000
NAICS:
561621
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF78
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W15QKN-16-T-1107
Section SF 30 - BLOCK 14 CONTINUATION PAGE
CONTRACT ADMINISTRATION
Inquiries concerning all contractual actions after award shall be directed first to the
Contract Specialist. In my absence, please contact the Contracting Officer.
CHANGES: The Contract Specialist will incorporate all changes and other administrative actions to the contract as directed and authorized by the Contracting Officer.
Contracting Officer:
June Olmsted
(609) 562-6072 chongwan.s.olmsted2.civ@mail.mil
Contract Specialist:
Deborah Terrell
(609) 562-2093 deborah.e.terrell.civ@mail.mil
Government Point of Contact:
Sal Zangari
(610) 974 – 9601 salvatore.j.zangari.civ@mail.mil
Service Location:
Army Maintenance Support Activity (AMSA) #31
2101 S Delchester Rd.
Edgemont, PA 19073
Contractor:
TBD
mailto:chongwan.s.olmsted2.civ@mail.mil mailto:salvatore.j.zangari.civ@mail.mil
INSTRUCTOINS TO OFFERORS
1.The purpose of this Request for Proposal (RFP) is to procure Fire System Inspection Services in support of the
99th Regional Support Command (RSC). Services are to be performed at the Army Maintenance Support Activity
(AMSA) #31, 2101 S. Delchester Rd., Edgemont, PA 19073
2. The Government intends to award a single, firm-fixed-price contract. The period of performance for this effort shall be a 12-month base period and four, 12-month option periods from date of contract award.
3. See Federal Acquisition Regulation (FAR) clause 52.212-1, "Instruction to Offeror – Commercial Items" and
FAR 52.212-1, Addendum for additional information.
4. See FAR clause 52.212-2, “Evaluation – Commercial Items” and FAR 52.212-2, Addendum for additional information and for evaluation criteria.
5. Questions regarding this RFP shall be submitted via email no later than 20 May 2016 1:00 PM EST to Deborah
Terrell, Contract Specialist via deborah.e.terrell.civ@mail.mil.
6. All proposals are due no later than the time specified in Block 8 of the SF1449 Eastern Standard Time. Proposals are to be emailed to Deborah E. Terrell at deborah.e.terrell.civ@mail.mil.
7. Offerors shall provide all qualifications as per the Unified Facilities Criteria 3-601-02 section 1-8 as listed in
Technical Exhibit C “Required License & Certifications”.
8. All services shall be performed in accordance with the Performance Work Statement.
9 All offerors must submit pricing for each Line Item. Pricing must be submitted in the proper format. The proper format consists of QUANTITY * UNIT AMOUNT = NET AMT. In the event there is a difference between a unit price and the extended total, the unit price will be held to the intended price. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended price.
10. All offers shall remain valid for 120 calendar days.
mailto:deborah.e.terrell.civ@mail.mil mailto:deborah.e.terrell.civ@mail.mil
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
Inspection and Annual Certification of Fire Protection Systems at
Edgemont, PA
MAY 2016
1. GENERAL. This is a non-personal services contract to provide inspection and annual certification services for
Fire Protection Systems at various facilities in support of the 99th Regional Support Command. The Government shall not exercise any supervision or control over the contract service providers performing the services herein.
Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the
Government.
1.1. DESCRIPTION OF SERVICES. The contractor shall provide all personnel, supplies, supervision, tools, materials, equipment, transportation and other items and non-personal services necessary to provide inspection and annual maintenance services in accordance with this Performance Work Statement (PWS) except as those items specified as government furnished property and services. The contractor shall perform to the standards in the contract as well as all local, state and federal regulations.
1.2. OBJECTIVE: The objective of this contract is annual inspection and certification of fire extinguishers, fire sprinkler systems, fire alarm systems, kitchen fire suppression systems, and any other specified fire protection systems.
1.3. SCOPE. Annual inspection and certification of fire extinguishers, fire sprinkler systems, fire alarm systems, kitchen fire suppression systems, and any other specified fire protection systems applies to the equipment identified in Technical Exhibit B.
1.4. PERIOD OF PERFORMANCE. The period of performance shall be identified in the solicitation and resultant contract.
1.5. GENERAL INFORMATION.
1.5.1. QUALITY CONTROL. The contractor shall maintain effective quality control to ensure services are performed in accordance with this PWS. The contractor’s quality control is a means by which he assures himself that his work complies with the requirement of the contract.
1.5.2. QUALITY ASSURANCE. The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. The plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
The Government will utilize the Performance Requirements Summary found in the Technical Exhibit A to document quality of service provided.
1.5.3. HOURS OF OPERATION. The contractor is responsible for conducting business between the hours of 7:30
AM to 4:00 PM, Monday through Friday except Federal Holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar directed facility closings. No work shall be performed during non-duty hours, weekends or when the Government has no workforce on duty available for inspection of the Contractor’s work unless prior approval has been obtained. The contractor must maintain an adequate workforce for uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.5.3.1. RECOGNIZED HOLIDAYS: Any reference to holidays shall be construed to mean the Government holidays listed below:
New Year’s Day 1 January
Martin Luther King Day 3rd Monday in January
Presidents Day 3rd Monday in February
Memorial Day Last Monday in May
Independence Day 4 July
Labor Day 1st Monday in September
Columbus Day 2nd Monday in October
Veteran’s Day 11 November
Thanksgiving Day 4th Thursday in November
Christmas Day 25 December
When one of the above designated legal holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the proceeding Friday will be observed as a legal holiday.
If a holiday falls on a scheduled Contractor workday, the following workday will be used to schedule the work to be accomplished.
1.5.4. PLACE OF PERFORMANCE. The work to be performed under this contract will be performed at the
Army Maintenance Support Activity (AMSA) #31, 2101 S Delchester Rd., Edgemont, PA 19073
1.5.5. TYPE OF CONTRACT. The Government will award a Firm Fixed Price contract vehicle.
1.5.6. PERSONNEL. The Contractor shall provide the Contracting Officer, and the Contracting Officer’s
Representative (COR) or Regional Facilities Operational Specialist (RFOS) with a list of the names of employees or alternates to be employed in performance of the work within 15 calendar days of performance start date. The
Contractor shall also notify the COR or RFOS with any additions or deletions to the list of employees immediately.
1.5.6.1 Employees of the contractor assigned for performance of this contract shall be capable employees with sufficient experience and training to assure compliance with the contract requirements. The employees shall be required by the Contractor to maintain themselves and their clothing in a neat and clean manner.
1.5.6.2. CONTRACTOR REPRESENTATIVE. The contractor shall provide an onsite contractor representative who shall be physically present during normal duty hours to conduct overall management coordination and furnish liaison with the government. The contractor representative shall be the point of contact with the government and shall have authority to act or make decisions for the contractor on all matters pertaining to this contract.
1.5.6.3. CONDUCT OF PERSONNEL. The Contracting Officer may require the contractor to remove from the job site any employee working under this contract for reasons of misconduct, security, or found to be or suspected to be under the influence of alcohol, drugs, or other incapacitating agent. Contractor employee shall be subject to dismissal from the premises upon determination by the contracting officer that such action is in the best interests of the government. The installation commander has the authority to bar individuals from the installation. Such removal from the job site or dismissal from the premises shall not relieve the contractor of the requirement to provide sufficient personnel to perform the services as required by this PWS.
1.5.7 IDENTIFICATION OF CONTRACTOR EMPLOYEES. All contract personnel working in situations where their contractor status is not obvious to third parties are required to identify themselves by wearing clearly written and visible nametags at all times, as such to avoid creating an impression in the minds of members of the public that they are Government officials.
1.5.8. ORGANIZATIONAL CONFLICT OF INTEREST. The contractor shall not employ any employee of the
United States Government or the Department of Defense, either military or civilian, if such employment may create a current or subsequent Organizational Conflict of Interest (OCI) as defined in Federal Acquisition Regulation
Subpart 9.5. The contractor shall notify the Contracting Officer immediately whenever it becomes aware that participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such
OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary.
1.5.9. SECURITY REQUIREMENTS. Contractor personnel or any representative of the contractor entering the
Reserve Center shall abide by all security regulations and shall be subject to security checks. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.5.9.1. At no time shall the contractor allow anyone other than authorized contractor personnel into any locked or unlocked areas of the facility being serviced.
1.5.10. VEHICLE OPERATION. Contractor personnel operating motor vehicles used in performance of this contract shall have a valid state operator’s license and shall operate all motor vehicles in accordance with policies and procedures established by the Reserve Center. The contractor’s vehicles shall have an identification tag clearly visible while on site. Parking by contractor employees shall be in non-reserved spaces available to the public.
1.5.11. SAFETY. The contractor shall maintain a safe working environment to prevent accidents and preserve the life and health of contractor personnel and Government personnel. The Contractor shall instruct employees in appropriate measures as specified by the applicable provisions of the Occupational Safety and Health Act, 1970, PL
91-596 (84 Stat 1590). The Contractor’s employees shall not place equipment in traffic lanes or other locations in such a manner as to create safety hazards.
1.5.11.1. The Contractor shall protect the safety and health of employees and of members of the public and minimize dangers from all hazards of life and property and shall comply with all Health, Safety, and Fire Protection regulations and requirements (including reporting requirements) of the Army and Safety and Health regulations issued by the Secretary of Labor in 26 CFR (1910) and any subsequent amendments. The Contractor shall permit safety inspections of all work being performed under this contract.
1.5.11.2. All open flame/hot work or disconnection of fire protection alarms or suppression systems require prior written approval/coordination from the COR.
1.5.11.3. Any connection, disconnection or installation of fire protection alarms or suppression systems shall require an acceptance test performed by the contractor and witnessed by the local Fire Prevention Authority having jurisdiction over that facility. In the event the fire alarm system cannot be disconnected (i.e., child development, hospital, etc.) a temporary system will be provided and certified by the local Fire Prevention Authority having jurisdiction. Work required to be performed after hours due to the nature of the facility will be at no additional cost to the government.
1.5.11.4. All fire alarm system components, including all smoke and heat detectors, shall be protected from dirt, dust and damage during demolition and construction.
1.5.11.5. Lockout / Tagout Procedure: The Contractor shall perform this work in accordance with 29 CFR 1910.147, The Control of Hazardous Energy and the following general requirements.
1.5.11.5.1. Preparation: Make a survey to locate and identify all isolating devices to be certain which switches, valves, or other energy isolating devices apply to the equipment to be locked or tagged out. More than one energy source such as electrical, mechanical or others may be involved.
1.5.11.6. Sequence of Lockout/Tagout Procedure:
1.5.11.6.1 Notify all affected personnel that a lockout/tagout system is going to be used and the reason therefore.
The authorized personnel shall know the type and magnitude of energy the machine or equipment uses and shall understand hazards thereof.
1.5.11.6.2 If the machine or equipment is operating, shut it down by the normal stopping procedure such as depressing stop button, open toggle switch, etc.
1.5.11.6.3 Operate the switch, valve, or other energy isolating devices so that the equipment is isolated from its energy source. Stored energy such as in charged capacitors, springs, elevated machine members, rotating flywheels, hydraulic systems and other pressurized air, gas, steam, or water systems etc. must be dissipated or restrained by methods such as repositioning, blocking, or bleeding down the stored energy.
1.5.11.6.4 Lockout and/or tagout the energy isolating devices with assigned individual locks, tags, or additional safety measures as may be required.
1.5.11.6.5 After ensuring that no personnel are exposed, and as a check on having disconnected the energy sources, operate the push button or other normal operating controls to make certain the equipment will not operate.
CAUTION: Make sure the operating controls are returned to the "NEUTRAL" or "OFF" position after the test.
1.5.11.6.6 The equipment is now locked out or tagged out.
1.5.11.7 Restoring Machines or Equipment to Normal Production Operations:
1.5.11.7.1. After the servicing and/or maintenance is complete and equipment is ready for normal production operations, check the area around the machines or equipment to ensure that no one is exposed.
1.5.11.7.2. After all tools have been removed from the machine or equipment, guards have been reinstalled, and personnel are in the clear, remove all lockout and tagout devices. Operate the energy isolating devices to restore energy to the machine or equipment.
1.5.11.8 Procedure involving More Than One Person: In the preceding steps, if more than one individual is required to lockout or tagout equipment, each shall place his/her own personal lockout or tagout device on the energy isolating devices. When an energy isolating device cannot accept multiple locks or tags, a multiple lockout or tagout hasp shall be used. If a single lock is used to lockout the machine or equipment, the single key shall be placed in a lockout box or cabinet which allows the use of multiple locks to secure it. Each employee shall then use his/her own lock to secure the box or cabinet. As each person no longer needs to maintain his/her lockout protection, only that person shall remove his/her lock from the box or cabinet.
1.5.12. INTERFERENCE WITH GOVERNMENT BUSINESS. The Contractor shall schedule and arrange work so as to cause the least interference with the normal occurrence of Government business and a mission. In those cases where some interference may be essentially unavoidable, the Contractor shall be responsible to make every effort to minimize the impact of the interference and inconvenience of the customer.
1.5.13. PROTECTION OF GOVERNMENT PROPERTY
1.5.13.1. The Contractor shall assume full liability and responsibility for any loss or damage to Government property caused by his operations and shall assume full responsibility for any and all damages or claims for damage for injury to persons, property or equipment which might result from any service performed under this contract.
1.5.13.2. The Contractor shall return areas damaged as a result of work under this contract to their original condition, to include painting, refinishing, repairing or replacement, if necessary.
1.5.14. ENVIRONMENTAL PROTECTION REQUIRMENTS: Provide and maintain strict compliance with all federal, state, county and local environmental protection requirements including but not limited to, water, air, soil, and noise pollution during the life of this contract.
1.5.14.1. In the event of a spill, initiate containment operations utilizing personnel properly trained and protected for such situations and immediately notify the Contracting Officer and/or On Site Representative/COR.
1.5.14.2 Handle generated hazardous waste in accordance with federal, State, county and local regulations including
40 CFR 262.
1.5.15. OTHER REQUIREMENTS.
1.5.15.1. The Contractor shall at all times observe and comply with, and shall cause all the agents and employees of the Contractor to observe and comply with, all such existing and future laws, regulations, ordinances, by-laws, orders and decrees; and shall protect and indemnify the 99th Reserve Support Command against any claim or liability arising from or based upon the violation of any such laws, regulations, ordinances, by-laws, orders and decrees, whether by the Contractor or its agents or employees.
1.6.1 SPECIAL QUALIFICATIONS.
1.6.1.1 Fire protection inspection contractor shall be licensed and certified to perform inspections in accordance with the Unified Facilities Criteria (UFC) 3-601-02 dated 8 September 2010 or as updated. Please refer to Technical
Exhibit C for specific requirements by location/facility. Contractor shall supply all certifications with their proposal.
2. DEFINITIONS. As used throughout this contract, the following terms shall have the meaning set forth below.
2.1. CONTRACTING OFFICER. The Contracting Officer is a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting
Officer.
2.2. CONTRACTOR. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall ensure that his/her subcontractors comply with the provisions of the contract.
2.3. CONTRACTOR REPRESENTATIVE. A foreman or superintendent assigned in accordance with paragraph
1.5.6.2.
2.4. REGIONAL FACILITIES OPERATIONAL SPECIALIST (RFOS). A designated individual who shall have the primary responsibility for assuring that all supplies, service or workmanship presented to or performed for the Government meet all conditions of the contract.
2.5. CONTRACTING OFFICER REPRESENTATIVE (COR). The Government employee designated by the
Contracting Officer to be responsible for monitoring of Contractor performance.
2.6. PERFORMANCE REQUIREMENTS SUMMARY (PRS). Identifies the key performance indicators of the contract that will be evaluated by the Government to assure contract performance the contractor meets standards.
2.7. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document used for quality assurance surveillance. The document contains specific methods to perform surveillance of the contractor for each item of the Performance Requirements Summary.
2.8. QUALITY ASSURANCE (QA). A Method used by the Government to provide some measure of control over the quality of purchased goods and services received.
2.9. QUALITY CONTROL (QC). A method used by the Contractor to control the quality of goods and services received.
2.10. DISPOSAL. Disposal is the process of spreading and covering in sanitary fills, spreading and covering in landfills, and dumping in public dumps, or other solid waste disposal facility.
3. GOVERNMENT FURNISHED ITEMS AND SERVICES. The Government will provide the property and services listed below.
3.1. UTILITIES:
3.1.1 CONSERVATION OF UTILITIES. The Contractor shall instruct employees in utility conservation practices. The Contractor shall be responsible for operating under conditions, which preclude the waste of utilities, which shall include, but not be limited to the following and other like items:
a. Lights shall be used only in areas where and at a time when work is actually being performed.
b. Heating, Ventilation and Air Conditioning controls shall not be adjusted by the Contractor’s employees.
c. Water faucets and valves shall be turned off after use.
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES.
4.1. GENERAL. The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS. Material, equipment, and supplies provided shall be of acceptable commercial grade and quality.
5. SPECIFIC TASKS.
5.1. The contractor shall provide the inspection and annual maintenance services described herein. A list of specific requirements by facility is listed in Technical Exhibit B.
5.2. Basic services shall be performed at the locations identified in Technical Exhibit B. Any equipment (including waste containers) moved while performing basic services shall be returned to their original position.
5.3 SCHEDULE OF WORK. The contractor shall provide inspection and annual maintenance services for the areas set forth in Technical Exhibit B. Prior to commencing any work, the Contractor shall submit an inspection/maintenance schedule to the COR. The schedule shall be subject to change with a 48 hour notification period, if it is required to avoid a conflict or disruption of normal operations of the government in the facility involved.
5.4. FIRE PROTECTION INSPECTIONS AT VARIOUS FACILITIES
5.4.1 FIRE EXTINGUISHERS
5.4.1.1 The Contractor shall inspect and perform an annual service for all recessed, wall mounted, or enclosed cabinet fire extinguishers. The quantity of fire extinguishers at each location can be seen at the attached Technical
Exhibit B.
5.4.1.2 The contractor shall inspect, service and tag the fire extinguishers in accordance with the latest published edition of NFPA 10.
5.4.1.3 The contractor shall perform a hydrostatic test on all fire extinguishers during the initial inspection and an annual inspection the following years in accordance with the latest published edition of NFPA 10.
5.4.1.4 The contractor shall provide a serviceable temporary fire extinguisher in place of the existing fire extinguisher if the fire extinguisher has to be serviced at a separate location.
5.4.1.5 The contractor shall provide a fire extinguisher inspection report, provided in Technical Exhibit D to the
COR for each facility where fire extinguishers were serviced with any findings of discrepancies.
5.4.2 SPRINKLER SYSTEMS
5.4.2.1 The contractor shall inspect and perform an annual service for the wet and dry pipe sprinkler system in accordance with the latest published edition of NFPA 25. The quantity of sprinkler systems at each location can be seen at the attached Technical Exhibit B. If no system exists for the facility no testing will be required.
5.4.2.2 The contractor shall perform a 5-year internal inspection on all fire sprinkler systems during the initial year of the contract period and provide an internal investigation inspection report, provided in Technical Exhibit 4 to the
COR. Internal inspection shall be in accordance with the latest published edition of NFPA 25.
5.4.2.3 The contractor shall replace all sprinkler system pressure gauges during the initial year of the contract period.
5.4.2.4 The contractor shall provide a wet and dry pipe sprinkler system inspection report as provided in Technical
Exhibit D, with any findings of discrepancies of the sprinkler system to the COR. Inspection reports shall be in accordance with AFSA standards.
5.4.3 FIRE ALARM/MASS NOTIFICATION SYSTEMS
5.4.3.1. The contractor shall inspect and perform an annual service for the fire alarm/mass notification systems in accordance with the latest published edition of NFPA 72. The quantity of fire alarm systems at each location can be seen at the attached Technical Exhibit B. If no system exists for the facility no testing will be required.
5.4.3.2 The contractor shall perform sensitivity testing on all smoke sensing detectors within the initial year of the contract and an annual inspection the following years in accordance with the latest published edition of NFPA 72.
5.4.3.3 All devices shall be tested, regardless of location and auxiliary function. Contract will not be fulfilled unless each device is physically tested in accordance with latest published edition of NFPA 72.
5.4.3.4 The contractor shall provide a fire alarm inspection report, provided in Technical Exhibit 4 of all functions and devices tested that passed and failed to the COR as per NFPA 72.
5.4.4. KITCHEN FIRE SUPPRESION SYSTEMS
5.4.4.1 The contractor shall inspect and perform a semi-annual service for the kitchen fire suppression system in accordance with the latest published edition of NFPA 96. The kitchen fire suppression system at each location can be seen at the attached Technical Exhibit B. If no system exists for the facility no testing will be required.
5.4.4.2 The contractor shall perform a hydrostatic test on the kitchen fire suppression system tanks during the initial inspection and an annual inspection the following years in accordance with the latest published edition of NFPA 96.
5.4.4.3 The contractor shall notify the COR of when any fire extinguishers should need replacement.
5.4.4.4 The contractor shall provide a hood inspection report, provided in Technical Exhibit 4 of all functions and devices tested that passed and failed to the COR as per NFPA 96.
5.4.5. FIRE HYDRANTS
5.4.5.1 The contractor shall inspect all fire hydrants to be in compliance with the latest published edition of NFPA
25. Hydrants that are to be tested are listed in Technical Exhibit B. Hydrants tested will be within the boundary of our property line.
5.4.5.2 The contractor shall provide a fire hydrant inspection report, provided in Technical Exhibit 4 with any findings of discrepancies of the fire hydrant to the COR.
5.4.6 FIRE SUPPRESSION WATER STORAGE TANKS
5.4.6.1 The contractor shall inspect and perform an annual service for the fire suppression water storage tanks in accordance with the latest published edition of NFPA 25. The quantity of fire alarm systems at each location can be seen at the attached Technical Exhibit B. If no system exists for the facility no testing will be required
5.4.6.2 Inspection shall include all applicable inspections listed within table the latest published edition of NFPA 25.
All quarterly, semi-annual, and annual inspections shall be conducted each year. Upon first inspection, a complete interior inspection shall be conducted as well as pressure gauge and level indicator tests shall be conducted.
5.4.6.3 The contractor shall provide a water storage tank inspection report, provided in Technical Exhibit D with any findings of discrepancies of the fire suppression water storage tank to the COR.
5.4.7 FIRE PUMPS
5.4.7.1 Fire pumps shall be inspected for proper operation, batteries tested; oil and fuel filter changed annually.
Inspections shall be conducted in accordance with the latest published edition of NFPA 25. Inspections on the fire pumps shall be conducted on a quarterly, semiannually, and annual basis.
5.4.7.2 ALL FLUIDS AND FILTERS on diesel pumps shall be replaced annually, regardless of engine run time hours.
5.4.7.3 The contractor shall provide a fire pump inspection report provided in Technical Exhibit D with any findings of discrepancies of the fire pumps to the COR.
5.4.8 HAZARDOUS MATERIALS STORAGE SHEDS
5.4.8.1 These storage sheds contain either a system similar to a kitchen fire suppression system, with dry-chemical agent to act as the fire suppression mechanism or a sprinkler system with a direct fire hose connection.
5.4.8.2 Inspections shall be in accordance with the latest published edition of NFPA 17 or the latest published edition of NFPA 25, whichever is applicable.
5.4.8.3 The contractor shall provide a hood inspection or wet and dry pipe sprinkler system inspection report, provided in Technical Exhibit D as appropriate based upon type of system, with any findings of discrepancies of the hazardous material storage sheds to the COR.
6. CONTRACTOR MANPOWER REPORTING (CMR)
The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the 99th RSC via secure data collection site. The contractor is required to completely fill in all required data fields using the following address: http://www.ecmra.mil, and then click on http://www.ecmra.mil/
“Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from the contracted services.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year
(FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website”.
7. ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)
7.1. AT LEVEL 1 TRAINING. All contractor employees, to include subcontractor employees, requiring access
Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.
7.2. ACCESS, GENERAL PROTECTION, AND SECURITY POLICY AND PROCEDURES. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency
Services or Security Office. Contractor workforce must comply with all personal identity verification requirements
(FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force
Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
7.2.1 For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the
National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database
(TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at
OCONUS locations, in accordance with status of forces agreements and other theater regulations.
7.3 iWATCH TRAINING. The contractor and all associated subcontractor employees shall brief all employees on the local iWATCH program (training standards are provided by COR/RFOS). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR/RFOS. This training shall be completed within 30 calendar days of contract award and with 30 calendar days of new employees commencing performance with the results reported to the COR/RFOS not later than
5 calendar days after contract award.
7.4 OPSEC TRAINING. Per Army Regulation 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty and annually thereafter.
8. ATTACHMENT/TECHNICAL EXHIBIT LIST (will be posted on www.fbo.gov)
8.1 Attachment 1/Technical Exhibit A – Performance Requirements Summary
8.2 Attachment 2/Technical Exhibit B – Requirements by Facility
8.3 Attachment 3/Technical Exhibit C – Required License & Certifications by Facility & Specific Location
8.4 Attachment 4/Technical Exhibit D – Fire Protection Inspection Reports http://www.fbo.gov/
8.5 Attachment 5/Technical Exhibit E-Contract Data Item List for Fire Protection Inspection Reports
TECHNICAL EXHIBITS
All of the technical exhibits will be posted as an attachment on the www.fbo.gov website as apart of this solicitation.
8. ATTACHMENT/TECHNICAL EXHIBIT LIST
8.1 Attachment 1/Technical Exhibit A – Performance Requirements Summary
8.2 Attachment 2/Technical Exhibit B – Requirements by Facility
8.3 Attachment 3/Technical Exhibit C – Required License & Certifications by Facility &
Specific Location
8.4 Attachment 4/Technical Exhibit D – Fire Protection Inspection Reports
8.5 Attachment 5/Technical Exhibit E-Contract Data Item List for Fire Protection Inspection
Reports http://www.fbo.gov/
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Base: Fire Pump Diesel Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
FOB: Destination
PURCHASE REQUEST NUMBER: 0010809435
NET AMT
0002 1 Job Base: Fire Tank Inspection PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
0003 1 Job Base: Wet Pipe Fire Sprinkler Ann PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
0004 1 Job Base: Fire Extinguisher Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
0005 1 Job Base: Hazmat Shed Insp Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
0006 1 Job Base: Fire Hydrant Insp Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
0007 1 Job Base: FA/MN System Annual Insp PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
0008 1 Job Base: Fire Department Connect Rpr PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
0009 1 Job Base: CMR PA022
FFP
Contract Manpower Reporting The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Army Reserve via a secure data collection site.
The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reporting any time during the FY, all data shall be reported no later than Octover
31 of each calendar year, beginning with 2013.
0010 1 Each Base: CDRL- Fire Inspections Reports
FFP
Contract Data Requirements List for Fire Inspections Reports, in accordance with requirements, quantities, and schedules as set forth in DD From 1423 located at
Attachment 5.
1001 1 Job OPTION OY1: Fire Pump Diesel Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
1002 1 Job OPTION OY1: Fire Tank Inspection PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
1003 1 Job OPTION OY1: Wet Pipe Fire Sprinkler Ann PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
1004 1 Job OPTION OY1: Fire Extinguisher Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
1005 1 Job OPTION OY1: Hazmat Shed Insp Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
1006 1 Job OPTION OY1: Fire Hydrant Insp Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
1007 1 Job OPTION OY1: FA/MN System Annual Insp PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
1008 1 Job
OPTION OY1: CMR PA022
FFP
Contract Manpower Reporting The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Army Reserve via a secure data collection site.
The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reporting any time during the FY, all data shall be reported no later than Octover
31 of each calendar year, beginning with 2013.
1009 1 Each OPTION OY1: CDRL- Fire Inspections Reports
FFP
Contract Data Requirements List for Fire Inspections Reports, in accordance with requirements, quantities, and schedules as set forth in DD From 1423 located at
2001 1 Job OPTION OY2: Fire Pump Diesel Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
2002 1 Job OPTION OY2: Fire Tank Inspection PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
2003 1 Job OPTION OY2: Wet Pipe Fire Sprinkler Ann PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
2004 1 Job OPTION OY2: Fire Extinguisher Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
2005 1 Job OPTION OY2: Hazmat Shed Insp Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
2006 1 Job OPTION OY2: Fire Hydrant Insp Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
2007 1 Job OPTION OY2: FA/MN System Annual Insp PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
2008 1 Job
OPTION OY2: CMR PA022
FFP
Contract Manpower Reporting The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Army Reserve via a secure data collection site.
The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reporting any time during the FY, all data shall be reported no later than Octover
31 of each calendar year, beginning with 2013.
2009 1 Each OPTION OY2: CDRL- Fire Inspections Reports
FFP
Contract Data Requirements List for Fire Inspections Reports, in accordance with requirements, quantities, and schedules as set forth in DD From 1423 located at
3001 1 Job OPTION OY3: Fire Pump Diesel Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
3002 1 Job OPTION OY3: Fire Tank Inspection PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
3003 1 Job OPTION OY3: Wet Pipe Fire Sprinkler Ann PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
3004 1 Job OPTION OY3: Fire Extinguisher Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
3005 1 Job OPTION OY3: Hazmat Shed Insp Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
3006 1 Job OPTION OY3: Fire Hydrant Insp Annual PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
3007 1 Job OPTION OY3: FA/MN System Annual Insp PA022
FFP
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION,
SUPERVISION, TOOLS, PARTS, MATERIALS, SUPLLIES, AND
EQUIPMENT TO PERFORM FIRE PROTECTION SYSTEMS INSPECTIONS.
SERVICES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
PWS.
3008 1 Job
OPTION OY3: CMR PA022
FFP
Contract Manpower Reporting The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Army Reserve via a secure data collection site.
The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reporting any time during the FY, all data shall be reported no later than Octover
31 of each…