VendorChangeDetailsReport_GL-2026-18_v3_Jan_28_26.pdf
PDF 2 KB Posted
- Solicitation number
- GL-2026-18
- Issued by
- Hartford County, Connecticut
About this file
This is a Solicitation Change Details Report for the Town of Glastonbury, Connecticut, documenting modifications to solicitation GL-2026-18 for the House Street Pedestrian Bridge Replacement at Salmon Brook. The project scope involves the dismantling, removal, and disposal of the existing pedestrian bridge superstructure, followed by the design, fabrication, furnishing, and installation of a replacement prefabricated pedestrian bridge superstructure to be attached to the existing bridge abutments with reconstructed anchor bolts. The replacement structure shall match the original bridge plans in terms of make, general appearance, and aesthetic appeal. Bidders must respond online through the Glastonbury bonfire platform, with bids accompanied by a Bid Bond in the amount of not less than 10 percent of the base bid. The sole change documented in this report is the addition of Zoom Instructions for the solicitation, which was added on January 28, 2026.
The project is subject to Connecticut General Statutes Section 31-53 prevailing wage requirements. No information regarding specific pricing terms, bid submission deadlines, site visits, pre-bid meetings, award dates, or contract duration is contained within this change details report. Bidders should consult the complete solicitation documents and the online bidding platform for comprehensive project specifications, submission requirements, and all associated terms and conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Change Details Report Solicitation no.GL-2026-18
'House Street Pedestrian Bridge Replacement at Salmon Brook'
Header Information
There are no changes under this section.
Solicitation Fields
Solicitation Questionnaire
Documents Added
1. Document: 'Zoom Instructions- GL-2026-18.pdf' was added.
Solicitation Group Changes
Report Created: Jan 28, 2026 8:43 AM EST Page: 2
Solicitation GL-2026-18, House Street Pedestrian Bridge Replacement at Salmon Brook
Item Specifications and Quantities
File details come from the government source that posted it. Updated .