About this file

Contract Document Summary

This is a comprehensive bid solicitation and contract document package from the Town of Glastonbury, Connecticut, for the House Street Pedestrian Bridge Replacement at Salmon Brook (Bid #GL-2026-18). The project involves dismantling and removing the existing pedestrian bridge superstructure and designing, fabricating, furnishing, and installing a replacement prefabricated pedestrian bridge superstructure with either a timber or reinforced concrete deck to be attached to existing bridge abutments with new anchor bolts. The bid was advertised on January 6, 2026, with bids due on January 22, 2026, at 11:00 a.m., submitted online through the secure e-Procurement portal at https://glastonburyct.bonfirehub.com/. The project scope includes concrete abutment surface repair, replacement of eight existing anchor bolts, and traffic maintenance and protection during construction. The replacement bridge must span approximately 71 feet with a 6-foot width and resemble the original bridge in general appearance and aesthetic appeal. All work shall be completed within 30 calendar days of the Notice to Proceed, excluding the winter shutdown period from December 1 through March 31. The project is subject to Connecticut prevailing wage requirements under General Statutes Section 31-53, with wage rates effective as of December 31, 2025, and subject to annual adjustments each July 1st.

Each bid must be accompanied by a bid bond in the form of a certified check or surety bond in an amount not less than 10 percent of the base bid. The successful bidder will be required to provide 100 percent performance and labor and material payment bonds in the full amount of the agreed contract price prior to issuance of a purchase order. Liquidated damages are set at $850.00 per calendar day for delays beyond the specified completion date. Bidders must provide qualifications statements demonstrating successful experience with three similar projects, along with certifications regarding compliance with the Town's Code of Ethics, non-discrimination affidavits, prevailing wage compliance, and a statement certifying non-use of natural gas or oil waste from extraction activities. The town reserves the right to award based on either the base bid for timber deck construction or the alternate bid for concrete deck construction, selecting whichever option results in the lowest qualified bidder total project cost. Retainage shall be withheld at five percent and released upon final project acceptance. Municipal police officers and uniformed flaggers are required for traffic control operations during the temporary detour phase, with police services paid at actual hourly rates plus 5 percent markup and flagger services paid at the contract unit price per hour.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOWN OF GLASTONBURY

ENGINEERING DIVISION

PW-2509

CONTRACT DOCUMENTS

FOR

HOUSE STREET PEDESTRIAN BRIDGE REPLACEMENT

AT SALMON BROOK

GL-2026-18

ADVERTISED ON: JANUARY 6, 2026

BID DUE DATE: JANUARY 22, 2026

INVITATION TO BID

BID # ITEM DATE & TIME REQUIRED

GL-2026-18 House Street Pedestrian Bridge Replacement January 22, 2026 at 11:00 A.M.

at Salmon Brook

The Town of Glastonbury will receive on-line bids to perform dismantling, removal, and disposal of the existing pedestrian bridge superstructure and designing, fabricating, furnishing and installing a replacement prefabricated pedestrian bridge superstructure attached to the existing bridge abutments with replacement anchor bolts. The replacement prefabricated pedestrian bridge superstructure shall resemble the attached original bridge plans in terms of make, general appearance and aesthetic appeal.

Bidders wishing to submit a bid proposal for this solicitation are directed to respond online through a secure e-Procurement portal. Responses can be submitted at the following link:

https://glastonburyct.bonfirehub.com/, under the bid title “GL-2026-18 – House Street Pedestrian Bridge Replacement at Salmon Brook”. All bids will be publicly opened and read aloud. No late bids will be accepted.

This Invitation to Bid, Instructions to Bidders, Drawings, Specifications and other Bidding Documents (as defined in the Instruction to Bidders) are available for viewing and downloading on the Town of Glastonbury website www.glastonburyct.gov or the State’s website at www.das.state.ct.us at no cost.

Each Bid must be accompanied by a bid security in the form of a Bid Bond, certified in an amount not less than 10% of the base bid except as otherwise expressly provided in the Instruction to Bidders. The successful bidder will be required to provide performance and labor and material payment bonds in the full amount of the agreed contract price.

Bidders are further advised that this project is subject to the prevailing wage requirements of Connecticut General Statutes Section 31-53.

Bidders are also hereby alerted to the schedule requirements as outlined in Special Conditions Section 11.00.

The Town of Glastonbury is An Affirmative Action/Equal Opportunity Employer. Minority/Women’s Business Enterprises are encouraged to bid.

The Town reserves the right to amend or withdraw this Invitation to Bid for any reason, to accept or reject any or all Bids, to waive any informalities or non-material deficiencies in any Bid, and to make such award (or make no award) of a contract in connection with this Invitation to Bid all as determined by the Town, in its discretion, to be in the best interest of the Town. A Bid may be rejected for irregularities of any kind, including without limitation, alteration of form, additions not called for, conditional proposals, and incomplete Bids. A Bid may also be rejected if, in the opinion of the Town, the Bid does not meet the standard of quality established by the Bidding Documents.

Any or all Bids may be rejected if there is any reason to believe that collusion exists among two or more Bidders. The foregoing provisions are for illustrative purposes and shall in no way limit the right of the Town to reject any and all Bids, in whole or in part.

Gina Consiglio

Purchasing Agent https://glastonburyct.bonfirehub.com/ http://www.glastonburyct.gov/ http://www.das.state.ct.us/

HOUSE STREET PEDESTRIAN BRIDGE REPLACEMENT AT SALMON BROOK BID #GL-2026-18

INFORMATION FOR BIDDERS

IB - 1

TABLE OF CONTENTS SECTION

INFORMATION FOR BIDDERS IB

GENERAL CONSTRUCTION SPECIFICATIONS GCS

SPECIAL CONDITIONS SC

BID PROPOSAL BP

SPECIAL PROVISIONS SP

ATTACHMENT A: PREVAILING WAGE RATES

ATTACHMENT B: SAMPLE CONTRACT

ATTACHMENT C: IMPROVEMENT LOCATION DEPICTING LAND OF TOWN OF GLASTONBURY

HOUSE STREET PEDESTRIAN BRIDGE GLASTONBURY, CONNECTICUT

ATTACHMENT D: HOUSE STREET PEDESTRIAN BRIDGE AT SALMON BROOK- SHOP DRAWING

ATTACHMENT E: FIELD INSPECTION REPORT AND RECOMMENDATIONS OVER SALMON BROOK

GLASTONBURY,CT- JANUARY 26, 2024

IB - 2

1. Bidders submitting a response for this solicitation are directed to respond online through a secure e-

Procurement portal. Bids can be submitted at the following link: https://glastonburyct.bonfirehub.com/ under the bid title “GL-2026-18 – House Street Pedestrian Bridge Replacement at Salmon Brook”. Bidders will be required to create a profile before submitting their bid. Step-by-step instructions on how to register as a vendor are available at this website:

https://customer.eunasolutions.com/public/s/article/vendor-registration

Bidders will be required to upload their bid response in one consolidated pdf document in the following file located in the bid portal:

• Bid Response & Related Documents

2. Whenever it is deemed to be in the best interest of the Town, the Town Manager, Purchasing Agent or designated representative shall waive informalities in any and all bids. The right is reserved to reject any bid when such action is deemed to be in the best interest of the Town of Glastonbury.

3. The award will be on the basis of bid total cost of the lowest qualified, responsible, and responsive bidder, including any bid alternates selected by the Town, unless otherwise specified. The bid total cost shall be arrived at by the mathematical calculation of the unit price multiplied times the number of units specified for each line item, and the total sum of all line items in the bid. In the event that the Town finds computational errors in a respondent’s bid proposal, the bid total cost shall be recalculated by the Town based on the unit prices contained in the bid proposal.

4. Bids will be carefully evaluated as to conformance with stated specifications.

5. Specifications must be submitted complete in every detail and, when requested, samples shall be provided. If a bid involves any exception from stated specifications, they must be clearly noted as exceptions, underlined, and attached to the bid.

6. The Bid Documents contain the provisions required for the requested item. Information obtained from an officer, agent, or employee of the Town or any other person shall not affect the risks or obligations assumed by the Bidder or relieve him/her from fulfilling any of the conditions of the bid.

7. Each Bidder is held responsible for the examination and/or to have acquainted themselves with any conditions at the job site which would affect their work before submitting a bid. Failure to meet this criteria shall not relieve the Bidder of the responsibility of completing the bid without extra cost to the Town of Glastonbury.

8. Any bid may be withdrawn prior to the above-scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered.

No Bidder may withdraw a bid within sixty (60) days after the actual date of the opening thereof.

Should there be reasons why a bid cannot be awarded within the specified period, the time may be extended by mutual agreement between the Town and the Bidder.

9. Each electronic bid submission must be accompanied by a COPY of the bid bond payable to the

Town for ten percent (10%) of the total amount of the bid. Original bid bonds from all respondents must be mailed to the attention of the Purchasing Agent immediately (within 24 hours) following the virtual bid opening at the following address: Town of Glastonbury, PO Box 6523, Glastonbury, CT 06033-6523, Attn: Gina Consiglio, Purchasing Agent. The bid bond of the successful Bidder will be retained until the payment bond and performance bond have been executed and approved, after which it will be returned.

10. A 100% Performance and a 100% Payment bond are required of the successful bidder. This bond shall cover all aspects of the specification and shall be delivered to the Purchasing Agent prior to https://glastonburyct.bonfirehub.com/

IB - 3

the issuance of a purchase order. The Performance and Payment Bond will be returned upon the delivery and acceptance of the bid items.

11. The Bidder agrees and warrants that in the submission of this sealed Bid, they will not discriminate or permit discrimination against any person or group of persons on the grounds of race, color, religion, national origin, sex, or physical disability including, but not limited to blindness, unless it is shown by such Bidder that such disability prevents performance of that which must be done to successfully fulfill the terms of this sealed Bid or in any manner which is prohibited by the laws of the United States or the State of Connecticut: and further agrees to provide the Connecticut Human Relations Commission with such information requested by the Commission concerning the employment practices and procedures of the Bidder. An Affirmative Action Statement will be required by the successful Bidder.

(1) Pursuant to Conn. Gen. Stat. Sect. 4a-60, (1) The Contractor agrees and warrants that in the performance of the Contract such Contractor will not discriminate or permit discrimination against any person or group of persons on the grounds of race, color, religious creed, age, marital status, national origin, ancestry, sex, gender identity or expression, status as a veteran, intellectual disability, mental disability or physical disability, including, but not limited to, blindness, unless it is shown by such Contractor that such disability prevents performance of the Work involved, in any manner prohibited by the laws of the United States or of the state of Connecticut; and the Contractor further agrees to take affirmative action to ensure that applicants with job-related qualifications are employed and that employees are treated when employed without regard to their race, color, religious creed, age, marital status, national origin, ancestry, sex, gender identity or expression, status as a veteran, intellectual disability, mental disability or physical disability, including, but not limited to, blindness, unless it is shown by such Contractor that such disability prevents performance of the Work involved;

(2) The Contractor agrees, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, to state that it is an “affirmative action-equal opportunity employer” in accordance with regulations adopted by the Commission on Human Rights and Opportunities;

(3) The Contractor agrees to provide each labor union or representative of workers with which such

Contractor has a collective bargaining agreement or other contract or understanding and each vendor with which such Contractor has a contract or understanding, a notice to be provided by the Commission on Human Rights and Opportunities advising the labor union or workers' representative of the Contractor's commitments under this section, and to post copies of the notice in conspicuous places available to employees and applicants for employment;

(4) The Contractor agrees to comply with each provision of this section and sections 46a-68e and 46a-

68f and with each regulation or relevant order issued by said commission pursuant to sections 46a- 56, 46a-68e, 46a-68f and 46a-86; and

(5) The Contractor agrees to provide the Commission on Human Rights and Opportunities with such information requested by the commission, and permit access to pertinent books, records and accounts, concerning the employment practices and procedures of the Contractor as relate to the provisions of this section and section 46a-56.

(b) The contractor agrees and warrants that he or she will make good faith efforts to employ minority business enterprises as subcontractors and suppliers of materials on such public works or quasi-public agency project.

(c) Except as provided in section 10a-151i:

(1) Any Contractor who has one or more contracts with an awarding agency or who is a party to a municipal public works contract or a contract for a quasi-public agency project shall include a nondiscrimination affirmation provision certifying that the Contractor understands the obligations of

IB - 4

this section and will maintain a policy for the duration of the Contract to assure that the contract will be performed in compliance with the nondiscrimination requirements of subsection (a) of this section. The authorized signatory of the Contract shall demonstrate his or her understanding of this obligation by (A) initialing the nondiscrimination affirmation provision in the body of the Contract,

(B) providing an affirmative response in the required online bid or response to a proposal question which asks if the Contractor understands its obligations, or (C) signing the Contract.

(2) No awarding agency, or in the case of a municipal public works contract, no municipality, or in the case of a quasi-public agency project contract, no entity, shall award a contract to a contractor that has not included the nondiscrimination affirmation provision in the contract and demonstrated its understanding of such provision as required under subdivision (1) of this subsection.

(d) For the purposes of this section, “contract” includes any extension or modification of the contract, “contractor” includes any successors or assigns of the Contractor, “marital status” means being single, married as recognized by the state of Connecticut, widowed, separated or divorced, and “mental disability” means one or more mental disorders, as defined in the most recent edition of the American Psychiatric Association's “Diagnostic and Statistical Manual of Mental Disorders”, or a record of or regarding a person as having one or more such disorders. For the purposes of this section, “contract” does not include a contract where each contractor is (1) a political subdivision of the state, including, but not limited to, a municipality, unless the contract is a municipal public works contract or quasi-public agency project contract, (2) any other state, as defined in section 1- 267, (3) the federal government, (4) a foreign government, or (5) an agency of a subdivision, state or government described in subdivision (1), (2), (3) or (4) of this subsection.

(e) For the purposes of this section, “minority business enterprise” means any small contractor or supplier of materials fifty-one per cent or more of the capital stock, if any, or assets of which is owned by a person or persons: (1) Who are active in the daily affairs of the enterprise, (2) who have the power to direct the management and policies of the enterprise, and (3) who are members of a minority, as such term is defined in subsection (a) of section 32-9n; and “good faith” means that degree of diligence which a reasonable person would exercise in the performance of legal duties and obligations. “Good faith efforts” shall include, but not be limited to, those reasonable initial efforts necessary to comply with statutory or regulatory requirements and additional or substituted efforts when it is determined that such initial efforts will not be sufficient to comply with such requirements.

(f) Determination of the Contractor's good faith efforts shall include, but shall not be limited to, the following factors: The Contractor's employment and subcontracting policies, patterns and practices;

affirmative advertising, recruitment and training; technical assistance activities and such other reasonable activities or efforts as the Commission on Human Rights and Opportunities may prescribe that are designed to ensure the participation of minority business enterprises in public works projects.

(g) The Contractor shall develop and maintain adequate documentation, in a manner prescribed by the Commission on Human Rights and Opportunities, of its good faith efforts.

(h) The Contractor shall include the provisions of subsections (a) and (b) of this section in every

Subcontract or purchase order entered into in order to fulfill any obligation of a Contract with the state or municipality, and in every subcontract entered into in order to fulfill any obligation of a municipal public works contract or contract for a quasi-public agency project, and such provisions shall be binding on a Subcontractor, vendor or manufacturer, unless exempted by regulations or orders of the Commission on Human Rights and Opportunities. The Contractor shall take such action with respect to any such Subcontract or purchase order as the commission may direct as a means of enforcing such provisions, including sanctions for noncompliance in accordance with section 46a-56; provided, if such Contractor becomes involved in, or is threatened with, litigation with a Subcontractor or vendor as a result of such direction by the commission regarding a state

IB - 5

contract, the contractor may request the state of Connecticut to enter into any such litigation or negotiation prior thereto to protect the interests of the state and the state may so enter.

Pursuant to Conn. Gen. Stat. Sect 4a-60a, (1) The Contractor agrees and warrants that in the performance of the Contract such Contractor will not discriminate or permit discrimination against any person or group of persons on the grounds of sexual orientation, in any manner prohibited by the laws of the United States or of the state of Connecticut, and that employees are treated when employed without regard to their sexual orientation;

(2) The Contractor agrees to provide each labor union or representative of workers with which such Contractor has a collective bargaining agreement or other contract or understanding and each vendor with which such Contractor has a contract or understanding, a notice to be provided by the Commission on Human Rights and Opportunities advising the labor union or workers' representative of the Contractor's commitments under this section, and to post copies of the notice in conspicuous places available to employees and applicants for employment;

(3) The Contractor agrees to comply with each provision of this section and with each regulation or relevant order issued by said commission pursuant to section 46a-56; and

(4) The Contractor agrees to provide the Commission on Human Rights and Opportunities with such information requested by the commission, and permit access to pertinent books, records and accounts, concerning the employment practices and procedures of the contractor which relate to the provisions of this section and section 46a-56.

(b) Except as provided in section 10a-151i:

(1) Any Contractor who has one or more contracts with an awarding agency or who is a party to a municipal public works contract or a contract for a quasi-public agency project shall include a nondiscrimination affirmation provision in the Contract certifying that the Contractor understands the obligations of this section and will maintain a policy for the duration of the Contract to assure that the Contract will be performed in conformance with the nondiscrimination requirements of this section. The authorized signatory of the Contract shall demonstrate his or her understanding of this obligation by either (A) initialing the nondiscrimination affirmation provision in the body of the Contract, or (B) providing an affirmative response in the required online bid or response to a proposal question which asks if the Contractor understands its obligations.

(2) No awarding agency, or in the case of a municipal public works contract, no municipality, or in the case of a quasi-public agency project contract, no entity, shall award a contract to a contractor who has not included the nondiscrimination affirmation provision in the contract and demonstrated its understanding of such provision as required under subdivision (1) of this subsection.

(c) For the purposes of this section, “contract” includes any extension or modification of the contract, and “contractor” includes any successors or assigns of the contractor. For the purposes of this section, “contract” does not include a contract where each contractor is (1) a political subdivision of the state, including, but not limited to, a municipality, unless the contract is a municipal public works contract or quasi-public agency project contract, (2) any other state, as defined in section 1-267, (3) the federal government, (4) a foreign government, or (5) an agency of a subdivision, state or government described in subdivision (1), (2), (3) or (4) of this subsection.

(d) The Contractor shall include the provisions of subsection (a) of this section in every Subcontract or purchase order entered into in order to fulfill any obligation of a contract with the state or municipality, and in every subcontract entered into in order to fulfill any obligation of a municipal public works contractor contract for a quasi-public agency project, and such provisions shall be binding on a Subcontractor, vendor or manufacturer unless exempted by regulations or orders of the Commission on Human Rights and Opportunities. The Contractor shall take such action with respect to any such Subcontract or purchase order as the commission may direct as a means of

IB - 6

enforcing such provisions, including sanctions for noncompliance in accordance with section 46a- 56; provided, if such Contractor becomes involved in, or is threatened with, litigation with a Subcontractor or vendor as a result of such direction by the commission regarding a state contract, the Contractor may request the state of Connecticut to enter into any such litigation or negotiation prior thereto to protect the interests of the state and the state may so enter.

12. Bidder agrees to comply with all of the latest Federal and State Safety Standards and Regulations and certifies that all work required in this bid will conform to and comply with said standards and regulations. Bidder further agrees to indemnify and hold harmless the Town for all damages assessed against the Town as a result of Bidder’s failure to comply with said standards and/or regulations.

13. All correspondence regarding any purchase made by the Town of Glastonbury shall reference the

Town’s purchase order number. Each shipping container shall clearly indicate both Town purchase order number and item number.

14. Bidder is required to review the Town of Glastonbury Code of Ethics adopted July 8, 2003 and effective August 1, 2003 and revised October 29, 2013 and effective November 28, 2013. Bidder shall acknowledge that they have reviewed the document in the area provided on the bid/proposal response page (BP-1). The selected Bidder will also be required to complete and sign an Acknowledgement Form prior to award. The Code of Ethics and the Acknowledgement Form can be accessed at the Town of Glastonbury website at www.glastonburyct.gov. Upon entering the website scroll down to click on Bids & Proposals Icon which will bring you to the links for the Code of Ethics and the Acknowledgement Form.

15. Non-Resident Contractors: (if applicable)

Upon award the Town is required to report names of nonresident (out of state) Contractors to the State of Connecticut, Department of Revenue Services (DRS) to ensure that Employment Taxes and other applicable taxes are being paid by Contractors. A single surety bond for 5% of the entire contract price is required to be filed with DRS by any unverified nonresident prime or general contractor (if awarded) where the contract price for the project is $250,000 or more. The contractor will be required to promptly furnish to the Town a copy of the Form AU-968

- Certificate of Compliance issued by the State of Connecticut, DRS. See State of Connecticut Notice SN 2012 (2).

16. Bidder shall include on a sheet(s) attached to its proposal a complete disclosure of all past and pending mediation, arbitration and litigation cases that the bidder or its principals (regardless of their place of employment) have been involved in for the most recent five years. Please include a statement of the issues in dispute and their resolution. Acceptability of Bidder based upon this disclosure shall lie solely with the Town.

17. Bidder or its principals, regardless of their place of employment, shall not have been convicted of, nor entered any plea of guilty, or nolo contendere, or otherwise have been found civilly liable or criminally responsible for any criminal offense or civil action. Bidder shall not be in violation of any State or local ethics standards or other offenses arising out of the submission of bids or proposals, or performance of work on public works projects or contracts.

http://www.glastonburyct.gov/

IB - 7

18. State Prevailing Wage Rates:

This Contract is above the prevailing wage threshold as defined by Connecticut law, section 31-53, as amended, the Contractor shall include the costs of such wages including all yearly adjustments in the Contract Price. The wages paid on an hourly basis to any mechanic, laborer or workman employed upon the work herein contracted to be done and the amount of payment or contribution paid or payable on behalf of each such employee to any employee welfare fund, as defined in subsection (h) of this section, shall be at a rate equal to the rate customary or prevailing for the same work in the same trade or occupation in the town in which such public works project is being constructed. Any contractor who is not obligated by agreement to make payment or contribution on behalf of such employees to any such employee welfare fund shall pay to each employee as part of his wages the amount of payment or contribution for his classification on each pay day.

Certified payrolls for site labor shall be submitted weekly to the Town’s Representative or his designee on the correct State of Connecticut form (see RFP). The Town reserves the right to, without prior notice, audit payroll checks given to workers on site in order to ascertain that wages and fringe benefits are being paid as required by the State of Connecticut. Please make special note of the State requirement to adjust wage and fringe benefit rates on each July 1st following the original published rates.

NOTE that respondent is to include in its proposal all costs required by such annual increases in the PREVAILING RATES. NO escalation clauses are to be included in the respondent’s proposal and NO escalation clauses will be in the Contract Agreement. Respondent is to anticipate any future increases and include these costs in the proposal response. Contractor’s invoices will not be paid if certified payrolls are incomplete, incorrect or not received in a timely manner.

All Apprentices must be registered with the State of Connecticut and their number shall not exceed the number allowed by law. Otherwise, all workers must be paid at least the Journeyman rate listed including benefits.

OSHA SAFETY AND HEALTH CERTIFICATION

Effective July 1, 2009: Any Mechanic, Laborer, or Worker, who performs work in a classification listed on the prevailing wage rate schedule on any public works project covered under C.G.S.

Section 31-53, both on site and on or in the public building, must have completed a federal OSHA Safety and Health course within the last 5 years.

19. Each bid shall also include a description of three similar (3) projects completed by the bidder with references to demonstrate successful experience with similar projects. Please provide project name, contact information and contract value.

20. Compliance with Town Ordinance Prohibiting Natural Gas Waste & Oil Waste From Natural

Gas Extraction Activities or Oil Extraction Activities: If this bid is for the construction, repair or maintenance of Town owned and/or maintained roads or real property within the Town related to either (a) the purchase or acquisition of materials by the Town to be used to construct, repair or maintain any Town owned and/or maintained road or real property within the Town or (b) the performance of services for the Town to construct, repair or maintain any Town owned and/or maintained road or real property within the Town, the Bidder shall provide the following signed statement to the Town in its bid response, which shall be a certification under penalty of perjury by the Bidder:

“The undersigned Bidder, ____________________________, hereby submits a bid for materials, equipment and/or services for the Town of Glastonbury. The bid is for bid documents titled “GL- 2026-18 House Street Pedestrian Bridge Replacement at Salmon Brook”.

IB - 8

The undersigned Bidder hereby certifies under penalty of perjury that in connection with the bid and, if it is awarded the purchase order or contract by the Town, in connection with any purchase order or contract: (1) no materials containing natural gas waste or oil waste from natural gas extraction activities or oil extraction activities shall be provided to the Town or shall be used in providing any services to the Town by the undersigned Bidder or any contractor, sub-contractor or agent of the undersigned Bidder; (b) nor will the undersigned Bidder or any contractor, subcontractor or agent of the undersigned Bidder apply any natural gas waste or oil waste from natural gas extraction activities or oil extraction activities to any publicly owned and/or maintained road or real property within the Town of Glastonbury in performing its obligations under the purchase order or contract.

The undersigned Bidder hereby agrees and acknowledges that this requirement shall be a term of the purchase order or contract, if it awarded the purchase order or contract by the Town, and any breach of this provision shall be a breach of the purchase order or contract.”

21. Any technical questions regarding this bid shall be made in writing (email acceptable) and directed to Patrick Boggs, P.E., Assistant Town Engineer, 2155 Main Street, PO Box 6523, Glastonbury, CT 06033; patrick.boggs@glastonbury-ct.gov. Telephone (860) 652-7743 between the hours of 8:00 a.m. – 4:30 p.m. For administrative questions concerning this bid/proposal, please contact Gina Consiglio, Purchasing Agent, by email to the Purchasing Department at purchasing@glastonbury-ct.gov. All questions, answers, and/or addenda, as applicable, will be posted on the Town’s website at www.glastonbury-ct.gov (Upon entering the website scroll down to click on Bids & Proposals Icon, then scroll down page to see the active bid table. You must click the Bid Title to view all bid details and document links). The request must be received at least five

(5) business days prior to the advertised response deadline. It is the respondent’s responsibility to check the website for addenda prior to submission of any bid/proposal.

IMPORTANT:

• Failure to comply with general rules may result in disqualification of the Bidder.

• Municipal projects are exempt from Federal Excise Taxes, as well as, State of Connecticut Sales, Use and Service Taxes and should not be include in the Bidder’s proposal.

mailto:patrick.boggs@glastonbury-ct.gov mailto:purchasing@glastonbury-ct.gov http://www.glastonbury-ct.gov/

GENERAL CONSTRUCTION SPECIFICATIONS

GCS - 1

01.00 WORKMANSHIP, MATERIALS AND EMPLOYEES

01.01 Wherever in this contract the word “Engineer” is used, it shall be understood as referring to the Town Engineer/Manager of Physical Services of the Town of Glastonbury acting personally or through any assistants duly authorized.

01.02 The entire work described herein shall be completed in accordance with the plans and specifications to the full intent and meaning of the same. Unless otherwise specified, all materials incorporated in the permanent work shall be new, and both workmanship and material shall be of good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials.

01.03 The wording “furnish”, “install”, “construct”, “furnish and install”, or any similar terms, unless specifically noted to the contrary, shall include all labor, materials, water, tools, equipment, light, power, transportation, and any other services required for the completion of the work.

01.04 The Contractor shall at all times enforce strict discipline and good order among his employees, and shall seek to avoid employing on the work any unfit person or anyone not skilled in the work assigned to him.

02.00 SUPERINTENDENT

02.01 The Contractor shall keep on the work during its progress, in the absence of the Contractor, a competent Superintendent. The Superintendent shall be acceptable to the Engineer and shall fully represent the Contractor. All directions given to the Superintendent shall be binding as if given to the Contractor.

03.00 PRECONSTRUCTION MEETING

03.01 A Preconstruction Meeting will be held with the Engineer, Contractor, and any private utility company prior to commencing any work. The Engineer shall arrange the meeting based on a mutually convenient time.

04.00 PERMITS

04.01 Other than local permits, all permits, licenses, and fees required for the performance of the

Contract work shall be secured and paid for by the Contractor.

05.00 PROPERTY ACCESS

05.01 The Contractor shall take all proper precautions to protect from injury or unnecessary interference, and provide proper means of access to abutting property where the existing access is cut off by the Contractor.

05.02 The Contractor shall take all proper precautions to protect persons from injury or unnecessary inconvenience and leave an unobstructed way along the public and private places for travelers, vehicles, and access to hydrants.

05.03 The Contractor shall make arrangements with the adjacent property owners for such trespass as he may reasonably anticipate in the performance of the work. All such arrangements shall be reported, in writing, to the Engineer.

GCS - 2

06.00 PROTECTION OF THE PUBLIC AND OF WORK AND PROPERTY

06.01 The Contractor shall continuously maintain adequate protection of all work from damage, and shall take all reasonable precautions to protect the Town from injury or loss arising in connection with the Contract. Such barriers including temporary construction fence as directed by the Engineer, shall not be measured for payment, but rather included in the general cost of the work. Temporary signage shall be measured for payment under the Construction Signs pay item.

06.02 The Contractor shall adequately protect adjacent private and public property as provided by law and the Contract Documents.

06.03 The Contractor shall make good any damage, injury, or loss of his work and to the property of the Town resulting from lack of reasonable protective precautions.

07.00 EXISTING IMPROVEMENTS

07.01 The Contractor shall conduct his work so as to minimize damage to existing improvements.

Except where specifically stated otherwise in the specifications, drawings, or as directed by the Engineer, it will be the responsibility of the Contractor to restore to their original condition, as near as practical, all improvements on public or private property. This shall include:

a. Property within and adjacent to the side of installation such as shrubs, walks, driveways, fences, etc.

b. Utility mains, ducts, poles, and services. The Contractor is hereby notified that utilities, if/where shown on the plans, are at approximate locations. These locations are subject to possible errors in the source of information and errors in transcription. The Contractor shall make certain of the exact location of all mains, ducts, poles, and services prior to excavation.

08.00 SEPARATE CONTRACTS

08.01 The Engineer reserves the right to let other contracts in connection with this work. The

Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate his work with theirs. Wherever work being done by the Town of Glastonbury forces or by other contractors is contiguous to work covered by this Contract, the respective rights of the various interests involved shall be established by the Engineer to secure the completion of the various portions of the work.

09.00 INSPECTION OF WORK

09.01 The Town shall provide sufficient personnel for the inspection of the work.

09.02 The Engineer shall at all times have access to the work whenever it is in preparation or progress, and the Contractor shall provide proper facilities for such access and for inspection.

09.03 If the specifications or the Engineer’s instructions require any work to be specially tested or approved, the Contractor shall give the Engineer timely notice of its readiness for inspection and, if the inspection is by another authority other than the Engineer, of the date

GCS - 3

fixed for such inspection. Inspections by the Engineer shall be made promptly. If any work should be covered up without approval or consent of the Engineer, it must, if required by the Engineer, be uncovered for examination and properly restored at the Contractor’s expense.

09.04 Re-inspection of any work may be ordered by the Engineer. If such work is found to be in accordance with the Contract Documents, the Town shall pay the cost of re-inspection and replacement. If such work is not in accordance with the Contract Documents, the Contractor shall pay such cost.

10.00 RIGHT TO INCREASE OR DECREASE WORK

10.01 The Town shall have the right to increase or decrease the amount of work herein specified as may be required.

11.00 RIGHT OF ENGINEER TO STOP WORK FOR WEATHER CONDITIONS

11.01 Should the work, in the opinion of the Engineer, be in danger by reason of inclemency of weather, or could not be finished in time to prevent such danger, the Contractor shall cease operations upon order of the Engineer, and shall not resume them until ordered to do so by the Engineer when the weather conditions are favorable. The Contractor shall, upon such orders, discontinue work, remove all materials or appliances for or in use upon the work, and place the streets in proper condition for use by the public during the time the work is suspended as herein provided, without cost to the Town.

12.00 CONTRACTOR TO BE RESPONSIBLE FOR IMPERFECT WORK OR MATERIALS

12.01 Any faithful work or imperfect material that may be discovered before the acceptance and the payment of the work shall be corrected upon the order of the Engineer. The acceptance and payment of the work does not in any manner relieve the Contractor of his obligation to construct work in the proper manner and the use of materials herein specified.

13.00 TOWN MAY NOTIFY CONTRACTOR IF WORK IS NOT CARRIED ON

SATISFACTORILY

13.01 If, in the opinion of the Engineer, the Contractor is not proceeding with the work at a sufficient rate of progress so as to finish in the time specified, or has abandoned said work, or is not complying with the terms and stipulations or the Contract and specifications, the Engineer may serve notice on the Contractor to adopt such methods as will ensure the completion of the work in the time specified.

13.02 If, within five days after the Engineer has notified the Contractor that his work is not being carried on satisfactorily as before mentioned, the Engineer shall have the right to annul the Contract and manage the work under the direction of the Engineer, or re-let, for the very best interest of the Town as a new contract, the work under said new Contract shall be considered the responsibility of the defaulting Contractor.

13.03 Additional costs incurred over and above the original Contract shall be borne by the

Contractor.

GCS - 4

14.00 DEDUCTIONS FOR UNCORRECTED WORK

14.01 If the Engineer deems it inexpedient to correct work that has been damaged or that was not done in accordance with the Contract, an equitable deduction from the Contract price shall be made therefore.

14.02 The Contractor shall promptly remove from the premises all materials condemned by the

Engineer as failing to meet Contract requirements, whether incorporated in the work or not, and the Contractor shall promptly replace and re-execute his own work in accordance with the Contract and without expense to the Town, and shall bear the expense of making good all work by other contractors destroyed or damaged by such removal or replacement.

14.03 If the Contractor does not remove such condemned work and materials as promptly as possible after written notice, the Engineer may remove them and store the materials at the expense of the Contractor.

15.00 CLEANING UP

15.01 The Contractor must remove all debris of every description as the work progresses and leave the surroundings in a neat and orderly condition to the satisfaction of the Engineer.

15.02 Upon completion, and before acceptance and final payment, the Contractor shall remove from the site all equipment, forms, surplus material, rubbish and miscellaneous debris and leave the site in a neat and presentable condition.

16.00 ROYALTIES AND PATENTS

16.01 The Contractor shall pay all royalties and license fees. He shall defend all suits or claims for infringement of any patent rights and shall save the Town of Glastonbury harmless from loss on account thereof, except that the Town of Glastonbury shall be responsible for all such loss when a particular manufacturer, product, or process is specified by the Town of Glastonbury.

SPECIAL CONDITIONS

SC - 1

01.00 NOTICE TO CONTRACTOR

01.01 Intent of Contract: The intent of the Contract is to prescribe a complete work or improvement that the Contractor undertakes to do, in full compliance with the specifications, plans, special provisions, proposal, and Contract. The Contractor shall perform all work in close conformity with the lines, grades, typical cross-sections, dimensions, and other data shown on the plans or as modified by written orders, including the furnishing of all materials, implements, machinery, equipment, tools, supplies, transportation, labor, and all other things necessary to the satisfactory prosecution and completion of the project.

Much time and effort has gone into this project in an effort to minimize impact on trees and adjacent properties. Extreme care shall be taken by the Contractor to honor commitments made by the Town. Prior to doing any work, the Contractor should meet with the Engineer to become familiar with the conditions encountered and commitments made.

01.02 The Contractor is hereby alerted to the fact that the State of Connecticut Department of

Transportation Standard Specifications for Roads, Bridges, Facilities and Incidental Construction, Form 819 (Form 819) 2024 latest edition including supplements thereto dated July 2025, are the governing specifications and are to be considered part of the Contract Documents. The Form 819 shall not be provided by the Town and any cost associated therewith shall be the responsibility of the Contractor. In case of any discrepancy between the Contract Drawings or Specifications and the Form 819, the matter shall immediately be submitted to the Engineer. The Engineer shall have sole authority in resolving any discrepancies.

01.03 The Contractor shall ensure that suitable temporary access is provided to all residential and commercial driveways at all times as described in the Special Provision for Maintenance and Protection of Traffic.

01.04 Limitations on work hours are described in Special Conditions Section 17.00 and in the

Special Provisions. The Contractor shall understand and strictly comply with these limitations.

01.05 SEE ADDITIONAL NOTICES TO CONTRACTOR IN SPECIAL PROVISIONS SECTION

02.00 COMMUNICATIONS

02.01 All notices, demands, requests, instructions, approvals, proposals, and claims must be in writing.

02.02 Any notice to, or demand upon, the Contractor shall be sufficiently given if delivered at the office of the Contractor stated on the signature page of the Agreement (or at such other office as the Contractor may, from time to time, designate) in a sealed, postage-prepaid envelope or delivered with charges prepaid to any telegraph company for transmission, in each case addressed to such office.

02.03 All papers required to be delivered to the Town shall, unless otherwise specified in writing to the Contractor, be delivered to the Director of Engineering and Highways, 2155 Main Street, Glastonbury, CT 06033, and any notice to, or demand upon, the Town shall be delivered at the above address in a sealed, postage-prepaid envelope or delivered with charges prepaid to any telegraph company for transmission, in each case addressed to such office or to such other representatives of the Town, or to such other address as the Town may subsequently specify in writing to the Contractor for such purpose.

SC - 2

02.04 Any such notice shall be deemed to have been given as of the time of actual delivery or, in case of mailing, when the same should have been received in due course of post or, in the case of telegrams, at the time of actual receipt, as the case may be.

03.00 PARTIAL USE OF IMPROVEMENTS

03.01 The Town may, at its election, give notice to the Contractor and place in use those sections of the work that have been completed, inspected and can be accepted as complying with the Contractor Documents and if, in its opinion, each such section is reasonably safe and fit for the use and accommodation for which it was intended, provided:

a. The use of such sections of the work shall not materially impede the completion of the remainder of the work by the Contractor.

b. The Contractor shall not be responsible for any damages or maintenance costs due directly to the use of such sections.

c. The use of such sections shall in no way relieve the Contractor of his liability due to having used defective materials or to poor workmanship.

d. The period of guarantee shall not begin until the date of the final acceptance of all work required under this Contract.

04.00 INSURANCE

04.01 The Bidder shall, at its own expense and cost, obtain and keep in force during the entire duration of the Project or Work the following insurance coverage covering the Bidder and all of its agents, employees and sub-contractors and other providers of services and shall name the Town of Glastonbury and their employees and agents as an Additional Insured on a primary and non-contributory basis to the Bidders Commercial General Liability and Automobile Liability policies. These requirements shall be clearly stated in the remarks section on the Bidders Certificate of Insurance. Insurance shall be written with insurance carriers approved in the State of Connecticut and with a minimum Best’s Rating of A-VIII. In addition, all carriers are subject to approval by the Town.

Minimum Limits and requirements are stated below:

a. Worker’s Compensation Insurance:

• Statutory Coverage

• Employer’s Liability

• $1,000,000 each accident/$1,000,000 disease-policy limit/$1,000,000 each employee

• A Waiver of Subrogation shall be provided in favor of the Town of

Glastonbury and their employees and agents

b. Commercial General Liability:

• Including Premises and Operations, Products and Completed Operations, Personal and Advertising Injury, Contractual Liability and Independent Contractors

• Limits of Liability for Bodily Injury and Property Damage Each Occurrence: $1,000,000 Aggregate: $2,000,000 (The Aggregate Limit shall apply separately to each job.)

• A Waiver of Subrogation shall be provided in favor of the Town of Glastonbury and their employees and agents

c. Automobile Insurance:

SC - 3

• Including all owned, hired, borrowed, and non-owned vehicle

• Limit of Liability for Bodily Injury and Property Damage

Per Accident: $1,000,000

• A Waiver of Subrogation shall be provided in favor of the Town of

Glastonbury and their employees and agents

d. Umbrella of Excess Liability:

• State in the Remarks Section that coverage is follow form.

• Limit of Liability Each Occurrence $1,000,000

Aggregate $1,000,000

04.02 The Bidder shall direct its Insurer to provide a Certificate of Insurance to the Town before any work is performed. The Contractor shall be responsible to notify the Town 60 days in advance with written notice of cancellation or non-renewal. The Certificate shall evidence all required coverage. The Bidder shall provide the Town copies of any such insurance policies upon request.

04.03 INDEMNIFICATION: To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the Town and its consultants, agents, and employees (“Indemnitees”) from and against all claims, damages, losses and expenses, direct, indirect or consequential (including but not limited to fees and charges of engineers, attorneys and other professionals and court and arbitration costs) to the extent arising out of or resulting from the performance of the Contractor’s work, provided that such claim, damage, loss or expense is caused in whole or in part by any negligent act or omission by the Contractor, or breach of its obligations herein or by any person or organization directly or indirectly employed or engaged by the Contractor to perform or furnish either of the services, or anyone for whose acts the Contractor may be liable.

04.04 In claims against any person or entity indemnified under this Section 4.03 by an employee of the Contractor, a Subcontractor, anyone directly or indirectly employed by them, or anyone for whose acts they may be liable, the indemnification and defense obligations under this Section shall not be limited by a limitation on amount or type of damages, compensation, or benefits payable by or for the Contractor or a Subcontractor under workers’ compensation acts, disability benefit acts, or other employee benefit acts.

04.05 To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the Indemnitees from and against claims, damages, losses and expenses, including but not limited to attorneys’ fees, arising out of or resulting from any breach or failure of the Contractor to comply with the terms and conditions of the Contract Documents but only to the extent caused by the acts or omissions of the Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder.

This is the start of the file's text. The full file is on GovTribe.