VAPA-RVMU-Specifications_Vol_03.pdf
PDF 4 MB Posted
- Attached to
- Construction - Research and VMU Building Federal contract opportunity
- Solicitation number
- VA10115R0123
About this file
VAPA-RVMU-Specifications Vol 03
View the file
Other files for this federal contract opportunity
Show all 50
Construction - Research and VMU Building has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment
No. Date
Solicitation No.
VA101-15-R-0123
Project No. 640-424
Specifications
Vol. 3 of 5 For: Research and VMU At: VA Medical Center – Palo Alto
3801 Miranda Avenue Palo Alto, California 94304
Construction Documents
30 JULY 2015
Property of Department of Veterans Affairs
VA Medical Center, Palo Alto, California Proj. No. 640-424 Centers for Ambulatory Care, Polytrauma & Blind Rehabilitation Research and VMU
TABLE OF CONTENTS
VOLUME 1: DIVISION 01 - GENERAL REQUIREMENTS
VOLUME 2: DIVISIONS 00, 02 - 14
VOLUME 3: DIVISIONS 21 - 23
VOLUME 4: DIVISIONS 25 - 41
VOLUME 5: APPENDICES A and B
VOLUME 1 OF 5
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 010000 - GENERAL REQUIREMENTS
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION
SECTION 013216.13 - NETWORK ANALYSIS SCHEDULES - MAJOR PROJECTS
SECTION 013323 - SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 013526 – SAFETY REQUIREMENTS
SECTION 014219 - REFERENCE STANDARDS
SECTION 014339.13 - VISUAL MOCKUPS
SECTION 014529 - TESTING LABORATORY SERVICES
SECTION 015719 - TEMPORARY ENVIRONMENTAL CONTROLS
SECTION 015813 - TEMPORARY SIGNAGE
SECTION 016000 - PRODUCT REQUIREMENTS
SECTION 017000 - EXECUTION REQUIREMENTS
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT
SECTION 017700 - CLOSEOUT PROCEDURES
SECTION 018111 - SUSTAINABLE DESIGN REQUIREMENTS
LEED REQUIREMENTS SCORECARD
LEED PRODUCT DATA SUBMITTAL FORM
SECTION 019100 - GENERAL COMMISSIONING REQUIREMENTS
VOLUME 2 OF 5
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 000107 – SEALS
SECTION 000115 – LIST OF DRAWING SHEETS
DIVISION 02 - EXISTING CONDITIONS
SECTION 024100 - DEMOLITION
DIVISION 03 - CONCRETE
SECTION 033000 - CAST-IN-PLACE CONCRETE
SECTION 033300 – ARCHITECTURAL CONCRETE
SECTION 034100 - PRECAST STRUCTURAL CONCRETE FOR STEAM TRENCHES
SECTION 034500 – PRECAST ARCHITECTURAL CONCRETE
SECTION 035200 - INSULATING CONCRETE ROOF INSULATION
DIVISION 04 - MASONRY
CONSTRUCTION DOCUMENTS
TOC
000110 - 1
NOT APPLICABLE
DIVISION 05 - METALS
SECTION 051200 - STRUCTURAL STEEL FRAMING
SECTION 051250 - ARCHITECTURALLY EXPOSED STRUCTURAL
SECTION 051260 - BUCKLING RESTRAINED BRACES
SECTION 053100 – STEEL DECKING
SECTION 053600 - COMPOSITE METAL DECKING
SECTION 054000 – COLD-FORMED METAL FRAMING
SECTION 055000 - METAL FABRICATIONS
SECTION 055113 – METAL PAN STAIRS
SECTION 057005 – LANDSCAPE METALWORK
SECTION 057100 – DECORATIVE METAL STAIRS
SECTION 057313 – GLAZED DECORATIVE METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
SECTION 061000 - ROUGH CARPENTRY
SECTION 061663 – CEMENTITIOUS SHEATHING
SECTION 062000 - FINISH CARPENTRY
SECTION 066400 – PLASTIC PANELING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 070800 – FACILITY EXTERIOR CLOSURE COMMISSIONING
SECTION 071113 – BITUMINOUS DAMPPROOFING (WP-4)
SECTION 071324 – PRE-APPLIED SHEET MEMBRANCE WATERPROOFING (WP-1)
SECTION 071352 - MODIFIED BITUMINOUS SHEET WATERPROOFING (WP-2)
SECTION 071413 – HOT FLUID-APPLIED RUBBERIZED ASPHALT WATERPROOFING(WP-3)
SECTION 072113 - THERMAL INSULATION
SECTION 072200 - ROOF AND DECK INSULATION
SECTION 072613.13 - CONCRETE SLAB APPLIED VAPOR RETARDER
SECTION 072713 – MODIFIED BITUMINOUS SHEET AIR BARRIERS
SECTION 074013 – METAL SIDING PANELS
SECTION 074113.16 – STANDING SEAM METAL ROOF PANELS
SECTION 074213.23 – METAL COMPOSITE MATERIAL WALL PANELS
SECTION 074229 - TERRACOTTA RAINSCREEN PANELS
SECTION 075216.13 - STYRENE-BUTADIENE-STYRENE MODIFIED BITUMINOUS
MEMBRANE ROOFING, COLD-APPLIED
SECTION 075423 – THERMOPLASTIC POLYOLEFIN (TPO) ROOFING
SECTION 076000 - FLASHING AND SHEET METAL
SECTION 077100 - ROOF SPECIALTIES
SECTION 078100 - APPLIED FIREPROOFING
SECTION 078400 – FIRESTOPPING
SECTION 079126 – MODULAR PIPE SEALS
SECTION 079200 - JOINT SEALANTS
DIVISION 08 - OPENINGS
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES
SECTION 081119 – STAINLESS STEEL DOOR FRAMES
SECTION 081400 - INTERIOR WOOD DOORS
SECTION 083113 - ACCESS DOORS AND FRAMES
CONSTRUCTION DOCUMENTS
30 JULY 2015
000110 - 2
SECTION 083300 – COILING DOORS AND GRILLES
SECTION 083473 – SOUND CONTROL DOOR ASSEMBLIES
SECTION 084113 - ALUMINUM-FRAMED ENTRANCES
SECTION 084116 – INTERIOR ALUMINUM-FRAMED-STOREFRONTS
SECTION 084413 - GLAZED ALUMINUM CURTAIN WALLS
SECTION 087100 - DOOR HARDWARE
SECTION 087113 - AUTOMATIC DOOR OPERATORS
SECTION 087113.11 - LOW ENERGY POWER ASSIST DOOR OPERATORS
SECTION 088000 - GLAZING
SECTION 089000 - LOUVERS AND VENTS
DIVISION 09 - FINISHES
SECTION 090600 - SCHEDULE FOR FINISHES
SECTION 092216 - NON-STRUCTURAL METAL FRAMING
SECTION 092400 – PORTLAND CEMENT PLASTERING
SECTION 092900 - GYPSUM BOARD
SECTION 093013 - CERAMIC/PORCELAIN TILING
SECTION 095100 - ACOUSTICAL CEILINGS
SECTION 095126 – ALUMINUM PANEL CEILINGS
SECTION 095426 – LINEAR WOOD CEILINGS
SECTION 096513 - RESILIENT BASE AND ACCESSORIES
SECTION 096516 - RESILIENT SHEET FLOORING
SECTION 096723.50 – RESINOUS EPOXY FLOORING (RES-5)
SECTION 096723.60 - RESINOUS (URETHANE AND EPOXY MORTAR) FLOORING (RES-6)
SECTION 096800 - CARPETING
SECTION 098433 – SOUND-ABSORBING WALL UNITS
SECTION 099100 – PAINTING
SECTION 099654 - POLYVINYLIDENE DIFLOUORIDE (PVDF) COATING SYSTEM
SECTION 099733.01 - RESINOUS COATING SYSTEMS FOR WALLS AND CEILINGS
(RES-C/W)
DIVISION 10 - SPECIALTIES
SECTION 101113 - MARKERBOARDS
SECTION 101400 – SIGNAGE & SCHEDULES
SECTION 102013 – INTERIOR SPECIALTIES
SECTION 102113 - TOILET COMPARTMENTS
SECTION 102123 – CUBICLE CURTAIN TRACKS
SECTION 102213 – WIRE MESH PARTITIONS
SECTION 102600 - WALL AND DOOR PROTECTION
SECTION 102800 - TOILET, BATH, AND LAUNDRY ACCESSORIES
SECTION 104413 - FIRE PROTECTION CABINETS
SECTION 108113 - BIRD CONTROL DEVICES
SECTION 108200 – GREENSCREEN TREILLAGE
DIVISION 11 - EQUIPMENT
SECTION 111313 - LOADING DOCK BUMPERS
SECTION 112443.13 - WINDOW WASHING SYSTEMS SAFETY TIE-BACK ANCHOR
SECTION 113100 – RESIDENTIAL APPLIANCES
SECTION 115000 - MISCELLANEOUS LABORATORY EQUIPMENT
SECTION 115213 – PROJECTION SCREENS
SECTION 115313 - LABORATORY FUME HOODS
CONSTRUCTION DOCUMENTS
30 JULY 2015
000110 - 3
SECTION 115353 - BIOLOGICAL SAFETY CABINETS AND LAMINAR AIRFLOW WORK
STATIONS
SECTION 115361 - CUSTOM FABRICATED LABORATORY EQUIPMENT
SECTION 117102 - LABORATORY WASHING AND STERILIZING EQUIPMENT
SECTION 117112 - ANIMAL DRINKING WATERING SYSTEM
SECTION 118119 – VACUUM BEDDING HANDLING SYSTEM
DIVISION 12 - FURNISHINGS
SECTION 122400 - WINDOW SHADES
SECTION 123100 - MANUFACTURED METAL CASEWORK
SECTION 123103 - FLEXIBLE CASEWORK SYSTEMS
SECTION 123200 – MANUFACTURED WOOD MODULAR CASEWORK
SECTION 123600 - COUNTERTOPS
DIVISION 13 - SPECIAL CONSTRUCTION
SECTION 130541 - SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS
SECTION 132129 - CONSTANT TEMPERATURE ROOMS
SECTION 133423.26 – HAZMAT STORAGE UNIT
DIVISION 14 - CONVEYING EQUIPMENT
SECTION 140800 – COMMISSIONING OF CONVEYING EQUIPMENT
SECTION 142400 - HYDRAULIC ELEVATORS
VOLUME 3 0F 5
DIVISION 21 - FIRE SUPPRESSION
SECTION 210511 – COMMON WORK RESULTS FOR FIRE SUPPRESSION
SECTION 210800 – COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
SECTION 211313 – WET-PIPE SPRINKLER SYSTEMS
DIVISION 22 - PLUMBING
SECTION 220511 - COMMON WORK RESULTS FOR PLUMBING
SECTION 220512 - GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
SECTION 220519 - METERS AND GAGES FOR PLUMBING PIPING
SECTION 220523 - GENERAL-DUTY VALVES FOR PLUMBING PIPING
SECTION 220711 - PLUMBING INSULATION
SECTION 220800 - COMMISSIONING OF PLUMBING SYSTEMS
SECTION 221100 - FACILITY WATER DISTRIBUTION
SECTION 221123 - DOMESTIC WATER PUMPS
SECTION 221300 - FACILITY SANITARY AND VENT PIPING
SECTION 221333 - PACKAGED, SUBMERSIBLE SEWERAGE PUMP UNITS
SECTION 221400 - FACILITY STORM DRAINAGE
SECTION 221436 – PACKAGED, SUBMERSIBLE, DRAINAGE PUMP UNITS
SECTION 221500 - GENERAL SERVICE COMPRESSED-AIR SYSTEMS
SECTION 223500 - DOMESTIC WATER HEAT EXCHANGERS
SECTION 224000 - PLUMBING FIXTURES
SECTION 226200 - VACUUM SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES
CONSTRUCTION DOCUMENTS
30 JULY 2015
000110 - 4
SECTION 226300 - GAS SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES
SECTION 226600 - CHEMICAL-WASTE SYSTEMS FOR LABORATORY AND HEALTHCARE
FACILITIES
SECTION 226719 – DE-IONIZED WATER EQUIPMENT
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
SECTION 230511 - COMMON WORK RESULTS FOR HVAC
SECTION 230512 - GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION
EQUIPMENT
SECTION 230541 - NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT
SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC
SECTION 230711 – HVAC, PLUMBING, AND BOILER PLANT INSULATION
SECTION 230800 - COMMISSIONING OF HVAC SYSTEMS
SECTION 230923 - DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC
SECTION 231123 - FACILITY NATURAL-GAS PIPING
SECTION 232113 - HYDRONIC PIPING
SECTION 232123 - HYDRONIC PUMPS
SECTION 232213 - STEAM AND CONDENSATE HEATING PIPING
SECTION 232223 - STEAM CONDENSATE PUMPS
SECTION 232300 - REFRIGERANT PIPING
SECTION 232500 - HVAC WATER TREATMENT
SECTION 233100 - HVAC DUCTS AND CASINGS
SECTION 233400 – HVAC FANS
SECTION 233600 - AIR TERMINAL UNITS
SECTION 233625 – AIRFLOW CONTROL SYSTEM
SECTION 233700 - AIR OUTLETS AND INLETS
SECTION 233813 – COMMERCIAL CANOPY VAPOR HOODS
SECTION 234000 - HVAC AIR CLEANING DEVICES
SECTION 237200 - AIR-TO-AIR ENERGY RECOVERY EQUIPMENT
SECTION 237413 - OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS
SECTION 238100 - DECENTRALIZED UNITARY HVAC EQUIPMENT
SECTION 238123 – COMPUTER-ROOM AIR-CONDITIONERS
SECTION 238200 – CONVECTION HEATING AND COOLING UNITS
SECTION 238216 – AIR COILS
VOLUME 4 0F 5
DIVISION 25 - INTEGRATED AUTOMATION
NOT USED
DIVISION 26 - ELECTRICAL
SECTION 260511 - REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
SECTION 260513 - MEDIUM-VOLTAGE CABLES
SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
SECTION 260533 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
SECTION 260541 - UNDERGROUND ELECTRICAL CONSTRUCTION
SECTION 260573 - OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY
SECTION 260800 - COMMISSIONING OF ELECTRICAL SYSTEMS
SECTION 260923 - LIGHTING CONTROLS – NONVIVARIUM AREAS
SECTION 260924 – LIGHTING CONTROLS - VIVARIUM
CONSTRUCTION DOCUMENTS
30 JULY 2015
000110 - 5
SECTION 261116 - SECONDARY UNIT SUBSTATIONS
SECTION 261313 - MEDIUM-VOLTAGE CIRCUIT BREAKER SWITCHGEAR
SECTION 261333 – GENERATOR PARALLELING SWITCHGEAR
SECTION 262011 - ISOLATED POWER SYSTEMS
SECTION 262200 - LOW-VOLTAGE TRANSFORMERS
SECTION 262300 - LOW-VOLTAGE SWITCHGEAR
SECTION 262413 - DISTRIBUTION SWITCHBOARDS
SECTION 262416 - PANELBOARDS
SECTION 262713 – ELECTRICAL METERING
SECTION 262726 - WIRING DEVICES
SECTION 262911 - MOTOR CONTROLLERS
SECTION 262921 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS
SECTION 263005 – PHOTOVOLTAIC SYSTEMS (FOR REFERENCE ONLY)
SECTION 263623 - AUTOMATIC TRANSFER SWITCHES
SECTION 264100 - FACILITY LIGHTNING PROTECTION
SECTION 264200 – CATHODIC PROTECTION
SECTION 264313 - SURGE PROTECTIVE DEVICE
SECTION 265100 - INTERIOR LIGHTING
SECTION 265571 - MEDICAL AND SURGICAL EXAM LIGHTING FIXTURES
SECTION 265600 - EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
SECTION 270511 - REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS
SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
SECTION 270533 - RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS
SECTION 270543 - UNDERGROUND DUCTS AND RACEWAYS FOR COMMUNICATIONS
SECTION 270800 – COMMISSIONING OF COMMUNICATION SYSTEMS
SECTION 270811 - TESTING FOR COMMUNICATIONS
SECTION 271100 - COMMUNICATIONS EQUIPMENT ROOM FITTINGS
SECTION 271313 - TELECOMMUNICATION BACKBONE TWISTED PAIR CABLING
SECTION 271314 - COMMUNICATIONS BACKBONE OSP TWISTED PAIR CABLING
SECTION 271323 - TELECOMMUNICATION BACKBONE ISP FIBER CABLING
SECTION 271324 - COMMUNICATIONS BACKBONE OSP FIBER CABLING
SECTION 271500 - COMMUNICATIONS HORIZONTAL CABLING
SECTION 274116 - INTEGRATED AUDIOVISUAL SYSTEMS
SECTION 274131 - MASTER ANTENNA TV EQUIPMENT AND SYSTEMS
SECTION 275116 - PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
SECTION 280511 - BASIC SECURITY REQUIREMENTS
SECTION 280513 - SECURITY SYSTEM CABLING
SECTION 280553 - SECURITY SYSTEM LABELING
SECTION 280800 - COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEM
SECTION 281300 - ACCESS AND ALARM MONITORING SYSTEM
SECTION 282600 - ENTRY PHONE SYSTEM
SECTION 283100 – DETECTION AND ALARM
DIVISION 31 - EARTHWORK
SECTION 312000 – EARTHWORK
SECTION 312319 – DEWATERING
SECTION 312323.33 - FLOWABLE FILL
CONSTRUCTION DOCUMENTS
30 JULY 2015
000110 - 6
SECTION 315100 - EXCAVATION SUPPORT AND PROTECTION
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 320523 - CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS
SECTION 321216 - ASPHALT PAVING
SECTION 321723 - PAVEMENT MARKINGS
SECTION 323153 – PERIMETER SECURITY FENCES AND GATES
SECTION 328400 - PLANTING IRRIGATION
SECTION 329000 – PLANTING
DIVISION 33 - UTILITIES
SECTION 330800 – COMMISSIONING FO SITE UTILITY SYSTEMS
SECTION 331000 - WATER UTILITIES
SECTION 333000 - SANITARY SEWER UTILITIES
SECTION 334000 - STORM SEWER UTILITIES
SECTION 334613 – FOUNDATION DRAINAGE
SECTION 335100 – NATURAL GAS DISTRIBUTION
SECTION 336300 – STEAM ENERGY DISTRIBUTION
DIVISION 34 – TRANSPORTATION
SECTION 347513.13 – ACTIVE VEHICLE BARRIERS
DIVISION 41 – MATERIALS PROCESSING AND HANDLING EQUIPMENT
SECTION 412200 – HOISTS AND CRANES
VOLUME 5 OF 5
APPENDIX A – Geotechnical Investigation: Phase 2 Improvements – Packages 1, 2, 3, and 5
APPENDIX B – Storm Water Pollution Prevention Plan
000110 - 7
Construction Documents 210511 - 1
SECTION 21 05 11
COMMON WORK RESULTS FOR FIRE SUPPRESSION
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section apply to all sections of Division 21.
B. Definitions:
1. Exposed: Piping and equipment exposed to view in finished rooms.
2. Option or optional: Contractor's choice of an alternate material or method.
1.2 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS.
B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
C. Excavation and Backfill: Section 31 20 00, EARTH MOVING.
D. Concrete and Grout: Section 03 30 00, CAST-IN-PLACE CONCRETE.
E. Building Components for Attachment of Hangers: Section 05 31 00, STEEL
DECKING and Section 05 36 00, COMPOSITE METAL DECKING.
F. Section 05 50 00, METAL FABRICATIONS.
G. Section 07 84 00, FIRESTOPPING.
H. Flashing for Wall and Roof Penetrations: Section 07 60 00, FLASHING AND
SHEET METAL.
I. Section 07 92 00, JOINT SEALANTS.
J. Section 09 91 00, PAINTING.
K. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS
L. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
1.3 QUALITY ASSURANCE
A. Products Criteria:
1. Standard Products: Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of the products for at least 3 years. See other specification sections for any exceptions.
2. Equipment Service: Products shall be supported by a service organization which maintains a complete inventory of repair parts and is located reasonably close to the site.
3. Multiple Units: When two or more units of materials or equipment of the same type or class are required, these units shall be products of one manufacturer.
Construction Documents 210511 - 2
4. Assembled Units: Manufacturers of equipment assemblies, which use components made by others, assume complete responsibility for the final assembled product.
5. Nameplates: Nameplate bearing manufacturer's name or identifiable trademark shall be securely affixed in a conspicuous place on equipment, or name or trademark cast integrally with equipment, stamped or otherwise permanently marked on each item of equipment.
6. Asbestos products or equipment or materials containing asbestos shall not be used.
B. Manufacturer's Recommendations: Where installation procedures or any part thereof are required to be in accordance with the recommendations of the manufacturer of the material being installed, printed copies of these recommendations shall be furnished to the Resident Engineer prior to installation. Installation of the item will not be allowed to proceed until the recommendations are received. Failure to furnish these recommendations can be cause for rejection of the material.
C. Guaranty: Refer to Contract Documents.
D. Supports for sprinkler piping shall be in conformance with NFPA 13.
E. Supports for standpipe shall be in conformance with NFPA 14.
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
B. Manufacturer's Literature and Data: Submit under the pertinent section rather than under this section.
1. Equipment and materials identification.
2. Fire-stopping materials.
3. Hangers, inserts, supports and bracing. Provide load calculations for variable spring and constant support hangers.
4. Wall, floor, and ceiling plates.
C. Coordination Drawings: Provide detailed layout drawings of all piping systems. In addition provide details of the following.
1. Mechanical equipment rooms.
2. Interstitial space.
3. Hangers, inserts, supports, and bracing.
4. Pipe sleeves.
5. Equipment penetrations of floors, walls, ceilings, or roofs.
D. Maintenance Data and Operating Instructions:
Construction Documents 210511 - 3
1. Maintenance and operating manuals in accordance with Section 01 00
00, GENERAL REQUIREMENTS, Article, INSTRUCTIONS, for systems and equipment.
2. Provide a listing of recommended replacement parts for keeping in stock supply, including sources of supply, for equipment. Include in the listing belts for equipment.
1.5 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American Society for Testing and Materials (ASTM):
A36/A36M-2001...........Carbon Structural Steel
A575-96.................Steel Bars, Carbon, Merchant Quality, M-Grades
R (2002)
E84-2003................Standard Test Method for Burning
Characteristics of Building Materials
E119-2000...............Standard Test Method for Fire Tests of Building
Construction and Materials
C. National Fire Protection Association (NFPA):
90A-09..................Installation of Air Conditioning and
Ventilating Systems
101-09..................Life Safety Code
PART 2 - PRODUCTS
2.1 LIFTING ATTACHMENTS
Provide equipment with suitable lifting attachments to enable equipment to be lifted in its normal position. Lifting attachments shall withstand any handling conditions that might be encountered, without bending or distortion of shape, such as rapid lowering and braking of load.
2.2 EQUIPMENT AND MATERIALS IDENTIFICATION
A. Use symbols, nomenclature and equipment numbers specified, shown on the drawings and shown in the maintenance manuals. Identification for piping is specified in Section 09 91 00, PAINTING.
B. Interior (Indoor) Equipment: Engraved nameplates, with letters not less than 48 mm (3/16-inch) high of brass with black-filled letters, or rigid black plastic with white letters specified in Section 09 91 00, Construction Documents 210511 - 4
PAINTING permanently fastened to the equipment. Identify unit components such as coils, filters, fans, etc.
C. Exterior (Outdoor) Equipment: Brass nameplates, with engraved black filled letters, not less than 48 mm (3/16-inch) high riveted or bolted to the equipment.
D. Control Items: Label all temperature and humidity sensors, controllers and control dampers. Identify and label each item as they appear on the control diagrams.
E. Valve Tags and Lists:
1. Valve tags: Engraved black filled numbers and letters not less than
13 mm (1/2-inch) high for number designation, and not less than 6.4 mm(1/4-inch) for service designation on 19 gage 38 mm (1-1/2 inches) round brass disc, attached with brass "S" hook or brass chain.
2. Valve lists: Typed or printed plastic coated card(s), sized 216 mm
(8-1/2 inches) by 280 mm (11 inches) showing tag number, valve function and area of control, for each service or system. Punch sheets for a 3-ring notebook.
3. Provide detailed plan for each floor of the building indicating the location and valve number for each valve. Identify location of each valve with a color coded thumb tack in ceiling.
2.3 FIRESTOPPING
Section 07 84 00, FIRESTOPPING specifies an effective barrier against the spread of fire, smoke and gases where penetrations occur for piping.
2.4 GALVANIZED REPAIR COMPOUND
Mil. Spec. DOD-P-21035B, paint form.
2.5 PIPE PENETRATIONS
A. Install sleeves during construction for other than blocked out floor openings for risers in mechanical bays.
B. To prevent accidental liquid spills from passing to a lower level, provide the following:
1. For sleeves: Extend sleeve 25 mm (one inch) above finished floor and provide sealant for watertight joint.
2. For blocked out floor openings: Provide 40 mm (1-1/2 inch) angle set in silicone adhesive around opening.
3. For drilled penetrations: Provide 40 mm (1-1/2 inch) angle ring or square set in silicone adhesive around penetration.
Construction Documents 210511 - 5
C. Penetrations are not allowed through beams or ribs, but may be installed in concrete beam flanges. Any deviation from this requirement must receive prior approval of Resident Engineer.
D. Sheet Metal, Plastic, or Moisture-resistant Fiber Sleeves: Provide for pipe passing through floors, interior walls, and partitions, unless brass or steel pipe sleeves are specifically called for below.
E. Cast Iron or Zinc Coated Pipe Sleeves: Provide for pipe passing through exterior walls below grade. Make space between sleeve and pipe watertight with a modular or link rubber seal. Seal shall be applied at both ends of sleeve.
F. Galvanized Steel or an alternate Black Iron Pipe with asphalt coating
Sleeves: Provide for pipe passing through concrete beam flanges, except where brass pipe sleeves are called for. Provide sleeve for pipe passing through floor of mechanical rooms, laundry work rooms, and animal rooms above basement. Except in mechanical rooms, connect sleeve with floor plate.
G. Brass Pipe Sleeves: Provide for pipe passing through quarry tile, terrazzo or ceramic tile floors. Connect sleeve with floor plate.
H. Sleeves are not required for wall hydrants for fire department connections or in drywall construction.
I. Sleeve Clearance: Sleeve through floors, walls, partitions, and beam flanges shall be one inch greater in diameter than external diameter of pipe. Sleeve for pipe with insulation shall be large enough to accommodate the insulation. Interior openings shall be caulked tight with fire stopping material and sealant to prevent the spread of fire, smoke, and gases.
J. Sealant and Adhesives: Shall be as specified in Section 07 92 00, JOINT
SEALANTS.
2.6 TOOLS AND LUBRICANTS
A. Furnish, and turn over to the Resident Engineer, special tools not readily available commercially, that are required for disassembly or adjustment of equipment and machinery furnished.
B. Grease Guns with Attachments for Applicable Fittings: One for each type of grease required for each motor or other equipment.
C. Tool Containers: Hardwood or metal, permanently identified for intended service and mounted, or located, where directed by the Resident
Engineer.
Construction Documents 210511 - 6
D. Lubricants: A minimum of 0.95 L (one quart) of oil, and 0.45 kg (one pound) of grease, of equipment manufacturer's recommended grade and type, in unopened containers and properly identified as to use for each different application.
2.7 WALL, FLOOR AND CEILING PLATES
A. Material and Type: Chrome plated brass or chrome plated steel, one piece or split type with concealed hinge, with set screw for fastening to pipe, or sleeve. Use plates that fit tight around pipes, cover openings around pipes and cover the entire pipe sleeve projection.
B. Thickness: Not less than 2.4 mm (3/32-inch) for floor plates. For wall and ceiling plates, not less than 0.64 mm (0.025-inch) for up to 80 mm
(3-inch pipe), 0.89 mm (0.035-inch) for larger pipe.
C. Locations: Use where pipe penetrates floors, walls and ceilings in exposed locations, in finished areas only. Use also where insulation ends on exposed water supply pipe drop from overhead. Provide a watertight joint in spaces where brass or steel pipe sleeves are specified.
2.8 SEALANTS FOR VIVARIUM
A. At areas in Level V Vivarium that require vermin and microorganism control, seal all fire sprinkler piping, fire sprinkler system components, and seismic bracing components. See Architectural drawing
AE2.1.1 for boundaries and additional requirements. Provide sealant type 1 to attain fully caulked joints:
1. As indicated in the drawings and specifications.
2. At all penetrations through partitions, ceiling and floors.
3. At interface of partitions, ceilings and floors with door frames, window frames, wall protection system brackets and anchor plates, corner and edge guards, floor drains, trench drains, casework and any other fixed element interfacing with partitions, ceilings and floors.
4. At interface of partitions, ceilings and floors with with escutcheon plates and trim, including, but not limited to, escutcheon plats and trim of pipes, ducts, conduits, fire extinguisher cabinets, fire hose cabinets, electrical panels, plumbing panels, control panels and access doors.
5. At gaps created at the interface of materials, systems, fixed equipment and fixed devices.
Construction Documents 210511 - 7
B. Sealants must be vermin and microorganism-proof and resist passage of microorganisms. Sealants that will be in contact with chemicals used in the Vivarium must also be able to resist Chlorine (bleach) and
Hydrogen Peroxide.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Coordinate location of piping, sleeves, inserts, hangers, and equipment. Locate piping, sleeves, inserts, hangers, and equipment clear of windows, doors, openings, light outlets, and other services and utilities. Follow manufacturer's published recommendations for installation methods not otherwise specified.
B. Protection and Cleaning:
1. Equipment and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation, in accordance with the manufacturer's recommendations and as approved by the Resident Engineer. Damaged or defective items in the opinion of the Resident Engineer, shall be replaced.
2. Protect all finished parts of equipment, such as shafts and bearings where accessible, from rust prior to operation by means of protective grease coating and wrapping. Close pipe openings with caps or plugs during installation. Tightly cover and protect equipment against dirt, water chemical, or mechanical injury. At completion of all work thoroughly exposed materials and equipment.
C. Concrete and Grout: Use concrete and shrink compensating grout 25 MPa
(3000 psi) minimum, specified in Section 03 30 00, CAST-IN-PLACE
CONCRETE.
D. Install gages, valves, and other devices with due regard for ease in reading or operating and maintaining said devices. Locate and position gages to be easily read by operator or staff standing on floor or walkway provided. Servicing shall not require dismantling adjacent equipment or pipe work.
E. Work in Existing Building:
1. Perform as specified in Article, OPERATIONS AND STORAGE AREAS, Article, ALTERATIONS, and Article, RESTORATION of the Section 01 00
00, GENERAL REQUIREMENTS for relocation of existing equipment, alterations and restoration of existing building(s).
Construction Documents 210511 - 8
2. As specified in Section 01 00 00, GENERAL REQUIREMENTS, Article, OPERATIONS AND STORAGE AREAS, make alterations to existing service piping at times that will least interfere with normal operation of the facility.
3. Cut required openings through existing masonry and reinforced concrete using diamond core drills. Use of pneumatic hammer type drills, impact type electric drills, and hand or manual hammer type drills, will be permitted only with approval of the Resident
Engineer. Locate openings that will least effect structural slabs, columns, ribs or beams. Refer to the Resident Engineer for determination of proper design for openings through structural sections and opening layouts approval, prior to cutting or drilling into structure. After Resident Engineer's approval, carefully cut opening through construction no larger than absolutely necessary for the required installation.
F. Switchgear Drip Protection: Every effort shall be made to eliminate the installation of pipe above electrical and telephone switchgear. If this is not possible, encase pipe in a second pipe with a minimum of joints.
G. Inaccessible Equipment:
1. Where the Government determines that the Contractor has installed equipment not conveniently accessible for operation and maintenance, equipment shall be removed and reinstalled or remedial action performed as directed at no additional cost to the Government.
2. The term "conveniently accessible" is defined as capable of being reached without the use of ladders, or without climbing or crawling under or over obstacles such as motors, fans, pumps, belt guards, transformers, high voltage lines, piping, and ductwork.
3.2 LUBRICATION
Field check and lubricate equipment requiring lubrication prior to initial operation.
3.3 STARTUP AND TEMPORARY OPERATION
Startup equipment as described in equipment specifications. Temporary use of equipment is specified in Section 01 00 00, GENERAL
REQUIREMENTS, Article, TEMPORARY USE OF MECHANICAL AND ELECTRICAL
EQUIPMENT.
Construction Documents 210511 - 9
3.4 OPERATING AND PERFORMANCE TESTS
A. Prior to the final inspection, perform required tests as specified in
Section 01 00 00, GENERAL REQUIREMENTS, Article, TESTS and submit the test reports and records to the Resident Engineer.
B. Should evidence of malfunction in any tested system, or piece of equipment or component part thereof, occur during or as a result of tests, make proper corrections, repairs or replacements, and repeat tests at no additional cost to the Government.
C. When completion of certain work or system occurs at a time when final control settings and adjustments cannot be properly made to make performance tests, then make performance tests for heating systems and for cooling systems respectively during first actual seasonal use of respective systems following completion of work.
3.5 INSTRUCTIONS TO VA PERSONNEL
Provide in accordance with Article, INSTRUCTIONS, of Section 01 00 00, GENERAL REQUIREMENTS.
- - - E N D - - -
05-01-15
SECTION 21 08 00
COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section apply to all sections of Division 21.
B. This project will have selected building systems commissioned. The complete list of equipment and systems to be commissioned is specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00 GENERAL COMMISSIONING REQUIRMENTS. A
Commissioning Agent (CxA) appointed by the VA will manage the commissioning process.
1.2 RELATED WORK
A. Section 01 00 00 GENERAL REQUIREMENTS.
B. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.
C. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
1.3 SUMMARY
A. This Section includes requirements for commissioning the Fire
Suppression systems, subsystems and equipment. This Section supplements the general requirements specified in Section 01 91 00
General Commissioning Requirements.
B. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members.
1.4 DEFINITIONS
A. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for definitions.
1.5 COMMISSIONED SYSTEMS
A. Commissioning of a system or systems specified in Division 21 is part of the construction process. Documentation and testing of these systems, as well as training of the VA’s Operation and Maintenance personnel in accordance with the requirements of Section 01 91 00 and of Division 21, is required in cooperation with the VA and the
Commissioning Agent.
B. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for a list of systems to be commissioned.
21 08 00 - 1
1.6 SUBMITTALS
A. The commissioning process requires review of selected Submittals. The
Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to
Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.
B. The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL
COMMISSIONING REQUIREMENTS.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 CONSTRUCTION INSPECTIONS
A. Commissioning of the building fire suppression systems will require inspection of individual elements of the fire suppression construction throughout the construction period. The Contractor shall coordinate with the Commissioning Agent in accordance with Section 01 19 00 and the Commissioning plan to schedule inspections as required to support the Commissioning Process.
3.2 PRE-FUNCTIONAL CHECKLISTS
A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional Performance Testing. The
Commissioning Agent will prepare Pre-Functional Checklists to be used to document equipment installation. The Contractor shall complete the checklists. Completed checklists shall be submitted to the VA and to the Commissioning Agent for review. The Commissioning Agent may spot check a sample of completed checklists. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the
Commissioning Agent determines that a significant number of completed checklists for similar equipment are not accurate, the Commissioning
Agent will select a broader sample of checklists for review. If the
Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all the checklists for the type of equipment will be returned to the Contractor for correction and
21 08 00 - 2 resubmission. Refer to SECTION 01 91 00 GENERAL COMMISSIONING
REQUIREMENTS for submittal requirements for Pre-Functional Checklists, Equipment Startup Reports, and other commissioning documents.
3.3 CONTRACTORS TESTS
A. Contractor tests as required by other sections of Division 21 shall be scheduled and documented in accordance with Section 01 00 00 GENERAL
REQUIREMENTS. All testing shall be incorporated into the project schedule. Contractor shall provide no less than 7 calendar days’ notice of testing. The Commissioning Agent will witness selected
Contractor tests at the sole discretion of the Commissioning Agent.
Contractor tests shall be completed prior to scheduling Systems
Functional Performance Testing.
3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING
A. The Commissioning Process includes Systems Functional Performance
Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency conditions. The Commissioning Agent will prepare detailed Systems
Functional Performance Test procedures for review and approval by the
COR. The Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning Agent will witness and document the testing.
The Contractor shall sign the test reports to verify tests were performed. See Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS, for additional details.
3.5 TRAINING OF VA PERSONNEL
A. Training of the VA operation and maintenance personnel is required in cooperation with the COR and Commissioning Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the requirements of Section 01 19 00. The instruction shall be scheduled in coordination with the COR after submission and approval of formal training plans. Refer to Section 01 91 00 GENERAL COMMISSIONING
REQUIREMENTS and Division 21 Sections for additional Contractor training requirements.
21 08 00 - 3
----- END -----
21 08 00 - 4
Construction Documents 211313 - 1
30 JULY 2015 VA Ver. 05-08
SECTION 21 13 13
WET-PIPE SPRINKLER SYSTEMS
PART 1 - GENERAL
1.1 SCOPE OF WORK
A. Design, installation and testing shall be in accordance with
1. NFPA 13 except for specified exceptions.
B. The design and installation of a hydraulically calculated automatic wet system complete and ready for operation, for all portions of the
Research and VMU Building.
1.2 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Section 33 10 00, WATER UTILITIES.
C. Section 07 84 00, FIRESTOPPING, Treatment of penetrations through rated enclosures.
D. Section 09 91 00, PAINTING.
E. Section 28 31 00, FIRE DETECTION AND ALARM, Connection to fire alarm of flow switches, pressure switches and valve supervisory switches.
F. Section 21 05 11 COMMON WORK RESULTS FOR FIRE SUPPRESSION
1.3 QUALITY ASSURANCE
A. Installer Reliability: The installer shall possess a valid State of
California fire sprinkler contractor's license. The installer shall have been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.
B. Materials and Equipment: All equipment and devices shall be of a make and type listed by UL and approved by FM, or other nationally recognized testing laboratory for the specific purpose for which it is used. All materials, devices, and equipment shall be approved by the
VA.
C. Submittals: Submit as one package in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detailed working drawings that are signed by a NICET Level III or Level IV Sprinkler
Technician or stamped by a Registered Professional Engineer practicing in the field of Fire Protection Engineering. As Government review is for technical adequacy only, the installer remains responsible for correcting any conflicts with other trades and building construction
Construction Documents 211313 - 2 that arise during installation. Partial submittals will not be accepted. Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in notebooks or binders and provide index referencing the appropriate specification section. Submittals shall include, but not be limited to, the following:
1. Qualifications:
a. Provide a copy of the installing contractors fire sprinkler and state contractors license.
b. Provide a copy of the NICET certification for the NICET Level
III or Level IV Sprinkler Technician who prepared and signed the detailed working drawings unless the drawings are stamped by a Registered Professional Engineer practicing in the field of Fire Protection Engineering.
2. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to NFPA 13. Include a site plan showing the piping to the water supply test location.
3. Manufacturers Data Sheets:
a. For backflow preventers (to be provided by Civil), provide flow test curves from UL, FM, or the Foundation for Hydraulic
Research and Cross-Connection Control to verify pressure loss calculations.
b. Provide for materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets. Where data sheet describes items in addition to that item being submitted, clearly identify proposed item on the sheet.
4. Calculation Sheets: Submit hydraulic calculation sheets in tabular form conforming to the requirements and recommendations of NFPA 13.
5. Final Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requirements in
Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
Submittals shall include, but not be limited to, the following:
a. One complete set of reproducible as-built drawings showing the installed system with the specific interconnections between the waterflow switch or pressure switch and the fire alarm equipment.
b. Complete, simple, understandable, step-by-step, testing instructions giving recommended and required testing frequency of all equipment, methods for testing all equipment, and a complete trouble shooting manual. Provide maintenance instructions on replacing any components of the system including internal parts, periodic cleaning and adjustment of the equipment and components with information as to the address and telephone number of both the manufacturer and the local supplier of each item.
c. Material and Testing Certificate: Upon completion of the sprinkler system installation or any partial section of the system, including testing and flushing, provide a copy of a
Construction Documents 211313 - 3 completed Material and Testing Certificate as indicated in
NFPA 13.
d. Certificates shall document all parts of the installation.
e. Instruction Manual: Provide one copy of the instruction manual covering the system in a flexible protective cover and mount in an accessible location adjacent to the riser.
D. Design Basis Information: Provide design, materials, equipment, installation, inspection, and testing of the automatic sprinkler system in accordance with the requirements of NFPA 13. Recommendations in appendices shall be treated as requirements.
1. Perform hydraulic calculations in accordance with NFPA 13 utilizing the Area/Density method. Do not restrict design area reductions permitted for using quick response sprinklers throughout by the required use of standard response sprinklers in the areas identified in this section.
2. Sprinkler Protection: To determining spacing and sizing, apply the following coverage classifications:
a. Light Hazard Occupancies: Patient care, treatment, and customary access areas.
b. Ordinary Hazard Group 1 Occupancies: Laboratories, Mechanical
Equipment Rooms, Transformer Rooms, Electrical Switchgear
Rooms, Electric Closets, Elevator Shafts, Elevator Machine
Rooms, Refrigeration Service Rooms, Repair Shops.
c. Ordinary Hazard Group 2 Occupancies: Storage rooms, trash rooms, clean and soiled linen rooms, pharmacy and associated storage, laundry, kitchens, kitchen storage areas, retail stores, retail store storage rooms, storage areas, building management storage, boiler plants, energy centers, warehouse spaces, file storage areas for the entire area of the space up to 140 square meters (1500 square feet) and Supply
Processing and Distribution (SPD).
d. Request clarification from the Government for any hazard classification not identified.
3. Hydraulic Calculations: Calculated demand including hose stream requirements shall fall no less than 10 percent below the available water supply curve.
4. Water Supply: Base water supply on a flow test of the following.
A safety factor shall be included by calculating the demand to a point no greater than 10% below the available water supply curve.
Contractor to conduct new water test once underground mains have been re-routed and prior to shop drawing submittal:
a. Location Fire Hydrant #7
b. Elevation Static Test Gauge Unknown
c. Elevation Residual Test Gauge Unknown
d. Static pressure: 85 psi
e. Residual pressure: 75 psi
f. Flow: 1,063 gpm
g. Date: February 24, 2009 Time 1:50 pm
Construction Documents 211313 - 4
5. Zoning:
a. For each sprinkler zone provide a control valve, flow switch and a test and drain assembly with pressure gauge.
b. Sprinkler zones shall conform to the smoke barrier zones shown on the drawings.
c. Provide seismic protection in accordance with NFPA 13.
1.4 APPLICABLE PUIBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. National Fire Protection Association (NFPA):
1. 13-2007 Installation of Sprinkler Systems
2. 101-2009 Safety to Life from Fire in Buildings and Structures
(Life Safety Code)
3. 170-2006 Fire Safety Symbols
C. Underwriters Laboratories, Inc. (UL):
D. Fire Protection Equipment Directory – 2001
E. Factory Mutual Engineering Corporation (FM):
1. Approval Guide – Online Version
F. Foundation for Cross-Connection Control and Hydraulic Research-2005
PART 2 - PRODUCTS
2.1 PIPING & FITTINGS
A. Sprinkler systems in accordance with NFPA 13. Use nonferrous piping in
MRI Scanning Rooms.
2.2 VALVES
A. Valves in accordance with NFPA 13.
B. Do not use quarter turn ball valves for 2 inch or larger drain valves.
C. The wet system control valve shall be a listed indicating type valve.
Control valve shall be UL Listed and FM Approved for fire protection installations. System control valve shall be rated for normal system pressure but in no case less than 175 PSI. (No Substitutions Allowed).
D. Alarm valve shall be UL Listed and Factory Mutual Approved. The alarm valve shall be equipped with a removable cover assembly. The alarm valve shall be listed for installation in the vertical or horizontal position. The alarm valve shall be equipped with gauge connections on
Construction Documents 211313 - 5 the system side and supply side of the valve clapper. The alarm valve shall be equipped with an external bypass to eliminate false water flow alarms. The alarm valve trim piping shall be externally galvanized. Maximum water working pressure to 250 PSI.
E. Automatic Ball Drips: Cast brass 20 mm (3/4 inch) in-line automatic ball drip with both ends threaded with iron pipe threads.
2.3 FIRE DEPARTMENT SIAMESE CONNECTION
A. (To be provided by Civil) Brass, exterior fire department connection with brass escutcheon plate, without sill cock, and a minimum of two
65 mm (2-1/2 inch) connections threaded to match those on the local fire protection service, with polished brass caps and chains. Provide escutcheon with integral raised letters "Standpipe and Automatic
Sprinkler".
2.4 SPRINKLERS
A. All sprinklers except “institutional” type sprinklers shall be FM approved. Provide quick response sprinklers in all areas, except where specifically prohibited by their listing or approval.
1. Cold storage rooms: Standard response dry pendant sprinklers.
2. Elevator machine rooms: Standard response sprinklers.
3. Elevator pit: sidewall sprinklers.
4. In generator rooms: Standard response sprinklers.
5. (Note: Provide ‘cages’ to protect sprinkler heads from breakage/damage when the elevation of the head is less than 7 feet 6 inches above finished floor (mechanical rooms, janitor closets, etc).
B. Temperature Ratings: In accordance with NFPA 13, except as follows:
1. Sprinklers in elevator pits, and elevator machine rooms:
Intermediate temperature rated.
2. Sprinklers in Generator Rooms: High temperature rated.
2.5 SPRINKLER CABINET
A. Provide sprinkler cabinet with the required number of sprinkler heads of all ratings and types installed, and a sprinkler wrench for each system. Locate adjacent to the riser. Sprinkler heads shall be installed in center of tile or center to center.
2.6 IDENTIFICATION SIGNS/HYDRAULIC PLACARDS
A. Plastic, steel or aluminum signs with white lettering on a red background with holes for easy attachment. Enter pertinent data for each system on the hydraulic placard.
Construction Documents 211313 - 6
2.7 SWITCHES:
A. Contain in a weatherproof die cast/red baked enamel, oil resistant, aluminum housing with tamper resistant screws, 13 mm (1/2 inch) conduit entrance and necessary facilities for attachment to the valves. Provide two SPDT switches rated at 2.5 amps at 24 VDC.
B. Water flow Alarm Switches: Mechanical, non-coded, non-accumulative retard and adjustable from 0 to 60 seconds minimum. Set flow switches at an initial setting between 20 and 30 seconds.
C. Pressure Switches: Activation by any flow of water equal to or in excess of the discharge from one sprinkler. Water Flow Indicating
Pressure Switch will activate an alarm by way of an alarm pressure switch. The alarm pressure switch shall be compatible with system devices. The alarm pressure enclosure shall be UL Listed and Factory
Mutual Approved for the application in which it is used. The alarm pressure switch shall have the ability to be wired for Class A or
Class B service.
D. Valve Supervisory Switches for Ball and Butterfly Valves: May be integral with the valve.
2.8 GAUGES
A. Provide gauges as required by NFPA 13.
2.9 PIPE HANGERS AND SUPPORTS
A. Supports, hangers, etc., of an approved pattern placement to conform to NFPA 13. System piping shall be substantially supported to the building structure. The installation of hangers and supports shall adhere to the requirements set forth in NFPA 13, Standard for
Installation of Sprinkler Systems. Materials used in the installation or construction of hangers and supports shall be listed and approved for such application. Hangers or supports not specifically listed for service shall be designed and bear the seal of a professional engineer.
2.10 WALL, FLOOR AND CEILING PLATES
A. Provide chrome plated steel escutcheon plates for exposed piping passing though walls, floors or ceilings.
2.7 SEALANTS FOR VIVARIUM
A. At areas in Level V Vivarium that require vermin and microorganism control, seal all fire sprinkler piping, fire sprinkler system components, and seismic bracing components. See Architectural drawing
AE2.1.1 for boundaries and additional requirements. Provide sealant type 1 to attain fully caulked joints:
1. As indicated in the drawings and specifications.
Construction Documents 211313 - 7
2. At all penetrations through partitions, ceiling and floors.
3. At interface of partitions, ceilings and floors with door frames, window frames, wall protection system brackets and anchor plates, corner and edge guards, floor drains, trench drains, casework and any other fixed element interfacing with partitions, ceilings and floors.
4. At interface of partitions, ceilings and floors with with escutcheon plates and trim, including, but not limited to,…