VOLUME_6a.pdf
PDF 44 MB Posted
- Attached to
- Construction - Research and VMU Building Federal contract opportunity
- Solicitation number
- VA10115R0123
About this file
VOLUME 6a
View the file
Other files for this federal contract opportunity
Show all 50
Construction - Research and VMU Building has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS - PALO ALTO CALIFORNIA
CENTERS FOR AMBULATORY CARE, POLYTRAUMA AND BLIND REHABILITATION
ARCHITECT
301 BATTERY STREET, 7TH FLOOR
SAN FRANCISCO, CA 94111
T 415.227.0100 F 415.908.0862 www.smithgroup.com
1629 TELEGRAPH AVE, #500
OAKLAND, CA 94612
T 415.777.3737 F 415.777.3476 www.dpsf.com
The Design Partnership LLP Architects + Planners
CIVIL LANDSCAPE STRUCTURAL MECHANICAL / PLUMBING ELECTRICAL
ELEVATOR
GEOTECHNICAL COMMUNICATION
SIGNAGE FIRE PROTECTION CODE COST ESTIMATE
BKF ENGINEERS
980 - 9TH STREET, SUITE 1770
SACRAMENTO, CA 95814
916.556.5800 T
916.556.5899 F
ROYSTON HANAMOTO ALLEY & ABEY
225 MILLER AVENUE
MILL VALLEY, CA 94941
415.383.7900 T
415.383.1433 F
www.rhaa.com
DEGENKOLB ENGINEERS
235 MONTGOMERY STREET, SUITE
SAN FRANCISCO, CA 94104
415.392.6952 T
415.544.0782 F
www.degenkolb.com
CAPITAL ENGINEERING CONSULTANTS
11020 SUN CENTER DRIVE, SUITE 100
RANCHO CORDOVA, CA 95670
916.851.3500 T
916.631.4424 F
www.capital-engineering.com
CAMMISA & WIPF
642 HARRISON STREET, SUITE 400
SAN FRANCISCO, CA 94107
415.863.5740 T
415.863.5758 F
SYSKA HENNESSY GROUP
425 CALIFORNIA STREET, SUITE 700
SAN FRANCISCO, CA 94104
415.288.9061 T
415.935.0385 F
www.syska.com
TREADWELL AND ROLLO, INC.
555 MONTGOMERY STREET, SUITE 1300
SAN FRANCISCO, CA 94111
415.955.9040 T
415.955.9041 F
TEECOM
1333 BROADWAY, SUITE 601
OAKLAND, CA 94612
510.337.2800 T
510.337.2804 F
https://teecom.com/
KATE KEATING ASSOCIATES, INC.
1045 SANSOME STREET, SUITE 202
SAN FRANCISCO, CA 94111
415.773.1000 T
415.773.1008 F
www.kkainc.com
FIRETECH CONSULTING, INC.
8967 W. RADCLIFFE DRIVE
LITTLETON, CO 80123
720.981.3413 T
720.981.3454 F
www.FiretechConsulting.com
THE FIRE CONSULTANTS, INC.
1981 N. BROADWAY, SUITE 400
WALNUT CREEK, CA 94596
925.979.9993 T
925.979.9994 F
www.thefireconsultants.com
CUMMING
475 SANSOME STREET, SUITE 740
SAN FRANCISCO, CA 94111
415. 748.3080 T
415. 748.3090 F
VA PROJECT NUMBER: 640-424
BLAST CONSULTANT
WEIDLINGER ASSOCIATES, INC.
40 WALL STREET, 19TH FLOOR
NEW YORK, NY 10005
212.367.3000 T
www.wai.com
ACOUSTICAL
CHARLES M. SALTER ASSOCIATES, INC
130 SUTTER STREET, SUITE 500
SAN FRANCISCO, CA 94104
415.397.0442 T
www.cmsalter.com
RESEARCH AND VMU
SMITHGROUP PROJECT NUMBER: 38363.307
CONSTRUCTION DOCUMENTS
30 JULY 2015
VOLUME 6
GENERAL CIVIL LANDSCAPE STRUCTURAL ARCHITECTURAL SIGNAGE EQUIPMENT MECHANICAL PLUMBING FIRE PROTECTION ELECTRICAL FIRE ALARMTELECOM SECURITY
3801 Miranda Ave., Palo Alto CA
CENTERS FOR AMBULATORY CARE,
POLYTRAUMA AND BLIND REHABILITATION
CONSTRUCTION DOCUMENTS
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Seals and Signatures on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
301 BATTERY STREET, 7TH FLOOR
SAN FRANCISCO, CA 94111
T 415.227.0100 F 415.908.0862 www.smithgroupjjr.com
The Design Partnership LLP Architects + Planners
1629 TELEGRAPH AVE, #500
OAKLAND, CA 94612
T 415.777.3737 F 415.777.3476 www.dpsf.com Department of
Veterans Affairs
Associate Architect:
PR
IN
TE
D
ON
FULLY SPRINKLERED
8/
/2
2:
:0
PM
INDEX OF DRAWINGS
GI0.1.1
JG/DJ BN/JI30 JULY 2015
RESEARCH AND VMU
640-424
INDEX OF DRAWINGS VOLUME 1
RESEARCH AND VMU
CIVIL
CD1.2.1 DEMOLITION PLAN
CS0.1.1 NOTES, LEGEND + ABBREVIATIONS
CS1.1.1 EXISTING CONDITIONS
CS1.3.0 HORIZONTAL CONTROL PLAN
CS1.3.1 LAYOUT PLAN
CS1.4.1 GRADING PLAN
CS1.4.2 GRADING PLAN
CS1.5.1 UTILITY PLAN
CS1.5.2 UTILITY PLAN - UTILITY YARD
CS1.5.3 STEAM TRENCH PROFILE
CS1.5.4 RESEARCH EAST SEWER CORRIDOR PROFILE
CS1.5.5 RESEARCH WEST SEWER CORRIDOR PROFILE
CS1.5.6 STORMWATER MANAGEMENT PLAN
CS1.6.1 EROSION CONTROL PLAN
CS1.8.1 DETAILS
CS1.8.2 DETAILS
CS1.8.3 DETAILS
CS1.8.4 DETAILS
CS1.8.5 DETAILS
CS1.8.6 DETAILS
CS1.8.7 DETAILS
CS1.8.8 DETAILS
LANDSCAPE
LP1.1.0 SCHEDULES, NOTES, AND LEGENDS
LP3.1.0 CONSTRUCTION PLAN
LP3.1.1 LAYOUT PLAN
LP4.1.0 CONSTRUCTION PLAN ENLARGEMENT
LP4.1.1 CONSTRUCTION PLAN ENLARGEMENTS
LP4.1.2 CONSTRUCTION SECTIONS
LP4.1.3 CONSTRUCTION SECTIONS
LP5.1.0 CONSTRUCTION DETAILS
LP5.1.1 CONSTRUCTION DETAILS
LP7.1.0 PLANTING PLAN
LP7.1.1 PLANTING PLAN DEDUCT ALTERNATE 4
LP7.1.2 PLANTING PLAN DEDUCT ALTERNATE 5
LP7.3.0 PLANTING DETAILS
LI1.1.0 IRRIGATION PLAN
LI1.1.1 IRRIGATION PLAN DEDUCT 4
LI1.1.2 IRRIGATION PLAN DEDUCT 5
LI1.3.0 IRRIGATION NOTES AND LEGEND
LI1.4.0 IRRIGATION DETAILS
LI1.5.0 IRRIGATION DETAILS
STRUCTURAL
S0.1.1 GENERAL NOTES
S0.1.2 SYMBOLS AND ABBREVIATIONS
S1.1.1 TYPICAL CONCRETE DETAILS
S1.1.2 TYPICAL CONCRETE DETAILS
S1.2.1 TYPICAL STEEL DETAILS
S1.2.2 TYPICAL STEEL DETAILS
S1.3.1 TYPICAL METAL DECK DETAILS
SB2.1.0 OVERALL MAT FOUNDATION PLAN
SB2.1.0A MAT FOUNDATION PLAN AREAS A-D-G
SB2.1.0B MAT FOUNDATION PLAN AREAS B-E-H
SB2.1.0C MAT FOUNDATION PLAN AREAS C-F-J
SF2.1.1 OVERALL FLOOR FRAMING PLAN LEVEL V
SF2.1.1A FLOOR FRAMING PLAN LEVEL V AREAS A-D-G
SF2.1.1B FLOOR FRAMING PLAN LEVEL V AREAS B-E-H
SF2.1.1C FLOOR FRAMING PLAN LEVEL V AREAS C-F-J
SF2.1.2 OVERALL FLOOR FRAMING PLAN LEVEL U
SF2.1.2A FLOOR FRAMING PLAN LEVEL U AREAS A-D-G
SF2.1.2B FLOOR FRAMING PLAN LEVEL U AREAS B-E-H
SF2.1.2C FLOOR FRAMING PLAN LEVEL U AREAS C-F-J
SF2.1.3 OVERALL FLOOR FRAMING PLAN LEVEL 1
SF2.1.3A FLOOR FRAMING PLAN LEVEL 1 AREAS A-D-G
SF2.1.3B FLOOR FRAMING PLAN LEVEL 1 AREAS B-E-H
SF2.1.3C FLOOR FRAMING PLAN LEVEL 1 AREAS C-F-J
SF2.1.4 OVERALL FLOOR FRAMING PLAN LEVEL 2
SF2.1.4A FLOOR FRAMING PLAN LEVEL 2 AREAS A-D-G
SF2.1.4B FLOOR FRAMING PLAN LEVEL 2 AREAS B-E-H
SF2.1.4C FLOOR FRAMING PLAN LEVEL 2 AREAS C-F-J
SF2.1.5 OVERALL FRAMING PLAN ROOF LEVEL
SF2.1.5A FRAMING PLAN ROOF LEVEL AREAS A-D-G
SF2.1.5B FRAMING PLAN ROOF LEVEL AREAS B-E-H
SF2.1.5C FRAMING PLAN ROOF LEVEL AREAS C-F-J
SF2.2.1 STAIR 1 PARTIAL PLANS & DETAILS
SF2.2.2 STAIRS 2 & 3 PARTIAL PLANS & DETAILS
SF2.2.3 STAIR 4 PARTIAL PLANS & DETAILS
SF2.3.1 ROOFTOP PENTHOUSES PARTIAL FRAMING PLANS
SF2.3.2 ROOFTOP PENTHOUSE DETAILS
SF3.1.1 BRACED FRAME ELEVATIONS
SF3.1.2 BRACED FRAME ELEVATIONS
SF4.1.1 DESIGN LOADING DIAGRAM
SF5.1.1 CONCRETE DETAILS
SF5.1.2 CONCRETE DETAILS
SF7.1.1 STEEL COLUMN SCHEDULE
SF7.1.2 STEEL COLUMN SCHEDULE
SF7.2.1 STEEL DETAILS
SF7.2.2 STEEL DETAILS
SF7.2.3 STEEL DETAILS
SF7.2.4. STEEL DETAILS
SF7.2.5 EQUIPMENT ANCHORAGE SCHEDULE & DETAILS
SF7.2.6 EQUIPMENT ANCHORAGE DETAILS
SF7.3.1 BRACED FRAME DETAILS
AE6.1.15 STAIR DETAILS - STAIRS #2, #3, #4
AE6.1.16 STAIR DETAILS
AE6.2.1 ELEVATOR PLANS AND SECTIONS
AE6.2.2 ELEVATOR PLANS AND SECTIONS
AE6.2.3 ELEVATOR PLANS AND SECTIONS
AE6.2.4 ELEVATOR CAB FINISH PLANS, RCP, ELEVATIONS
AE6.2.5 ELEVATOR DETAILS
AE7.1.1 ENLARGED RCPs - LOBBY WOOD GRILLE CEILINGS
AE7.1.5 ENLARGED FLOOR PLANS AND ELEVATIONS LEVEL V
AE7.1.6 ENLARGED FLOOR PLANS, RCPs, AND ELEVATIONS
LEVELS V, 1, AND 2
AE8.1.1 INTERIOR ELEVATIONS LEVEL V
AE8.3.1 INTERIOR ELEVATIONS LEVEL 1
AE8.3.2 INTERIOR ELEVATIONS LEVEL 1
AE8.3.3 INTERIOR ELEVATIONS LEVEL 1 AND LEVEL 2
AE8.3.4 INTERIOR ELEVATIONS LEVEL 1
AE8.6.1 INTERIOR DETAILS CORNER GUARDS, HANDRAILS AND
MISCELLANEOUS
AE8.7.1 MODULAR CASEWORK SCHEDULE
AE8.7.2 MODULAR CASEWORK DETAILS
AE9.0.1A FINISH SCHEDULE LEVEL V
AE9.0.1B FINISH SCHEDULE LEVEL V
AE9.0.2 FINISH SCHEDULE LEVEL U
AE9.0.3 FINISH SCHEDULE LEVEL 1
AE9.0.4 FINISH SCHEDULE LEVEL 2
AE9.1.1A FINISH PLAN LEVEL V AREA A
AE9.1.1B FINISH PLAN LEVEL V AREA B
AE9.1.1C FINISH PLAN LEVEL V AREA C
AE9.1.1D FINISH PLAN LEVEL V AREA D
AE9.1.1E FINISH PLAN LEVEL V AREA E
AE9.1.1F FINISH PLAN LEVEL V AREA F
AE9.1.1G FINISH PLAN LEVEL V AREA G
AE9.1.1H FINISH PLAN LEVEL V AREA H
AE9.1.1J FINISH PLAN LEVEL V AREA J
AE9.1.3A FINISH PLAN LEVEL 1 AREA A
AE9.1.3B FINISH PLAN LEVEL 1 AREA B
AE9.1.3C FINISH PLAN LEVEL 1 AREA C
AE9.1.3D FINISH PLAN LEVEL 1 AREA D
AE9.1.3E FINISH PLAN LEVEL 1 AREA E
AE9.1.4A FINISH PLAN LEVEL 2 AREA A
AE9.1.4B FINISH PLAN LEVEL 2 AREA B
AE9.1.4C FINISH PLAN LEVEL 2 AREA C
AE9.1.4D FINISH PLAN LEVEL 2 AREA D
AE9.1.4E FINISH PLAN LEVEL 2 AREA E
AE9.2.1A PARTITION TYPES - NON RATED
AE9.2.1B PARTITION TYPES - ONE HOUR
AE9.2.1C PARTITION TYPES - TWO HOUR
AE9.2.2 PARTITION SCHEDULE AND DETAILS
AE9.2.3 PARTITION SCHEDULE AND DETAILS
AE9.2.4 PARTITION SCHEDULE AND DETAILS
AE9.2.5 PARTITION SCHEDULE AND DETAILS
AE9.2.6 PARTITION SCHEDULE AND DETAILS
AE9.2.7 PARTITION DETAILS
AE9.2.8 PARTITION PLAN DETAILS @ CURTAINWALL
AE9.3.1 DOOR SCHEDULE LEVEL V & U
AE9.3.2 DOOR SCHEDULE LEVEL 1 & 2
AE9.3.3 DOOR STANDARDS AND DETAILS
AE9.3.4 DOOR AND FRAME DETAILS
AE9.4.1 TYPICAL CEILING DETAILS
AE9.4.2 TYPICAL CEILING DETAILS
AE9.4.4 INTERIOR DETAILS
AE9.5.1 INTERIOR DETAILS - LOBBY
AE9.5.2 INTERIOR DETAILS - LOBBY
AE9.5.3 INTERIOR DETAILS - LOBBY
AE9.6.1 INTERIOR DETAILS
AE9.6.2 INTERIOR DETAILS
AE9.7.1 INTERIOR GLAZING TYPES
AE9.8.1 INTERIOR DETAILS
AE9.8.2 INTERIOR DETAILS
ARCHITECTURAL
AE0.1.1 ABBREVIATIONS, GENERAL NOTES AND DIMENSIONING
CONVENTIONS
AE0.1.2 ARCHITECTURAL SYMBOLS
AE0.2.0 LIFE SAFETY DIAGRAM - SITE
AE0.2.1 LIFE SAFETY DIAGRAM LEVEL V
AE0.2.3 LIFE SAFETY DIAGRAM LEVEL 1
AE0.2.4 LIFE SAFETY DIAGRAM LEVEL 2
AE1.1.1 ARCHITECTURAL OVERALL PLAN SITE
AE1.1.2 ARCHITECTURAL ENLARGED PLAN SITE
AE1.1.3 SERVICE YARD AND UTILITY YARD ENLARGED PLANS
AE1.1.10 SITE DETAILS
AE1.1.11 SITE DETAILS
AE1.1.12 SITE DETAILS
AE2.1.1 OVERALL FLOOR PLAN LEVEL V
AE2.1.1A FLOOR PLAN LEVEL V AREA A
AE2.1.1B FLOOR PLAN LEVEL V AREA B
AE2.1.1C FLOOR PLAN LEVEL V AREA C
AE2.1.1D FLOOR PLAN LEVEL V AREA D
AE2.1.1E FLOOR PLAN LEVEL V AREA E
AE2.1.1F FLOOR PLAN LEVEL V AREA F
AE2.1.1G FLOOR PLAN LEVEL V AREA G
AE2.1.1H FLOOR PLAN LEVEL V AREA H
AE2.1.1J FLOOR PLAN LEVEL V AREA J
AE2.1.2 OVERALL FLOOR PLAN LEVEL U
AE2.1.2A FLOOR PLAN LEVEL U AREA A
AE2.1.2B FLOOR PLAN LEVEL U AREA B
AE2.1.2C FLOOR PLAN LEVEL U AREA C
AE2.1.2D FLOOR PLAN LEVEL U AREA D
AE2.1.2E FLOOR PLAN LEVEL U AREA E
AE2.1.2F FLOOR PLAN LEVEL U AREA F
AE2.1.2G FLOOR PLAN LEVEL U AREA G
AE2.1.2H FLOOR PLAN LEVEL U AREA H
AE2.1.2J FLOOR PLAN LEVEL U AREA J
AE2.1.3 OVERALL FLOOR PLAN LEVEL 1
AE2.1.3A FLOOR PLAN LEVEL 1 AREA A
AE2.1.3B FLOOR PLAN LEVEL 1 AREA B
AE2.1.3C FLOOR PLAN LEVEL 1 AREA C
AE2.1.3D FLOOR PLAN LEVEL 1 AREA D
AE2.1.3E FLOOR PLAN LEVEL 1 AREA E
AE2.1.4 OVERALL FLOOR PLAN LEVEL 2
AE2.1.4A FLOOR PLAN LEVEL 2 AREA A
AE2.1.4B FLOOR PLAN LEVEL 2 AREA B
AE2.1.4C FLOOR PLAN LEVEL 2 AREA C
AE2.1.4D FLOOR PLAN LEVEL 2 AREA D
AE2.1.4E FLOOR PLAN LEVEL 2 AREA E
AE2.1.5 OVERALL ROOF LEVEL PLAN
AE2.1.5A FLOOR PLAN ROOF LEVEL AREA A
AE2.1.5B FLOOR PLAN ROOF LEVEL AREA B
AE2.1.5C FLOOR PLAN ROOF LEVEL AREA C AND PARTIAL UPPER
ROOF PLAN
AE2.1.5D FLOOR PLAN ROOF LEVEL AREA D
AE2.1.5E FLOOR PLAN ROOF LEVEL AREA E
AE3.1.1 OVERALL REFLECTED CEILING PLAN LEVEL V
AE3.1.1A REFLECTED CEILING PLAN LEVEL V AREA A
AE3.1.1B REFLECTED CEILING PLAN LEVEL V AREA B
AE3.1.1C REFLECTED CEILING PLAN LEVEL V AREA C
AE3.1.1D REFLECTED CEILING PLAN LEVEL V AREA D
AE3.1.1E REFLECTED CEILING PLAN LEVEL V AREA E
AE3.1.1F REFLECTED CEILING PLAN LEVEL V AREA F
AE3.1.1G REFLECTED CEILING PLAN LEVEL V AREA G
AE3.1.1H REFLECTED CEILING PLAN LEVEL V AREA H
AE3.1.1J REFLECTED CEILING PLAN LEVEL V AREA J
AE3.1.2 OVERALL REFLECTED CEILING PLAN LEVEL U
AE3.1.3 OVERALL REFLECTED CEILING PLAN LEVEL 1
AE3.1.3A REFLECTED CEILING PLAN LEVEL 1 AREA A
AE3.1.3B REFLECTED CEILING PLAN LEVEL 1 AREA B
AE3.1.3C REFLECTED CEILING PLAN LEVEL 1 AREA C
AE3.1.3D REFLECTED CEILING PLAN LEVEL 1 AREA D
AE3.1.3E REFLECTED CEILING PLAN LEVEL 1 AREA E
AE3.1.4 OVERALL REFLECTED CEILING PLAN LEVEL 2
AE3.1.4A REFLECTED CEILING PLAN LEVEL 2 AREA A
AE3.1.4B REFLECTED CEILING PLAN LEVEL 2 AREA B
AE3.1.4C REFLECTED CEILING PLAN LEVEL 2 AREA C
AE3.1.4D REFLECTED CEILING PLAN LEVEL 2 AREA D
AE3.1.4E REFLECTED CEILING PLAN LEVEL 2 AREA E
AE4.1.1 EXTERIOR ELEVATIONS
AE4.1.2 EXTERIOR ELEVATIONS
AE4.1.3 PATTERN ELEVATIONS & TERRACOTTA VERTICAL
LAYOUT
AE4.2.1 BUILDING SECTIONS
AE4.2.2 BUILDING SECTIONS
AE4.2.3 BUILDING SECTIONS
AE4.3.1 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS
AE4.3.2 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS
AE4.3.3 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS
AE4.3.4 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS
AE4.3.5 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS
AE4.3.6 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS
AE4.3.7 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS
AE4.3.8 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS
AE4.3.9 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS
AE4.3.10 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS
AE4.3.11 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS
AE4.3.12 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS
AE4.3.13 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS
AE4.3.14 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS
AE4.3.15 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS
AE4.4.1 TYPICAL WALL SECTIONS
AE5.1.1 EXTERIOR DETAILS
AE5.1.8 EXTERIOR MOCKUP
AE5.2.1 EXTERIOR DETAILS- CURTAINWALL
AE5.2.2 EXTERIOR DETAILS- CURTAINWALL
AE5.3.1 EXTERIOR DETAILS- TERRACOTTA
AE5.3.2 EXTERIOR DETAILS- TERRACOTTA
AE5.4.0 EXTERIOR DETAILS- ROOF
AE5.4.1 EXTERIOR DETAILS - ROOF
AE5.5.1 EXTERIOR DETAILS - LOBBY
AE5.5.2 EXTERIOR DETAILS - LOBBY
AE5.6.0 EXTERIOR DETAILS - LOADING DOCK
AE6.1.1A STAIR 1 PLANS AND DETAILS
AE6.1.1B STAIR 1 SECTIONS
AE6.1.1C STAIR 1 SECTIONS
AE6.1.2 STAIR 2 AND STAIR 3 PLANS AND SECTIONS
AE6.1.3 STAIR 2 AND STAIR 3 SECTIONS
AE6.1.4 STAIR 4 PLANS AND SECTIONS
AE6.1.5 STAIR 4 - SECTIONS
AE6.1.10 STAIR DETAILS - STAIR #1
AE6.1.11 STAIR DETAILS - STAIR #1
AE6.1.12 STAIR DETAILS - STAIR #1
AE6.1.13 STAIR DETAILS - STAIR #1
AE6.1.14 STAIR DETAILS - STAIRS #2, #3, #4
QL2.4.3 LEVEL 2 AREA C ENLARGED LABORATORY PLAN
QL2.4.4 LEVEL 2 AREA D ENLARGED LABORATORY PLAN
QL2.4.5 LEVEL 2 AREA E ENLARGED LABORATORY PLAN
QL2.4.6 LEVEL 2 AREA F ENLARGED LABORATORY PLAN
QL8.1.1 INTERIOR ELEVATIONS-LEVEL V
QL8.1.2 INTERIOR ELEVATIONS-LEVEL V
QL8.1.3 INTERIOR ELEVATIONS-LEVEL V
QL8.1.4 INTERIOR ELEVATIONS-LEVEL V
QL8.1.5 INTERIOR ELEVATIONS-LEVEL V
QL8.1.6 INTERIOR ELEVATIONS-LEVEL V
QL8.1.7 INTERIOR ELEVATIONS-LEVEL V
QL8.1.8 INTERIOR ELEVATIONS-LEVEL V
QL8.1.9 INTERIOR ELEVATIONS-LEVEL V
QL8.3.1 INTERIOR ELEVATIONS-LEVELS 1 & 2 OPEN LABS
QL8.3.2 INTERIOR ELEVATIONS-LEVELS 1 & 2 OPEN LABS
QL8.3.3 INTERIOR ELEVATIONS-LEVELS 1 & 2
QL8.3.4 INTERIOR ELEVATIONS-LEVELS 1 & 2
QL8.3.5 INTERIOR ELEVATIONS-LEVELS 1 & 2
QL8.3.6 INTERIOR ELEVATIONS-LEVELS 1 & 2
QL9.8.1 EQUIPMENT DETAILS - PIT LAYOUTS
QL9.8.3 LEVEL V ENLARGED BEDDING DISPENSER/DISPOSAL PLAN
EQUIPMENT
QL0.0.1 GENERAL INFORMATION
QL0.0.2 GENERAL INFORMATION
QL0.0.3 GENERAL INFORMATION
QL0.0.4 GENERAL INFORMATION
QL0.0.5 GENERAL INFORMATION
QL0.0.6 GENERAL INFORMATION
QL0.0.7 GENERAL INFORMATION
QL0.0.8 GENERAL INFORMATION
QL0.0.9 GENERAL INFORMATION
QL0.0.10 GENERAL INFORMATION
QL0.0.11 GENERAL INFORMATION
QL0.1.1 DEDUCT ALTERNATE - LEVEL V AREA A CASEWORK -
ASSEMBLIES
QL0.1.2 DEDUCT ALTERNATE - LEVEL V AREA B CASEWORK -
ASSEMBLIES
QL0.1.3 DEDUCT ALTERNATE - LEVEL V AREA C CASEWORK -
ASSEMBLIES
QL0.1.4 DEDUCT ALTERNATE - LEVEL V AREA D CASEWORK -
ASSEMBLIES
QL0.1.5 DEDUCT ALTERNATE - LEVEL V AREA E CASEWORK -
ASSEMBLIES
QL0.1.6 DEDUCT ALTERNATE - LEVEL V AREA F CASEWORK -
ASSEMBLIES
QL0.1.7 DEDUCT ALTERNATE - LEVEL V AREA H CASEWORK -
ASSEMBLIES
QL0.1.8 DEDUCT ALTERNATE - LEVEL V AREA J CASEWORK -
ASSEMBLIES
QL0.3.1 DEDUCT ALTERNATE - LEVEL 1 AREA A CASEWORK -
ASSEMBLIES
QL0.3.2 DEDUCT ALTERNATE - LEVEL 1 AREA B CASEWORK -
ASSEMBLIES
QL0.3.3A DEDUCT ALTERNATE - LEVEL 1 AREA C CASEWORK -
ASSEMBLIES
QL0.3.3B DEDUCT ALTERNATE - LEVEL 1 AREA C CASEWORK -
ASSEMBLIES
QL0.3.4 DEDUCT ALTERNATE - LEVEL 1 AREA D CASEWORK -
ASSEMBLIES
QL0.3.5 DEDUCT ALTERNATE - LEVEL 1 AREA E CASEWORK -
ASSEMBLIES
QL0.3.6 DEDUCT ALTERNATE - LEVEL 1 AREA F CASEWORK -
ASSEMBLIES
QL0.4.1 DEDUCT ALTERNATE - LEVEL 2 AREA A CASEWORK -
ASSEMBLIES
QL0.4.2 DEDUCT ALTERNATE - LEVEL 2 AREA B CASEWORK -
ASSEMBLIES
QL0.4.3A DEDUCT ALTERNATE - LEVEL 2 AREA C CASEWORK -
ASSEMBLIES
QL0.4.3B DEDUCT ALTERNATE - LEVEL 2 AREA C CASEWORK -
ASSEMBLIES
QL0.4.4 DEDUCT ALTERNATE - LEVEL 2 AREA D CASEWORK -
ASSEMBLIES
QL0.4.5 DEDUCT ALTERNATE - LEVEL 2 AREA E CASEWORK -
ASSEMBLIES
QL0.4.6 DEDUCT ALTERNATE - LEVEL 2 AREA F CASEWORK -
ASSEMBLIES
QL1.0.1 SINK SCHEDULE
QL1.1.1 EQUIPMENT SCHEDULE LEVEL V
QL1.1.2 EQUIPMENT SCHEDULE LEVEL V
QL1.1.3 EQUIPMENT SCHEDULE LEVEL V
QL1.1.4 EQUIPMENT SCHEDULE LEVEL V
QL1.1.5 EQUIPMENT SCHEDULE LEVEL V
QL1.1.6 EQUIPMENT SCHEDULE LEVEL V
QL1.1.7 EQUIPMENT SCHEDULE LEVEL V
QL1.1.8 EQUIPMENT SCHEDULE LEVEL V
QL1.1.9 EQUIPMENT SCHEDULE LEVEL V
QL1.1.10 EQUIPMENT SCHEDULE LEVEL V
QL1.1.11 EQUIPMENT SCHEDULE LEVEL V
QL1.2.1 EQUIPMENT SCHEDULE LEVEL U
QL1.3.1 EQUIPMENT SCHEDULE LEVEL 1
QL1.3.2 EQUIPMENT SCHEDULE LEVEL 1
QL1.4.1 EQUIPMENT SCHEDULE LEVEL 2
QL1.4.2 EQUIPMENT SCHEDULE LEVEL 2
QL1.4.3 EQUIPMENT SCHEDULE LEVEL 2
QL2.0.1 LEVEL V OVERALL LABORATORY PLAN
QL2.0.2 LEVEL U OVERALL LABORATORY PLAN
QL2.0.3 LEVEL 1 OVERALL LABORATORY PLAN
QL2.0.4 LEVEL 2 OVERALL LABORATORY PLAN
QL2.1.1 LEVEL V AREA A ENLARGED LABORATORY PLAN
QL2.1.2 LEVEL V AREA B ENLARGED LABORATORY PLAN
QL2.1.3 LEVEL V AREA C ENLARGED LABORATORY PLAN
QL2.1.4 LEVEL V AREA D ENLARGED LABORATORY PLAN
QL2.1.5 LEVEL V AREA E ENLARGED LABORATORY PLAN
QL2.1.6 LEVEL V AREA F ENLARGED LABORATORY PLAN
QL2.1.7 LEVEL V AREA G ENLARGED LABORATORY PLAN
QL2.1.8 LEVEL V AREA H ENLARGED LABORATORY PLAN
QL2.1.9 LEVEL V AREA J ENLARGED LABORATORY PLAN
QL2.2.4 LEVEL U AREA D ENLARGED LABORATORY PLAN
QL2.2.8 LEVEL U AREA H ENLARGED LABORATORY PLAN
QL2.2.9 LEVEL U AREA J ENLARGED LABORATORY PLAN
QL2.3.1 LEVEL 1 AREA A ENLARGED LABORATORY PLAN
QL2.3.2 LEVEL 1 AREA B ENLARGED LABORATORY PLAN
QL2.3.3 LEVEL 1 AREA C ENLARGED LABORATORY PLAN
QL2.3.4 LEVEL 1 AREA D ENLARGED LABORATORY PLAN
QL2.3.5 LEVEL 1 AREA E ENLARGED LABORATORY PLAN
QL2.3.6 LEVEL 1 AREA F ENLARGED LABORATORY PLAN
QL2.3.9 LEVEL 1 AREA J ENLARGED LABORATORY PLAN
QL2.4.1 LEVEL 2 AREA A ENLARGED LABORATORY PLAN
QL2.4.2 LEVEL 2 AREA B ENLARGED LABORATORY PLAN
COVER SHEET VOLUME 3GI0.1.1 INDEX OF DRAWINGS
GI0.1.2 INDEX OF DRAWINGS
GENERAL GENERAL
GENERAL
GI0.1.1 INDEX OF DRAWINGS
GI0.1.2 INDEX OF DRAWINGS
INDEX OF DRAWINGS VOLUME 2
RESEARCH AND VMU INDEX OF DRAWINGS VOLUME 3
RESEARCH AND VMU
INDEX OF DRAWINGS VOLUME 4
RESEARCH AND VMU
SIGNAGE
AG1.1.1A SIGN LOCATION PLAN LEVEL V AREA A
AG1.1.1B SIGN LOCATION PLAN LEVEL V AREA B
AG1.1.1C SIGN LOCATION PLAN LEVEL V AREA C
AG1.1.2A SIGN LOCATION PLAN LEVEL U AREA A
AG1.1.2B SIGN LOCATION PLAN LEVEL U AREA B
AG1.1.2C SIGN LOCATION PLAN LEVEL U AREA C
AG1.1.3A SIGN LOCATION PLAN LEVEL 1 AREA A
AG1.1.3B SIGN LOCATION PLAN LEVEL 1 AREA B
AG1.1.3C SIGN LOCATION PLAN LEVEL 1 AREA C
AG1.1.3D SIGN LOCATION PLAN LEVEL 1 AREA D
AG1.1.3E SIGN LOCATION PLAN LEVEL 1 AREA E
AG1.1.4A SIGN LOCATION PLAN LEVEL 2 AREA A
AG1.1.4B SIGN LOCATION PLAN LEVEL 2 AREA B
AG1.1.4C SIGN LOCATION PLAN LEVEL 2 AREA C
AG1.1.4D SIGN LOCATION PLAN LEVEL 2 AREA D
AG1.1.4E SIGN LOCATION PLAN LEVEL 2 AREA E
AG1.1.5A SIGN LOCATION PLAN ROOF AREA A
AG1.1.5B SIGN LOCATION PLAN ROOF AREA B
AG1.1.5C SIGN LOCATION PLAN ROOF AREA C
AG1.1.5D SIGN LOCATION PLAN ROOF AREA D
AG1.1.5E SIGN LOCATION PLAN ROOF AREA E
AG1.2.1 EXTERIOR SIGNS WAYFINDING & IDENTIFICATION
AG1.2.2 INTERIOR SIGNS CODE REQUIRED
AG1.2.3 INTERIOR SIGNS WAYFINDING & IDENTIFICATION
AG1.2.4 INTERIOR SIGNS CODE, WAYFINDING & IDENTIFICATION
AG1.2.5 INTERIOR SIGNS WAYFINDING & IDENTIFICATION
AG1.2.6 INTERIOR SIGNS WAYFINDING & IDENTIFICATION
GI0.1.1 INDEX OF DRAWINGS
GI0.1.2 INDEX OF DRAWINGS
GI0.1.3 SAMPLE CPM NETWORK
GI0.2.1 PROJECT INFORMATION AND APPLICABLE CODES
GI1.1.2 TYPICAL MOUNTING HEIGHTS AND CONFIGURATION DIAGRAMS
GI1.1.3 TYPICAL TOILET ROOM MOUNTING HEIGHTS AND STALL
CONFIGURATION DIAGRAMS
GI1.1.4 TYPICAL RULES FOR DETERMINING MOUNTING HEIGHTS AND
LOCATIONS
GI1.1.5 TYPICAL REFLECTED CEILING PLAN LOCATIONS AND
CONFIGURATIONS
GI3.3.1 SEQUENCE OF CONSTRUCTION ACTIVITY STEPS 0-3
GI3.3.2 SEQUENCE OF CONSTRUCTION ACTIVITY STEPS 4-5
COVER SHEET VOLUME 2 GENERAL
GI0.1.1 INDEX OF DRAWINGS
GI0.1.2 INDEX OF DRAWINGS
COVER SHEET VOLUME 4
MH8.1.7 MECHANICAL CONTROLS
MH8.1.8 MECHANICAL CONTROLS
MP2.1.1 OVERALL MECHANICAL PIPING FLOOR PLAN LEVEL V
MP2.1.1A MECHANICAL PIPING FLOOR PLAN LEVEL V AREA A
MP2.1.1B MECHANICAL PIPING FLOOR PLAN LEVEL V AREA B
MP2.1.1C MECHANICAL PIPING FLOOR PLAN LEVEL V AREA C
MP2.1.1D MECHANICAL PIPING FLOOR PLAN LEVEL V AREA D
MP2.1.1E MECHANICAL PIPING FLOOR PLAN LEVEL V AREA E
MP2.1.1F MECHANICAL PIPING FLOOR PLAN LEVEL V AREA F
MP2.1.1G MECHANICAL PIPING FLOOR PLAN LEVEL V AREA G
MP2.1.1H MECHANICAL PIPING FLOOR PLAN LEVEL V AREA H
MP2.1.1J MECHANICAL PIPING FLOOR PLAN LEVEL V AREA J
MP2.1.2 OVERALL MECHANICAL PIPING FLOOR PLAN LEVEL U
MP2.1.2A MECHANICAL PIPING FLOOR PLAN LEVEL U AREA A
MP2.1.2B MECHANICAL PIPING FLOOR PLAN LEVEL U AREA B
MP2.1.2C MECHANICAL PIPING FLOOR PLAN LEVEL U AREA C
MP2.1.2D MECHANICAL PIPING FLOOR PLAN LEVEL U AREA D
MP2.1.2E MECHANICAL PIPING FLOOR PLAN LEVEL U AREA E
MP2.1.2F MECHANICAL PIPING FLOOR PLAN LEVEL U AREA F
MP2.1.2G MECHANICAL PIPING FLOOR PLAN LEVEL U AREA G
MP2.1.2H MECHANICAL PIPING FLOOR PLAN LEVEL U AREA H
MP2.1.2J MECHANICAL PIPING FLOOR PLAN LEVEL U AREA J
MP2.1.3 OVERALL MECHANICAL PIPING FLOOR PLAN LEVEL 1
MP2.1.3A MECHANICAL PIPING FLOOR PLAN LEVEL 1 AREA A
MP2.1.3B MECHANICAL PIPING FLOOR PLAN LEVEL 1 AREA B
MP2.1.3C MECHANICAL PIPING FLOOR PLAN LEVEL 1 AREA C
MP2.1.3D MECHANICAL PIPING FLOOR PLAN LEVEL 1 AREA D
MP2.1.3E MECHANICAL PIPING FLOOR PLAN LEVEL 1 AREA E
MP2.1.4 OVERALL MECHANICAL PIPING FLOOR PLAN LEVEL 2
MP2.1.4A MECHANICAL PIPING FLOOR PLAN LEVEL 2 AREA A
MP2.1.4B MECHANICAL PIPING FLOOR PLAN LEVEL 2 AREA B
MP2.1.4C MECHANICAL PIPING FLOOR PLAN LEVEL 2 AREA C
MP2.1.4D MECHANICAL PIPING FLOOR PLAN LEVEL 2 AREA D
MP2.1.4E MECHANICAL PIPING FLOOR PLAN LEVEL 2 AREA E
MP2.1.5 OVERALL MECHANICAL PIPING ROOF PLAN
MP2.1.5A MECHANICAL PIPING ROOF PLAN AREA A
MP2.1.5B MECHANICAL PIPING ROOF PLAN AREA B
MP2.1.5C MECHANICAL PIPING ROOF PLAN AREA C
MP2.1.5D MECHANICAL PIPING ROOF PLAN AREA D
MP2.1.5E MECHANICAL PIPING ROOF PLAN AREA E
MP4.1.1 ENLARGED MECHANICAL ROOM HVAC SECTIONS
MP6.1.1 MECH PIPING FLOW DIAGRAMS - BUILDING CHILLED &
HEATING HOT WATER
MP6.1.2 MECH PIPING FLOW DIAGRAM - BUILDING STEAM AND
CONDENSATE
MP6.1.3 MECHANICAL PIPING FLOW DIAGRAM - HEAT RECOVERY
COILS
MP6.1.4 MECHANICAL WIRING DIAGRAM - SPLIT SYSTEM UNIT
MP6.1.5 MECHANICAL PIPING DIAGRAM - SPLIT SYSTEM UNIT
MP7.1.1 MECHANICAL PIPING RISER DIAGRAMS
MECHANICAL
MH0.1.1 GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS
MS1.1.1 MECHANICAL SITE PIPING PLAN
MH1.1.1 OVERALL AHU ZONING FLOOR PLAN LEVEL V
MH1.1.3 OVERALL AHU ZONING FLOOR PLAN LEVEL 1
MH1.1.4 OVERALL AHU ZONING FLOOR PLAN LEVEL 2
MH1.2.1 OVERALL EXHAUST FANS ZONING FLOOR PLAN LEVEL V
MH1.2.3 OVERALL EXHAUST FANS ZONING FLOOR PLAN LEVEL 1
MH1.2.4 OVERALL EXHAUST FANS ZONING FLOOR PLAN LEVEL 2
MH1.3.1 OVERALL HVAC TU ZONING FLOOR PLAN LEVEL V
MH1.3.1A HVAC TU ZONING FLOOR PLAN LEVEL V AREA A+D+G
MH1.3.1B HVAC TU ZONING FLOOR PLAN LEVEL V AREA B+E+H
MH1.3.1C HVAC TU ZONING FLOOR PLAN LEVEL V AREA C+F+J
MH1.3.3 OVERALL HVAC TU ZONING FLOOR PLAN LEVEL 1
MH1.3.3A HVAC TU ZONING FLOOR PLAN LEVEL 1 AREA A+B
MH1.3.3B HVAC TU ZONING FLOOR PLAN LEVEL 1 AREA C
MH1.3.3C HVAC TU ZONING FLOOR PLAN LEVEL 1 AREA D+E
MH1.3.4 OVERALL HVAC TU ZONING FLOOR PLAN LEVEL 2
MH1.3.4A HVAC TU ZONING FLOOR PLAN LEVEL 2 AREA A+B
MH1.3.4B HVAC TU ZONING FLOOR PLAN LEVEL 2 AREA C
MH1.3.4C HVAC TU ZONING FLOOR PLAN LEVEL 2 AREA D+E
MH2.1.1 OVERALL HVAC MECHANICAL FLOOR PLAN LEVEL V
MH2.1.1A HVAC MECHANICAL FLOOR PLAN LEVEL V AREA A
MH2.1.1B HVAC MECHANICAL FLOOR PLAN LEVEL V AREA B
MH2.1.1C HVAC MECHANICAL FLOOR PLAN LEVEL V AREA C
MH2.1.1D HVAC MECHANICAL FLOOR PLAN LEVEL V AREA D
MH2.1.1E HVAC MECHANICAL FLOOR PLAN LEVEL V AREA E
MH2.1.1F HVAC MECHANICAL FLOOR PLAN LEVEL V AREA F
MH2.1.1G HVAC MECHANICAL FLOOR PLAN LEVEL V AREA G
MH2.1.1H HVAC MECHANICAL FLOOR PLAN LEVEL V AREA H
MH2.1.1J HVAC MECHANICAL FLOOR PLAN LEVEL V AREA J
MH2.1.2 OVERALL HVAC MECHANICAL FLOOR PLAN LEVEL U
MH2.1.2A HVAC MECHANICAL FLOOR PLAN LEVEL U AREA A
MH2.1.2B HVAC MECHANICAL FLOOR PLAN LEVEL U AREA B
MH2.1.2C HVAC MECHANICAL FLOOR PLAN LEVEL U AREA C
MH2.1.2D HVAC MECHANICAL FLOOR PLAN LEVEL U AREA D
MH2.1.2E HVAC MECHANICAL FLOOR PLAN LEVEL U AREA E
MH2.1.2F HVAC MECHANICAL FLOOR PLAN LEVEL U AREA F
MH2.1.2G HVAC MECHANICAL FLOOR PLAN LEVEL U AREA G
MH2.1.2H HVAC MECHANICAL FLOOR PLAN LEVEL U AREA H
MH2.1.2J HVAC MECHANICAL FLOOR PLAN LEVEL U AREA J
MH2.1.3 OVERALL HVAC MECHANICAL FLOOR PLAN LEVEL 1
MH2.1.3A HVAC MECHANICAL FLOOR PLAN LEVEL 1 AREA A
MH2.1.3B HVAC MECHANICAL FLOOR PLAN LEVEL 1 AREA B
MH2.1.3C HVAC MECHANICAL FLOOR PLAN LEVEL 1 AREA C
MH2.1.3D HVAC MECHANICAL FLOOR PLAN LEVEL 1 AREA D
MH2.1.3E HVAC MECHANICAL FLOOR PLAN LEVEL 1 AREA E
MH2.1.4 OVERALL HVAC MECHANICAL FLOOR PLAN LEVEL 2
MH2.1.4A HVAC MECHANICAL FLOOR PLAN LEVEL 2 AREA A
MH2.1.4B HVAC MECHANICAL FLOOR PLAN LEVEL 2 AREA B
MH2.1.4C HVAC MECHANICAL FLOOR PLAN LEVEL 2 AREA C
MH2.1.4D HVAC MECHANICAL FLOOR PLAN LEVEL 2 AREA D
MH2.1.4E HVAC MECHANICAL FLOOR PLAN LEVEL 2 AREA E
MH2.1.5 OVERALL HVAC MECHANICAL ROOF PLAN
MH2.1.5A HVAC MECHANICAL ROOF PLAN AREA A
MH2.1.5B HVAC MECHANICAL ROOF PLAN AREA B
MH2.1.5C HVAC MECHANICAL ROOF PLAN AREA C
MH2.1.5D HVAC MECHANICAL ROOF PLAN AREA D
MH2.1.5E HVAC MECHANICAL ROOF PLAN AREA E
MH3.1.1 HVAC SECTIONS
MH3.1.2 HVAC SECTIONS
MH3.1.3 HVAC SECTIONS
MH3.1.4 HVAC SECTIONS
MH3.1.5 HVAC SECTIONS
MH3.1.6 HVAC SECTIONS
MH3.1.7 HVAC SECTIONS
MH3.1.8 HVAC SECTIONS
MH3.1.9 HVAC SECTIONS
MH5.1.1 MECHANICAL DETAILS
MH5.1.2 MECHANICAL DETAILS
MH5.1.3 MECHANICAL DETAILS
MH5.1.4 MECHANICAL DETAILS
MH5.1.5 MECHANICAL DETAILS
MH5.1.6 MECHANICAL DETAILS
MH5.1.7 MECHANICAL DETAILS
MH5.1.8 MECHANICAL DETAILS
MH5.1.9 MECHANICAL DETAILS
MH5.1.10 MECHANICAL DETAILS
MH6.1.1 MECHANICAL EQUIPMENT SCHEDULES
MH6.1.2 MECHANICAL EQUIPMENT SCHEDULES
MH6.1.3 MECHANICAL EQUIPMENT SCHEDULES
MH6.1.4 MECHANICAL EQUIPMENT SCHEDULES
MH6.1.5 MECHANICAL EQUIPMENT SCHEDULES
MH6.1.6 MECHANICAL EQUIPMENT SCHEDULES
MH6.1.7 MECHANICAL EQUIPMENT SCHEDULES
MH6.1.8 MECHANICAL EQUIPMENT SCHEDULES
MH6.1.9 MECHANICAL EQUIPMENT SCHEDULES
MH6.1.10 MECHANICAL EQUIPMENT SCHEDULES
MH7.1.1 AIR FLOW DIAGRAMS - AIR HANDLING UNITS
MH7.1.2 AIR FLOW DIAGRAMS - EXHAUST SYSTEMS
MH7.1.3 AIR FLOW DIAGRAMS - EXHAUST SYSTEMS
MH7.2.1 BUILDING PRESSURIZATION DIAGRAM LEVEL V
MH7.2.3 BUILDING PRESSURIZATION DIAGRAM LEVEL 1
MH7.2.4 BUILDING PRESSURIZATION DIAGRAM LEVEL 2
MH7.3.1 AIRFLOW EQUIPMENT DIAGRAMS - AHUS & EFS
MH7.3.2 AIRFLOW EQUIPMENT DIAGRAMS - EFS
MH8.1.1 MECHANICAL CONTROLS
MH8.1.2 MECHANICAL CONTROLS
MH8.1.3 MECHANICAL CONTROLS
MH8.1.4 MECHANICAL CONTROLS
MH8.1.5 MECHANICAL CONTROLS
MH8.1.6 MECHANICAL CONTROLS
COVER SHEET VOLUME 1
POLYTRAUMA AND BLIND REHABILITATION
CONSTRUCTION DOCUMENTS
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Seals and Signatures on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
301 BATTERY STREET, 7TH FLOOR
SAN FRANCISCO, CA 94111
T 415.227.0100 F 415.908.0862 www.smithgroupjjr.com
The Design Partnership LLP Architects + Planners
1629 TELEGRAPH AVE, #500
OAKLAND, CA 94612
T 415.777.3737 F 415.777.3476 www.dpsf.com Department of
Veterans Affairs
Associate Architect:
PR
IN
TE
D
ON
FULLY SPRINKLERED
8/
/2
:3 8:
P
M
INDEX OF DRAWINGS
GI0.1.2
JG/DJ BN/JI30 JULY 2015
RESEARCH AND VMU
640-424
FIRE ALARM
FA0.1.0 GENERAL NOTES, SYMBOLS AND SCHEDULES
FA1.1.1 FIRE ALARM SITE PLAN
FA2.1.1 OVERALL FIRE ALARM ZONING PLANS LEVEL V & LEVEL U
FA2.1.2 OVERALL FIRE ALARM ZONING PLANS LEVEL 1 & LEVEL 2
FA2.1.3 OVERALL FIRE ALARM ZONING PLAN ROOF LEVEL
FA3.1.1 OVERALL FIRE ALARM FLOOR PLAN LEVEL V
FA3.1.1A FIRE ALARM FLOOR PLAN LEVEL V
FA3.1.1B FIRE ALARM FLOOR PLAN LEVEL V
FA3.1.2 OVERALL FIRE ALARM FLOOR PLAN LEVEL U
FA3.1.2A FIRE ALARM FLOOR PLAN LEVEL U
FA3.1.2B FIRE ALARM FLOOR PLAN LEVEL U
FA3.1.3 OVERALL FIRE ALARM FLOOR PLAN LEVEL 1
FA3.1.3A FIRE ALARM FLOOR PLAN LEVEL 1
FA3.1.3B FIRE ALARM FLOOR PLAN LEVEL 1
FA3.1.4 OVERALL FIRE ALARM FLOOR PLAN LEVEL 2
FA3.1.4A FIRE ALARM FLOOR PLAN LEVEL 2
FA3.1.4B FIRE ALARM FLOOR PLAN LEVEL 2
FA3.1.5 OVERALL FIRE ALARM FLOOR PLAN ROOF
FA3.1.5A FIRE ALARM FLOOR PLAN ROOF
FA3.1.5B FIRE ALARM FLOOR PLAN ROOF
FA5.1.1 FIRE ALARM RISER DIAGRAM
FA5.1.2 FIRE ALARM RISER DIAGRAM
FA6.1.1 FIRE ALARM DETAILS
TELECOM
TN0.0.1 SYMBOLS LIST AND GENERAL NOTES
TN0.0.2 DEVICE SCHEDULE
TN0.1.0 RISER DIAGRAM - PATHWAYS
TN0.1.1 RISER DIAGRAM - GROUNDING
TN0.1.2 RISER DIAGRAM - CABLING
TN0.1.3 RISER DIAGRAM - MATV
TN0.1.4 RISER DIAGRAM - PUBLIC ADDRESS
TN0.2.0 TYPICAL AUDIOVISUAL FUNCTIONAL SYSTEM DIAGRAMS
TN1.0.1 TELECOMMUNICATIONS SITE PLAN
TN1.0.2 TELECOMMUNICATIONS CABLING SITE PLAN
TN2.1.1A TELECOM PLAN LEVEL V AREA A+D
TN2.1.1B TELECOM PLAN LEVEL V AREA B+E
TN2.1.1C TELECOM PLAN LEVEL V AREA C+F
TN2.1.2A TELECOM PLAN LEVEL U AREA A+D
TN2.1.2B TELECOM PLAN LEVEL U AREA B+E
TN2.1.2C TELECOM PLAN LEVEL U AREA C+F
TN2.1.3A TELECOM PLAN LEVEL 1 AREA A
TN2.1.3B TELECOM PLAN LEVEL 1 AREA D+G
TN2.1.3C TELECOM PLAN LEVEL 1 AREA B+E
TN2.1.3D TELECOM PLAN LEVEL 1 AREA C+F
TN2.1.3E TELECOM PLAN LEVEL 1 AREA E
TN2.1.4A TELECOM PLAN LEVEL 2 AREA A
TN2.1.4B TELECOM PLAN LEVEL 2 AREA B
TN2.1.4C TELECOM PLAN LEVEL 2 AREA C
TN2.1.4D TELECOM PLAN LEVEL 2 AREA C+F
TN2.1.4E TELECOM PLAN LEVEL 2 AREA E
TN3.1.1A TELECOM RCP LEVEL V AREA A+D
TN3.1.1B TELECOM RCP LEVEL V AREA B+E
TN3.1.1C TELECOM RCP LEVEL V AREA C+F
TN3.1.2A TELECOM RCP LEVEL U AREA A+D
TN3.1.2B TELECOM RCP LEVELU AREA B+E
TN3.1.2C TELECOM RCP LEVEL U AREA C+F
TN3.1.3A TELECOM RCP LEVEL 1 AREA A
TN3.1.3B TELECOM RCP LEVEL 1 AREA B
TN3.1.3C TELECOM RCP LEVEL 1 AREA C
TN3.1.3D TELECOM RCP LEVEL 1 AREA D
TN3.1.3E TELECOM RCP LEVEL 1 AREA E
TN3.1.4A TELECOM RCP LEVEL 2 AREA A
TN3.1.4B TELECOM RCP LEVEL 2 AREA B
TN3.1.4C TELECOM RCP LEVEL 2 AREA C
TN3.1.4D TELECOM RCP LEVEL 2 AREA D
TN3.1.4E TELECOM RCP LEVEL 2 AREA E
TN4.0.1 TYPICAL TELECOM ROOM PLAN LEVEL V
TN4.0.2 TYPICAL TELECOM ROOM PLANS LEVEL 1
TN4.0.3 TYPICAL TELECOM ROOM PLANS LEVEL 2
TN4.1.0 TYPICAL AUDIOVISUAL ENLARGED PLANS
TN5.0.1 INSTALLATION DETAILS
TN5.0.2 INSTALLATION DETAILS
TN5.0.3 INSTALLATION DETAILS
TN5.0.4 INSTALLATION DETAILS
TN5.0.5 INSTALLATION DETAILS
SECURITY
TY0.0.1 SYMBOLS LIST AND GENERAL NOTES
TY0.1.0 SECURITY RISER DIAGRAM
TY0.1.1 SECURTY ACAMS BLOCK DIAGRAM
TY1.0.1 SECURITY SITE PLAN
TY2.1.1A SECURITY PLAN LEVEL V AREA A+D
TY2.1.1B SECURITY PLAN LEVEL V AREA B+E
TY2.1.1C SECURITY PLAN LEVEL V AREA C+F
TY2.1.2A SECURITY PLAN LEVEL U AREA A+D
TY2.1.2B SECURITY PLAN LEVEL U AREA B+E
TY2.1.2C SECURITY PLAN LEVEL U AREA C+F
TY2.1.3A SECURITY PLAN LEVEL 1 AREA A
TY2.1.3B SECURITY PLAN LEVEL 1 AREA B
TY2.1.3C SECURITY PLAN LEVEL 1 AREA C
TY2.1.3D SECURITY PLAN LEVEL 1 AREA D
TY2.1.3E SECURITY PLAN LEVEL 1 AREA E
TY2.1.4A SECURITY PLAN LEVEL 2 AREA A
TY2.1.4B SECURITY PLAN LEVEL 2 AREA B
TY2.1.4C SECURITY PLAN LEVEL 2 AREA C
TY2.1.4D SECURITY PLAN LEVEL 2 AREA D
TY2.1.4E SECURITY PLAN LEVEL 2 AREA E
TY2.1.5C SECURITY PLAN ROOF AREA C+F
TY4.0.1 TYPICAL SECURITY SIGNAL ROOM PLAN LEVELS V - 2
TY5.0.1 SECURITY DETAILS - DOORS
TY5.0.2 SECURITY DETAILS - CAMERAS
GI0.1.1 INDEX OF DRAWINGS
GI0.1.2 INDEX OF DRAWINGS
EP7.1.0 PANEL SCHEDULES, MAIN SWITCHGEAR
EP7.1.1 PANEL SCHEDULES, EMERGENCY SYSTEM
EP7.1.2 PANEL SCHEDULES, EMERGENCY SYSTEM
EP7.2.1 PANEL SCHEDULES, LEGALLY REQUIRED SYSTEM
EP7.2.2 PANEL SCHEDULES, LEGALLY REQUIRED SYSTEM
EP7.2.3 PANEL SCHEDULES, LEGALLY REQUIRED SYSTEM
EP7.2.4 PANEL SCHEDULES, LEGALLY REQUIRED SYSTEM
EP7.2.5 PANEL SCHEDULES, LEGALLY REQUIRED SYSTEM
EP7.2.6 PANEL SCHEDULES, LEGALLY REQUIRED SYSTEM
EP7.3.1 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.3.2 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.3.3 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.3.4 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.3.5 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.3.6 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.3.7 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.4.1 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.4.2 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.4.3 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.4.4 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.4.5 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.4.6 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.4.7 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.5.1 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.5.2 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.5.3 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.6.1 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
EP7.6.2 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM
ELECTRICAL
ES0.1.0 SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
ES1.1.0 ELECTRICAL DEMOLITION SITE PLAN
ES1.1.1 ELECTRICAL OVERALL SITE PLAN
ES1.1.2 ELECTRICAL ENLARGED SITE PLAN - FEEDERS
ES1.1.3 ELECTRICAL ENLARGED SITE PLAN - LIGHTING AND POWER
EL2.1.1 OVERALL LIGHTING FLOOR PLAN LEVEL V
EL2.1.1A LIGHTING FLOOR PLAN LEVEL V AREA A
EL2.1.1B LIGHTING FLOOR PLAN LEVEL V AREA B
EL2.1.1C LIGHTING FLOOR PLAN LEVEL V AREA C
EL2.1.1D LIGHTING FLOOR PLAN LEVEL V AREA D
EL2.1.1E LIGHTING FLOOR PLAN LEVEL V AREA E
EL2.1.1F LIGHTING FLOOR PLAN LEVEL V AREA F
EL2.1.1G LIGHTING FLOOR PLAN LEVEL V AREA G
EL2.1.1H LIGHTING FLOOR PLAN LEVEL V AREA H
EL2.1.1J LIGHTING FLOOR PLAN LEVEL V AREA J
EL2.1.2 OVERALL LIGHTING FLOOR PLAN LEVEL U
EL2.1.2A LIGHTING FLOOR PLAN LEVEL U AREA A
EL2.1.2B LIGHTING FLOOR PLAN LEVEL U AREA B
EL2.1.2C LIGHTING FLOOR PLAN LEVEL U AREA C
EL2.1.2D LIGHTING FLOOR PLAN LEVEL U AREA D
EL2.1.2E LIGHTING FLOOR PLAN LEVEL U AREA E
EL2.1.2F LIGHTING FLOOR PLAN LEVEL U AREA F
EL2.1.2G LIGHTING FLOOR PLAN LEVEL U AREA G
EL2.1.2J LIGHTING FLOOR PLAN LEVEL U AREA J
EL2.1.3 OVERALL LIGHTING FLOOR PLAN LEVEL 1
EL2.1.3A LIGHTING FLOOR PLAN LEVEL 1 AREA A
EL2.1.3B LIGHTING FLOOR PLAN LEVEL 1 AREA B
EL2.1.3C LIGHTING FLOOR PLAN LEVEL 1 AREA C
EL2.1.3D LIGHTING FLOOR PLAN LEVEL 1 AREA D
EL2.1.3E LIGHTING FLOOR PLAN LEVEL 1 AREA E
EL2.1.4 OVERALL LIGHTING FLOOR PLAN LEVEL 2
EL2.1.4A LIGHTING FLOOR PLAN LEVEL 2 AREA A
EL2.1.4B LIGHTING FLOOR PLAN LEVEL 2 AREA B
EL2.1.4C LIGHTING FLOOR PLAN LEVEL 2 AREA C
EL2.1.4D LIGHTING FLOOR PLAN LEVEL 2 AREA D
EL2.1.4E LIGHTING FLOOR PLAN LEVEL 2 AREA E
EL2.1.5 OVERALL LIGHTING FLOOR PLAN ROOF LEVEL
EL2.1.5A LIGHTING FLOOR PLAN ROOF LEVEL AREA A
EL2.1.5B LIGHTING FLOOR PLAN ROOF LEVEL AREA B
EL2.1.5C LIGHTING FLOOR PLAN ROOF LEVEL AREA C
EL2.1.5D LIGHTING FLOOR PLAN ROOF LEVEL AREA D
EL2.1.5E LIGHTING FLOOR PLAN ROOF LEVEL AREA E
EL6.1.1 LIGHTING CONTROL DIAGRAMS
EL7.1.1 LUMINAIRE SCHEDULE
EL7.1.2 LUMINAIRE SCHEDULE
EL7.1.3 LUMINAIRE SCHEDULE
EL7.1.4 LUMINAIRE SCHEDULE
EL7.2.1 LIGHTING CONTROL SCHEDULES - VIVARIUM
EL7.2.2 LIGHTING CONTROL SCHEDULES - LABS
EL7.2.3 LIGHTING CONTROL SCHEDULES - OCCUPANCY SENSORS
EP2.1.1 OVERALL FLOOR PLAN LEVEL V FEEDER ROUTING
EP2.1.2 OVERALL FLOOR PLAN LEVEL U FEEDER ROUTING
EP2.1.3 OVERALL FLOOR PLAN LEVEL 1 FEEDER ROUTING
EP2.1.4 OVERALL FLOOR PLAN LEVEL 2 FEEDER ROUTING
EP2.1.5 OVERALL FLOOR PLAN ROOF LEVEL FEEDER ROUTING
EP3.1.1 OVERALL POWER FLOOR PLAN LEVEL V
EP3.1.1A POWER FLOOR PLAN LEVEL V AREA A
EP3.1.1B POWER FLOOR PLAN LEVEL V AREA B
EP3.1.1C POWER FLOOR PLAN LEVEL V AREA C
EP3.1.1D POWER FLOOR PLAN LEVEL V AREA D
EP3.1.1E POWER FLOOR PLAN LEVEL V AREA E
EP3.1.1F POWER FLOOR PLAN LEVEL V AREA F
EP3.1.1G POWER FLOOR PLAN LEVEL V AREA G
EP3.1.1H POWER FLOOR PLAN LEVEL V AREA H
EP3.1.1J POWER FLOOR PLAN LEVEL V AREA J
EP3.1.2 OVERALL POWER FLOOR PLAN LEVEL U
EP3.1.2A POWER FLOOR PLAN LEVEL U AREA A
EP3.1.2B POWER FLOOR PLAN LEVEL U AREA B
EP3.1.2C POWER FLOOR PLAN LEVEL U AREA C
EP3.1.2D POWER FLOOR PLAN LEVEL U AREA D
EP3.1.2E POWER FLOOR PLAN LEVEL U AREA E
EP3.1.2F POWER FLOOR PLAN LEVEL U AREA F
EP3.1.2G POWER FLOOR PLAN LEVEL U AREA G
EP3.1.3 OVERALL POWER FLOOR PLAN LEVEL 1
EP3.1.3A POWER FLOOR PLAN LEVEL 1 AREA A
EP3.1.3B POWER FLOOR PLAN LEVEL 1 AREA B
EP3.1.3C POWER FLOOR PLAN LEVEL 1 AREA C
EP3.1.3D POWER FLOOR PLAN LEVEL 1 AREA D
EP3.1.3E POWER FLOOR PLAN LEVEL 1 AREA E
EP3.1.4 OVERALL POWER FLOOR PLAN LEVEL 2
EP3.1.4A POWER FLOOR PLAN LEVEL 2 AREA A
EP3.1.4B POWER FLOOR PLAN LEVEL 2 AREA B
EP3.1.4C POWER FLOOR PLAN LEVEL 2 AREA C
EP3.1.4D POWER FLOOR PLAN LEVEL 2 AREA D
EP3.1.4E POWER FLOOR PLAN LEVEL 2 AREA E
EP3.1.5 OVERALL POWER FLOOR PLAN ROOF LEVEL
EP3.1.5A POWER FLOOR PLAN ROOF LEVEL AREA A
EP3.1.5B POWER FLOOR PLAN ROOF LEVEL AREA B
EP3.1.5C POWER FLOOR PLAN ROOF LEVEL AREA C
EP3.1.5D POWER FLOOR PLAN ROOF LEVEL AREA D
EP3.1.5E POWER FLOOR PLAN ROOF LEVEL AREA E
EP3.2.1 OVERALL LIGHTNING PROTECTION FLOOR PLANS
EP3.2.2 OVERALL GROUNDING FLOOR PLAN LEVEL U
EP4.1.1 ENLARGED ELECTRICAL ROOMS LEVELS V AND ROOF
EP4.1.2 ENLARGED ELECTRICAL ROOMS LEVELS 1 & 2
EP4.2.1 ENLARGED FLOOR PLANS LOADING DOCK AND ELEVATOR
MACHINE ROOM V-EV2
EP4.2.2 ENLARGED FLOOR PLANS IT AND SIGNAL ROOMS
EP5.1.0 SINGLE LINE DIAGRAM - PARTIAL CAMPUS DISTRIBUTION -
NORMAL SS-1 (EXISTING)
EP5.1.1 SINGLE LINE DIAGRAM - PARTIAL CAMPUS DISTRIBUTION -
NORMAL SS-2 (EXISTING)
EP5.1.2 SINGLE LINE DIAGRAM - PARTIAL CAMPUS DISTRIBUTION
EMERGENCY
EP5.1.3 SINGLE LINE DIAGRAM NORMAL AND EMERGENCY MAIN
SERVICES
EP5.1.4 SINGLE LINE DIAGRAM EMERGENCY AND LEGALLY REQUIRED
STANDBY SYSTEMS
EP5.1.5 SINGLE LINE DIAGRAM OPTIONAL STANDBY SYSTEM #1
EP5.1.6 SINGLE LINE DIAGRAM OPTIONAL STANDBY SYSTEM #2
EP5.1.7 SINGLE LINE DIAGRAM OPTIONAL STANDBY SYSTEM #3
EP5.1.8 SINGLE LINE DIAGRAM OPTIONAL STANDBY SYSTEM #4
EP5.2.1 ELECTRICAL SYSTEM RISER DIAGRAM
EP5.2.2 GROUNDING GRID RISER DIAGRAM
EP6.1.1 EQUIPMENT ELEVATIONS AND ANCHORAGE DETAILS
EP6.1.2 EQUIPMENT ELEVATIONS
EP6.1.3 EQUIPMENT ELEVATIONS
EP6.1.4 EQUIPMENT ELEVATIONS
EP6.2.1 DETAILS
EP6.2.2 DETAILS
EP6.2.3 DETAILS
EP6.2.4 DETAILS
EP6.2.5 DETAILS
EP6.3.1 DETAILS
EP6.3.2 DETAILS
EP7.0.0 SHUTDOWN SCHEDULE AND NOTES
EP7.0.1 EQUIPMENT SCHEDULE
EP7.0.2 EQUIPMENT SCHEDULE
GENERAL
PL2.1.1A WASTE AND VENT FLOOR PLAN LEVEL V AREA A
PL2.1.1B WASTE AND VENT FLOOR PLAN LEVEL V AREA B
PL2.1.1C WASTE AND VENT FLOOR PLAN LEVEL V AREA C
PL2.1.1D WASTE AND VENT FLOOR PLAN LEVEL V AREA D
PL2.1.1E WASTE AND VENT FLOOR PLAN LEVEL V AREA E
PL2.1.1F WASTE AND VENT FLOOR PLAN LEVEL V AREA F
PL2.1.1G WASTE AND VENT FLOOR PLAN LEVEL V AREA G
PL2.1.1H WASTE AND VENT FLOOR PLAN LEVEL V AREA H
PL2.1.1J WASTE AND VENT FLOOR PLAN LEVEL V AREA J
PL2.1.2 OVERALL WASTE AND VENT FLOOR PLAN LEVEL U
PL2.1.2A WASTE AND VENT FLOOR PLAN LEVEL U AREA A
PL2.1.2B WASTE AND VENT FLOOR PLAN LEVEL U AREA B
PL2.1.2C WASTE AND VENT FLOOR PLAN LEVEL U AREA C
PL2.1.2D WASTE AND VENT FLOOR PLAN LEVEL U AREA D
PL2.1.2E WASTE AND VENT FLOOR PLAN LEVEL U AREA E
PL2.1.2F WASTE AND VENT FLOOR PLAN LEVEL U AREA F
PL2.1.2G WASTE AND VENT FLOOR PLAN LEVEL U AREA G
PL2.1.2H WASTE AND VENT FLOOR PLAN LEVEL U AREA H
PL2.1.2J WASTE AND VENT FLOOR PLAN LEVEL U AREA J
PL2.1.3 OVERALL WASTE AND VENT FLOOR PLAN LEVEL 1
PL2.1.3A WASTE AND VENT FLOOR PLAN LEVEL 1 AREA A
PL2.1.3B WASTE AND VENT FLOOR PLAN LEVEL 1 AREA B
PL2.1.3C WASTE AND VENT FLOOR PLAN LEVEL 1 AREA C
PL2.1.3D WASTE AND VENT FLOOR PLAN LEVEL 1 AREA D
PL2.1.3E WASTE AND VENT FLOOR PLAN LEVEL 1 AREA E
PL2.1.4 OVERALL WASTE AND VENT FLOOR PLAN LEVEL 2
PL2.1.4A WASTE AND VENT FLOOR PLAN LEVEL 2 AREA A
PL2.1.4B WASTE AND VENT FLOOR PLAN LEVEL 2 AREA B
PL2.1.4C WASTE AND VENT FLOOR PLAN LEVEL 2 AREA C
PL2.1.4D WASTE AND VENT FLOOR PLAN LEVEL 2 AREA D
PL2.1.4E WASTE AND VENT FLOOR PLAN LEVEL 2 AREA E
PL2.1.5 OVERALL WASTE AND VENT PLAN ROOF LEVEL
PL3.1.1 PLUMBING WASTE AND VENT LEVELS 01 AND 02 RISER
DIAGRAMS
PL3.1.2 PLUMBING WASTE AND VENT LEVELS U RISER DIAGRAM
PL3.1.3 PLUMBING WASTE AND VENT LEVELS V RISER DIAGRAM
PLUMBING
PP0.1.1 GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS
PP2.1.1 OVERALL COLD & HOT WATER FLOOR PLAN LEVEL V
PP2.1.1A COLD & HOT WATER FLOOR PLAN LEVEL V AREA A
PP2.1.1B COLD & HOT WATER FLOOR PLAN LEVEL V AREA B
PP2.1.1C COLD & HOT WATER FLOOR PLAN LEVEL V AREA C
PP2.1.1D COLD & HOT WATER FLOOR PLAN LEVEL V AREA D
PP2.1.1E COLD & HOT WATER FLOOR PLAN LEVEL V AREA E
PP2.1.1F COLD & HOT WATER FLOOR PLAN LEVEL V AREA F
PP2.1.1G COLD & HOT WATER FLOOR PLAN LEVEL V AREA G
PP2.1.1H COLD & HOT WATER FLOOR PLAN LEVEL V AREA H
PP2.1.1J COLD & HOT WATER FLOOR PLAN LEVEL V AREA J
PP2.1.2 OVERALL COLD & HOT WATER FLOOR PLAN LEVEL U
PP2.1.2A COLD & HOT WATER FLOOR PLAN LEVEL U AREA A
PP2.1.2B COLD & HOT WATER FLOOR PLAN LEVEL U AREA B
PP2.1.2C COLD & HOT WATER FLOOR PLAN LEVEL U AREA C
PP2.1.2D COLD & HOT WATER FLOOR PLAN LEVEL U AREA D
PP2.1.2E COLD & HOT WATER FLOOR PLAN LEVEL U AREA E
PP2.1.2F COLD & HOT WATER FLOOR PLAN LEVEL U AREA F
PP2.1.2G COLD & HOT WATER FLOOR PLAN LEVEL U AREA G
PP2.1.2H COLD & HOT WATER FLOOR PLAN LEVEL U AREA H
PP2.1.2J COLD & HOT WATER FLOOR PLAN LEVEL U AREA J
PP2.1.3 OVERALL COLD & HOT WATER FLOOR PLAN LEVEL 1
PP2.1.3A COLD & HOT WATER FLOOR PLAN LEVEL 1 AREA A
PP2.1.3B COLD & HOT WATER FLOOR PLAN LEVEL 1 AREA B
PP2.1.3C COLD & HOT WATER FLOOR PLAN LEVEL 1 AREA C
PP2.1.3D COLD & HOT WATER FLOOR PLAN LEVEL 1 AREA D
PP2.1.3E COLD & HOT WATER FLOOR PLAN LEVEL 1 AREA E
PP2.1.4 OVERALL COLD & HOT WATER FLOOR PLAN LEVEL 2
PP2.1.4A COLD & HOT WATER FLOOR PLAN LEVEL 2 AREA A
PP2.1.4B COLD & HOT WATER FLOOR PLAN LEVEL 2 AREA B
PP2.1.4C COLD & HOT WATER FLOOR PLAN LEVEL 2 AREA C
PP2.1.4D COLD & HOT WATER FLOOR PLAN LEVEL 2 AREA D
PP2.1.4E COLD & HOT WATER FLOOR PLAN LEVEL 2 AREA E
PP2.1.5 OVERALL COLD & HOT WATER ROOF PLAN
PP2.2.1 OVERALL MED/LAB GAS FLOOR PLAN LEVEL V
PP2.2.1A MED/LAB GAS FLOOR PLAN LEVEL V AREA A
PP2.2.1B MED/LAB GAS FLOOR PLAN LEVEL V AREA B
PP2.2.1C MED/LAB GAS FLOOR PLAN LEVEL V AREA C
PP2.2.1D MED/LAB GAS FLOOR PLAN LEVEL V AREA D
PP2.2.1E MED/LAB GAS FLOOR PLAN LEVEL V AREA E
PP2.2.1F MED/LAB GAS FLOOR PLAN LEVEL V AREA F
PP2.2.1G MED/LAB GAS FLOOR PLAN LEVEL V AREA G
PP2.2.1H MED/LAB GAS FLOOR PLAN LEVEL V AREA H
PP2.2.1J MED/LAB GAS FLOOR PLAN LEVEL V AREA J
PP2.2.2 OVERALL MED/LAB GAS FLOOR PLAN LEVEL U
PP2.2.2A MED/LAB GAS FLOOR PLAN LEVEL U AREA A
PP2.2.2B MED/LAB GAS FLOOR PLAN LEVEL U AREA B
PP2.2.2C MED/LAB GAS FLOOR PLAN LEVEL U AREA C
PP2.2.2D MED/LAB GAS FLOOR PLAN LEVEL U AREA D
PP2.2.2E MED/LAB GAS FLOOR PLAN LEVEL U AREA E
PP2.2.2F MED/LAB GAS FLOOR PLAN LEVEL U AREA F
PP2.2.2G MED/LAB GAS FLOOR PLAN LEVEL U AREA G
PP2.2.2H MED/LAB GAS FLOOR PLAN LEVEL U AREA H
PP2.2.2J MED/LAB GAS FLOOR PLAN LEVEL U AREA J
PP2.2.3 OVERALL LABORATORY GAS FLOOR PLAN LEVEL 1
PP2.2.3A LABORATORY GAS FLOOR PLAN LEVEL 1 AREA A
PP2.2.3B LABORATORY GAS FLOOR PLAN LEVEL 1 AREA B
PP2.2.3C LABORATORY GAS FLOOR PLAN LEVEL 1 AREA C
PP2.2.3D LABORATORY GAS FLOOR PLAN LEVEL 1 AREA D
PP2.2.3E LABORATORY GAS FLOOR PLAN LEVEL 1 AREA E
PP2.2.4 OVERALL LABORATORY GAS FLOOR PLAN LEVEL 2
PP2.2.4A LABORATORY GAS FLOOR PLAN LEVEL 2 AREA A
PP2.2.4B LABORATORY GAS FLOOR PLAN LEVEL 2 AREA B
PP2.2.4C LABORATORY GAS FLOOR PLAN LEVEL 2 AREA C
PP2.2.4D LABORATORY GAS FLOOR PLAN LEVEL 2 AREA D
PP2.2.4E LABORATORY GAS FLOOR PLAN LEVEL 2 AREA E
PP2.2.5 OVERALL MED/LAB GAS ROOF PLAN
PP2.4.1 ENLARGED MECHANICAL ROOM PLUMBING PLANS
PP3.1.1 PLUMBING COLD AND HOT WATER LEVELS 01 AND 02
RISER DIAGRAMS
PP3.1.2 PLUMBING COLD AND HOT WATER LEVELS U AND V RISER
DIAGRAM
PP4.1.1 PLUMBING PIPING DETAILS
PP4.1.2 PLUMBING PIPING DETAILS
PP4.1.3 PLUMBING PIPING DETAILS
PP4.1.4 PLUMBING PIPING DETAILS
PP4.1.5 PLUMBING PIPING DETAILS
PP5.1.1 PLUMBING EQUIPMENT SCHEDULES
PP5.1.2 PLUMBING EQUIPMENT SCHEDULES
PP5.1.3 PLUMBING EQUIPMENT SCHEDULE
PP6.1.1 MEDICAL GAS LEVELS 01 AND 02 RISER DIAGRAMS
PP6.1.2 MEDICAL GAS LEVELS U AND V RISER DIAGRAM
PL2.1.0 OVERALL WASTE AND VENT FOUNDATION PLAN
PL2.1.0A WASTE AND VENT FOUNDATION PLAN AREA A
PL2.1.0B WASTE AND VENT FOUNDATION PLAN AREA B
PL2.1.0C WASTE AND VENT FOUNDATION PLAN AREA C
PL2.1.0D WASTE AND VENT FOUNDATION PLAN AREA D
PL2.1.0E WASTE AND VENT FOUNDATION PLAN AREA E
PL2.1.0F WASTE AND VENT FOUNDATION PLAN AREA F
PL2.1.0G WASTE AND VENT FOUNDATION PLAN AREA G
PL2.1.0H WASTE AND VENT FOUNDATION PLAN AREA H
PL2.1.0J WASTE AND VENT FOUNDATION PLAN AREA J
PL2.1.1 OVERALL WASTE AND VENT FLOOR PLAN LEVEL V
FIRE PROTECTION
FX2.1.0 FIRE SPRINKLER PLANS LEVEL V RESEARCH
AND VMU
FX2.2.0 FIRE SPRINKLER PLANS LEVEL U RESEARCH
AND VMU
FX2.3.0 FIRE SPRINKLER PLANS LEVEL 1 RESEARCH AND
VMU
FX2.4.0 FIRE SPRINKLER PLANS LEVEL 2 RESEARCH AND
VMU
FX2.5.0 FIRE SPRINKLER PLANS ROOF RESEARCH AND
VMU
FX6.0.0 FIRE SPRINKLER DETAILS RESEARCH AND VMU
COVER SHEET VOLUME 6COVER SHEET VOLUME 5
INDEX OF DRAWINGS VOLUME 6
RESEARCH AND VMU
GI0.1.1 INDEX OF DRAWINGS
GI0.1.2 INDEX OF DRAWINGS
INDEX OF DRAWINGS VOLUME 5
RESEARCH AND VMU
GENERAL
FIRE ALARM OVERALL SITE PLAN
J
J
J
DO
PP
J
M
EPO
FSD
DPT
DPS
X
A
K
T
TC
VFD
X
OS
X
PC
PC
T
DISCONNECT SWITCH, FUSED
COMBINATION FLOOR BOX/POKE THRU FLUSHED WITH FINISHED
FLOOR, CONSISTING OF TWO DUPLEX RECEPTACLE OUTLETS AND
SIGNAL DEVICES. PROVIDED BY ANOTHER DIVISION. FOR
ADDITIONAL REQUIREMENTS, SEE TELECOM DRAWINGS.
MOTOR, SINGLE-PHASE
DUPLEX RECEPTACLE, NEMA 5-20R, +45" A.F.F., E.A.N.
X - STANDS FOR LETTER DESIGNATION (SIMILAR TO OTHER DUPLEX
RECEPTACLE TYPES INDICATED)
D - DEDICATED
TR - TAMPER RESISTANT
WP - WEATHERPROOF, WEATHER-RESISTANT
DUPLEX RECEPTACLE WITH GROUND FAULT CIRCUIT INTERRUPTER,
NEMA 5-20R, +45" A.F.F., E.A.N. AND EXCEPT WHERE LOCATED
OUTSIDE WHERE THEY SHALL BE +18" A.F.F. NOTE: RECEPTACLES
SHALL BE WIRED TO OTHER RECEPTACLES USING THE LINE SIDE
TERMINALS.
TWO DUPLEX RECEPTACLES MOUNTED UNDER COMMON
COVERPLATE, +45" A.F.F., E.A.N.
SPECIAL PURPOSE RECEPTACLE, +45" A.F.F., E.A.N.
X - STANDS FOR LETTER DESIGNATION
A=120V, 20A, 1 PHASE, 2-POLE, 3W, NEMA L5-20R, SIMPLEX
B= 208V, 15A, 1 PHASE, 2-POLE, 3W, NEMA L6-15R, SIMPLEX
C= 208V, 30A, 1 PHASE, 2-POLE, 3W, NEMA L6-30R, SIMPLEX
D= 208V, 20A, 2 PHASE, 3-POLE, 4W, NEMA L14-20R, SIMPLEX
E=208V, 20A, 3 PHASE, 4-POLE, 5W, NEMA L21-20R, SIMPLEX
F=208V, 15A, 1 PHASE, 2-POLE, 3W, NEMA 6-15R, SIMPLEX
FLOOR BOX WITH ONE DUPLEX OUTLET, MONUMENT TYPE, E.A.N.
JUNCTION BOX. LOCATED IN CEILING SPACE OR TERMINATION
DIRECTLY INTO EQUIPMENT AS INDICATED. REFER TO DRAWINGS.
JUNCTION BOX, WALL MOUNTED, +18" A.F.F., E.A.N.
X - STANDS FOR LETTER DESIGNATION (SIMILAR TO OTHER
JUNCTION BOX TYPES INDICATED)
D - DEDICATED
WP - WEATHERPROOF
1'X4' FLUORESCENT RECESSED MOUNTED
LUMINAIRE.
2'X4' FLUORESCENT RECESSED MOUNTED
LUMINAIRE.
1'X8' FLUORESCENT RECESSED
MOUNTED LUMINAIRE.
1'X4' FLUORESCENT SURFACE MOUNTED
LUMINAIRE.
2'X4' FLUORESCENT SURFACE MOUNTED
LUMINAIRE.
1'X8' FLUORESCENT SURFACE
MOUNTED LUMINAIRE.
FLUORESCENT LUMINAIRE. - SHADING INDICATES
LUMINAIRE ON EMERGENCY CIRCUIT. LETTER AND
NUMBER INDICATES IDENTIFICATION. TYPICAL
2'X2' FLUORESCENT RECESSED MOUNTED
LUMINAIRE.
2'X2' FLUORESCENT SURFACE MOUNTED
LUMINAIRE.
SURFACE WALL MOUNTED LUMINAIRE
PENDANT MOUNTED LINEAR LUMINAIRE, LENGTH AS
SHOWN.
STRIPLIGHT LINEAR LUMINAIRE, LENGTH AS SHOWN.
LETTER INDICATES TYPE.
UNDERCABINET LUMINAIRE, LENGTH AS SHOWN.
LIGHT TRACK WITH HEADS AS SHOWN.
RECESSED DOWNLIGHT LUMINAIRE
RECESSED WALLWASH OR ACCENT LUMINAIRE.
ARROW INDICATES MAIN LIGHT DIRECTION.
SURFACE WALL MOUNTED LUMINAIRE
RECESSED WALL MOUNTED LUMINAIRE
CEILING MOUNTED LUMINAIRE
CEILING OR WALL MOUNTED EXIT SIGN.
DIRECTIONAL ARROWS AND FACES AS SHOWN.
LIGHTING, TWO HEAD EMERGENCY BATTERY
POWER.
BOLLARD LUMINAIRE
LIGHT POLE, ONE MAST ARM, ONE LUMINAIRE
LIGHT POLE, POST TOP MOUNT LUMINAIRE
LIGHT POLE, TWO MAST ARMS, TWO
LUMINAIRES
LIGHT POLE, ONE LUMINAIRE
LIGHT POLE, TWO LUMINAIRES
SURFACE MOUNTED LUMINAIRE
SURFACE WALLWASH OR ACCENT LUMINAIRE.
ARROW INDICATES MAIN LIGHT DIRECTION.
LIGHT SWITCH, +44" A.F.F., E.A.N.
BLANK = SINGLE POLE
3 = THREE WAY
4 = FOUR WAY
D = DIMMER
LV = LOW VOLTAGE
Mo1 = OCCUPANCY SENSOR WITH SINGLE SWITCH
Mo2 = OCCUPANCY SENSOR WITH DUAL RELAY
T = TIMER
WP = WEATHERPROOF
LIGHTING SYMBOLS:POWER SYMBOLS:
PANELBOARD, FLUSH MOUNTED
PANELBOARD, SURFACE MOUNTED
DROP CORD, SINGLE CONVENIENCE RECEPTACLE, 3-WIRE,
GROUNDING TYPE, 20A WITH #12 CONDUCTORS IN FLEXIBLE CORD
(CENTER LINE OF OUTLET: 6'-6" A.F.F., MAXIMUM). REFER TO
RECEPTACLE CORD DROP DETAIL ON SHEET EP6.2.3.
ELECTRICAL STRIP MOLD, DUPLEX OUTLET AS DESIGNATED ON
DRAWINGS. PROVIDE GFCI RECEPTACLE OUTLET WHERE LOCATE
WITHIN 6'-0" OF A SINK). SEE EQUIPMENT DRAWINGS QL SERIES FOR
ELEVATIONS. FOR ADDITIONAL REQUIREMENTS, SEE TELECOM
DRAWINGS.
MOTOR, THREE-PHASE
TRANSFORMER
EARTH GROUND
DISCONNECT SWITCH, UNFUSED, E.A.N.
STARTER COMBINATION WITH DISCONNECT SWITCH
STARTER OR MOTOR CONTROLLER
VARIABLE FREQUENCY DRIVE
TIME CLOCK
SWITCH, +44" A.F.F., E.A.N.
K = KEY OPERATED
LM = LOW VOLTAGE MASTER
WP = WEATHERPROOF
FLOOR JUNCTION BOX, MONUMENT TYPE, E.A.N.
CEILING OCCUPANCY SENSOR, LINE VOLTAGE
C9
GENERAL:
SEE KEY NOTE #1.01
BRANCH CIRCUIT WIRING, CONCEALED. CROSSLINES INDICATE
NUMBER OF #12 AWG WIRES WITH SEPARATE NEUTRAL PER PHASE
AND 1#12 AWG GREEN INSULATED GROUND WIRE. NO CROSSLINES
INDICATE 2#12 AND 1#12G (CROSSLINES DO NOT INCLUDE GROUND
WIRE), UNLESS OTHERWISE NOTED.
2 GANG
DUPLEX RECEPTACLE, NEMA 5-20R, CEILING - LOCATE IN
CEILING SPACE.
DUPLEX RECEPTACLE, NEMA 5-20R, CEILING - FLUSH WITH
FINISHED CEILING.
FLOOR BOX WITH TWO DUPLEX OUTLETS, MONUMENT TYPE, E.A.N.
EMERGENCY POWER OFF PUSH BUTTON, +44" A.F.F, E.A.N.
DUPLEX RECEPTACLE ON EMERGENCY POWER.
SPECIAL PURPOSE RECEPTACLE, CEILING - FLUSH WITH
FINISHED CEILING.
DROP CORD, SINGLE SPECIAL - PURPOSE RECEPTACLE, WIRING
CONFIGURATION - AND CONDUCTOR SIZES/QUANTITY IN FLEXIBLE
CORD TO MATCH NEMA OUTLET TYPE INDICATED (CENTER LINE OF
OUTLET: 6'-6" A.F.F. MINIMUM). REFER TO RECEPTACLE CORD DROP
DETAIL ON SHEET EP6.2.3.
AUTOMATIC DOOR, DOOR OPERATOR - PROVIDED BY ANOTHER
DIVISION. PROVIDE 120V CONNECTION. COORDINATE WIRING
TERMINATION AND CONCEAL ALL WIRING.
AUTOMATIC DOOR, PUSH PLATE - PROVIDED BY ANOTHER DIVISION.
PROVIDE 4"SQ.x2 1/8"D BACKBOX AND INTERCONNECTING WIRING TO
AUTOMATIC DOOR HEAD-END TO SUIT MANUFACTURER
REQUIREMENTS. COORDINATE LOCATION AND INSTALLATION WITH
OTHER TRADES. REFER TO ARCHITECTURAL DRAWINGS FOR
QUANTITY OF PUSHPLATES REQUIRED AT EACH AUTO-DOOR
LOCATION - PROVIDE ADDITIONAL BACKBOX AND INTERCONNECTING
CONDUIT AS REQUIRED AT HI AND LO PUSHPLATE LOCATIONS.
DUPLEX RECEPTACLE IN ELECTRICAL STRIP MOLD
SPECIAL PURPOSE RECEPTACLE IN ELECTRICAL STRIP MOLD.
DUPLEX RECEPTACLE OUTLET AND NEMA L5-20R RECEPTACLE
OUTLET IN COMMON COVER PLATE, +18" A.F.F., E.A.N. PROVIDE
TAMPER RESISTANT TYPE WHERE LOCATED IN LOBBIES.
RACEWAY UNDERFLOOR, BELOW GRADE AND/OR IN SLAB.
COMBINATION TABLE BOX, CONSISTING OF TWO DUPLEX
RECEPTACLE OUTLETS AND SIGNAL DEVICES. PROVIDED BY
ANOTHER DIVISION. FOR ADDITIONAL REQUIREMENTS, SEE
TELECOM DRAWINGS.
FIRE SMOKE DAMPER - PROVIDED IN MECHANICAL WORK. PROVIDE
120V ELECTRICAL CONNECTION AND LOCAL 20A-1P, MOTOR RATED,
HEAVY DUTY, TOGGLE TYPE DISCONNECT SWITCH. COORDINATE
INSTALLATION WITH MECHANICAL AND FIRE ALARM WORK. FOR
ADDITIONAL REQUIREMENTS, REFER TO DETAIL 32 ON FIRE ALARM
DRAWING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .