VOLUME_6a.pdf

PDF 44 MB Posted

Attached to
Construction - Research and VMU Building Federal contract opportunity
Solicitation number
VA10115R0123
Issued by
Department of Veterans Affairs Headquarters

About this file

VOLUME 6a

View the file

Other files for this federal contract opportunity

Other files attached to Construction - Research and VMU Building, newest first.
File Type Posted
VA101-15-R-0123-A00008000.docx DOCX document
VA101-15-R-0123-A00008001.pdf PDF
VA101-15-R-0123-A00008003.pdf PDF
VA101-15-R-0123-A00007008.pdf PDF
VA101-15-R-0123-A00007007.pdf PDF
VA101-15-R-0123-A00007003.pdf PDF
VA101-15-R-0123-A00007002.pdf PDF
VA101-15-R-0123-A00007000.docx DOCX document
VA101-15-R-0123-A00007004.pdf PDF
VA101-15-R-0123-A00006001.pdf PDF
VA101-15-R-0123-A00006000.docx DOCX document
VA101-15-R-0123-A00005008.pdf PDF
VA101-15-R-0123-A00005001.pdf PDF
VA101-15-R-0123-A00005015.pdf PDF
VA101-15-R-0123-A00005010.pdf PDF
VA101-15-R-0123-A00005003.pdf PDF
VA101-15-R-0123-A00005011.pdf PDF
VA101-15-R-0123-A00005014.pdf PDF
VA101-15-R-0123-A00004003.pdf PDF
VA101-15-R-0123-A00004006.pdf PDF
VA101-15-R-0123-A00004005.pdf PDF
VA101-15-R-0123-A00002106.pdf PDF
VA101-15-R-0123-A00002099.pdf PDF
VA101-15-R-0123-A00002084.pdf PDF
VA101-15-R-0123-A00002087.pdf PDF
VA101-15-R-0123-A00002098.pdf PDF
VA101-15-R-0123-A00002074.pdf PDF
VA101-15-R-0123-A00002081.pdf PDF
VA101-15-R-0123-A00002101.pdf PDF
VA101-15-R-0123-A00002102.pdf PDF
VA101-15-R-0123-A00002097.pdf PDF
VA101-15-R-0123-A00002082.pdf PDF
VA101-15-R-0123-A00002075.pdf PDF
VA101-15-R-0123-A00002078.pdf PDF
VA101-15-R-0123-A00002088.pdf PDF
VA101-15-R-0123-A00002080.pdf PDF
VA101-15-R-0123-A00001003.pdf PDF
VA101-15-R-0123-A00001001.ppt PPT presentation
VA101-15-R-0123-A00001000.docx DOCX document
VA101-15-R-0123_2.docx DOCX document
General_Decision_Number.pdf PDF
VAPA-RVMU-Specifications_Vol_01.pdf PDF
VOLUME_5b.pdf PDF
VOLUME_3.pdf PDF
VOLUME_5a.pdf PDF
VOLUME_4b.pdf PDF
VOLUME_6c.pdf PDF
List_of_Attachments.pdf PDF
VOLUME_6b.pdf PDF
VOLUME_2.pdf PDF
Show all 50

Construction - Research and VMU Building has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS - PALO ALTO CALIFORNIA

CENTERS FOR AMBULATORY CARE, POLYTRAUMA AND BLIND REHABILITATION

ARCHITECT

301 BATTERY STREET, 7TH FLOOR

SAN FRANCISCO, CA 94111

T 415.227.0100 F 415.908.0862 www.smithgroup.com

1629 TELEGRAPH AVE, #500

OAKLAND, CA 94612

T 415.777.3737 F 415.777.3476 www.dpsf.com

The Design Partnership LLP Architects + Planners

CIVIL LANDSCAPE STRUCTURAL MECHANICAL / PLUMBING ELECTRICAL

ELEVATOR

GEOTECHNICAL COMMUNICATION

SIGNAGE FIRE PROTECTION CODE COST ESTIMATE

BKF ENGINEERS

980 - 9TH STREET, SUITE 1770

SACRAMENTO, CA 95814

916.556.5800 T

916.556.5899 F

ROYSTON HANAMOTO ALLEY & ABEY

225 MILLER AVENUE

MILL VALLEY, CA 94941

415.383.7900 T

415.383.1433 F

www.rhaa.com

DEGENKOLB ENGINEERS

235 MONTGOMERY STREET, SUITE

SAN FRANCISCO, CA 94104

415.392.6952 T

415.544.0782 F

www.degenkolb.com

CAPITAL ENGINEERING CONSULTANTS

11020 SUN CENTER DRIVE, SUITE 100

RANCHO CORDOVA, CA 95670

916.851.3500 T

916.631.4424 F

www.capital-engineering.com

CAMMISA & WIPF

642 HARRISON STREET, SUITE 400

SAN FRANCISCO, CA 94107

415.863.5740 T

415.863.5758 F

SYSKA HENNESSY GROUP

425 CALIFORNIA STREET, SUITE 700

SAN FRANCISCO, CA 94104

415.288.9061 T

415.935.0385 F

www.syska.com

TREADWELL AND ROLLO, INC.

555 MONTGOMERY STREET, SUITE 1300

SAN FRANCISCO, CA 94111

415.955.9040 T

415.955.9041 F

TEECOM

1333 BROADWAY, SUITE 601

OAKLAND, CA 94612

510.337.2800 T

510.337.2804 F

https://teecom.com/

KATE KEATING ASSOCIATES, INC.

1045 SANSOME STREET, SUITE 202

SAN FRANCISCO, CA 94111

415.773.1000 T

415.773.1008 F

www.kkainc.com

FIRETECH CONSULTING, INC.

8967 W. RADCLIFFE DRIVE

LITTLETON, CO 80123

720.981.3413 T

720.981.3454 F

www.FiretechConsulting.com

THE FIRE CONSULTANTS, INC.

1981 N. BROADWAY, SUITE 400

WALNUT CREEK, CA 94596

925.979.9993 T

925.979.9994 F

www.thefireconsultants.com

CUMMING

475 SANSOME STREET, SUITE 740

SAN FRANCISCO, CA 94111

415. 748.3080 T

415. 748.3090 F

VA PROJECT NUMBER: 640-424

BLAST CONSULTANT

WEIDLINGER ASSOCIATES, INC.

40 WALL STREET, 19TH FLOOR

NEW YORK, NY 10005

212.367.3000 T

www.wai.com

ACOUSTICAL

CHARLES M. SALTER ASSOCIATES, INC

130 SUTTER STREET, SUITE 500

SAN FRANCISCO, CA 94104

415.397.0442 T

www.cmsalter.com

RESEARCH AND VMU

SMITHGROUP PROJECT NUMBER: 38363.307

CONSTRUCTION DOCUMENTS

30 JULY 2015

VOLUME 6

GENERAL CIVIL LANDSCAPE STRUCTURAL ARCHITECTURAL SIGNAGE EQUIPMENT MECHANICAL PLUMBING FIRE PROTECTION ELECTRICAL FIRE ALARMTELECOM SECURITY

3801 Miranda Ave., Palo Alto CA

CENTERS FOR AMBULATORY CARE,

POLYTRAUMA AND BLIND REHABILITATION

CONSTRUCTION DOCUMENTS

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Seals and Signatures on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

301 BATTERY STREET, 7TH FLOOR

SAN FRANCISCO, CA 94111

T 415.227.0100 F 415.908.0862 www.smithgroupjjr.com

The Design Partnership LLP Architects + Planners

1629 TELEGRAPH AVE, #500

OAKLAND, CA 94612

T 415.777.3737 F 415.777.3476 www.dpsf.com Department of

Veterans Affairs

Associate Architect:

PR

IN

TE

D

ON

FULLY SPRINKLERED

8/

/2

2:

:0

PM

INDEX OF DRAWINGS

GI0.1.1

JG/DJ BN/JI30 JULY 2015

RESEARCH AND VMU

640-424

INDEX OF DRAWINGS VOLUME 1

RESEARCH AND VMU

CIVIL

CD1.2.1 DEMOLITION PLAN

CS0.1.1 NOTES, LEGEND + ABBREVIATIONS

CS1.1.1 EXISTING CONDITIONS

CS1.3.0 HORIZONTAL CONTROL PLAN

CS1.3.1 LAYOUT PLAN

CS1.4.1 GRADING PLAN

CS1.4.2 GRADING PLAN

CS1.5.1 UTILITY PLAN

CS1.5.2 UTILITY PLAN - UTILITY YARD

CS1.5.3 STEAM TRENCH PROFILE

CS1.5.4 RESEARCH EAST SEWER CORRIDOR PROFILE

CS1.5.5 RESEARCH WEST SEWER CORRIDOR PROFILE

CS1.5.6 STORMWATER MANAGEMENT PLAN

CS1.6.1 EROSION CONTROL PLAN

CS1.8.1 DETAILS

CS1.8.2 DETAILS

CS1.8.3 DETAILS

CS1.8.4 DETAILS

CS1.8.5 DETAILS

CS1.8.6 DETAILS

CS1.8.7 DETAILS

CS1.8.8 DETAILS

LANDSCAPE

LP1.1.0 SCHEDULES, NOTES, AND LEGENDS

LP3.1.0 CONSTRUCTION PLAN

LP3.1.1 LAYOUT PLAN

LP4.1.0 CONSTRUCTION PLAN ENLARGEMENT

LP4.1.1 CONSTRUCTION PLAN ENLARGEMENTS

LP4.1.2 CONSTRUCTION SECTIONS

LP4.1.3 CONSTRUCTION SECTIONS

LP5.1.0 CONSTRUCTION DETAILS

LP5.1.1 CONSTRUCTION DETAILS

LP7.1.0 PLANTING PLAN

LP7.1.1 PLANTING PLAN DEDUCT ALTERNATE 4

LP7.1.2 PLANTING PLAN DEDUCT ALTERNATE 5

LP7.3.0 PLANTING DETAILS

LI1.1.0 IRRIGATION PLAN

LI1.1.1 IRRIGATION PLAN DEDUCT 4

LI1.1.2 IRRIGATION PLAN DEDUCT 5

LI1.3.0 IRRIGATION NOTES AND LEGEND

LI1.4.0 IRRIGATION DETAILS

LI1.5.0 IRRIGATION DETAILS

STRUCTURAL

S0.1.1 GENERAL NOTES

S0.1.2 SYMBOLS AND ABBREVIATIONS

S1.1.1 TYPICAL CONCRETE DETAILS

S1.1.2 TYPICAL CONCRETE DETAILS

S1.2.1 TYPICAL STEEL DETAILS

S1.2.2 TYPICAL STEEL DETAILS

S1.3.1 TYPICAL METAL DECK DETAILS

SB2.1.0 OVERALL MAT FOUNDATION PLAN

SB2.1.0A MAT FOUNDATION PLAN AREAS A-D-G

SB2.1.0B MAT FOUNDATION PLAN AREAS B-E-H

SB2.1.0C MAT FOUNDATION PLAN AREAS C-F-J

SF2.1.1 OVERALL FLOOR FRAMING PLAN LEVEL V

SF2.1.1A FLOOR FRAMING PLAN LEVEL V AREAS A-D-G

SF2.1.1B FLOOR FRAMING PLAN LEVEL V AREAS B-E-H

SF2.1.1C FLOOR FRAMING PLAN LEVEL V AREAS C-F-J

SF2.1.2 OVERALL FLOOR FRAMING PLAN LEVEL U

SF2.1.2A FLOOR FRAMING PLAN LEVEL U AREAS A-D-G

SF2.1.2B FLOOR FRAMING PLAN LEVEL U AREAS B-E-H

SF2.1.2C FLOOR FRAMING PLAN LEVEL U AREAS C-F-J

SF2.1.3 OVERALL FLOOR FRAMING PLAN LEVEL 1

SF2.1.3A FLOOR FRAMING PLAN LEVEL 1 AREAS A-D-G

SF2.1.3B FLOOR FRAMING PLAN LEVEL 1 AREAS B-E-H

SF2.1.3C FLOOR FRAMING PLAN LEVEL 1 AREAS C-F-J

SF2.1.4 OVERALL FLOOR FRAMING PLAN LEVEL 2

SF2.1.4A FLOOR FRAMING PLAN LEVEL 2 AREAS A-D-G

SF2.1.4B FLOOR FRAMING PLAN LEVEL 2 AREAS B-E-H

SF2.1.4C FLOOR FRAMING PLAN LEVEL 2 AREAS C-F-J

SF2.1.5 OVERALL FRAMING PLAN ROOF LEVEL

SF2.1.5A FRAMING PLAN ROOF LEVEL AREAS A-D-G

SF2.1.5B FRAMING PLAN ROOF LEVEL AREAS B-E-H

SF2.1.5C FRAMING PLAN ROOF LEVEL AREAS C-F-J

SF2.2.1 STAIR 1 PARTIAL PLANS & DETAILS

SF2.2.2 STAIRS 2 & 3 PARTIAL PLANS & DETAILS

SF2.2.3 STAIR 4 PARTIAL PLANS & DETAILS

SF2.3.1 ROOFTOP PENTHOUSES PARTIAL FRAMING PLANS

SF2.3.2 ROOFTOP PENTHOUSE DETAILS

SF3.1.1 BRACED FRAME ELEVATIONS

SF3.1.2 BRACED FRAME ELEVATIONS

SF4.1.1 DESIGN LOADING DIAGRAM

SF5.1.1 CONCRETE DETAILS

SF5.1.2 CONCRETE DETAILS

SF7.1.1 STEEL COLUMN SCHEDULE

SF7.1.2 STEEL COLUMN SCHEDULE

SF7.2.1 STEEL DETAILS

SF7.2.2 STEEL DETAILS

SF7.2.3 STEEL DETAILS

SF7.2.4. STEEL DETAILS

SF7.2.5 EQUIPMENT ANCHORAGE SCHEDULE & DETAILS

SF7.2.6 EQUIPMENT ANCHORAGE DETAILS

SF7.3.1 BRACED FRAME DETAILS

AE6.1.15 STAIR DETAILS - STAIRS #2, #3, #4

AE6.1.16 STAIR DETAILS

AE6.2.1 ELEVATOR PLANS AND SECTIONS

AE6.2.2 ELEVATOR PLANS AND SECTIONS

AE6.2.3 ELEVATOR PLANS AND SECTIONS

AE6.2.4 ELEVATOR CAB FINISH PLANS, RCP, ELEVATIONS

AE6.2.5 ELEVATOR DETAILS

AE7.1.1 ENLARGED RCPs - LOBBY WOOD GRILLE CEILINGS

AE7.1.5 ENLARGED FLOOR PLANS AND ELEVATIONS LEVEL V

AE7.1.6 ENLARGED FLOOR PLANS, RCPs, AND ELEVATIONS

LEVELS V, 1, AND 2

AE8.1.1 INTERIOR ELEVATIONS LEVEL V

AE8.3.1 INTERIOR ELEVATIONS LEVEL 1

AE8.3.2 INTERIOR ELEVATIONS LEVEL 1

AE8.3.3 INTERIOR ELEVATIONS LEVEL 1 AND LEVEL 2

AE8.3.4 INTERIOR ELEVATIONS LEVEL 1

AE8.6.1 INTERIOR DETAILS CORNER GUARDS, HANDRAILS AND

MISCELLANEOUS

AE8.7.1 MODULAR CASEWORK SCHEDULE

AE8.7.2 MODULAR CASEWORK DETAILS

AE9.0.1A FINISH SCHEDULE LEVEL V

AE9.0.1B FINISH SCHEDULE LEVEL V

AE9.0.2 FINISH SCHEDULE LEVEL U

AE9.0.3 FINISH SCHEDULE LEVEL 1

AE9.0.4 FINISH SCHEDULE LEVEL 2

AE9.1.1A FINISH PLAN LEVEL V AREA A

AE9.1.1B FINISH PLAN LEVEL V AREA B

AE9.1.1C FINISH PLAN LEVEL V AREA C

AE9.1.1D FINISH PLAN LEVEL V AREA D

AE9.1.1E FINISH PLAN LEVEL V AREA E

AE9.1.1F FINISH PLAN LEVEL V AREA F

AE9.1.1G FINISH PLAN LEVEL V AREA G

AE9.1.1H FINISH PLAN LEVEL V AREA H

AE9.1.1J FINISH PLAN LEVEL V AREA J

AE9.1.3A FINISH PLAN LEVEL 1 AREA A

AE9.1.3B FINISH PLAN LEVEL 1 AREA B

AE9.1.3C FINISH PLAN LEVEL 1 AREA C

AE9.1.3D FINISH PLAN LEVEL 1 AREA D

AE9.1.3E FINISH PLAN LEVEL 1 AREA E

AE9.1.4A FINISH PLAN LEVEL 2 AREA A

AE9.1.4B FINISH PLAN LEVEL 2 AREA B

AE9.1.4C FINISH PLAN LEVEL 2 AREA C

AE9.1.4D FINISH PLAN LEVEL 2 AREA D

AE9.1.4E FINISH PLAN LEVEL 2 AREA E

AE9.2.1A PARTITION TYPES - NON RATED

AE9.2.1B PARTITION TYPES - ONE HOUR

AE9.2.1C PARTITION TYPES - TWO HOUR

AE9.2.2 PARTITION SCHEDULE AND DETAILS

AE9.2.3 PARTITION SCHEDULE AND DETAILS

AE9.2.4 PARTITION SCHEDULE AND DETAILS

AE9.2.5 PARTITION SCHEDULE AND DETAILS

AE9.2.6 PARTITION SCHEDULE AND DETAILS

AE9.2.7 PARTITION DETAILS

AE9.2.8 PARTITION PLAN DETAILS @ CURTAINWALL

AE9.3.1 DOOR SCHEDULE LEVEL V & U

AE9.3.2 DOOR SCHEDULE LEVEL 1 & 2

AE9.3.3 DOOR STANDARDS AND DETAILS

AE9.3.4 DOOR AND FRAME DETAILS

AE9.4.1 TYPICAL CEILING DETAILS

AE9.4.2 TYPICAL CEILING DETAILS

AE9.4.4 INTERIOR DETAILS

AE9.5.1 INTERIOR DETAILS - LOBBY

AE9.5.2 INTERIOR DETAILS - LOBBY

AE9.5.3 INTERIOR DETAILS - LOBBY

AE9.6.1 INTERIOR DETAILS

AE9.6.2 INTERIOR DETAILS

AE9.7.1 INTERIOR GLAZING TYPES

AE9.8.1 INTERIOR DETAILS

AE9.8.2 INTERIOR DETAILS

ARCHITECTURAL

AE0.1.1 ABBREVIATIONS, GENERAL NOTES AND DIMENSIONING

CONVENTIONS

AE0.1.2 ARCHITECTURAL SYMBOLS

AE0.2.0 LIFE SAFETY DIAGRAM - SITE

AE0.2.1 LIFE SAFETY DIAGRAM LEVEL V

AE0.2.3 LIFE SAFETY DIAGRAM LEVEL 1

AE0.2.4 LIFE SAFETY DIAGRAM LEVEL 2

AE1.1.1 ARCHITECTURAL OVERALL PLAN SITE

AE1.1.2 ARCHITECTURAL ENLARGED PLAN SITE

AE1.1.3 SERVICE YARD AND UTILITY YARD ENLARGED PLANS

AE1.1.10 SITE DETAILS

AE1.1.11 SITE DETAILS

AE1.1.12 SITE DETAILS

AE2.1.1 OVERALL FLOOR PLAN LEVEL V

AE2.1.1A FLOOR PLAN LEVEL V AREA A

AE2.1.1B FLOOR PLAN LEVEL V AREA B

AE2.1.1C FLOOR PLAN LEVEL V AREA C

AE2.1.1D FLOOR PLAN LEVEL V AREA D

AE2.1.1E FLOOR PLAN LEVEL V AREA E

AE2.1.1F FLOOR PLAN LEVEL V AREA F

AE2.1.1G FLOOR PLAN LEVEL V AREA G

AE2.1.1H FLOOR PLAN LEVEL V AREA H

AE2.1.1J FLOOR PLAN LEVEL V AREA J

AE2.1.2 OVERALL FLOOR PLAN LEVEL U

AE2.1.2A FLOOR PLAN LEVEL U AREA A

AE2.1.2B FLOOR PLAN LEVEL U AREA B

AE2.1.2C FLOOR PLAN LEVEL U AREA C

AE2.1.2D FLOOR PLAN LEVEL U AREA D

AE2.1.2E FLOOR PLAN LEVEL U AREA E

AE2.1.2F FLOOR PLAN LEVEL U AREA F

AE2.1.2G FLOOR PLAN LEVEL U AREA G

AE2.1.2H FLOOR PLAN LEVEL U AREA H

AE2.1.2J FLOOR PLAN LEVEL U AREA J

AE2.1.3 OVERALL FLOOR PLAN LEVEL 1

AE2.1.3A FLOOR PLAN LEVEL 1 AREA A

AE2.1.3B FLOOR PLAN LEVEL 1 AREA B

AE2.1.3C FLOOR PLAN LEVEL 1 AREA C

AE2.1.3D FLOOR PLAN LEVEL 1 AREA D

AE2.1.3E FLOOR PLAN LEVEL 1 AREA E

AE2.1.4 OVERALL FLOOR PLAN LEVEL 2

AE2.1.4A FLOOR PLAN LEVEL 2 AREA A

AE2.1.4B FLOOR PLAN LEVEL 2 AREA B

AE2.1.4C FLOOR PLAN LEVEL 2 AREA C

AE2.1.4D FLOOR PLAN LEVEL 2 AREA D

AE2.1.4E FLOOR PLAN LEVEL 2 AREA E

AE2.1.5 OVERALL ROOF LEVEL PLAN

AE2.1.5A FLOOR PLAN ROOF LEVEL AREA A

AE2.1.5B FLOOR PLAN ROOF LEVEL AREA B

AE2.1.5C FLOOR PLAN ROOF LEVEL AREA C AND PARTIAL UPPER

ROOF PLAN

AE2.1.5D FLOOR PLAN ROOF LEVEL AREA D

AE2.1.5E FLOOR PLAN ROOF LEVEL AREA E

AE3.1.1 OVERALL REFLECTED CEILING PLAN LEVEL V

AE3.1.1A REFLECTED CEILING PLAN LEVEL V AREA A

AE3.1.1B REFLECTED CEILING PLAN LEVEL V AREA B

AE3.1.1C REFLECTED CEILING PLAN LEVEL V AREA C

AE3.1.1D REFLECTED CEILING PLAN LEVEL V AREA D

AE3.1.1E REFLECTED CEILING PLAN LEVEL V AREA E

AE3.1.1F REFLECTED CEILING PLAN LEVEL V AREA F

AE3.1.1G REFLECTED CEILING PLAN LEVEL V AREA G

AE3.1.1H REFLECTED CEILING PLAN LEVEL V AREA H

AE3.1.1J REFLECTED CEILING PLAN LEVEL V AREA J

AE3.1.2 OVERALL REFLECTED CEILING PLAN LEVEL U

AE3.1.3 OVERALL REFLECTED CEILING PLAN LEVEL 1

AE3.1.3A REFLECTED CEILING PLAN LEVEL 1 AREA A

AE3.1.3B REFLECTED CEILING PLAN LEVEL 1 AREA B

AE3.1.3C REFLECTED CEILING PLAN LEVEL 1 AREA C

AE3.1.3D REFLECTED CEILING PLAN LEVEL 1 AREA D

AE3.1.3E REFLECTED CEILING PLAN LEVEL 1 AREA E

AE3.1.4 OVERALL REFLECTED CEILING PLAN LEVEL 2

AE3.1.4A REFLECTED CEILING PLAN LEVEL 2 AREA A

AE3.1.4B REFLECTED CEILING PLAN LEVEL 2 AREA B

AE3.1.4C REFLECTED CEILING PLAN LEVEL 2 AREA C

AE3.1.4D REFLECTED CEILING PLAN LEVEL 2 AREA D

AE3.1.4E REFLECTED CEILING PLAN LEVEL 2 AREA E

AE4.1.1 EXTERIOR ELEVATIONS

AE4.1.2 EXTERIOR ELEVATIONS

AE4.1.3 PATTERN ELEVATIONS & TERRACOTTA VERTICAL

LAYOUT

AE4.2.1 BUILDING SECTIONS

AE4.2.2 BUILDING SECTIONS

AE4.2.3 BUILDING SECTIONS

AE4.3.1 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS

AE4.3.2 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS

AE4.3.3 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS

AE4.3.4 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS

AE4.3.5 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS

AE4.3.6 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS

AE4.3.7 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS

AE4.3.8 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS

AE4.3.9 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS

AE4.3.10 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS

AE4.3.11 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS

AE4.3.12 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS

AE4.3.13 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS

AE4.3.14 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS

AE4.3.15 EXTERIOR PLAN, ELEVATIONS & WALL SECTIONS

AE4.4.1 TYPICAL WALL SECTIONS

AE5.1.1 EXTERIOR DETAILS

AE5.1.8 EXTERIOR MOCKUP

AE5.2.1 EXTERIOR DETAILS- CURTAINWALL

AE5.2.2 EXTERIOR DETAILS- CURTAINWALL

AE5.3.1 EXTERIOR DETAILS- TERRACOTTA

AE5.3.2 EXTERIOR DETAILS- TERRACOTTA

AE5.4.0 EXTERIOR DETAILS- ROOF

AE5.4.1 EXTERIOR DETAILS - ROOF

AE5.5.1 EXTERIOR DETAILS - LOBBY

AE5.5.2 EXTERIOR DETAILS - LOBBY

AE5.6.0 EXTERIOR DETAILS - LOADING DOCK

AE6.1.1A STAIR 1 PLANS AND DETAILS

AE6.1.1B STAIR 1 SECTIONS

AE6.1.1C STAIR 1 SECTIONS

AE6.1.2 STAIR 2 AND STAIR 3 PLANS AND SECTIONS

AE6.1.3 STAIR 2 AND STAIR 3 SECTIONS

AE6.1.4 STAIR 4 PLANS AND SECTIONS

AE6.1.5 STAIR 4 - SECTIONS

AE6.1.10 STAIR DETAILS - STAIR #1

AE6.1.11 STAIR DETAILS - STAIR #1

AE6.1.12 STAIR DETAILS - STAIR #1

AE6.1.13 STAIR DETAILS - STAIR #1

AE6.1.14 STAIR DETAILS - STAIRS #2, #3, #4

QL2.4.3 LEVEL 2 AREA C ENLARGED LABORATORY PLAN

QL2.4.4 LEVEL 2 AREA D ENLARGED LABORATORY PLAN

QL2.4.5 LEVEL 2 AREA E ENLARGED LABORATORY PLAN

QL2.4.6 LEVEL 2 AREA F ENLARGED LABORATORY PLAN

QL8.1.1 INTERIOR ELEVATIONS-LEVEL V

QL8.1.2 INTERIOR ELEVATIONS-LEVEL V

QL8.1.3 INTERIOR ELEVATIONS-LEVEL V

QL8.1.4 INTERIOR ELEVATIONS-LEVEL V

QL8.1.5 INTERIOR ELEVATIONS-LEVEL V

QL8.1.6 INTERIOR ELEVATIONS-LEVEL V

QL8.1.7 INTERIOR ELEVATIONS-LEVEL V

QL8.1.8 INTERIOR ELEVATIONS-LEVEL V

QL8.1.9 INTERIOR ELEVATIONS-LEVEL V

QL8.3.1 INTERIOR ELEVATIONS-LEVELS 1 & 2 OPEN LABS

QL8.3.2 INTERIOR ELEVATIONS-LEVELS 1 & 2 OPEN LABS

QL8.3.3 INTERIOR ELEVATIONS-LEVELS 1 & 2

QL8.3.4 INTERIOR ELEVATIONS-LEVELS 1 & 2

QL8.3.5 INTERIOR ELEVATIONS-LEVELS 1 & 2

QL8.3.6 INTERIOR ELEVATIONS-LEVELS 1 & 2

QL9.8.1 EQUIPMENT DETAILS - PIT LAYOUTS

QL9.8.3 LEVEL V ENLARGED BEDDING DISPENSER/DISPOSAL PLAN

EQUIPMENT

QL0.0.1 GENERAL INFORMATION

QL0.0.2 GENERAL INFORMATION

QL0.0.3 GENERAL INFORMATION

QL0.0.4 GENERAL INFORMATION

QL0.0.5 GENERAL INFORMATION

QL0.0.6 GENERAL INFORMATION

QL0.0.7 GENERAL INFORMATION

QL0.0.8 GENERAL INFORMATION

QL0.0.9 GENERAL INFORMATION

QL0.0.10 GENERAL INFORMATION

QL0.0.11 GENERAL INFORMATION

QL0.1.1 DEDUCT ALTERNATE - LEVEL V AREA A CASEWORK -

ASSEMBLIES

QL0.1.2 DEDUCT ALTERNATE - LEVEL V AREA B CASEWORK -

ASSEMBLIES

QL0.1.3 DEDUCT ALTERNATE - LEVEL V AREA C CASEWORK -

ASSEMBLIES

QL0.1.4 DEDUCT ALTERNATE - LEVEL V AREA D CASEWORK -

ASSEMBLIES

QL0.1.5 DEDUCT ALTERNATE - LEVEL V AREA E CASEWORK -

ASSEMBLIES

QL0.1.6 DEDUCT ALTERNATE - LEVEL V AREA F CASEWORK -

ASSEMBLIES

QL0.1.7 DEDUCT ALTERNATE - LEVEL V AREA H CASEWORK -

ASSEMBLIES

QL0.1.8 DEDUCT ALTERNATE - LEVEL V AREA J CASEWORK -

ASSEMBLIES

QL0.3.1 DEDUCT ALTERNATE - LEVEL 1 AREA A CASEWORK -

ASSEMBLIES

QL0.3.2 DEDUCT ALTERNATE - LEVEL 1 AREA B CASEWORK -

ASSEMBLIES

QL0.3.3A DEDUCT ALTERNATE - LEVEL 1 AREA C CASEWORK -

ASSEMBLIES

QL0.3.3B DEDUCT ALTERNATE - LEVEL 1 AREA C CASEWORK -

ASSEMBLIES

QL0.3.4 DEDUCT ALTERNATE - LEVEL 1 AREA D CASEWORK -

ASSEMBLIES

QL0.3.5 DEDUCT ALTERNATE - LEVEL 1 AREA E CASEWORK -

ASSEMBLIES

QL0.3.6 DEDUCT ALTERNATE - LEVEL 1 AREA F CASEWORK -

ASSEMBLIES

QL0.4.1 DEDUCT ALTERNATE - LEVEL 2 AREA A CASEWORK -

ASSEMBLIES

QL0.4.2 DEDUCT ALTERNATE - LEVEL 2 AREA B CASEWORK -

ASSEMBLIES

QL0.4.3A DEDUCT ALTERNATE - LEVEL 2 AREA C CASEWORK -

ASSEMBLIES

QL0.4.3B DEDUCT ALTERNATE - LEVEL 2 AREA C CASEWORK -

ASSEMBLIES

QL0.4.4 DEDUCT ALTERNATE - LEVEL 2 AREA D CASEWORK -

ASSEMBLIES

QL0.4.5 DEDUCT ALTERNATE - LEVEL 2 AREA E CASEWORK -

ASSEMBLIES

QL0.4.6 DEDUCT ALTERNATE - LEVEL 2 AREA F CASEWORK -

ASSEMBLIES

QL1.0.1 SINK SCHEDULE

QL1.1.1 EQUIPMENT SCHEDULE LEVEL V

QL1.1.2 EQUIPMENT SCHEDULE LEVEL V

QL1.1.3 EQUIPMENT SCHEDULE LEVEL V

QL1.1.4 EQUIPMENT SCHEDULE LEVEL V

QL1.1.5 EQUIPMENT SCHEDULE LEVEL V

QL1.1.6 EQUIPMENT SCHEDULE LEVEL V

QL1.1.7 EQUIPMENT SCHEDULE LEVEL V

QL1.1.8 EQUIPMENT SCHEDULE LEVEL V

QL1.1.9 EQUIPMENT SCHEDULE LEVEL V

QL1.1.10 EQUIPMENT SCHEDULE LEVEL V

QL1.1.11 EQUIPMENT SCHEDULE LEVEL V

QL1.2.1 EQUIPMENT SCHEDULE LEVEL U

QL1.3.1 EQUIPMENT SCHEDULE LEVEL 1

QL1.3.2 EQUIPMENT SCHEDULE LEVEL 1

QL1.4.1 EQUIPMENT SCHEDULE LEVEL 2

QL1.4.2 EQUIPMENT SCHEDULE LEVEL 2

QL1.4.3 EQUIPMENT SCHEDULE LEVEL 2

QL2.0.1 LEVEL V OVERALL LABORATORY PLAN

QL2.0.2 LEVEL U OVERALL LABORATORY PLAN

QL2.0.3 LEVEL 1 OVERALL LABORATORY PLAN

QL2.0.4 LEVEL 2 OVERALL LABORATORY PLAN

QL2.1.1 LEVEL V AREA A ENLARGED LABORATORY PLAN

QL2.1.2 LEVEL V AREA B ENLARGED LABORATORY PLAN

QL2.1.3 LEVEL V AREA C ENLARGED LABORATORY PLAN

QL2.1.4 LEVEL V AREA D ENLARGED LABORATORY PLAN

QL2.1.5 LEVEL V AREA E ENLARGED LABORATORY PLAN

QL2.1.6 LEVEL V AREA F ENLARGED LABORATORY PLAN

QL2.1.7 LEVEL V AREA G ENLARGED LABORATORY PLAN

QL2.1.8 LEVEL V AREA H ENLARGED LABORATORY PLAN

QL2.1.9 LEVEL V AREA J ENLARGED LABORATORY PLAN

QL2.2.4 LEVEL U AREA D ENLARGED LABORATORY PLAN

QL2.2.8 LEVEL U AREA H ENLARGED LABORATORY PLAN

QL2.2.9 LEVEL U AREA J ENLARGED LABORATORY PLAN

QL2.3.1 LEVEL 1 AREA A ENLARGED LABORATORY PLAN

QL2.3.2 LEVEL 1 AREA B ENLARGED LABORATORY PLAN

QL2.3.3 LEVEL 1 AREA C ENLARGED LABORATORY PLAN

QL2.3.4 LEVEL 1 AREA D ENLARGED LABORATORY PLAN

QL2.3.5 LEVEL 1 AREA E ENLARGED LABORATORY PLAN

QL2.3.6 LEVEL 1 AREA F ENLARGED LABORATORY PLAN

QL2.3.9 LEVEL 1 AREA J ENLARGED LABORATORY PLAN

QL2.4.1 LEVEL 2 AREA A ENLARGED LABORATORY PLAN

QL2.4.2 LEVEL 2 AREA B ENLARGED LABORATORY PLAN

COVER SHEET VOLUME 3GI0.1.1 INDEX OF DRAWINGS

GI0.1.2 INDEX OF DRAWINGS

GENERAL GENERAL

GENERAL

GI0.1.1 INDEX OF DRAWINGS

GI0.1.2 INDEX OF DRAWINGS

INDEX OF DRAWINGS VOLUME 2

RESEARCH AND VMU INDEX OF DRAWINGS VOLUME 3

RESEARCH AND VMU

INDEX OF DRAWINGS VOLUME 4

RESEARCH AND VMU

SIGNAGE

AG1.1.1A SIGN LOCATION PLAN LEVEL V AREA A

AG1.1.1B SIGN LOCATION PLAN LEVEL V AREA B

AG1.1.1C SIGN LOCATION PLAN LEVEL V AREA C

AG1.1.2A SIGN LOCATION PLAN LEVEL U AREA A

AG1.1.2B SIGN LOCATION PLAN LEVEL U AREA B

AG1.1.2C SIGN LOCATION PLAN LEVEL U AREA C

AG1.1.3A SIGN LOCATION PLAN LEVEL 1 AREA A

AG1.1.3B SIGN LOCATION PLAN LEVEL 1 AREA B

AG1.1.3C SIGN LOCATION PLAN LEVEL 1 AREA C

AG1.1.3D SIGN LOCATION PLAN LEVEL 1 AREA D

AG1.1.3E SIGN LOCATION PLAN LEVEL 1 AREA E

AG1.1.4A SIGN LOCATION PLAN LEVEL 2 AREA A

AG1.1.4B SIGN LOCATION PLAN LEVEL 2 AREA B

AG1.1.4C SIGN LOCATION PLAN LEVEL 2 AREA C

AG1.1.4D SIGN LOCATION PLAN LEVEL 2 AREA D

AG1.1.4E SIGN LOCATION PLAN LEVEL 2 AREA E

AG1.1.5A SIGN LOCATION PLAN ROOF AREA A

AG1.1.5B SIGN LOCATION PLAN ROOF AREA B

AG1.1.5C SIGN LOCATION PLAN ROOF AREA C

AG1.1.5D SIGN LOCATION PLAN ROOF AREA D

AG1.1.5E SIGN LOCATION PLAN ROOF AREA E

AG1.2.1 EXTERIOR SIGNS WAYFINDING & IDENTIFICATION

AG1.2.2 INTERIOR SIGNS CODE REQUIRED

AG1.2.3 INTERIOR SIGNS WAYFINDING & IDENTIFICATION

AG1.2.4 INTERIOR SIGNS CODE, WAYFINDING & IDENTIFICATION

AG1.2.5 INTERIOR SIGNS WAYFINDING & IDENTIFICATION

AG1.2.6 INTERIOR SIGNS WAYFINDING & IDENTIFICATION

GI0.1.1 INDEX OF DRAWINGS

GI0.1.2 INDEX OF DRAWINGS

GI0.1.3 SAMPLE CPM NETWORK

GI0.2.1 PROJECT INFORMATION AND APPLICABLE CODES

GI1.1.2 TYPICAL MOUNTING HEIGHTS AND CONFIGURATION DIAGRAMS

GI1.1.3 TYPICAL TOILET ROOM MOUNTING HEIGHTS AND STALL

CONFIGURATION DIAGRAMS

GI1.1.4 TYPICAL RULES FOR DETERMINING MOUNTING HEIGHTS AND

LOCATIONS

GI1.1.5 TYPICAL REFLECTED CEILING PLAN LOCATIONS AND

CONFIGURATIONS

GI3.3.1 SEQUENCE OF CONSTRUCTION ACTIVITY STEPS 0-3

GI3.3.2 SEQUENCE OF CONSTRUCTION ACTIVITY STEPS 4-5

COVER SHEET VOLUME 2 GENERAL

GI0.1.1 INDEX OF DRAWINGS

GI0.1.2 INDEX OF DRAWINGS

COVER SHEET VOLUME 4

MH8.1.7 MECHANICAL CONTROLS

MH8.1.8 MECHANICAL CONTROLS

MP2.1.1 OVERALL MECHANICAL PIPING FLOOR PLAN LEVEL V

MP2.1.1A MECHANICAL PIPING FLOOR PLAN LEVEL V AREA A

MP2.1.1B MECHANICAL PIPING FLOOR PLAN LEVEL V AREA B

MP2.1.1C MECHANICAL PIPING FLOOR PLAN LEVEL V AREA C

MP2.1.1D MECHANICAL PIPING FLOOR PLAN LEVEL V AREA D

MP2.1.1E MECHANICAL PIPING FLOOR PLAN LEVEL V AREA E

MP2.1.1F MECHANICAL PIPING FLOOR PLAN LEVEL V AREA F

MP2.1.1G MECHANICAL PIPING FLOOR PLAN LEVEL V AREA G

MP2.1.1H MECHANICAL PIPING FLOOR PLAN LEVEL V AREA H

MP2.1.1J MECHANICAL PIPING FLOOR PLAN LEVEL V AREA J

MP2.1.2 OVERALL MECHANICAL PIPING FLOOR PLAN LEVEL U

MP2.1.2A MECHANICAL PIPING FLOOR PLAN LEVEL U AREA A

MP2.1.2B MECHANICAL PIPING FLOOR PLAN LEVEL U AREA B

MP2.1.2C MECHANICAL PIPING FLOOR PLAN LEVEL U AREA C

MP2.1.2D MECHANICAL PIPING FLOOR PLAN LEVEL U AREA D

MP2.1.2E MECHANICAL PIPING FLOOR PLAN LEVEL U AREA E

MP2.1.2F MECHANICAL PIPING FLOOR PLAN LEVEL U AREA F

MP2.1.2G MECHANICAL PIPING FLOOR PLAN LEVEL U AREA G

MP2.1.2H MECHANICAL PIPING FLOOR PLAN LEVEL U AREA H

MP2.1.2J MECHANICAL PIPING FLOOR PLAN LEVEL U AREA J

MP2.1.3 OVERALL MECHANICAL PIPING FLOOR PLAN LEVEL 1

MP2.1.3A MECHANICAL PIPING FLOOR PLAN LEVEL 1 AREA A

MP2.1.3B MECHANICAL PIPING FLOOR PLAN LEVEL 1 AREA B

MP2.1.3C MECHANICAL PIPING FLOOR PLAN LEVEL 1 AREA C

MP2.1.3D MECHANICAL PIPING FLOOR PLAN LEVEL 1 AREA D

MP2.1.3E MECHANICAL PIPING FLOOR PLAN LEVEL 1 AREA E

MP2.1.4 OVERALL MECHANICAL PIPING FLOOR PLAN LEVEL 2

MP2.1.4A MECHANICAL PIPING FLOOR PLAN LEVEL 2 AREA A

MP2.1.4B MECHANICAL PIPING FLOOR PLAN LEVEL 2 AREA B

MP2.1.4C MECHANICAL PIPING FLOOR PLAN LEVEL 2 AREA C

MP2.1.4D MECHANICAL PIPING FLOOR PLAN LEVEL 2 AREA D

MP2.1.4E MECHANICAL PIPING FLOOR PLAN LEVEL 2 AREA E

MP2.1.5 OVERALL MECHANICAL PIPING ROOF PLAN

MP2.1.5A MECHANICAL PIPING ROOF PLAN AREA A

MP2.1.5B MECHANICAL PIPING ROOF PLAN AREA B

MP2.1.5C MECHANICAL PIPING ROOF PLAN AREA C

MP2.1.5D MECHANICAL PIPING ROOF PLAN AREA D

MP2.1.5E MECHANICAL PIPING ROOF PLAN AREA E

MP4.1.1 ENLARGED MECHANICAL ROOM HVAC SECTIONS

MP6.1.1 MECH PIPING FLOW DIAGRAMS - BUILDING CHILLED &

HEATING HOT WATER

MP6.1.2 MECH PIPING FLOW DIAGRAM - BUILDING STEAM AND

CONDENSATE

MP6.1.3 MECHANICAL PIPING FLOW DIAGRAM - HEAT RECOVERY

COILS

MP6.1.4 MECHANICAL WIRING DIAGRAM - SPLIT SYSTEM UNIT

MP6.1.5 MECHANICAL PIPING DIAGRAM - SPLIT SYSTEM UNIT

MP7.1.1 MECHANICAL PIPING RISER DIAGRAMS

MECHANICAL

MH0.1.1 GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS

MS1.1.1 MECHANICAL SITE PIPING PLAN

MH1.1.1 OVERALL AHU ZONING FLOOR PLAN LEVEL V

MH1.1.3 OVERALL AHU ZONING FLOOR PLAN LEVEL 1

MH1.1.4 OVERALL AHU ZONING FLOOR PLAN LEVEL 2

MH1.2.1 OVERALL EXHAUST FANS ZONING FLOOR PLAN LEVEL V

MH1.2.3 OVERALL EXHAUST FANS ZONING FLOOR PLAN LEVEL 1

MH1.2.4 OVERALL EXHAUST FANS ZONING FLOOR PLAN LEVEL 2

MH1.3.1 OVERALL HVAC TU ZONING FLOOR PLAN LEVEL V

MH1.3.1A HVAC TU ZONING FLOOR PLAN LEVEL V AREA A+D+G

MH1.3.1B HVAC TU ZONING FLOOR PLAN LEVEL V AREA B+E+H

MH1.3.1C HVAC TU ZONING FLOOR PLAN LEVEL V AREA C+F+J

MH1.3.3 OVERALL HVAC TU ZONING FLOOR PLAN LEVEL 1

MH1.3.3A HVAC TU ZONING FLOOR PLAN LEVEL 1 AREA A+B

MH1.3.3B HVAC TU ZONING FLOOR PLAN LEVEL 1 AREA C

MH1.3.3C HVAC TU ZONING FLOOR PLAN LEVEL 1 AREA D+E

MH1.3.4 OVERALL HVAC TU ZONING FLOOR PLAN LEVEL 2

MH1.3.4A HVAC TU ZONING FLOOR PLAN LEVEL 2 AREA A+B

MH1.3.4B HVAC TU ZONING FLOOR PLAN LEVEL 2 AREA C

MH1.3.4C HVAC TU ZONING FLOOR PLAN LEVEL 2 AREA D+E

MH2.1.1 OVERALL HVAC MECHANICAL FLOOR PLAN LEVEL V

MH2.1.1A HVAC MECHANICAL FLOOR PLAN LEVEL V AREA A

MH2.1.1B HVAC MECHANICAL FLOOR PLAN LEVEL V AREA B

MH2.1.1C HVAC MECHANICAL FLOOR PLAN LEVEL V AREA C

MH2.1.1D HVAC MECHANICAL FLOOR PLAN LEVEL V AREA D

MH2.1.1E HVAC MECHANICAL FLOOR PLAN LEVEL V AREA E

MH2.1.1F HVAC MECHANICAL FLOOR PLAN LEVEL V AREA F

MH2.1.1G HVAC MECHANICAL FLOOR PLAN LEVEL V AREA G

MH2.1.1H HVAC MECHANICAL FLOOR PLAN LEVEL V AREA H

MH2.1.1J HVAC MECHANICAL FLOOR PLAN LEVEL V AREA J

MH2.1.2 OVERALL HVAC MECHANICAL FLOOR PLAN LEVEL U

MH2.1.2A HVAC MECHANICAL FLOOR PLAN LEVEL U AREA A

MH2.1.2B HVAC MECHANICAL FLOOR PLAN LEVEL U AREA B

MH2.1.2C HVAC MECHANICAL FLOOR PLAN LEVEL U AREA C

MH2.1.2D HVAC MECHANICAL FLOOR PLAN LEVEL U AREA D

MH2.1.2E HVAC MECHANICAL FLOOR PLAN LEVEL U AREA E

MH2.1.2F HVAC MECHANICAL FLOOR PLAN LEVEL U AREA F

MH2.1.2G HVAC MECHANICAL FLOOR PLAN LEVEL U AREA G

MH2.1.2H HVAC MECHANICAL FLOOR PLAN LEVEL U AREA H

MH2.1.2J HVAC MECHANICAL FLOOR PLAN LEVEL U AREA J

MH2.1.3 OVERALL HVAC MECHANICAL FLOOR PLAN LEVEL 1

MH2.1.3A HVAC MECHANICAL FLOOR PLAN LEVEL 1 AREA A

MH2.1.3B HVAC MECHANICAL FLOOR PLAN LEVEL 1 AREA B

MH2.1.3C HVAC MECHANICAL FLOOR PLAN LEVEL 1 AREA C

MH2.1.3D HVAC MECHANICAL FLOOR PLAN LEVEL 1 AREA D

MH2.1.3E HVAC MECHANICAL FLOOR PLAN LEVEL 1 AREA E

MH2.1.4 OVERALL HVAC MECHANICAL FLOOR PLAN LEVEL 2

MH2.1.4A HVAC MECHANICAL FLOOR PLAN LEVEL 2 AREA A

MH2.1.4B HVAC MECHANICAL FLOOR PLAN LEVEL 2 AREA B

MH2.1.4C HVAC MECHANICAL FLOOR PLAN LEVEL 2 AREA C

MH2.1.4D HVAC MECHANICAL FLOOR PLAN LEVEL 2 AREA D

MH2.1.4E HVAC MECHANICAL FLOOR PLAN LEVEL 2 AREA E

MH2.1.5 OVERALL HVAC MECHANICAL ROOF PLAN

MH2.1.5A HVAC MECHANICAL ROOF PLAN AREA A

MH2.1.5B HVAC MECHANICAL ROOF PLAN AREA B

MH2.1.5C HVAC MECHANICAL ROOF PLAN AREA C

MH2.1.5D HVAC MECHANICAL ROOF PLAN AREA D

MH2.1.5E HVAC MECHANICAL ROOF PLAN AREA E

MH3.1.1 HVAC SECTIONS

MH3.1.2 HVAC SECTIONS

MH3.1.3 HVAC SECTIONS

MH3.1.4 HVAC SECTIONS

MH3.1.5 HVAC SECTIONS

MH3.1.6 HVAC SECTIONS

MH3.1.7 HVAC SECTIONS

MH3.1.8 HVAC SECTIONS

MH3.1.9 HVAC SECTIONS

MH5.1.1 MECHANICAL DETAILS

MH5.1.2 MECHANICAL DETAILS

MH5.1.3 MECHANICAL DETAILS

MH5.1.4 MECHANICAL DETAILS

MH5.1.5 MECHANICAL DETAILS

MH5.1.6 MECHANICAL DETAILS

MH5.1.7 MECHANICAL DETAILS

MH5.1.8 MECHANICAL DETAILS

MH5.1.9 MECHANICAL DETAILS

MH5.1.10 MECHANICAL DETAILS

MH6.1.1 MECHANICAL EQUIPMENT SCHEDULES

MH6.1.2 MECHANICAL EQUIPMENT SCHEDULES

MH6.1.3 MECHANICAL EQUIPMENT SCHEDULES

MH6.1.4 MECHANICAL EQUIPMENT SCHEDULES

MH6.1.5 MECHANICAL EQUIPMENT SCHEDULES

MH6.1.6 MECHANICAL EQUIPMENT SCHEDULES

MH6.1.7 MECHANICAL EQUIPMENT SCHEDULES

MH6.1.8 MECHANICAL EQUIPMENT SCHEDULES

MH6.1.9 MECHANICAL EQUIPMENT SCHEDULES

MH6.1.10 MECHANICAL EQUIPMENT SCHEDULES

MH7.1.1 AIR FLOW DIAGRAMS - AIR HANDLING UNITS

MH7.1.2 AIR FLOW DIAGRAMS - EXHAUST SYSTEMS

MH7.1.3 AIR FLOW DIAGRAMS - EXHAUST SYSTEMS

MH7.2.1 BUILDING PRESSURIZATION DIAGRAM LEVEL V

MH7.2.3 BUILDING PRESSURIZATION DIAGRAM LEVEL 1

MH7.2.4 BUILDING PRESSURIZATION DIAGRAM LEVEL 2

MH7.3.1 AIRFLOW EQUIPMENT DIAGRAMS - AHUS & EFS

MH7.3.2 AIRFLOW EQUIPMENT DIAGRAMS - EFS

MH8.1.1 MECHANICAL CONTROLS

MH8.1.2 MECHANICAL CONTROLS

MH8.1.3 MECHANICAL CONTROLS

MH8.1.4 MECHANICAL CONTROLS

MH8.1.5 MECHANICAL CONTROLS

MH8.1.6 MECHANICAL CONTROLS

COVER SHEET VOLUME 1

POLYTRAUMA AND BLIND REHABILITATION

CONSTRUCTION DOCUMENTS

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Seals and Signatures on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

301 BATTERY STREET, 7TH FLOOR

SAN FRANCISCO, CA 94111

T 415.227.0100 F 415.908.0862 www.smithgroupjjr.com

The Design Partnership LLP Architects + Planners

1629 TELEGRAPH AVE, #500

OAKLAND, CA 94612

T 415.777.3737 F 415.777.3476 www.dpsf.com Department of

Veterans Affairs

Associate Architect:

PR

IN

TE

D

ON

FULLY SPRINKLERED

8/

/2

:3 8:

P

M

INDEX OF DRAWINGS

GI0.1.2

JG/DJ BN/JI30 JULY 2015

RESEARCH AND VMU

640-424

FIRE ALARM

FA0.1.0 GENERAL NOTES, SYMBOLS AND SCHEDULES

FA1.1.1 FIRE ALARM SITE PLAN

FA2.1.1 OVERALL FIRE ALARM ZONING PLANS LEVEL V & LEVEL U

FA2.1.2 OVERALL FIRE ALARM ZONING PLANS LEVEL 1 & LEVEL 2

FA2.1.3 OVERALL FIRE ALARM ZONING PLAN ROOF LEVEL

FA3.1.1 OVERALL FIRE ALARM FLOOR PLAN LEVEL V

FA3.1.1A FIRE ALARM FLOOR PLAN LEVEL V

FA3.1.1B FIRE ALARM FLOOR PLAN LEVEL V

FA3.1.2 OVERALL FIRE ALARM FLOOR PLAN LEVEL U

FA3.1.2A FIRE ALARM FLOOR PLAN LEVEL U

FA3.1.2B FIRE ALARM FLOOR PLAN LEVEL U

FA3.1.3 OVERALL FIRE ALARM FLOOR PLAN LEVEL 1

FA3.1.3A FIRE ALARM FLOOR PLAN LEVEL 1

FA3.1.3B FIRE ALARM FLOOR PLAN LEVEL 1

FA3.1.4 OVERALL FIRE ALARM FLOOR PLAN LEVEL 2

FA3.1.4A FIRE ALARM FLOOR PLAN LEVEL 2

FA3.1.4B FIRE ALARM FLOOR PLAN LEVEL 2

FA3.1.5 OVERALL FIRE ALARM FLOOR PLAN ROOF

FA3.1.5A FIRE ALARM FLOOR PLAN ROOF

FA3.1.5B FIRE ALARM FLOOR PLAN ROOF

FA5.1.1 FIRE ALARM RISER DIAGRAM

FA5.1.2 FIRE ALARM RISER DIAGRAM

FA6.1.1 FIRE ALARM DETAILS

TELECOM

TN0.0.1 SYMBOLS LIST AND GENERAL NOTES

TN0.0.2 DEVICE SCHEDULE

TN0.1.0 RISER DIAGRAM - PATHWAYS

TN0.1.1 RISER DIAGRAM - GROUNDING

TN0.1.2 RISER DIAGRAM - CABLING

TN0.1.3 RISER DIAGRAM - MATV

TN0.1.4 RISER DIAGRAM - PUBLIC ADDRESS

TN0.2.0 TYPICAL AUDIOVISUAL FUNCTIONAL SYSTEM DIAGRAMS

TN1.0.1 TELECOMMUNICATIONS SITE PLAN

TN1.0.2 TELECOMMUNICATIONS CABLING SITE PLAN

TN2.1.1A TELECOM PLAN LEVEL V AREA A+D

TN2.1.1B TELECOM PLAN LEVEL V AREA B+E

TN2.1.1C TELECOM PLAN LEVEL V AREA C+F

TN2.1.2A TELECOM PLAN LEVEL U AREA A+D

TN2.1.2B TELECOM PLAN LEVEL U AREA B+E

TN2.1.2C TELECOM PLAN LEVEL U AREA C+F

TN2.1.3A TELECOM PLAN LEVEL 1 AREA A

TN2.1.3B TELECOM PLAN LEVEL 1 AREA D+G

TN2.1.3C TELECOM PLAN LEVEL 1 AREA B+E

TN2.1.3D TELECOM PLAN LEVEL 1 AREA C+F

TN2.1.3E TELECOM PLAN LEVEL 1 AREA E

TN2.1.4A TELECOM PLAN LEVEL 2 AREA A

TN2.1.4B TELECOM PLAN LEVEL 2 AREA B

TN2.1.4C TELECOM PLAN LEVEL 2 AREA C

TN2.1.4D TELECOM PLAN LEVEL 2 AREA C+F

TN2.1.4E TELECOM PLAN LEVEL 2 AREA E

TN3.1.1A TELECOM RCP LEVEL V AREA A+D

TN3.1.1B TELECOM RCP LEVEL V AREA B+E

TN3.1.1C TELECOM RCP LEVEL V AREA C+F

TN3.1.2A TELECOM RCP LEVEL U AREA A+D

TN3.1.2B TELECOM RCP LEVELU AREA B+E

TN3.1.2C TELECOM RCP LEVEL U AREA C+F

TN3.1.3A TELECOM RCP LEVEL 1 AREA A

TN3.1.3B TELECOM RCP LEVEL 1 AREA B

TN3.1.3C TELECOM RCP LEVEL 1 AREA C

TN3.1.3D TELECOM RCP LEVEL 1 AREA D

TN3.1.3E TELECOM RCP LEVEL 1 AREA E

TN3.1.4A TELECOM RCP LEVEL 2 AREA A

TN3.1.4B TELECOM RCP LEVEL 2 AREA B

TN3.1.4C TELECOM RCP LEVEL 2 AREA C

TN3.1.4D TELECOM RCP LEVEL 2 AREA D

TN3.1.4E TELECOM RCP LEVEL 2 AREA E

TN4.0.1 TYPICAL TELECOM ROOM PLAN LEVEL V

TN4.0.2 TYPICAL TELECOM ROOM PLANS LEVEL 1

TN4.0.3 TYPICAL TELECOM ROOM PLANS LEVEL 2

TN4.1.0 TYPICAL AUDIOVISUAL ENLARGED PLANS

TN5.0.1 INSTALLATION DETAILS

TN5.0.2 INSTALLATION DETAILS

TN5.0.3 INSTALLATION DETAILS

TN5.0.4 INSTALLATION DETAILS

TN5.0.5 INSTALLATION DETAILS

SECURITY

TY0.0.1 SYMBOLS LIST AND GENERAL NOTES

TY0.1.0 SECURITY RISER DIAGRAM

TY0.1.1 SECURTY ACAMS BLOCK DIAGRAM

TY1.0.1 SECURITY SITE PLAN

TY2.1.1A SECURITY PLAN LEVEL V AREA A+D

TY2.1.1B SECURITY PLAN LEVEL V AREA B+E

TY2.1.1C SECURITY PLAN LEVEL V AREA C+F

TY2.1.2A SECURITY PLAN LEVEL U AREA A+D

TY2.1.2B SECURITY PLAN LEVEL U AREA B+E

TY2.1.2C SECURITY PLAN LEVEL U AREA C+F

TY2.1.3A SECURITY PLAN LEVEL 1 AREA A

TY2.1.3B SECURITY PLAN LEVEL 1 AREA B

TY2.1.3C SECURITY PLAN LEVEL 1 AREA C

TY2.1.3D SECURITY PLAN LEVEL 1 AREA D

TY2.1.3E SECURITY PLAN LEVEL 1 AREA E

TY2.1.4A SECURITY PLAN LEVEL 2 AREA A

TY2.1.4B SECURITY PLAN LEVEL 2 AREA B

TY2.1.4C SECURITY PLAN LEVEL 2 AREA C

TY2.1.4D SECURITY PLAN LEVEL 2 AREA D

TY2.1.4E SECURITY PLAN LEVEL 2 AREA E

TY2.1.5C SECURITY PLAN ROOF AREA C+F

TY4.0.1 TYPICAL SECURITY SIGNAL ROOM PLAN LEVELS V - 2

TY5.0.1 SECURITY DETAILS - DOORS

TY5.0.2 SECURITY DETAILS - CAMERAS

GI0.1.1 INDEX OF DRAWINGS

GI0.1.2 INDEX OF DRAWINGS

EP7.1.0 PANEL SCHEDULES, MAIN SWITCHGEAR

EP7.1.1 PANEL SCHEDULES, EMERGENCY SYSTEM

EP7.1.2 PANEL SCHEDULES, EMERGENCY SYSTEM

EP7.2.1 PANEL SCHEDULES, LEGALLY REQUIRED SYSTEM

EP7.2.2 PANEL SCHEDULES, LEGALLY REQUIRED SYSTEM

EP7.2.3 PANEL SCHEDULES, LEGALLY REQUIRED SYSTEM

EP7.2.4 PANEL SCHEDULES, LEGALLY REQUIRED SYSTEM

EP7.2.5 PANEL SCHEDULES, LEGALLY REQUIRED SYSTEM

EP7.2.6 PANEL SCHEDULES, LEGALLY REQUIRED SYSTEM

EP7.3.1 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.3.2 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.3.3 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.3.4 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.3.5 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.3.6 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.3.7 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.4.1 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.4.2 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.4.3 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.4.4 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.4.5 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.4.6 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.4.7 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.5.1 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.5.2 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.5.3 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.6.1 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

EP7.6.2 PANEL SCHEDULES, OPTIONAL STANDBY SYSTEM

ELECTRICAL

ES0.1.0 SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

ES1.1.0 ELECTRICAL DEMOLITION SITE PLAN

ES1.1.1 ELECTRICAL OVERALL SITE PLAN

ES1.1.2 ELECTRICAL ENLARGED SITE PLAN - FEEDERS

ES1.1.3 ELECTRICAL ENLARGED SITE PLAN - LIGHTING AND POWER

EL2.1.1 OVERALL LIGHTING FLOOR PLAN LEVEL V

EL2.1.1A LIGHTING FLOOR PLAN LEVEL V AREA A

EL2.1.1B LIGHTING FLOOR PLAN LEVEL V AREA B

EL2.1.1C LIGHTING FLOOR PLAN LEVEL V AREA C

EL2.1.1D LIGHTING FLOOR PLAN LEVEL V AREA D

EL2.1.1E LIGHTING FLOOR PLAN LEVEL V AREA E

EL2.1.1F LIGHTING FLOOR PLAN LEVEL V AREA F

EL2.1.1G LIGHTING FLOOR PLAN LEVEL V AREA G

EL2.1.1H LIGHTING FLOOR PLAN LEVEL V AREA H

EL2.1.1J LIGHTING FLOOR PLAN LEVEL V AREA J

EL2.1.2 OVERALL LIGHTING FLOOR PLAN LEVEL U

EL2.1.2A LIGHTING FLOOR PLAN LEVEL U AREA A

EL2.1.2B LIGHTING FLOOR PLAN LEVEL U AREA B

EL2.1.2C LIGHTING FLOOR PLAN LEVEL U AREA C

EL2.1.2D LIGHTING FLOOR PLAN LEVEL U AREA D

EL2.1.2E LIGHTING FLOOR PLAN LEVEL U AREA E

EL2.1.2F LIGHTING FLOOR PLAN LEVEL U AREA F

EL2.1.2G LIGHTING FLOOR PLAN LEVEL U AREA G

EL2.1.2J LIGHTING FLOOR PLAN LEVEL U AREA J

EL2.1.3 OVERALL LIGHTING FLOOR PLAN LEVEL 1

EL2.1.3A LIGHTING FLOOR PLAN LEVEL 1 AREA A

EL2.1.3B LIGHTING FLOOR PLAN LEVEL 1 AREA B

EL2.1.3C LIGHTING FLOOR PLAN LEVEL 1 AREA C

EL2.1.3D LIGHTING FLOOR PLAN LEVEL 1 AREA D

EL2.1.3E LIGHTING FLOOR PLAN LEVEL 1 AREA E

EL2.1.4 OVERALL LIGHTING FLOOR PLAN LEVEL 2

EL2.1.4A LIGHTING FLOOR PLAN LEVEL 2 AREA A

EL2.1.4B LIGHTING FLOOR PLAN LEVEL 2 AREA B

EL2.1.4C LIGHTING FLOOR PLAN LEVEL 2 AREA C

EL2.1.4D LIGHTING FLOOR PLAN LEVEL 2 AREA D

EL2.1.4E LIGHTING FLOOR PLAN LEVEL 2 AREA E

EL2.1.5 OVERALL LIGHTING FLOOR PLAN ROOF LEVEL

EL2.1.5A LIGHTING FLOOR PLAN ROOF LEVEL AREA A

EL2.1.5B LIGHTING FLOOR PLAN ROOF LEVEL AREA B

EL2.1.5C LIGHTING FLOOR PLAN ROOF LEVEL AREA C

EL2.1.5D LIGHTING FLOOR PLAN ROOF LEVEL AREA D

EL2.1.5E LIGHTING FLOOR PLAN ROOF LEVEL AREA E

EL6.1.1 LIGHTING CONTROL DIAGRAMS

EL7.1.1 LUMINAIRE SCHEDULE

EL7.1.2 LUMINAIRE SCHEDULE

EL7.1.3 LUMINAIRE SCHEDULE

EL7.1.4 LUMINAIRE SCHEDULE

EL7.2.1 LIGHTING CONTROL SCHEDULES - VIVARIUM

EL7.2.2 LIGHTING CONTROL SCHEDULES - LABS

EL7.2.3 LIGHTING CONTROL SCHEDULES - OCCUPANCY SENSORS

EP2.1.1 OVERALL FLOOR PLAN LEVEL V FEEDER ROUTING

EP2.1.2 OVERALL FLOOR PLAN LEVEL U FEEDER ROUTING

EP2.1.3 OVERALL FLOOR PLAN LEVEL 1 FEEDER ROUTING

EP2.1.4 OVERALL FLOOR PLAN LEVEL 2 FEEDER ROUTING

EP2.1.5 OVERALL FLOOR PLAN ROOF LEVEL FEEDER ROUTING

EP3.1.1 OVERALL POWER FLOOR PLAN LEVEL V

EP3.1.1A POWER FLOOR PLAN LEVEL V AREA A

EP3.1.1B POWER FLOOR PLAN LEVEL V AREA B

EP3.1.1C POWER FLOOR PLAN LEVEL V AREA C

EP3.1.1D POWER FLOOR PLAN LEVEL V AREA D

EP3.1.1E POWER FLOOR PLAN LEVEL V AREA E

EP3.1.1F POWER FLOOR PLAN LEVEL V AREA F

EP3.1.1G POWER FLOOR PLAN LEVEL V AREA G

EP3.1.1H POWER FLOOR PLAN LEVEL V AREA H

EP3.1.1J POWER FLOOR PLAN LEVEL V AREA J

EP3.1.2 OVERALL POWER FLOOR PLAN LEVEL U

EP3.1.2A POWER FLOOR PLAN LEVEL U AREA A

EP3.1.2B POWER FLOOR PLAN LEVEL U AREA B

EP3.1.2C POWER FLOOR PLAN LEVEL U AREA C

EP3.1.2D POWER FLOOR PLAN LEVEL U AREA D

EP3.1.2E POWER FLOOR PLAN LEVEL U AREA E

EP3.1.2F POWER FLOOR PLAN LEVEL U AREA F

EP3.1.2G POWER FLOOR PLAN LEVEL U AREA G

EP3.1.3 OVERALL POWER FLOOR PLAN LEVEL 1

EP3.1.3A POWER FLOOR PLAN LEVEL 1 AREA A

EP3.1.3B POWER FLOOR PLAN LEVEL 1 AREA B

EP3.1.3C POWER FLOOR PLAN LEVEL 1 AREA C

EP3.1.3D POWER FLOOR PLAN LEVEL 1 AREA D

EP3.1.3E POWER FLOOR PLAN LEVEL 1 AREA E

EP3.1.4 OVERALL POWER FLOOR PLAN LEVEL 2

EP3.1.4A POWER FLOOR PLAN LEVEL 2 AREA A

EP3.1.4B POWER FLOOR PLAN LEVEL 2 AREA B

EP3.1.4C POWER FLOOR PLAN LEVEL 2 AREA C

EP3.1.4D POWER FLOOR PLAN LEVEL 2 AREA D

EP3.1.4E POWER FLOOR PLAN LEVEL 2 AREA E

EP3.1.5 OVERALL POWER FLOOR PLAN ROOF LEVEL

EP3.1.5A POWER FLOOR PLAN ROOF LEVEL AREA A

EP3.1.5B POWER FLOOR PLAN ROOF LEVEL AREA B

EP3.1.5C POWER FLOOR PLAN ROOF LEVEL AREA C

EP3.1.5D POWER FLOOR PLAN ROOF LEVEL AREA D

EP3.1.5E POWER FLOOR PLAN ROOF LEVEL AREA E

EP3.2.1 OVERALL LIGHTNING PROTECTION FLOOR PLANS

EP3.2.2 OVERALL GROUNDING FLOOR PLAN LEVEL U

EP4.1.1 ENLARGED ELECTRICAL ROOMS LEVELS V AND ROOF

EP4.1.2 ENLARGED ELECTRICAL ROOMS LEVELS 1 & 2

EP4.2.1 ENLARGED FLOOR PLANS LOADING DOCK AND ELEVATOR

MACHINE ROOM V-EV2

EP4.2.2 ENLARGED FLOOR PLANS IT AND SIGNAL ROOMS

EP5.1.0 SINGLE LINE DIAGRAM - PARTIAL CAMPUS DISTRIBUTION -

NORMAL SS-1 (EXISTING)

EP5.1.1 SINGLE LINE DIAGRAM - PARTIAL CAMPUS DISTRIBUTION -

NORMAL SS-2 (EXISTING)

EP5.1.2 SINGLE LINE DIAGRAM - PARTIAL CAMPUS DISTRIBUTION

EMERGENCY

EP5.1.3 SINGLE LINE DIAGRAM NORMAL AND EMERGENCY MAIN

SERVICES

EP5.1.4 SINGLE LINE DIAGRAM EMERGENCY AND LEGALLY REQUIRED

STANDBY SYSTEMS

EP5.1.5 SINGLE LINE DIAGRAM OPTIONAL STANDBY SYSTEM #1

EP5.1.6 SINGLE LINE DIAGRAM OPTIONAL STANDBY SYSTEM #2

EP5.1.7 SINGLE LINE DIAGRAM OPTIONAL STANDBY SYSTEM #3

EP5.1.8 SINGLE LINE DIAGRAM OPTIONAL STANDBY SYSTEM #4

EP5.2.1 ELECTRICAL SYSTEM RISER DIAGRAM

EP5.2.2 GROUNDING GRID RISER DIAGRAM

EP6.1.1 EQUIPMENT ELEVATIONS AND ANCHORAGE DETAILS

EP6.1.2 EQUIPMENT ELEVATIONS

EP6.1.3 EQUIPMENT ELEVATIONS

EP6.1.4 EQUIPMENT ELEVATIONS

EP6.2.1 DETAILS

EP6.2.2 DETAILS

EP6.2.3 DETAILS

EP6.2.4 DETAILS

EP6.2.5 DETAILS

EP6.3.1 DETAILS

EP6.3.2 DETAILS

EP7.0.0 SHUTDOWN SCHEDULE AND NOTES

EP7.0.1 EQUIPMENT SCHEDULE

EP7.0.2 EQUIPMENT SCHEDULE

GENERAL

PL2.1.1A WASTE AND VENT FLOOR PLAN LEVEL V AREA A

PL2.1.1B WASTE AND VENT FLOOR PLAN LEVEL V AREA B

PL2.1.1C WASTE AND VENT FLOOR PLAN LEVEL V AREA C

PL2.1.1D WASTE AND VENT FLOOR PLAN LEVEL V AREA D

PL2.1.1E WASTE AND VENT FLOOR PLAN LEVEL V AREA E

PL2.1.1F WASTE AND VENT FLOOR PLAN LEVEL V AREA F

PL2.1.1G WASTE AND VENT FLOOR PLAN LEVEL V AREA G

PL2.1.1H WASTE AND VENT FLOOR PLAN LEVEL V AREA H

PL2.1.1J WASTE AND VENT FLOOR PLAN LEVEL V AREA J

PL2.1.2 OVERALL WASTE AND VENT FLOOR PLAN LEVEL U

PL2.1.2A WASTE AND VENT FLOOR PLAN LEVEL U AREA A

PL2.1.2B WASTE AND VENT FLOOR PLAN LEVEL U AREA B

PL2.1.2C WASTE AND VENT FLOOR PLAN LEVEL U AREA C

PL2.1.2D WASTE AND VENT FLOOR PLAN LEVEL U AREA D

PL2.1.2E WASTE AND VENT FLOOR PLAN LEVEL U AREA E

PL2.1.2F WASTE AND VENT FLOOR PLAN LEVEL U AREA F

PL2.1.2G WASTE AND VENT FLOOR PLAN LEVEL U AREA G

PL2.1.2H WASTE AND VENT FLOOR PLAN LEVEL U AREA H

PL2.1.2J WASTE AND VENT FLOOR PLAN LEVEL U AREA J

PL2.1.3 OVERALL WASTE AND VENT FLOOR PLAN LEVEL 1

PL2.1.3A WASTE AND VENT FLOOR PLAN LEVEL 1 AREA A

PL2.1.3B WASTE AND VENT FLOOR PLAN LEVEL 1 AREA B

PL2.1.3C WASTE AND VENT FLOOR PLAN LEVEL 1 AREA C

PL2.1.3D WASTE AND VENT FLOOR PLAN LEVEL 1 AREA D

PL2.1.3E WASTE AND VENT FLOOR PLAN LEVEL 1 AREA E

PL2.1.4 OVERALL WASTE AND VENT FLOOR PLAN LEVEL 2

PL2.1.4A WASTE AND VENT FLOOR PLAN LEVEL 2 AREA A

PL2.1.4B WASTE AND VENT FLOOR PLAN LEVEL 2 AREA B

PL2.1.4C WASTE AND VENT FLOOR PLAN LEVEL 2 AREA C

PL2.1.4D WASTE AND VENT FLOOR PLAN LEVEL 2 AREA D

PL2.1.4E WASTE AND VENT FLOOR PLAN LEVEL 2 AREA E

PL2.1.5 OVERALL WASTE AND VENT PLAN ROOF LEVEL

PL3.1.1 PLUMBING WASTE AND VENT LEVELS 01 AND 02 RISER

DIAGRAMS

PL3.1.2 PLUMBING WASTE AND VENT LEVELS U RISER DIAGRAM

PL3.1.3 PLUMBING WASTE AND VENT LEVELS V RISER DIAGRAM

PLUMBING

PP0.1.1 GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS

PP2.1.1 OVERALL COLD & HOT WATER FLOOR PLAN LEVEL V

PP2.1.1A COLD & HOT WATER FLOOR PLAN LEVEL V AREA A

PP2.1.1B COLD & HOT WATER FLOOR PLAN LEVEL V AREA B

PP2.1.1C COLD & HOT WATER FLOOR PLAN LEVEL V AREA C

PP2.1.1D COLD & HOT WATER FLOOR PLAN LEVEL V AREA D

PP2.1.1E COLD & HOT WATER FLOOR PLAN LEVEL V AREA E

PP2.1.1F COLD & HOT WATER FLOOR PLAN LEVEL V AREA F

PP2.1.1G COLD & HOT WATER FLOOR PLAN LEVEL V AREA G

PP2.1.1H COLD & HOT WATER FLOOR PLAN LEVEL V AREA H

PP2.1.1J COLD & HOT WATER FLOOR PLAN LEVEL V AREA J

PP2.1.2 OVERALL COLD & HOT WATER FLOOR PLAN LEVEL U

PP2.1.2A COLD & HOT WATER FLOOR PLAN LEVEL U AREA A

PP2.1.2B COLD & HOT WATER FLOOR PLAN LEVEL U AREA B

PP2.1.2C COLD & HOT WATER FLOOR PLAN LEVEL U AREA C

PP2.1.2D COLD & HOT WATER FLOOR PLAN LEVEL U AREA D

PP2.1.2E COLD & HOT WATER FLOOR PLAN LEVEL U AREA E

PP2.1.2F COLD & HOT WATER FLOOR PLAN LEVEL U AREA F

PP2.1.2G COLD & HOT WATER FLOOR PLAN LEVEL U AREA G

PP2.1.2H COLD & HOT WATER FLOOR PLAN LEVEL U AREA H

PP2.1.2J COLD & HOT WATER FLOOR PLAN LEVEL U AREA J

PP2.1.3 OVERALL COLD & HOT WATER FLOOR PLAN LEVEL 1

PP2.1.3A COLD & HOT WATER FLOOR PLAN LEVEL 1 AREA A

PP2.1.3B COLD & HOT WATER FLOOR PLAN LEVEL 1 AREA B

PP2.1.3C COLD & HOT WATER FLOOR PLAN LEVEL 1 AREA C

PP2.1.3D COLD & HOT WATER FLOOR PLAN LEVEL 1 AREA D

PP2.1.3E COLD & HOT WATER FLOOR PLAN LEVEL 1 AREA E

PP2.1.4 OVERALL COLD & HOT WATER FLOOR PLAN LEVEL 2

PP2.1.4A COLD & HOT WATER FLOOR PLAN LEVEL 2 AREA A

PP2.1.4B COLD & HOT WATER FLOOR PLAN LEVEL 2 AREA B

PP2.1.4C COLD & HOT WATER FLOOR PLAN LEVEL 2 AREA C

PP2.1.4D COLD & HOT WATER FLOOR PLAN LEVEL 2 AREA D

PP2.1.4E COLD & HOT WATER FLOOR PLAN LEVEL 2 AREA E

PP2.1.5 OVERALL COLD & HOT WATER ROOF PLAN

PP2.2.1 OVERALL MED/LAB GAS FLOOR PLAN LEVEL V

PP2.2.1A MED/LAB GAS FLOOR PLAN LEVEL V AREA A

PP2.2.1B MED/LAB GAS FLOOR PLAN LEVEL V AREA B

PP2.2.1C MED/LAB GAS FLOOR PLAN LEVEL V AREA C

PP2.2.1D MED/LAB GAS FLOOR PLAN LEVEL V AREA D

PP2.2.1E MED/LAB GAS FLOOR PLAN LEVEL V AREA E

PP2.2.1F MED/LAB GAS FLOOR PLAN LEVEL V AREA F

PP2.2.1G MED/LAB GAS FLOOR PLAN LEVEL V AREA G

PP2.2.1H MED/LAB GAS FLOOR PLAN LEVEL V AREA H

PP2.2.1J MED/LAB GAS FLOOR PLAN LEVEL V AREA J

PP2.2.2 OVERALL MED/LAB GAS FLOOR PLAN LEVEL U

PP2.2.2A MED/LAB GAS FLOOR PLAN LEVEL U AREA A

PP2.2.2B MED/LAB GAS FLOOR PLAN LEVEL U AREA B

PP2.2.2C MED/LAB GAS FLOOR PLAN LEVEL U AREA C

PP2.2.2D MED/LAB GAS FLOOR PLAN LEVEL U AREA D

PP2.2.2E MED/LAB GAS FLOOR PLAN LEVEL U AREA E

PP2.2.2F MED/LAB GAS FLOOR PLAN LEVEL U AREA F

PP2.2.2G MED/LAB GAS FLOOR PLAN LEVEL U AREA G

PP2.2.2H MED/LAB GAS FLOOR PLAN LEVEL U AREA H

PP2.2.2J MED/LAB GAS FLOOR PLAN LEVEL U AREA J

PP2.2.3 OVERALL LABORATORY GAS FLOOR PLAN LEVEL 1

PP2.2.3A LABORATORY GAS FLOOR PLAN LEVEL 1 AREA A

PP2.2.3B LABORATORY GAS FLOOR PLAN LEVEL 1 AREA B

PP2.2.3C LABORATORY GAS FLOOR PLAN LEVEL 1 AREA C

PP2.2.3D LABORATORY GAS FLOOR PLAN LEVEL 1 AREA D

PP2.2.3E LABORATORY GAS FLOOR PLAN LEVEL 1 AREA E

PP2.2.4 OVERALL LABORATORY GAS FLOOR PLAN LEVEL 2

PP2.2.4A LABORATORY GAS FLOOR PLAN LEVEL 2 AREA A

PP2.2.4B LABORATORY GAS FLOOR PLAN LEVEL 2 AREA B

PP2.2.4C LABORATORY GAS FLOOR PLAN LEVEL 2 AREA C

PP2.2.4D LABORATORY GAS FLOOR PLAN LEVEL 2 AREA D

PP2.2.4E LABORATORY GAS FLOOR PLAN LEVEL 2 AREA E

PP2.2.5 OVERALL MED/LAB GAS ROOF PLAN

PP2.4.1 ENLARGED MECHANICAL ROOM PLUMBING PLANS

PP3.1.1 PLUMBING COLD AND HOT WATER LEVELS 01 AND 02

RISER DIAGRAMS

PP3.1.2 PLUMBING COLD AND HOT WATER LEVELS U AND V RISER

DIAGRAM

PP4.1.1 PLUMBING PIPING DETAILS

PP4.1.2 PLUMBING PIPING DETAILS

PP4.1.3 PLUMBING PIPING DETAILS

PP4.1.4 PLUMBING PIPING DETAILS

PP4.1.5 PLUMBING PIPING DETAILS

PP5.1.1 PLUMBING EQUIPMENT SCHEDULES

PP5.1.2 PLUMBING EQUIPMENT SCHEDULES

PP5.1.3 PLUMBING EQUIPMENT SCHEDULE

PP6.1.1 MEDICAL GAS LEVELS 01 AND 02 RISER DIAGRAMS

PP6.1.2 MEDICAL GAS LEVELS U AND V RISER DIAGRAM

PL2.1.0 OVERALL WASTE AND VENT FOUNDATION PLAN

PL2.1.0A WASTE AND VENT FOUNDATION PLAN AREA A

PL2.1.0B WASTE AND VENT FOUNDATION PLAN AREA B

PL2.1.0C WASTE AND VENT FOUNDATION PLAN AREA C

PL2.1.0D WASTE AND VENT FOUNDATION PLAN AREA D

PL2.1.0E WASTE AND VENT FOUNDATION PLAN AREA E

PL2.1.0F WASTE AND VENT FOUNDATION PLAN AREA F

PL2.1.0G WASTE AND VENT FOUNDATION PLAN AREA G

PL2.1.0H WASTE AND VENT FOUNDATION PLAN AREA H

PL2.1.0J WASTE AND VENT FOUNDATION PLAN AREA J

PL2.1.1 OVERALL WASTE AND VENT FLOOR PLAN LEVEL V

FIRE PROTECTION

FX2.1.0 FIRE SPRINKLER PLANS LEVEL V RESEARCH

AND VMU

FX2.2.0 FIRE SPRINKLER PLANS LEVEL U RESEARCH

AND VMU

FX2.3.0 FIRE SPRINKLER PLANS LEVEL 1 RESEARCH AND

VMU

FX2.4.0 FIRE SPRINKLER PLANS LEVEL 2 RESEARCH AND

VMU

FX2.5.0 FIRE SPRINKLER PLANS ROOF RESEARCH AND

VMU

FX6.0.0 FIRE SPRINKLER DETAILS RESEARCH AND VMU

COVER SHEET VOLUME 6COVER SHEET VOLUME 5

INDEX OF DRAWINGS VOLUME 6

RESEARCH AND VMU

GI0.1.1 INDEX OF DRAWINGS

GI0.1.2 INDEX OF DRAWINGS

INDEX OF DRAWINGS VOLUME 5

RESEARCH AND VMU

GENERAL

FIRE ALARM OVERALL SITE PLAN

J

J

J

DO

PP

J

M

EPO

FSD

DPT

DPS

X

A

K

T

TC

VFD

X

OS

X

PC

PC

T

DISCONNECT SWITCH, FUSED

COMBINATION FLOOR BOX/POKE THRU FLUSHED WITH FINISHED

FLOOR, CONSISTING OF TWO DUPLEX RECEPTACLE OUTLETS AND

SIGNAL DEVICES. PROVIDED BY ANOTHER DIVISION. FOR

ADDITIONAL REQUIREMENTS, SEE TELECOM DRAWINGS.

MOTOR, SINGLE-PHASE

DUPLEX RECEPTACLE, NEMA 5-20R, +45" A.F.F., E.A.N.

X - STANDS FOR LETTER DESIGNATION (SIMILAR TO OTHER DUPLEX

RECEPTACLE TYPES INDICATED)

D - DEDICATED

TR - TAMPER RESISTANT

WP - WEATHERPROOF, WEATHER-RESISTANT

DUPLEX RECEPTACLE WITH GROUND FAULT CIRCUIT INTERRUPTER,

NEMA 5-20R, +45" A.F.F., E.A.N. AND EXCEPT WHERE LOCATED

OUTSIDE WHERE THEY SHALL BE +18" A.F.F. NOTE: RECEPTACLES

SHALL BE WIRED TO OTHER RECEPTACLES USING THE LINE SIDE

TERMINALS.

TWO DUPLEX RECEPTACLES MOUNTED UNDER COMMON

COVERPLATE, +45" A.F.F., E.A.N.

SPECIAL PURPOSE RECEPTACLE, +45" A.F.F., E.A.N.

X - STANDS FOR LETTER DESIGNATION

A=120V, 20A, 1 PHASE, 2-POLE, 3W, NEMA L5-20R, SIMPLEX

B= 208V, 15A, 1 PHASE, 2-POLE, 3W, NEMA L6-15R, SIMPLEX

C= 208V, 30A, 1 PHASE, 2-POLE, 3W, NEMA L6-30R, SIMPLEX

D= 208V, 20A, 2 PHASE, 3-POLE, 4W, NEMA L14-20R, SIMPLEX

E=208V, 20A, 3 PHASE, 4-POLE, 5W, NEMA L21-20R, SIMPLEX

F=208V, 15A, 1 PHASE, 2-POLE, 3W, NEMA 6-15R, SIMPLEX

FLOOR BOX WITH ONE DUPLEX OUTLET, MONUMENT TYPE, E.A.N.

JUNCTION BOX. LOCATED IN CEILING SPACE OR TERMINATION

DIRECTLY INTO EQUIPMENT AS INDICATED. REFER TO DRAWINGS.

JUNCTION BOX, WALL MOUNTED, +18" A.F.F., E.A.N.

X - STANDS FOR LETTER DESIGNATION (SIMILAR TO OTHER

JUNCTION BOX TYPES INDICATED)

D - DEDICATED

WP - WEATHERPROOF

1'X4' FLUORESCENT RECESSED MOUNTED

LUMINAIRE.

2'X4' FLUORESCENT RECESSED MOUNTED

LUMINAIRE.

1'X8' FLUORESCENT RECESSED

MOUNTED LUMINAIRE.

1'X4' FLUORESCENT SURFACE MOUNTED

LUMINAIRE.

2'X4' FLUORESCENT SURFACE MOUNTED

LUMINAIRE.

1'X8' FLUORESCENT SURFACE

MOUNTED LUMINAIRE.

FLUORESCENT LUMINAIRE. - SHADING INDICATES

LUMINAIRE ON EMERGENCY CIRCUIT. LETTER AND

NUMBER INDICATES IDENTIFICATION. TYPICAL

2'X2' FLUORESCENT RECESSED MOUNTED

LUMINAIRE.

2'X2' FLUORESCENT SURFACE MOUNTED

LUMINAIRE.

SURFACE WALL MOUNTED LUMINAIRE

PENDANT MOUNTED LINEAR LUMINAIRE, LENGTH AS

SHOWN.

STRIPLIGHT LINEAR LUMINAIRE, LENGTH AS SHOWN.

LETTER INDICATES TYPE.

UNDERCABINET LUMINAIRE, LENGTH AS SHOWN.

LIGHT TRACK WITH HEADS AS SHOWN.

RECESSED DOWNLIGHT LUMINAIRE

RECESSED WALLWASH OR ACCENT LUMINAIRE.

ARROW INDICATES MAIN LIGHT DIRECTION.

SURFACE WALL MOUNTED LUMINAIRE

RECESSED WALL MOUNTED LUMINAIRE

CEILING MOUNTED LUMINAIRE

CEILING OR WALL MOUNTED EXIT SIGN.

DIRECTIONAL ARROWS AND FACES AS SHOWN.

LIGHTING, TWO HEAD EMERGENCY BATTERY

POWER.

BOLLARD LUMINAIRE

LIGHT POLE, ONE MAST ARM, ONE LUMINAIRE

LIGHT POLE, POST TOP MOUNT LUMINAIRE

LIGHT POLE, TWO MAST ARMS, TWO

LUMINAIRES

LIGHT POLE, ONE LUMINAIRE

LIGHT POLE, TWO LUMINAIRES

SURFACE MOUNTED LUMINAIRE

SURFACE WALLWASH OR ACCENT LUMINAIRE.

ARROW INDICATES MAIN LIGHT DIRECTION.

LIGHT SWITCH, +44" A.F.F., E.A.N.

BLANK = SINGLE POLE

3 = THREE WAY

4 = FOUR WAY

D = DIMMER

LV = LOW VOLTAGE

Mo1 = OCCUPANCY SENSOR WITH SINGLE SWITCH

Mo2 = OCCUPANCY SENSOR WITH DUAL RELAY

T = TIMER

WP = WEATHERPROOF

LIGHTING SYMBOLS:POWER SYMBOLS:

PANELBOARD, FLUSH MOUNTED

PANELBOARD, SURFACE MOUNTED

DROP CORD, SINGLE CONVENIENCE RECEPTACLE, 3-WIRE,

GROUNDING TYPE, 20A WITH #12 CONDUCTORS IN FLEXIBLE CORD

(CENTER LINE OF OUTLET: 6'-6" A.F.F., MAXIMUM). REFER TO

RECEPTACLE CORD DROP DETAIL ON SHEET EP6.2.3.

ELECTRICAL STRIP MOLD, DUPLEX OUTLET AS DESIGNATED ON

DRAWINGS. PROVIDE GFCI RECEPTACLE OUTLET WHERE LOCATE

WITHIN 6'-0" OF A SINK). SEE EQUIPMENT DRAWINGS QL SERIES FOR

ELEVATIONS. FOR ADDITIONAL REQUIREMENTS, SEE TELECOM

DRAWINGS.

MOTOR, THREE-PHASE

TRANSFORMER

EARTH GROUND

DISCONNECT SWITCH, UNFUSED, E.A.N.

STARTER COMBINATION WITH DISCONNECT SWITCH

STARTER OR MOTOR CONTROLLER

VARIABLE FREQUENCY DRIVE

TIME CLOCK

SWITCH, +44" A.F.F., E.A.N.

K = KEY OPERATED

LM = LOW VOLTAGE MASTER

WP = WEATHERPROOF

FLOOR JUNCTION BOX, MONUMENT TYPE, E.A.N.

CEILING OCCUPANCY SENSOR, LINE VOLTAGE

C9

GENERAL:

SEE KEY NOTE #1.01

BRANCH CIRCUIT WIRING, CONCEALED. CROSSLINES INDICATE

NUMBER OF #12 AWG WIRES WITH SEPARATE NEUTRAL PER PHASE

AND 1#12 AWG GREEN INSULATED GROUND WIRE. NO CROSSLINES

INDICATE 2#12 AND 1#12G (CROSSLINES DO NOT INCLUDE GROUND

WIRE), UNLESS OTHERWISE NOTED.

2 GANG

DUPLEX RECEPTACLE, NEMA 5-20R, CEILING - LOCATE IN

CEILING SPACE.

DUPLEX RECEPTACLE, NEMA 5-20R, CEILING - FLUSH WITH

FINISHED CEILING.

FLOOR BOX WITH TWO DUPLEX OUTLETS, MONUMENT TYPE, E.A.N.

EMERGENCY POWER OFF PUSH BUTTON, +44" A.F.F, E.A.N.

DUPLEX RECEPTACLE ON EMERGENCY POWER.

SPECIAL PURPOSE RECEPTACLE, CEILING - FLUSH WITH

FINISHED CEILING.

DROP CORD, SINGLE SPECIAL - PURPOSE RECEPTACLE, WIRING

CONFIGURATION - AND CONDUCTOR SIZES/QUANTITY IN FLEXIBLE

CORD TO MATCH NEMA OUTLET TYPE INDICATED (CENTER LINE OF

OUTLET: 6'-6" A.F.F. MINIMUM). REFER TO RECEPTACLE CORD DROP

DETAIL ON SHEET EP6.2.3.

AUTOMATIC DOOR, DOOR OPERATOR - PROVIDED BY ANOTHER

DIVISION. PROVIDE 120V CONNECTION. COORDINATE WIRING

TERMINATION AND CONCEAL ALL WIRING.

AUTOMATIC DOOR, PUSH PLATE - PROVIDED BY ANOTHER DIVISION.

PROVIDE 4"SQ.x2 1/8"D BACKBOX AND INTERCONNECTING WIRING TO

AUTOMATIC DOOR HEAD-END TO SUIT MANUFACTURER

REQUIREMENTS. COORDINATE LOCATION AND INSTALLATION WITH

OTHER TRADES. REFER TO ARCHITECTURAL DRAWINGS FOR

QUANTITY OF PUSHPLATES REQUIRED AT EACH AUTO-DOOR

LOCATION - PROVIDE ADDITIONAL BACKBOX AND INTERCONNECTING

CONDUIT AS REQUIRED AT HI AND LO PUSHPLATE LOCATIONS.

DUPLEX RECEPTACLE IN ELECTRICAL STRIP MOLD

SPECIAL PURPOSE RECEPTACLE IN ELECTRICAL STRIP MOLD.

DUPLEX RECEPTACLE OUTLET AND NEMA L5-20R RECEPTACLE

OUTLET IN COMMON COVER PLATE, +18" A.F.F., E.A.N. PROVIDE

TAMPER RESISTANT TYPE WHERE LOCATED IN LOBBIES.

RACEWAY UNDERFLOOR, BELOW GRADE AND/OR IN SLAB.

COMBINATION TABLE BOX, CONSISTING OF TWO DUPLEX

RECEPTACLE OUTLETS AND SIGNAL DEVICES. PROVIDED BY

ANOTHER DIVISION. FOR ADDITIONAL REQUIREMENTS, SEE

TELECOM DRAWINGS.

FIRE SMOKE DAMPER - PROVIDED IN MECHANICAL WORK. PROVIDE

120V ELECTRICAL CONNECTION AND LOCAL 20A-1P, MOTOR RATED,

HEAVY DUTY, TOGGLE TYPE DISCONNECT SWITCH. COORDINATE

INSTALLATION WITH MECHANICAL AND FIRE ALARM WORK. FOR

ADDITIONAL REQUIREMENTS, REFER TO DETAIL 32 ON FIRE ALARM

DRAWING…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .