This document is a work package attachment for the de-activation of the USNS Walter S. Diehl. It outlines category A items and services required for the decommissioning, which include general services and requirements, hull and structural work, propulsion machinery removal, communications and navigation equipment removal, auxiliary machinery services, habitability outfitting and furnishings removal, drydocking, and underway replenishment equipment removal. Key services identified include furnishing an office for the overhaul management team, towing preparations and towing of the vessel, removal of various antennas, electronics, and navigation equipment, draining of seawater and jacket water piping, general cleaning, securing doors and hatches, drydocking and undocking, and underwater hull cleaning and spot painting. Pricing is requested for labor hours and materials for both prime contractor and subcontractor work. The related federal contract opportunity is solicitation number N3220522R4053 for the de-activation of the USNS Walter S. Diehl issued by the Department of the Navy Military Sealift Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment J-9 Disclosure Lobbying Activities (SF-LLL).doc | DOC document | |
| J-8 Request for Clarification.docx | DOCX document | |
| USNS DIEHL J-3 Attachment.xlsx | XLSX spreadsheet | |
| Attachment J-12 Past Performance Data.docx | DOCX document | |
| N3220522R4053 Solicitation.pdf | ||
| JA N3220522R4053 Posting.docx | DOCX document | |
| Attachment J-11 MSC Dry Dock Evaluation Form.docx | DOCX document | |
| J - 14 NDA.docx | DOCX document | |
| Attachment J-13 Past Performance Questionnaire.docx | DOCX document | |
| Attachment J-10 Interport Differential.doc | DOC document | |
| J-7 MSC Ship Repair Facility Survey.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WorkPackage J-2 Report
| J-2 ATTACHMENT |
| CATEGORY "A" ITEMS |
| GENERAL REQUIREMENT | PRIME CONTRACTOR | SUBCONTRACTOR | MANDATED SUB | OTHER COSTS | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL PRICE | BASIS OF ESTIMATE | |
| CATEGORY "A" | |||||||||||
| 000 | GENERAL SERVICES AND REQUIREMENTS | ||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) | ||||||||||
| 011 | GENERAL SERVICES FOR SHIP | ||||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES | ||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS | ||||||||||
| 014 | WEIGHT AND MOMENT REPORT | ||||||||||
| 015 | ILS GFM | ||||||||||
| 016 | FIRE PROTECTION AND SHIPS SAFETY PROGRAM | ||||||||||
| 017 | HANDLING SHIPS STORES | ||||||||||
| 018 | DELIVERY AND REDELIVERY OF THE VESSEL | ||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | ||||||||||
| 020 | GAS FREE CERTIFICATES | ||||||||||
| 021 | CLEAN AND GAS FREE TANKS VOIDS COFFERDAMS AND SPACES | ||||||||||
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | ||||||||||
| 050 | TOWING PREPARATIONS | ||||||||||
| 051 | TOWING OF VESSEL | ||||||||||
| 090 | LEVEL I DAILY COVID-19 PREVENTION AND CONTROL SERVICES | ||||||||||
| 100 | HULL AND STRUCTURAL | ||||||||||
| 102 | WATERLINE FLOODING MARKINGS | ||||||||||
| 103 | SURFACE PREPS AND PAINT ABOVE WATERLINE | ||||||||||
| 104 | CUT MAST AND INSTALL STACK_COVERS | ||||||||||
| 200 | PROPULSION MACHINERY | ||||||||||
| 201 | MAIN ENGINE PARTS REMOVAL | ||||||||||
| 202 | STEERING GEAR LOCK INSTALLATION | ||||||||||
| 203 | SHAFT LOCKS INSTALLATION | ||||||||||
| 400 | COMMUNICATION AND NAVIGATION | ||||||||||
| 401 | ANTENNA REMOVALS | ||||||||||
| 402 | RADAR ANTENNA REMOVALS | ||||||||||
| 403 | FATHOMETER & DOPPLER SPEED LOG SYSTEM Removal | ||||||||||
| 404 | ELECTRONICS REMOVALS | ||||||||||
| 405 | ANURT-23 AND ANURR-2668A REMOVALS | ||||||||||
| 406 | NAVIGAT X GYRO SYSTEM REMOVAL | ||||||||||
| 407 | BRIDGE NAVIGATION EQUIPMENT REMOVALS | ||||||||||
| 408 | AVAYA TELEPHONE SYSTEM REMOVALS | ||||||||||
| 500 | AUXILIARY MACHINERY | ||||||||||
| 501 | POLYCHLORINATED BIPHENYLS (PCBs), ZINC CHROMATE AND ASBESTOS ANALYSIS | ||||||||||
| 502 | DRAIN SEAWATER AND JACKET WATER PIPING, REFRIGERANT RECOVERY | ||||||||||
| 503 | SSDG PARTS REMOVAL | ||||||||||
| 600 | HABITABILITY OUTFITTING AND FURNISHINGS | ||||||||||
| 601 | FIXED FIRE FIGHTING SYSTEMS REMOVAL (HALON, CO2, AFFF) | ||||||||||
| 602 | GENERAL CLEANING | ||||||||||
| 603 | MSD ACID CLEAN | ||||||||||
| 604 | VACUUM SEWAGE SYSTEM PIPING ACID CLEANING | ||||||||||
| 605 | LIFEBOAT AND LIFERAFT REMOVAL | ||||||||||
| 606 | SECURE DOORS, VENTS, AND HATCHES | ||||||||||
| 900 | DRYDOCKING | ||||||||||
| 901 | DRYDOCKING AND UNDOCKING VESSEL | ||||||||||
| 902 | BLANKING INSTALLATION | ||||||||||
| 903 | ANCHOR CHAINS AND LOCKERS | ||||||||||
| 904 | OD BOX, PROPELLER AND HOPM REMOVAL | ||||||||||
| 960 | UNDERWATER HULL CLEANING AND PAINTING SPOT BLAST | ||||||||||
| 000 | UNDERWAY REPLENISHMENT EQUIPMENT | ||||||||||
| 01A | REMOVE PORT SIDE NAVY STANDARD TRANSMISSION - VICKERS | ||||||||||
| 01B | REMOVE STBD SIDE NAVY STANDARD TRANSMISSION - VICKERS | ||||||||||
| 02A | REMOVE STA 4 HIGHLINE HAULING WINCH ELECTRIC MOTOR | ||||||||||
| 02B | REMOVE STA 3 HIGHLINE HAULING WINCH ELECTRIC MOTOR | ||||||||||
| 03A | REMOVE PORT SPANWIRE WINCH ELECTRIC MOTORS | ||||||||||
| 03B | REMOVE STBD SPANWIRE WINCH ELECTRIC MOTORS | ||||||||||
| 04A | REMOVE PORT SADDLE WINCHES | ||||||||||
| 04B | REMOVE STBD SADDLE WINCHES | ||||||||||
| 05A | REMOVE STA 4 SLIDING BLOCK MOTOR AND GEAR BOX | ||||||||||
| 05B | REMOVE STA 3 SLIDING BLOCK MOTOR AND GEAR BOX | ||||||||||
| 06A | REMOVE STA 2 AND 4 HIGHLINE AND SPANEWIRE ANTI SLACK DEVICE | ||||||||||
| 06B | REMOVE STA 1 AND 3 HIGHLINE AND SPANEWIRE ANTI SLACK DEVICE | ||||||||||
| 08A | REMOVE STA 4 HAULING WINCH ANTI SLACK DEVICE | ||||||||||
| 08B | REMOVE STA 3 HAULING WINCH ANTI SLACK DEVICE | ||||||||||
| 10A | REMOVE PORT SIDE RAM TENSIONERS | ||||||||||
| 10B | REMOVE STBD SIDE RAM TENSIONERS | ||||||||||
| 11A | REMOVE PORT SIDE GYPSY WINCHES | ||||||||||
| 11B | REMOVE STBD SIDE GYPSY WINCHES | ||||||||||
| 012 | REMOVE ASTERN RIG | ||||||||||