UPDATED_PRICING_PAGE_194-25_Pricing_Page_GA___Parts__and_Service_01-08-25.xlsx

XLSX spreadsheet 44 KB Posted

Attached to
Competitive Selection OH|DOT194A25-3
Contract number
DOT194A25-3
Issued by
Ohio

About this file

This document is a state and local contract indefinite delivery vehicle pricing sheet for various aircraft maintenance and inspection services, primarily focused on aircraft from manufacturers such as Cessna, Partenavia, GippsAero, and involving the State of Ohio's aviation maintenance requirements. The contract appears to be issued under contract number 194-25, with references to multiple aircraft models including Cessna 182S, 182T, 208B Caravan, Partenavia P68, and GA8 Airvan, and includes detailed pricing for specific maintenance and inspection services.

The contract provides comprehensive hourly labor rates for inspection, maintenance, and overtime services ranging from $130 to $140 per hour, with additional fee calculations including a 1% airport concessions fee and 5% charge for hazardous materials and consumables. Pricing is broken down by specific aircraft models and includes detailed cost structures for various inspection types, such as 50-hour, 100-hour, annual, and other periodic maintenance intervals. The contract covers OEM parts, components, accessories, and inspection/maintenance services, with parts pricing inclusive of oil costs. The document also includes vendor reference information and insurance requirements, with minimum coverage limits of $4 million per occurrence and additional liability insurance provisions for premises, products, and hangar operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cessna 182S & T

194-25 Pricing
Vendor Name:
Please quote and insert below, your lowest net delivered prices for the commodities (or services) herein described, guaranteed firm for the contract duration for : Cessna: 182S, 182T, OEM parts, components, accessories, and the inspection and/or maintenance/repair. Please note the "Parts" sections noted with an asterisk as these inspections are to be inclusive of the cost of oil. Bidders may submit pricing for any or all bid items included below.
Each all items below should be bid as independent of one another. The Department may utilize a bidder for any line item below.
Bid ItemItem DescriptionQuote Hourly Labor/Travel Rates
1Inspection$130.00per hour
2Maintenance$130.00per hour
3Overtime$195.00per hour
4Travel Time$130.00per hour
Fee Calculation
5Airport concessions fee1% of Total charges
6Hazardous, Consumables, Hardware, etc5% of Total Labor Charge
7Pickup or drop-off outside our normal business hoursComplimentary
8Total cost of a PHASE 1 inspection for a Cessna 182T utilizing Cessna Model 182T Phasecard Inspection Program, Revision 6 dated 7/31/2015.Total Cost:
a. Parts*$200.00
b. Labor$1,040.00
$1,240.00
9Total cost of a PHASE 2 inspection for a Cessna 182T utilizing Cessna Model 182T Phasecard Inspection Program, Revision 6 dated 7/31/2015.Total Cost:
a. Parts*$225.00
b. Labor$1,690.00
Total Cost Item$1,915.00
10Total cost of a PHASE 3 inspection for a Cessna 182T utilizing Cessna Model 182T Phasecard Inspection Program, Revision 6 dated 7/31/2015.Total Cost:
a. Parts*$225.00
b. Labor$3,640.00
$3,865.00
11Total cost of a PHASE 1 inspection for a Cessna 182S utilizing Cessna Model 182S Phasecard Inspection Program, Revision 8 dated 7/31/2015.Total Cost:
a. Parts*$200.00
b. Labor$1,040.00
Total Cost Item$1,240.00
12Total cost of a PHASE 2 inspection for a Cessna 182S utilizing Cessna Model 182S Phasecard Inspection Program, Revision 8 dated 7/31/2015.Total Cost:
a. Parts*$225.00
b. Labor$1,690.00
Total Cost Item$1,915.00
13Total cost of a PHASE 3 inspection for a Cessna 182S utilizing Cessna Model 182S Phasecard Inspection Program, Revision 8 dated 7/31/2015.Total Cost:
a. Parts*$225.00
b. Labor$3,380.00
Total Cost Item$3,605.00
* Parts pricing shall be inclusive of all oil costs

Partenavia P68

194-25 Pricing
Vendor Name:
Please quote and insert below, your lowest net delivered prices for the commodities (or services) herein described, guaranteed firm for the contract duration for : Partenavia P68C & P68-OBS, OEM parts, components, accessories, and the inspection and/or maintenance/repair. Please note the "Parts" sections noted with an asterisk as these inspections are to be inclusive of the cost of oil. Bidders may submit pricing for any or all bid items included below.
Each all items below should be bid as independent of one another. The Department may utilize a bidder for any line item below.
Bid ItemItem DescriptionQuote Hourly Labor/Travel Rates
1Inspection$130.00per hour
2Maintenance$130.00per hour
3Overtime$195.00per hour
4Travel Time$130.00per hour
Fee Calculation
5Airport concessions fee1% of Total Charges
6Hazardous, Consumables, Hardware, etc5% of Total Labor Charge
7Pickup or drop-off outside our normal business hoursComplimentary
8Total cost of a 50-hour inspection on a Partenavia P68 Utilizing State of Ohio Partenavia 50 hour inspection formTotal Cost:
a. Parts*$375.00
b. Labor$1,690.00
Total Cost Item$2,065.00
9Total cost of a 100/200 hour inspection on a Partenavia P68 Utilizing State of Ohio Partenavia Annual/100/200 hour inspection formTotal Cost:
a. Parts*$425.00
b. Labor$4,160.00
Total Cost Item$4,585.00
10Total cost of a ANNUAL inspection on a Partenavia P68 Utilizing State of Ohio Partenavia Annual/100/200 hour inspection formTotal Cost:
a. Parts*$425.00
b. Labor$4,940.00
Total Cost Item$5,365.00
* Parts pricing shall be inclusive of all oil costs

GA8 Airvan

194-25 Pricing
Vendor Name:
Please quote and insert below, your lowest net delivered prices for the commodities (or services) herein described, guaranteed firm for the contract duration for : GippsAero GA8-TC 320, OEM parts, components, accessories, and the inspection and/or maintenance/repair. Please note the "Parts" sections noted with an asterisk as these inspections are to be inclusive of the cost of oil. Bidders may submit pricing for any or all bid items included below.
Each all items below should be bid as independent of one another. The Department may utilize a bidder for any line item below.
Bid ItemItem DescriptionQuote Hourly Labor/Travel Rates
1Inspection$130.00per hour
2Maintenance$130.00per hour
3Overtime$195.00per hour
4Travel Time$130.00per hour
Fee Calculation
5Airport concessions fee1% of Total Charges
6Hazardous, Consumables, Hardware, etc5% of Total Labor Charge
7Pickup or drop-off outside our normal business hoursComplimentary
Total cost of Inspections on a GA8 Airvan per GA8-TC 320 Airplane Service Manual C01-00-06 Initial issue 20 Mar 2009 & amendment date 20 Jan 2023.
8Total cost of a 50-hour inspection on a GA8-TC 320, Utilizing State of Ohio GA8-TC 320, 50 Hour/Annual Inspection Form.Total Cost:
a. Parts*$225.00
b. Labor$2,080.00
Total Cost Item$2,305.00
9Total cost of a 100-hour inspection on a GA8-TC 320 Utilizing State of Ohio GA8-TC 320, 100 Hour/Annual Inspection Form.Total Cost:
a. Parts*$250.00
b. Labor$4,550.00
Total Cost Item$4,800.00
10Total cost of a Annual inspection on a GA8-TC 320 Utilizing State of Ohio GA8-TC 320 , 100 Hour/Annual Inspection Form.Total Cost:
a. Parts*$250.00
b. Labor$5,200.00
Total Cost Item$5,450.00
* Parts pricing shall be inclusive of all oil costs

Cessna 208B Caravan

194-25 Pricing
Vendor Name:
Please quote and insert below, your lowest net delivered prices for the commodities (or services) herein described, guaranteed firm for the contract duration for : Cessna: 208B Caravan, OEM parts, components, accessories, and the inspection and/or maintenance/repair. Please note the "Parts" sections noted with an asterisk as these inspections are to be inclusive of the cost of oil. Bidders may submit pricing for any or all bid items included below.
Each all items below should be bid as independent of one another. The Department may utilize a bidder for any line item below.
Bid ItemItem DescriptionQuote Hourly Labor/Travel Rates
1Inspection$140.00per hour
2Maintenance$140.00per hour
3Overtime$210.00per hour
4Travel Time$140.00per hour
Fee Calculation
5Airport concessions fee1% of Total Charges
6Hazardous, Consumables, Hardware, etc5% of Total Labor Charges
7Pickup or drop-off outside our normal business hoursComplimentary
Total cost of Inspections on a Cessna Caravan 208B (s/n: 208B1061 & 208B5833) per Cessna Maintenance Manual 05-10-01, D2078-13: Revision - 42, Revision Date - Jun 1,, 2024
8Cost of 5-15-0A Inspection Document (every Annual Inspection)Total Cost:
a. Parts*$225.00
b. Labor$11,900.00
Total Cost Item$12,125.00
9Cost of 5-15-01 Inspection Document Interval (every 12 months)Total Cost:
a. Parts*$25.00
b. Labor$2,800.00
Total Cost Item$2,825.00
9aCost of 5-15-01 Inspection Document Interval (every 12 months) with TKSTotal Cost:
a. Parts*$25.00
b. Labor$3,220.00
Total Cost Item$3,245.00
10Cost of 5-15-02 Inspection Document (every 24 months) with Pneumatic De-IcingTotal Cost:
a. Parts*$25.00
b. Labor$2,800.00
Total Cost Item$2,825.00
10aCost of 5-15-02 Inspection Document (every 24 months) with TKSTotal Cost:
a. Parts*
b. Labor$2,800.00
Total Cost Item$2,800.00
11Cost of 5-15-03 Inspection Document (every 48 months)Total Cost:
a. Parts*$675.00
b. Labor$11,900.00
Total Cost Item$12,575.00
12Cost of 5-15-04 Inspection Document (every 72 months)Total Cost:
a. Parts*$275.00
b. Labor$3,500.00
Total Cost Item$3,775.00
12aCost of 5-15-04 Inspection Document (every 72 months) with Cargo PodTotal Cost:
a. Parts*$275.00
b. Labor$4,900.00
Total Cost Item$5,175.00
13Cost of 5-15-05 Inspection Document Interval 12C item(s) (every 144 months)Total Cost:
a. Parts*$225.00
b. Labor$140.00
Total Cost Item$365.00
14Cost of 5-15-06 Inspection Document (every 200 hours or 12 months) Main Battery Lead AcidTotal Cost:
a. Parts*$25.00
b. Labor$2,100.00
Total Cost Item$2,125.00
15Cost of 5-15-07 Inspection Document (every 400 hours or 12 months) with McCauley Propeller & de-ice bootsTotal Cost:
a. Parts*$125.00
b. Labor$2,240.00
Total Cost Item$2,365.00
15aCost of 5-15-07 Inspection Document (every 400 hours or 12 months) with TKS, Cargo Pod & McCauley PropellerTotal Cost:
a. Parts*$75.00
b. Labor$2,240.00
Total Cost Item$2,315.00
16Cost of 5-15-08 Inspection Document (every 400 hours or 24 months)Total Cost:
a. Parts*$25.00
b. Labor$560.00
Total Cost Item$585.00
17Cost of 5-15-09 Inspection Document (every 800 hours or 12 months)Total Cost:
a. Parts*$25.00
b. Labor$840.00
Total Cost Item$865.00
18Cost of 5-15-10 Inspection Document (every 800 hours or 24 months)Total Cost:
a. Parts*$25.00
b. Labor$280.00
Total Cost Item$305.00
19Cost of 5-15-11 Inspection Document (every 1600 hours or 24 months)Total Cost:
a. Parts*$25.00
b. Labor$4,900.00
Total Cost Item$4,925.00
20Cost of 5-15-12 Inspection Document (every 1600 hours or 60 months)Total Cost:
a. Parts*$175.00
b. Labor$3,360.00
Total Cost Item$3,535.00
21Cost of 5-15-20 Required 14CFR 91.207 interval item(s), which are completed every 12 calendar months (No grace period). (N717HP ARTEX C406-N) & (N850H ARTEX C406-2)Total Cost:
a. Parts*$25.00
b. Labor$280.00
Total Cost Item$305.00
22Cost of 5-15-26 Interval AN item(s), which are completed at the at 800 Flight Hours/12 Months, whichever occurs first. Main Battery Lead AcidTotal Cost:
a. Parts*$25.00
b. Labor$560.00
Total Cost Item$585.00
Pratt & Whitney Canada PT6-114A Engine Maintenance Manual 72-00-00 Revision: 48.0 (Jul 08/2024) Table 601 Periodic Inspection items.
24Cost of Table 601 Periodic Inspection; Interval MINOR item(s)Total Cost:
a. Parts*$125.00
b. Labor$1,120.00
Total Cost Item$1,245.00
25Cost of Table 601 Periodic Inspection; Interval ROUTINE item(s)Total Cost:
a. Parts*$75.00
b. Labor$840.00
Total Cost Item$915.00
26Cost of Table 601 Periodic Inspection; Interval 100 Hour item(s)Total Cost:
a. Parts*$75.00
b. Labor$1,960.00
Total Cost Item$2,035.00
27Cost of Table 601 Periodic Inspection; Interval 200 Hour item(s)Total Cost:
a. Parts*$25.00
b. Labor$840.00
Total Cost Item$865.00
28Cost of Table 601 Periodic Inspection; Interval 200 Hour or 6 months item(s)Total Cost:
a. Parts*$25.00
b. Labor$1,400.00
Total Cost Item$1,425.00
29Cost of Table 601 Periodic Inspection; Interval 300 Hours Item(s)Total Cost:
a. Parts*$125.00
b. Labor$1,400.00
Total Cost Item$1,525.00
30Cost of Table 601 Periodic Inspection; Interval 600 Hours Item(s)Total Cost:
a. Parts*$25.00
b. Labor$1,120.00
Total Cost Item$1,145.00
31Cost of Table 601 Periodic Inspection; Interval 600 Hours or 12 months Item(s)Total Cost:
a. Parts*$25.00
b. Labor$1,120.00
Total Cost Item$1,145.00
32Cost of Table 601 Periodic Inspection; Interval 1000 Hours Item(s)Total Cost:
a. Parts*$900.00
b. Labor$1,120.00
Total Cost Item$2,020.00
33Cost of Table 601 Periodic Inspection; Interval 1500 Hours Item(s)Total Cost:
a. Parts*$25.00
b. Labor$280.00
Total Cost Item$305.00
34Cost of Table 601 Periodic Inspection; Interval 1800 Hours Item(s)Total Cost:
a. Parts*$25.00
b. Labor$280.00
Total Cost Item$305.00
Pratt & Whitney Canada PT6-140 Engine Maintenance Manual 72-00-00 Revision: 22.0 (Nov. 18, 2024) 025.20.00 SCHEDULED MAINTENANCE CHECKS 1. B. Periodic Inspection Table 2 Scheduled Inspection Maintenance Tasks (Task 05-20-00-210-801)
24Cost of Table 2. Periodic Inspection; Interval MINOR item(s)Total Cost:
a. Parts*$125.00
b. Labor$1,120.00
Total Cost Item$1,275.00
25Cost of Table 2. Periodic Inspection; Interval ROUTINE item(s)Total Cost:
a. Parts*$75.00
b. Labor$840.00
Total Cost Item$915.00
26Cost of Table 2. Periodic Inspection; Interval 100 Hour item(s)Total Cost:
a. Parts*$75.00
b. Labor$1,680.00
Total Cost Item$1,755.00
27Cost of Table 2. Periodic Inspection; Interval 200 Hour item(s)Total Cost:
a. Parts*$75.00
b. Labor$1,120.00
Total Cost Item$1,195.00
28Cost of Table 2. Periodic Inspection; Interval 200 Hour or 6 months item(s)Total Cost:
a. Parts*$25.00
b. Labor$840.00
Total Cost Item$865.00
29Cost of Table 2. Periodic Inspection; Interval 400 Hours Item(s)Total Cost:
a. Parts*$125.00
b. Labor$840.00
Total Cost Item$965.00
30Cost of Table 2. Periodic Inspection; Interval 600 Hours Item(s)Total Cost:
a. Parts*$25.00
b. Labor$1,120.00
Total Cost Item$1,145.00
31Cost of Table 2. Periodic Inspection; Interval 600 Hours or 12 months Item(s)Total Cost:
a. Parts*$25.00
b. Labor$1,120.00
Total Cost Item$1,145.00
32Cost of Table 2. Periodic Inspection; Interval 1000 Hours Item(s)Total Cost:
a. Parts*$900.00
b. Labor$1,120.00
Total Cost Item$2,020.00
33Cost of Table 2. Periodic Inspection; Interval 1500 Hours Item(s)Total Cost:
a. Parts*$25.00
b. Labor$420.00
Total Cost Item$445.00
34Cost of Table 2. Periodic Inspection; Interval 1800 Hours Item(s)Total Cost:
a. Parts*$25.00
b. Labor$420.00
Total Cost Item$445.00

* Parts pricing shall be inclusive of all oil costs

References

194-24 VENDOR REFERENCES
Vendor Name:
References
Each bidder must submit below, the names, addresses and telephone numbers of three references of recurrent customers for General Aviation Aircraft, Parts, and Service. The references must be positive and address the overall ability of the vendor and its employees to perform General Aviation Aircraft, Parts, and Service in order to be considered a responsible bidder. It is a requirement of the contract that the vendor must have performed like services. References shall only be accepted from the companies for whom General Aviation Aircraft, Parts, and Service were performed.
Reference 1:
Dates Service Performed (From/to)2000 forward
Company NameLiberty Steel
Company Address2207 Larchmont Avenue
CityWarrenStateOHZip44483
Contact NameTim Tobey
Telephone330-219-0087Pager NumberNA
Reference 2:
Dates Service Performed (From/to)2000 forward
Company NameEdward J. Lewis
Company Address27 S. Hazel Street
CityYoungstownStateOHZip44503
Contact NameScott Lewis
Telephone330-518-5562Pager NumberNA
Reference 3:
Dates Service Performed (From/to)2010 forward
Company NameDavid Touretzky
Company Address800 Nordeen Drive
CityWest MifflinStatePAZip15122
Contact Name
Telephone412-580-8789Pager NumberNA

Insurance

194-24 Vendor Insurance
Vendor Name:
Bidder must furnish proof of insurance coverage for the Department’s aircraft while it is in their possession and shall include coverage during the test flights that they may perform with qualified staff upon completion of services rendered. The minimum coverage per occurrence that will be accepted by the Department is four million dollars ($4,000,000.00).
Bidder must also indicate the following coverage’s:Dollars ($)
1Possess products, premises, and complete operations insurance limits in the minimum amount of:Premises $10,000,000 Products and Complete Operations $10,000,000
2Show ground hangar keepers liability insurance limit minimum amount of:$7,000,000.00
3Show in flight hangar keepers liability insurance minimum limit each occurrence of:$7,000,000.00

File details come from the government source that posted it. Updated .