TTG_157-24_Pricing_Page.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Competitive Selection OH|DOT15724-2
Contract number
DOT15724-2
Issued by
Ohio

About this file

This document is a pricing sheet for ITB 157-22, a state and local contract indefinite delivery vehicle for installation, construction, materials, and supplies related to traffic monitoring sites. The contract is awarded to The Traffic Group, Inc. and covers four distinct geographic regions (Districts 4/11/12, Districts 1/2/3, Districts 7/8, and Districts 5/6/9/10), indicating a comprehensive statewide or multi-state transportation infrastructure contract.

The pricing document details rates for various traffic infrastructure services, including pre-construction site visits, mobilization, maintenance of traffic, equipment removal, conduit and pullbox installation, light pole foundations, technical services, sensor installations, and specialized traffic monitoring equipment. Pricing varies slightly across regions, with items ranging from $50 for loop detector tie-ins to $12,200 for Kistler Quartz Surface WIM sensors. The contract covers a wide range of services such as vegetation clearing, solar panel installation, grounding, cabinet installations, and various sensor and signalization services. Some specialized services like certain ATON50 transformer base installations and specific sensor types are marked as "No Bid", indicating limited coverage for those specific items.

View the file

Other files

File Type Posted
TTG_Affirmation_and_Disclosure.pdf PDF
157-24_Bid_Document.pdf PDF
ODOT_Co-Op_Program_Information.pdf PDF
Signature.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Items

157-24
Vendor Name: The Traffic Group, Inc.
PART A - GENERAL ITEMSPricePricePricePrice
Region 1Region 2Region 3Region 4
CategoryItemDESCRIPTIONUnitDist 4,11,12Dist 1,2,3Dist 7,8Dist 5,6,9,10
2.01Pre-Construction Site Visit$ 1,250.00$ 1,250.00$ 1,325.00$ 1,300.00
Mobilization
2.02a(a) Non-Sensor Mobilizationeach$ 2,550.00$ 2,550.00$ 3,325.00$ 2,985.00
2.02b(b) Sensor intall Mobilizationeach$ 2,325.00$ 2,325.00$ 3,100.00$ 2,875.00
2.03Project Site Planseach$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00
2.04Photo of Installationeach$ 700.00$ 700.00$ 700.00$ 700.00
Maintenance of Traffic (MOT) for Installation
2.05a(a) One lane closure of a two lane highway per lane with flaggerseach$ 2,995.00$ 2,995.00$ 3,290.00$ 3,140.00
2.05b(b) One Lane Closure on a Four Lane Undivided Highway per laneeach$ 2,900.00$ 2,900.00$ 3,190.00$ 3,045.00
2.05c(c) One Lane Closure on a Four Lane or Greater Divided Highway per laneeach$ 2,940.00$ 2,940.00$ 3,230.00$ 3,085.00
2.05d(d) Shoulder Closureeach$ 1,540.00$ 1,540.00$ 1,690.00$ 1,615.00
2.06Law Enforcement Officer with Patrol Car - With Mobilizationhour$ 150.00$ 150.00$ 150.00$ 150.00

ITB 157-22 Installation, Construction, Materials and Supplies, Traffic Monitoring Sites, Technical Services Price Sheet Page &P of &N

Non-Sensor

157-24
Vendor Name: The Traffic Group, Inc.
PART B - NON-SENSOR CONSTRUCTIONPricePricePricePrice
Region 1Region 2Region 3Region 4
CategoryItemDESCRIPTIONUnitDist 4,11,12Dist 1,2,3Dist 7,8Dist 5,6,9,10
2.07Removal of Miscellaneous Traffic Signal Item, Pole and Foundation Removaleach$ 3,500.00$ 3,500.00$ 3,500.00$ 3,500.00
2.08Removal of Misc. Traffic Signal Item, Concrete Cabinet Baseeach$ 1,400.00$ 1,400.00$ 1,400.00$ 1,400.00
2.09Removal of Misc. Traffic Signal Item, Pullboxeach$ 2,300.00$ 2,300.00$ 2,300.00$ 2,300.00
2.10Trench for conduit with tracing wire & marker tapefoot$ 14.25$ 14.25$ 14.25$ 14.25
2.11Conduit, 1 inchfoot$ 12.00$ 12.00$ 12.00$ 12.00
2.12Conduit, 3 inch PVC (Schedule 80)foot$ 15.00$ 15.00$ 15.00$ 15.00
2.13Conduit, Bored under pavement, 3 inch PVC (Schedule 80)foot$ 80.00$ 80.00$ 80.00$ 80.00
2.144 in. conduit, Type Efoot$ 11.00$ 11.00$ 11.00$ 11.00
Pull Boxes
2.15a(a) 725.08, 18 incheach$ 2,700.00$ 2,700.00$ 2,850.00$ 2,900.00
2.15b(b) 725.08, 24 incheach$ 2,880.00$ 2,880.00$ 3,030.00$ 3,080.00
2.15c(c) 725.06, 18 incheachNo BidNo BidNo BidNo Bid
2.15d(d) 725.06, 24 incheachNo BidNo BidNo BidNo Bid
Light Pole Foundation (Poured in place)
2.16a(a) Design ATON15, ATON30 – 6’ x 24”each$ 4,625.00$ 4,775.00$ 4,875.00$ 4,975.00
2.16b(b) Design ATON50 – 10’ x 24”each$ 5,755.00$ 5,905.00$ 5,970.00$ 6,070.00
2.17Controller Work Padeach$ 525.00$ 525.00$ 525.00$ 525.00
Technical Services Aluminum Light Pole with Transformer base, furnish and install
2.18a(a) Technical Services, Design ATON15 with Transformer Baseeach$ 4,800.00$ 4,800.00$ 4,800.00$ 4,800.00
2.18b(b) Technical Services, Design ATON30 with Transformer Baseeach$ 6,100.00$ 6,100.00$ 6,100.00$ 6,100.00
2.18c(c) Technical Services, Design ATON50 with Transformer BaseeachNo BidNo BidNo BidNo Bid
Technical Services Aluminum light pole and pedestal base, installed from stock
2.19a(a) 15’ Technical Services light pole and pedestal base installed from stockeach$ 1,400.00$ 1,400.00$ 1,400.00$ 1,400.00
2.19b(b) 30’ Technical Services light pole and pedestal base installed from stockeach$ 1,950.00$ 1,950.00$ 1,950.00$ 1,950.00
2.19c(c) 50’ Technical Services light pole and pedestal base installed from stockeachNo BidNo BidNo BidNo Bid
2.20Groundingeach$ 495.00$ 495.00$ 495.00$ 495.00
Solar Panel Furnished and Installed on Pole
2.21a(a) 165 to 200 Watt Solar Paneleach$ 1,870.00$ 1,870.00$ 1,870.00$ 1,870.00
2.21b(b) 200 or Greater Watt Solar Paneleach$ 1,950.00$ 1,950.00$ 1,950.00$ 1,950.00
2.22Solar Panel, installed from stockeach$ 1,295.00$ 1,295.00$ 1,295.00$ 1,295.00
Cabinet, pole design furnish and install
2.23aTechnical Services Cabinet, NEMA size 3, Pole Design, furnish and installeach$ 3,150.00$ 3,150.00$ 3,150.00$ 3,150.00
2.23bTechnical Services Cabinet, NEMA size 5, Pole Design, furnish and installeach$ 3,450.00$ 3,450.00$ 3,450.00$ 3,450.00
2.24Cabinet, installation from stockeach$ 1,325.00$ 1,325.00$ 1,325.00$ 1,325.00
Vegetation Clearing and Grubbing
2.25a(a) Existing site location with 15 to 50 foot pole protectedeach$ 3,500.00$ 3,500.00$ 3,700.00$ 3,700.00
2.25b(b) New site constructed with NO pole or cabinet onsiteeach$ 4,000.00$ 4,000.00$ 4,200.00$ 4,200.00

ITB 157-22 Installation, Construction, Materials and Supplies, Traffic Monitoring Sites, Technical Services Price Sheet

Sensor Installs

157-24
Vendor Name: The Traffic Group, Inc.
PART C - SENSOR INSTALLSPricePricePricePrice
Region 1Region 2Region 3Region 4
CategoryItemDESCRIPTIONUnitDist 4,11,12Dist 1,2,3Dist 7,8Dist 5,6,9,10
2.26Detector Loop, as per planeach$ 1,155.00$ 1,155.00$ 1,190.00$ 1,190.00
2.27Sealing of existing loopseach$ 395.00$ 395.00$ 408.00$ 408.00
2.28Loop Detector Lead-in Cablefoot$ 1.10$ 1.10$ 1.13$ 1.13
2.29Loop Detector Tie-In, Splice Kiteach$ 50.00$ 50.00$ 51.00$ 51.00
2.30Recapping of existing piezoeach$ 455.00$ 455.00$ 469.00$ 469.00
2.31Signalization, Piezocable Axle Sensor Class I, 11 feet long (typical)each$ 2,740.00$ 2,740.00$ 2,820.00$ 2,820.00
2.32Signalization, Piezocable Axle Sensor Class 2, eleven (11) feet long (typical)each$ 1,960.00$ 1,960.00$ 2,020.00$ 2,020.00
2.33Signalization, Piezocable Axle Sensor Class 2, Encapsulated 6 feet, 4 inches longeachNo BidNo BidNo BidNo Bid
2.34Signalization, Misc. In Pavement Sensor Installation, from stockeach$ 1,500.00$ 1,500.00$ 1,545.00$ 1,545.00
Kistler, funish and install Kistler WIM sensor
2.35aSignalization, Furnish and Install Kistler Quartz Surface WIM Sensor, Type 9195each$ 12,200.00$ 12,200.00$ 12,565.00$ 12,565.00
2.35bSignalization, Furnish and Install Kistler Lineas Compact Sub-surface sensor, Type 9196each$ 9,200.00$ 9,200.00$ 9,480.00$ 9,480.00
Wavetronix Smart Sensor HD to stock
2.36a(a) Wavetronix SSHD Packageinstalled – including sensor, all ancillary items, click! 200 and 60’ pigtail-with calibrationeach$ 12,300.00$ 12,300.00$ 12,670.00$ 12,670.00
2.36b(b) Wavetronix SSHD Sensor with bracket installed,with calibrationeach$ 10,600.00$ 10,600.00$ 10,920.00$ 10,920.00
2.37Non-Intrusive Sensor Installationeach$ 6,350.00$ 6,350.00$ 6,540.00$ 6,540.00

ITB 157-22 Installation, Construction, Materials and Supplies, Traffic Monitoring Sites, Technical Services Price Sheet

File details come from the government source that posted it. Updated .