This document is a Statement of Work (SOW) for a federal contract opportunity to provide tree maintenance services at the Fort Sam Houston National Cemetery in San Antonio, Texas.

The SOW requires the contractor to provide all labor, tools, materials, and equipment necessary to accomplish tree and/or stump removal, pruning, trimming, cabling, cavity repair, root pruning, and the removal and disposal of resulting waste and debris on a one-time basis. Specific requirements include the removal of 7 large trees, trimming/pruning of 60 large trees, removal of 4 medium trees, and trimming/pruning of 12 medium trees. The contractor must provide a Certified Arborist to manage the site and ensure all specifications are met. Detailed pruning, trimming, and disposal standards are included. The work is to be performed during normal business hours unless otherwise approved. The contractor is responsible for obtaining required licenses, permits, and insurance, and for preventing damage to government property. Electricity and water will be provided by the government.

View the file

Other files

File Type Posted
COMBINED SYNOPSIS SOLICITATION 36C78624Q50322.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

National Cemetery Administration

Fort Sam Houston National Cemetery San Antonio, TX 78209

Tree Trimming and Removal

A. GENERAL INFORMATION:

The Department of Veteran Affairs, National Cemetery Administration intends to award a firm, fixed price contract for the procurement of tree maintenance services. The Contractor(s) gaining award shall provide all labor, tools, materials, and equipment necessary to accomplish tree and/or stump removal, pruning, trimming, cabling, cavity repair, root pruning, and the removal and disposal of resulting waste and debris for the National Cemeteries listed below, on a one-time basis. The contractor shall provide all professional advice/guidance, parts, materials, equipment, and personnel, to provide these services.

1. LOCATION:

These services will be performed at the following location:

Fort Sam Houston National Cemetery 1520 Harry Wurzbach Road San Antonio, TX 78209

2. WORK SUMMARY:

As indicated on the Tree Worksheet (Attachment A) and CLIN Sheet (Attachment B), work to be done to trees shall consist of one or more of the following; tree removal, pruning, trimming, stump removal, and removal and disposal of resulting waste and debris.

- Seven (7) large trees (over 40 feet in height OR over 24 inches in DBH) are to be removed.

- Sixty (60) large trees (over 40 feet in height OR over 24 inches in DBH) are to be trimmed/pruned.

- Four (4) medium trees (height between 25-40 feet AND DBH between 12-24 inches) are to be removed.

- Twelve (12) medium trees (height between 25-40 feet AND DBH between 12-24 inches) are to be trimmed/pruned.

B. GENERAL REQUIREMENTS AND STATEMENT OF WORK:

1. CERTIFIED ARBORIST:

A “Certified Arborist” shall serve as the “site manager” for this contract and will be provided by the Contractor work is being performed - other than trash and debris pick-up. The Certified Arborist must have at least three (3) years’ experience as a direct supervisor of a commercial tree maintenance operation that included removal, trimming, and stump removal in commercial, industrial, or public sites.

The Certified Arborist will ensure all specifications are being met, ensure contract work does not conflict with ceremonies and funerals, and ensure employees are adequately supervised and proper conduct is maintained. The certified arborist must be certified by International Society of Arboriculture, or other acceptable national or state certifying agency, society, or association.

2. TREE REMOVAL/STUMP GRINDING:

a. Existing trees and stumps indicated on the Tree Work Sheet (See Attachment A) for removal shall be cut down under the instruction/guidance of a Contractor provided Certified Arborist.

b. All trees shall be topped prior to falling and all limbs over 3 ½” in diameter must be lowered to the ground by ropes. The Contractor shall take every precaution to prevent any falling branches or trees from damaging any headstones, adjacent plant material or structures.

c. The stumps are to be ground to a minimum of 6” and a maximum of 8" below soil level, or to the lateral roots, if reached before the specific depth. The Contractor shall never grind the stumps to the depth that would interfere with the roots of any adjacent tree(s) that the Government will retain.

The cavity of the stump is to be filled with high quality, weed free topsoil and tamped to meet the existing grade.

d. All wood, chip particles, and debris from the tree and stump removal shall be cleaned up thoroughly and removed from the cemetery grounds.

e. Any damage or breakage during the performance of these services by the Contractor shall be repaired, replaced, given remedial and/or corrective treatment and cleaned up by the Contractor at the Government’s satisfaction and at no additional cost to the Government.

3. PRUNING/TRIMMING STANDARDS:

a. The Contractor is responsible to ensure that all pruning cuts shall be made just outside the collar or shoulder ring (branch bark ridge/swollen trunk collar) close to parent stem so that healing can readily start under normal conditions.

b. The Contractor is responsible to ensure that when reducing the tree height and spread, he/she shall retain the natural shape of the tree by removing the entire lateral branches back to their point of origin also known as drop crotching or thinning.

c. The Contractor is responsible to ensure that all limbs one inch in diameter or over must be precut to prevent splitting. All branches and/or tree material 3 1/2" in diameter or larger shall be lowered by proper lowering methods, such as using ropes.

d. The Contractor is responsible to ensure that all trees shall be pruned and shaped to retain the trees natural crown characteristics and patterns.

e. The Contractor is responsible to ensure that all trees shall have the live branches removed to permit penetration of sunlight and circulation of air through the canopy in conjunction to the aesthetic appearance, natural crown characteristics, and growth patterns.

f. The Contractor is responsible to ensure care when removing living and/or dead crossed or rubbing branches, where practicable, so the removal will not leave large holes in the aesthetic appearance, natural crown characteristics and growth patterns of the tree.

g. The Contractor is responsible to ensure that, when pruning trees known to be diseased or susceptible to diseases, tools are disinfected with alcohol after each cut and between trees, where there is known to be danger of transmitting the disease on the tools.

h. The Contractor is responsible for reporting to the COR all of the following conditions: when old scars are not healing properly; where callus growth is not already established; visible girdling roots, and when there are any structural weaknesses such as but not limited to decayed trunk or branches, and split trunk/branch crotches.

i. The following methods of pruning are NOT acceptable therefore, the contractor is responsible to ensure that these methods are never performed: topping, stubbing, de-horning, and pollarding.

j. The Contractor is responsible to ensure that in lifting the bottom branches of the trees for under clearance, care shall be given to symmetrical appearance, esthetic appearance, natural crown characteristics and growth patterns of the trees.

k. In general, the Contractor shall ensure when reducing the size of a tree and with respect to retaining the tree’s natural crown characteristics and patterns, not more than 1/4 of the total area shall be reduced at a single operation, unless instructed in writing to do so by the COR.

l. The Contractor is required to dispose of all debris and other waste materials generated by his/her work at a licensed off-site landfill or recycling center, unless otherwise directed in writing by the COR. NOTE: The Government shall NOT provide receptacle(s) for disposal of debris related to this contract.

m. The contractor will take all necessary precautions to prevent damage to trees while performing pruning. The use of climbing spikes is prohibited, unless prior permission is obtained from the COR in writing, and on a tree by tree basis. This permission will only be granted in cases where there are no other means to access the work to be performed, as determined by the COR.

C. WORK HOURS AND MEETINGS:

All work shall be performed during the normal working hours (8:00 a.m. to 4:30 p.m.), Monday through Friday, except with the written permission of the COR. When emergency situations are caused by the Contractor, then he/she shall make arrangements with the COR to work on weekends to correct/eliminate the emergency in order to meet the period of performance. The Government shall not compensate the Contractor for emergency situations caused by the Contractor.

D. RECORD KEEPING AND REPORTING:

1. REQUIRED DOCUMENTATION: The Contractor shall be responsible for obtaining all necessary and current licenses, permits, vehicular insurance and registration, Workman’s Compensatory Liability Insurance, property liability insurance etc., prior to the start date of these services. The Contractor gaining award shall provide the Contracting Officer copies of these required documents immediately after award of contract.

2. UTILITY LINES COMPLIANCE: Where pruning/stump grinding/tree removal conflicts with existing utility/service lines (above ground/below ground), the corresponding utilities company/cemetery staff shall be notified and the Contractor shall obtain any necessary permits/ blue prints and cooperate with the utilities company/cemetery staff to avoid any damage or liability, and provide a safe work environment for his/her employees.

E. GENERAL CONDITIONS:

1. The Contractor is responsible to ensure that all work shall be done in a manner that safeguards all VA visitors, employees, and public. The Contractor shall be solely responsible for any and all actions initiated and/or completed by his/her employees. Furthermore, the Contractor and his/her employees shall have a clear understanding of, and be sensitive to, such environmental issues as ground water contamination, wetlands, etc., and be consistent and fully compliant with all applicable Federal, State, County and City laws, ordinances, Right-to-Know laws, EPA guidelines, and regulations.

2. The Contractor shall be responsible for cleaning any cemetery structures that are soiled or stained as a result of Contractor’s performance. The Contractor shall wash-down with water all soiled or stained structures and grounds at the end of each workday. No hazardous chemicals are to be used at anytime on Government property. The Contractor shall bear all costs associated with washing and cleaning. Any such washing/cleaning shall be brought to the immediate attention of the COR prior to washing/cleaning.

3. At the end of each day the Contractor shall remove all debris from the cemetery site resulting from the work, unless otherwise specified by the COR. The Contractor shall ensure at all times that rubbish and trash generated by the Contractor is kept clear of vehicular and pedestrian traffic throughout the site. NOTE: The Government shall NOT provide receptacle(s) for disposal of debris related to this contract.

4. Adequate warning devices, barricades, guards, flagmen or other necessary precautions shall be provided by the Contractor for the protection, safety, and warning of all pedestrians and vehicular traffic within the area.

5. The Government may undertake or award other contracts for additional work at or near the site of work for this contract. The Contractor shall fully cooperate with any other Contractors and with Government employees and shall carefully adapt scheduling and performance of work, needing any direction, it shall be provided by the COR. The Contractor is responsible for reporting to the COR any problems or questions that may arise with any other personnel on site during the period of performance of this contract. The Contractor shall not take it upon him or herself to resolve any problems or issues with other on-site Contractors or employees, but rather will leave it to the COR to resolve the issue.

6. The Contractor shall not operate trucks, tractors, and other heavy equipment on any turf area except when authorized in writing by the COR.

7. Due to the sensitive mission of the cemetery, the work often requires contact with, and exposure to, grieving individuals. Contractor personnel must exercise and exhibit absolute decorum, composure and stability at all times.

8. The Government shall not be responsible for any loss, damage, or theft of contractor items.

Contractor shall be responsible for acceptable standards of housekeeping and custodial maintenance of Department of Veterans Affairs facilities used by Contractor's employees.

9. Electricity and water will be furnished by the Government.

10. The COR may designate an area for the Contractor to use to store a limited amount of supplies or equipment, if available.

11. The COR will designate an area for Contractor employees to take lunch and other breaks.

F. DAMAGE TO GOVERNMENT PROPERTY:

1. Contractors shall be responsible for replacement of any cemetery structure, to include: turf, curb, road pavement, headstone or marker, valve boxes, control markers, sprinkler heads, which is chipped, marred, damaged and/or ruined at the fault of the Contractor. The Contractor shall bear all costs associated with replacement and reinstallation. Any such damage shall be brought to the immediate attention of the appointed COR prior to repair/replacement/installation.

G. CONTRACTOR-FURNISHED ITEMS:

1. The Contractor is responsible for ensuring that all of his/her motor vehicles and equipment meet State inspection, safety, licensing, registration, and insurance requirements.

H. CONTRACTOR CONDUCT: Contractor personnel shall:

1. Be required to adhere to the following standards of dress, conduct, supervision and training while performing work on Government property. It shall be subject to immediate enforcement action by the Contracting Officer if these standards are not adhered to during the period of performance of this contract. Contractor shall be responsible for training and safety precautions prescribed by OSHA regarding safety equipment and devices.

2. Be fully clothed at all times, to include upper garment to cover body from the waist to the neck and long pants or slacks. Garments, which have a message, sSam Houston or printing of any kind other than the Contractor’s business attire, are prohibited. Uniforms are acceptable.

3. Maintain a neat and professional appearance throughout its workforce, vehicles, equipment, and maintenance areas. Uniforms are acceptable. If uniforms are used, they must be in unison among all employees.

4. The Contractor/personnel shall not engage in loud or boisterous behavior, angry outbursts or use profane or abusive language at anytime on Government premises. Playing radios and/or electronic games/devices, shall only be done at lunchtime and in a designated break area. Due to the sensitive mission of the cemetery, Contractor employees will come into daily contact with grieving individuals, therefore Contractor employees will exercise and exhibit absolute decorum, courtesy, and respect while within the cemetery or at its perimeter or entrances. Inquiries from cemetery visitors shall be politely referred to Government cemetery staff. Gratuities of any kind are strictly prohibited.

5. Consume food and beverage only within areas designated by the COR. Intoxication, and violence or criminal acts of any kind will not be tolerated - and is cause for immediate removal from Government property. Use or sale of intoxicating beverages and/or drugs is strictly prohibited, and use of tobacco products is only allowed in specific areas designated by the COR.

6. Contractor employees shall only take breaks/rest periods and lunch breaks at the Contractor Staging Area, not in the field. Workers are to utilize contractor provided temporary chemical toilet facilities located only in the Contractor Staging Area. Misconduct shall form the basis for immediate contract enforcement action, to include immediate removal from the cemetery.

7. Worker parking: Parking is limited. The COR will designate an area for all contract employees to park. Workers are not allowed to park throughout the cemetery grounds, and violation of this requirement shall form the basis for immediate contract enforcement action, to include immediate removal from the cemetery.

8. The Contractor shall be responsible to ensure that his/her employees (including contractor’s consultants, subcontractors, etc.) are aware of all the terms and conditions set forth above in this solicitation package regarding their performance and conduct during the performance period of this contract.

End of Scope of Work

ATTACHMENTS

Attachment A Tree Worksheet for Fort Sam Houston National Cemetery

Attachment B CLIN Sheet for Fort Sam Houston National Cemetery

Attachment C Wage Decision for Fort Sam Houston National Cemetery

Attachment D Site Plan for Fort Sam Houston National Cemetery

Attachment A Tree Worksheet for Fort Sam Houston National Cemetery

Individual

Tree Section Site ID# Species DBH Height Maint. Req.

1 6 20 B Italian Cypress 4 >40 ft Large Tree Removal 2 6 625 E Italian Cypress 4 >40 ft Large Tree Removal 3 6 303 C Italian Cypress 5 >40 ft Large Tree Removal 4 6 554 D Italian Cypress 5 >40 ft Large Tree Removal 5 7 & 6 Break Italian Cypress 5 >40 ft Large Tree Removal 6 7 & 6 Break Italian Cypress 6 >40 ft Large Tree Removal

7 CZ Front Crepe Myrtle 10 <40 ft Medium Tree Removal

8 CZ Behind Crepe Myrtle 10 <40 ft Medium Tree Removal

9 3 309B Live Oak 11 <40 ft Medium Tree Trim 10 4 241 Live Oak 11 <40 ft Medium Tree Trim 11 5 947 Live Oak 15 <40 ft Medium Tree Trim 12 AC 2 Live Oak 16 >40 ft Large Tree Trim 13 4 504 Live Oak 17 <40 ft Medium Tree Trim 14 4 1431A Live Oak 17 >40 ft Large Tree Trim 15 V 830 Live Oak 17 >40 ft Large Tree Trim 16 6 620 Black Oak 18 >40 ft Large Tree Trim

17 20 1309 Bradford Pear 19 <40 ft Medium Tree Removal

18 2S 528 Pine 19 >40 ft Large Tree Removal 19 B 55 Live Oak 19 >40 ft Large Tree Trim 20 W 1908 Live Oak 19 >40 ft Large Tree Trim 21 6 1348 Live Oak 20 >40 ft Large Tree Trim 22 B 24H Live Oak 20 >40 ft Large Tree Trim 23 20 1313 Red Oak 21 >40 ft Large Tree Trim 24 A 91 Live Oak 21 >40 ft Large Tree Trim 25 4 914 Live Oak 22 >40 ft Large Tree Trim 26 21 1307 English Oak 22 <40 ft Medium Tree Trim 27 B 241 Live Oak 22 >40 ft Large Tree Trim 28 4 242 Live Oak 23 <40 ft Medium Tree Trim 29 AH 954 Live Oak 23 >40 ft Large Tree Trim 30 J 151 Chinese Talo 23 >40 ft Large Tree Trim 31 K 4G Live Oak 23 >40 ft Large Tree Trim 32 8A 1953D Live Oak 24 >40 ft Large Tree Trim 33 AJ 1380 Emerald Ash 24 >40 ft Large Tree Trim 34 P 15 Live Oak 24 >40 ft Large Tree Trim 35 PA 9 Live Oak 24 >40 ft Large Tree Trim 36 5 153D Live Oak 25 >40 ft Large Tree Trim 37 6 518A Live Oak 25 <40 ft Large Tree Trim 38 AH 594 Live Oak 25 >40 ft Large Tree Trim 39 4 1669 Live Oak 26 >40 ft Large Tree Trim 40 CAA Corner Live Oak 26 >40 ft Large Tree Trim 41 K 23G Live Oak 26 >40 ft Large Tree Trim 42 W 1490 Live Oak 26 >40 ft Large Tree Trim 43 2 495 Live Oak 27 >40 ft Large Tree Trim 44 A 24 Live Oak 27 >40 ft Large Tree Trim 45 PA 3A Live Oak 27 >40 ft Large Tree Trim

46 1 515 Emerald Ash 28 >40 ft Large Tree Trim 47 9 1691 Live Oak 28 >40 ft Large Tree Trim 48 16 36 Live Oak 28 >40 ft Large Tree Trim 49 20 892 Live Oak 28 >40 ft Large Tree Trim 50 J 120A Live Oak 28 >40 ft Large Tree Trim 51 L 277 Live Oak 28 >40 ft Large Tree Trim 52 1 2359 Live Oak 29 >40 ft Large Tree Trim 53 W 1110 Live Oak 29 >40 ft Large Tree Trim 54 W 1552 Live Oak 29 >40 ft Large Tree Trim 55 4 306 Live Oak 30 <40 ft Large Tree Trim 56 4 217A Live Oak 30 <40 ft Large Tree Trim 57 16 74 Live Oak 31 >40 ft Large Tree Trim 58 F 193 Live Oak 31 >40 ft Large Tree Trim 59 PD 574 Live Oak 31 >40 ft Large Tree Trim 60 S 215 Live Oak 31 >40 ft Large Tree Trim 61 W 1125 Live Oak 31 >40 ft Large Tree Trim 62 B 7B Live Oak 32 >40 ft Large Tree Trim 63 K 1Q Live Oak 32 >40 ft Large Tree Trim 64 6 3A Live Oak 33 >40 ft Large Tree Trim 65 3 820 Live Oak 34 >40 ft Large Tree Trim 66 E 4 Emerald Ash 34 >40 ft Large Tree Trim 67 PA 12A Live Oak 34 >40 ft Large Tree Trim 68 PA 36 Z Live Oak 34 >40 ft Large Tree Trim 69 6 132 Live Oak 35 >40 ft Large Tree Trim 70 6 696 Live Oak 35 >40 ft Large Tree Trim 71 PA 296D Live Oak 35 >40 ft Large Tree Trim 72 W 2295 Live Oak 35 >40 ft Large Tree Trim 73 I 125 Live Oak 36 >40 ft Large Tree Trim 74 K 109 Live Oak 36 >40 ft Large Tree Trim 75 2 339 Live Oak 40 >40 ft Large Tree Trim 76 PD 119 Live Oak 44 >40 ft Large Tree Trim

Attachment B CLIN Sheet for Fort Sam Houston National Cemetery

CLIN DESCRIPTION QTY UNIT UNIT PRICE AMOUNT

Large Tree Removal (over 40 feet in height or over 24 inches in DBH) – Tree Removal, Stump Removal, Cleanup and Disposal of Waste and Debris. See Tree Worksheet and Site Plan.

7 EA. $_________ $________________

Large Tree Trim (over 40 feet in height or over 24 inches in DBH) - Pruning, Trimming, Cleanup and Disposal of Waste and Debris. See Tree Worksheet and Site Plan.

60 EA. $_________ $________________

Medium Tree Removal (height between 25-40 feet AND DBH between 12-24 inches) - Tree Removal, Stump Removal, Cleanup and Disposal of Waste and Debris.

See Tree Worksheet and Site Plan.

3 EA. $_________ $________________

Medium Tree Trim (height between 25-40 feet AND DBH between 12-24 inches) -Pruning, Trimming, Cleanup and Disposal of Waste and Debris. See Tree Worksheet and Site Plan.

6 EA. $_________ $________________

TOTAL AMOUNT = $___________________

SCOPE OF WORK
A. GENERAL INFORMATION:
B. GENERAL REQUIREMENTS AND STATEMENT OF WORK:
2. TREE REMOVAL/STUMP GRINDING:
3. PRUNING/TRIMMING STANDARDS:
C. WORK HOURS AND MEETINGS:
D. RECORD KEEPING AND REPORTING:
E. GENERAL CONDITIONS:
F. DAMAGE TO GOVERNMENT PROPERTY:
G. CONTRACTOR-FURNISHED ITEMS:
CLIN