This document is a contract cost package (Attachment K) for TRC Environmental Corp, appearing to be part of a state contract vehicle for environmental services. The document serves as a pricing schedule for various asbestos-related services and project staffing, with pricing structured around hourly rates, lump sum costs, and reimbursable expenses using current state rates.
The contract covers comprehensive asbestos services including bridge structure inspections at $766.50 per single structure and $700.00 per structure for multiple structures across five Wisconsin regions (Northeast, North Central, Northwest, Southeast, and Southwest). Asbestos inspection services for buildings and other structures are billed at $28.02 per hour for inspectors. The agreement includes project staffing rates ranging from $22.03 for administrative support to $66.14 for contract managers, with various technical positions priced between these ranges. The cost structure incorporates a 172% overhead rate on direct labor, a 7% profit margin, and standard state reimbursement rates for travel expenses including $0.51 per mile for vehicle use, meals ranging from $8.00-$20.00, and lodging at $70.00-$80.00 per night depending on county location. Equipment, supplies, and subcontractor costs are passed through at actual cost with no markup.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3193_1.PDF | ||
| 3193_2.PDF | ||
| 3193_3.DOCX | DOCX document | |
| 3193_4.DOCX | DOCX document | |
| 3193_5.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tab 1 Hourly Rates and Costs
| ATTACHMENT K Contract Cost Package | |||
| Fill in only those cells highlighted in blue. Cells in green are calculated. | |||
| FIRM NAME: | TRC Environmental Corp | ||
| Asbestos Inspections - Bridges | Terms: Lump Sum | ||
| 1 structure | 2 or more structures | ||
| Asbestos inspection, per bridge structure, Northeast region | $ 766.50 | $ 700.00 | cost per structure |
| Asbestos inspection, per bridge structure, North Central region | $ 766.50 | $ 700.00 | cost per structure |
| Asbestos inspection, per bridge structure, Northwest region | $ 766.50 | $ 700.00 | cost per structure |
| Asbestos inspection, per bridge structure, Southeast region | $ 766.50 | $ 700.00 | cost per structure |
| Asbestos inspection, per bridge structure, Southwest region | $ 766.50 | $ 700.00 | cost per structure |
| NOTE: Prices for long, multiple-section structures such as the Hoan Bridge in Milwaukee will be negotiated separately at the time of request. | |||
| Asbestos inspection, buildings, bridge tender houses, other structures | Terms: direct hourly rate | ||
| Asbestos Inspector | $ 28.02 | Average Hourly Rate | |
| Asbestos Inspector | $21.82 to $ 35.33 | Hourly Wage Range | |
| Asbestos abatement | Terms: direct hourly rate | ||
| Exterior Abatement Worker | Average Hourly Rate | ||
| Exterior Asbestos Supervisor | Average Hourly Rate | ||
| Asbestos Worker | Average Hourly Rate | ||
| Asbestos Supervisor | Average Hourly Rate | ||
| Asbestos Project Designer | Average Hourly Rate | ||
| Asbestos Management Planner | Average Hourly Rate | ||
| Equipment and supplies | Terms: direct expense, no markup | ||
| Subcontractor Costs | Terms: actual cost, no markup | ||
| Overhead rate | 172% | Percentage of Direct Labor | |
| Mileage | Terms: current state reimbursement rate | ||
| Per mile, personal vehicle rate | $0.51/mile | ||
| Meals | Terms: current state reimbursement rate | ||
| Breakfast | $ 8.00 | ||
| Lunch | $ 10.00 | ||
| Dinner | $ 20.00 | ||
| Lodging | Terms: current state reimbursement rate, excluding taxes | ||
| Per night | $70.00 | ||
| Per night, Milwaukee, Racine and Kenosha counties | $80.00 | ||
| Project Staff | Terms: direct hourly rate | ||
| Contract Manager | $ 66.14 | Average Hourly Rate | |
| Project Supervisor | $ 50.88 | Average Hourly Rate | |
| Engineer | $ 39.45 | Average Hourly Rate | |
| Hydrogeologist | $ 36.62 | Average Hourly Rate | |
| Scientist | $ 24.86 | Average Hourly Rate | |
| Field Technician | $ 23.43 | Average Hourly Rate | |
| CADD, GIS | $ 27.20 | Average Hourly Rate | |
| Accounting | $ 22.03 | Average Hourly Rate | |
| Administrative Support | $ 24.22 | Average Hourly Rate | |
| Profit | Terms: percentage of labor and overhead | ||
| Rate | 7% | Percentage of Direct Labor + Labor Overhead |