3193_4.DOCX
DOCX document 23 KB Posted
- Attached to
- Environmental Consulting Services
- Contract number
- 407413
- Issued by
- Wisconsin
About this file
This document is a project proposal template form from the Wisconsin Department of Transportation (WisDOT). The template is designed for contractors or vendors to submit cost estimates and project details for WisDOT infrastructure projects, with distribution requirements specifying that copies should be provided to WisDOT ESS (2 copies - 1 bound paper and 1 electronic PDF) and the Region Environmental Coordinator.
The template includes sections for comprehensive project cost breakdown including lump sum items, vendor labor costs with hourly rates and titles, direct expenses, overhead, profit margins, and subcontractor costs. The form requires contractors to specify project elements with completion dates, include site health and safety plans, document assumptions, and provide detailed cost justifications across all service categories. While this appears to be a blank template rather than a completed contract, it demonstrates WisDOT's standardized approach to soliciting detailed cost proposals for highway and transportation infrastructure projects throughout Wisconsin.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3193_3.DOCX | DOCX document | |
| TRC Revised_Edits.xlsx | XLSX spreadsheet | |
| 3193_5.PDF | ||
| 3193_1.PDF | ||
| 3193_2.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WisDOT Project ID:
Site(s):
City:
County:
Highway and Termini (when applicable):
Total Estimated Cost:
Report recipients and report format (electronic or paper):
| Recipient |
| Number of Copies |
| Preferred format |
| WisDOT ESS |
| 2 |
| 1 bound/stapled paper |
1 electronic (PDF)
| Region Environmental Coordinator |
| 1 |
Paper Electronic
Timetable for completion:
| Project Element |
| Completion date |
Scope of Services:
Include Site Health and Safety Plan:
Assumptions:
Estimated Cost:
Lump Sum Items: Total: $ List items
Vendor Labor: Total: $
| Task |
| Rate Title |
| Hours |
| Rate |
| Cost |
Direct Expenses: Total: $
| Item |
| Quantity |
| Unit |
| Unit Price |
| Total |
Overhead: $ Profit: $
Subcontractor costs: Total: $
| Subcontractor |
| Subcontracted Services |
| Cost basis /Unit Price |
| Cost |
File details come from the government source that posted it. Updated .