Summary of TRA Request for Qualifications for Professional Services
This is a Request for Qualifications (RFQ) issued by the Trinity River Authority of Texas (TRA), a conservation and reclamation district that owns and operates water treatment, wastewater treatment, and water reuse facilities serving multiple cities and municipalities. TRA seeks Statement of Qualifications (SOQs) from prime consulting firms to provide professional services in Planning, Design, and Construction Administration (PDCA) across 18 primary and 13 specialty service categories. The qualification term spans two fiscal years from December 1, 2026, through November 30, 2028. Eligible firms may submit qualifications for a maximum of 12 service categories. A non-mandatory pre-submittal meeting is scheduled for June 9, 2026, at the University of Texas at Arlington. Firms must submit their SOQs as single searchable PDF files by August 24, 2026, at 3:00 p.m. via the ProcureWare system. Qualified firms will be notified by November 2, 2026, and will subsequently be invited to respond to requests for proposals (RFPs) on a project-by-project basis. The submission process follows a two-phase selection methodology required by Texas environmental regulations, with Phase One being the qualification phase (this RFQ) and Phase Two involving competitive proposals for specific projects.
SOQ submissions must include a three-page infographic-style proposal in 11-by-17-inch landscape format, a detailed category-specific submission addressing firm qualifications and project experience from the past five years, a quality management approach description, staff resumes in an appendix, and a company-wide Quality Management Plan (QMP) signed by the firm's Executive Officer. Firms must achieve a minimum score of 150 points out of 200 to qualify, with evaluation criteria weighted as follows: Firm's Professional Experience (80 points), Firm's Project Staff Qualifications (80 points), and Firm's Approach to Quality Management (40 points). Firms must maintain at least one fully functioning office within Texas and employ staff properly licensed by applicable Texas professional licensing boards. The RFQ identifies 41 anticipated capital improvement projects across multiple regional water and wastewater systems anticipated for initiation in FY 2027-2028, including pipeline rehabilitation, treatment plant expansions, meter station improvements, and system master planning. Questions must be submitted in writing by July 20, 2026, at noon. No pricing information or contract award amounts are specified in this qualification document, as pricing will be negotiated during Phase Two following firm selection for specific projects.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6/5/2026 RFQ: FY 2027 - 2028 1
Trinity River Authority of Texas Request for Qualifications Professional Services Fiscal Years 2027-2028
SECTION 1: INTRODUCTION
The Trinity River Authority of Texas (Authority) is a conservation and reclamation district of the State of Texas, created by TEX. REV. CIV. ANN. art. 8280-188, and operating pursuant to special and general law. The Authority’s services are contracted for cities, municipalities, and other special districts. The Authority owns and operates water treatment and supply facilities, wastewater treatment facilities, interceptor collection systems, and water reuse facilities. The Authority invites the submission of a Statement of Qualifications (SOQ) from interested prime consulting firms (Firms or Firm) to provide professional consulting services across the required primary and specialty categories. Firms are the main focus of this SOQ process. Do not provide an SOQ with multiple Firms (i.e., teams). The qualification will be for a term of two years during the Authority’s fiscal years (FY) 2027 and 2028, beginning December 1, 2026, and ending November 30, 2028. Firms are encouraged to submit qualifications and contact information in response to this Request for Qualifications (RFQ) to assist the Authority in creating a list of FY 2027 to 2028 Firms that may provide opportunity for assignment to specific capital improvement projects not currently under contract in Planning, Design and Construction Administration (PDCA). Please note, this qualification process is only for professional services in compliance with 30 Tex. Admin. Code § 292.13(4). Once a Firm has been deemed qualified, it will be invited to provide a specific proposal for a specific project on an as-needed basis. This two-step process is unique to river authorities and required by the rules of the Texas Commission on Environmental Quality.
The Authority will utilize ProcureWare for this RFQ process. The full RFQ packet and submittal instructions will be available for download under BID NUMBER - PDCA_RFQ_FY_27/28. Firms that are not currently registered in ProcureWare must complete registration in order to participate.
Follow the instructions provided in this document and submit the SOQ packet as a single, searchable PDF File no later than Monday, August 24, 2026, by 3:00 p.m. via ProcureWare at:
https://tra.ProcureWare.com/Bids.
SECTION 2: SCHEDULE
The following anticipated schedule is subject to change. SOQ submittals received after the due date specified below or by addenda shall be rejected and listed as non-responsive.
Issue Request for Qualifications (RFQ) Friday, June 5, 2026 Pre-Submittal Meeting (Non-mandatory) Tuesday, June 9, 2026, 10:00 a.m.
University of Texas at Arlington Nedderman Hall (NH100) 416 Yates Street, Arlington, Texas
Deadline for Additional Questions Monday, July 20, 2026, by Noon SOQ Submission Due Monday, August 24, 2026, by 3:00 p.m.
Notification of Qualified Firms Monday, November 2, 2026
6/5/2026 RFQ: FY 2027 - 2028 2
SECTION 3: PROFESSIONAL SERVICE CATEGORIES AND CAPITAL PROJECTS
A. Professional Service Categories
Professional engineering and surveying services required by the Authority are identified by 18 primary and 13 specialty service categories (Categories), along with the associated codes listed in Attachment A.
B. Capital Improvement Projects
A list of anticipated regional system capital improvement projects (CIP), associated Category code, and project descriptions anticipated to be initiated in the Authority’s FY 2027 and 2028 is included in Attachment B.
SECTION 4: QUALIFICATION EVALUATION AND SELECTION PROCESS
A. Two-Phase Selection Process
Selection of consulting Firms for Authority professional services will be conducted in a two-phase process in accordance with 30 TEX. ADMIN. CODE § 292.13(4). Firms must be qualified under a Project Category during Phase One (RFQ/Qualification Phase) to be eligible to receive a Request for Proposal (RFP) for a specific project in Phase Two (RFP Selection Phase). Project Categories are identified in Attachment A, Professional Service Categories, and are identified by the Authority for each project.
(1) Phase One – RFQ/Qualification Phase
(a) Submission of Statement of Qualifications (SOQ) – Interested Firms must submit a completed SOQ in response to this RFQ for each category of interest. Firms may submit for a maximum of 12 Categories identified in Attachment A, Professional Service Categories. Each Category submission should include the following:
(i) Three-page, 11- by 17-inch Infographic-style proposal with Category, Firm’s name or logo, Professional License Registration number, and all relevant company contact information, including primary and secondary points of contact, address, phone, and email clearly identified on page one. Each page should include the Firm’s name or logo, Category name, and page number in the footer. Guidance on the infographic format will be provided in the presubmittal meeting presentation. (Note: Primary and Secondary contacts provided on each SOQ will receive all RFPs and correspondence for that category. PDCA will not be responsible for miscommunication of opportunities due to incorrect or omitted primary and secondary contacts.)
(ii) Each Category submission shall be a separate SOQ and should include the Firm’s Category-specific general qualifications and technical capabilities, team organization chart of staff members qualified and anticipated to participate in that category, and similar project experience within the last five years with references as outlined in Section 4.C.
Evaluation Criteria.
6/5/2026 RFQ: FY 2027 - 2028 3
(iii) The Firm’s quality management approach, as outlined in Section 4.C.
Evaluation Criteria.
(iv) Each Category submittal is limited to a maximum of three pages and should be submitted electronically in searchable PDF format using an 11-by-17-inch landscape format with no less than 3/4 -inch margins on all sides. One side of a page is considered a single page. If the response exceeds the identified maximum number of pages, it will be evaluated only up to that limit.
(v) Submittals should be clear, concise, and complete. Infographic and resume submissions are to be single-spaced and use a font no smaller than 11-point. There are no special requirements for font types, styles, captions, or titles on the infographic or resume pages. Use best judgment as to readability.
(vi) Do not include a cover letter and table of contents.
(vii) Do not include QR Codes.
(viii) Resumes of staff should be provided in an appendix using an 8.5 by 11-inch format. Please provide only one set of resumes that includes all team members, as noted in each category submission.
(ix) No USB flash drives are allowed.
(x) SOQs must be submitted in full by the Submission Due deadline outlined in Section 2: Schedule.
(b) Qualification Team Evaluation – Authority’s appointed qualification teams will review, evaluate, and rank the SOQ and supporting documentation submitted by each interested Firm in accordance with the numerical evaluation criteria outlined in Section 4.C. Evaluation Criteria.
(c) Notice to Qualified Firms – Authority anticipates concluding the RFQ evaluation and review process within the time outlined in Section 2: Schedule. Upon completion of the review and evaluation process described herein, the Authority shall provide written notice to all submitting Firms as to whether they are deemed qualified. Qualified Firms will be invited to participate in the Phase Two – RFP Selection Phase, for upcoming FY 2027-2028 projects within the qualifying Category.
(2) Phase Two – RFP Selection Phase
(a) Firms determined in Phase One by the Authority to be qualified will be invited by
RFP to propose on FY 2027-2028 projects identified within the qualified Category.
(b) Authority will review proposals received, select the most qualified firm, and request a fee proposal from the selected Firm for an Engineering Services Agreement (ESA) that will be considered for approval by the General Manager
6/5/2026 RFQ: FY 2027 - 2028 4
and the Authority’s Board of Directors. ESAs shall be negotiated to ensure that the Authority obtains the best and fairest rates for the required services. In the event that a fee acceptable to the Authority cannot be reached with the Firm deemed most qualified, the Authority will commence negotiations with the Firm deemed next most qualified. ESA templates are available on ProcureWare. The standard terms in the ESA template (Articles I, II, VII – XX) are non-negotiable. Submission of an SOQ by Firms constitutes an acknowledgment of that condition.
B. Evaluation for Qualification Selection
The Authority’s qualification teams shall evaluate interested Firms based on the evaluation criteria and scoring points set out in Section 4. C, Evaluation Criteria. Firms that achieve a minimum total score of 150 points shall be considered for an invitation to submit a proposal in response to an RFP, consistent with the selection process.
(1) Qualification will be based on the submittal as well as information obtained regarding prior project experience, from governmental agencies and entities, Texas Board of Professional Engineers and Land Surveyors, certifying agencies, and any resources related to the evaluation criteria.
(2) The qualification team may also request and review additional information as necessary to clarify or supplement the information provided to or obtained by the Authority.
(3) Poor past performance may result in the Authority denying qualification.
(4) Each SOQ is for one responding Firm only. If two Firms have recently merged and are operating as a single consulting Firm, only one Firm’s SOQ can be submitted. The listed experience of both Firms within the last five years may be included in the SOQ.
(5) A submitting Firm’s score shall be made available to that Firm upon request.
(6) All SOQs are subject to Texas Public Information Act requests in their entirety. All information contained in the SOQs will be considered public record. Do not submit any information that the Firm claims is confidential, proprietary, or otherwise not subject to disclosure under the Texas Public Information Act.
(7) The decision of the Authority shall be final and shall not be subject to appeal.
C. Evaluation Criteria
Firms submitting an SOQ that does not comply with the instructions in this RFQ shall be disqualified from consideration. The evaluation criteria are defined herein and the scoring points of each criterion are provided in parentheses, which total 200 points as follows:
(1) Firm’s Professional Experience (80 points) – Firms applying for qualification are required to demonstrate experience to perform professional services within the Category service disciplines. Local experience is a factor in evaluating this criterion, but project experience is not limited to local projects.
(2) Firm’s Project Staff Qualifications (80 points) – Firms applying for qualification are required to demonstrate technical qualifications of the identified staff to perform
6/5/2026 RFQ: FY 2027 - 2028 5
professional services within the Category service disciplines. Please provide a summary of the project staff’s general qualifications and technical capabilities. The Firm must maintain at least one fully functioning office within the State of Texas and employ qualified personnel who are properly licensed by the applicable Texas professional licensing boards for the services to be performed, including the Texas Board of Professional Engineers and Land Surveyors and the American Institute of Architects.
(3) Firm’s Approach to Quality Management (40 points) – Each Firm is expected to provide services to the Authority with a commitment to quality. Describe the Firm’s approach to quality, including but not limited to the Firm’s company-wide written Quality Management Plan, project Category-specific adaptation to your Firm’s overall Quality Control (QC) plan, a Category-specific QC plan, the Firm’s company-wide Quality Officer, and integration of the Firm’s Quality Management guidelines and procedures into all phases of a project. As a separate document, provide a copy of the Firm's company-wide Quality Management Plan (QMP), which should include a signed and dated declaration from the Firm's Executive Officer stating that the QMP is being adhered to as part of operations.
Per Section 552.1101 of the Texas Government Code, the QMP is excepted from the Texas Public Information Act. Failure to include both information on a company-wide Quality Officer and a QMP will result in the SOQ being deemed "non-compliant" and not considered for review.
SECTION 5: COMMUNICATIONS
A. Pre-Submittal Meeting
The Authority will host a pre-submittal meeting, as outlined in Section 2: Schedule, to present the RFQ, provide an overview of the FY 2027–2028 projects, and address questions previously received from Firms.
PLEASE NOTE: The Pre-Submittal Meeting for TRA’s RFQ: Professional Services Fiscal Years 2027-2028 is not mandatory for in-person attendance. However, it is highly recommended that you send at least one representative from your Firm to attend, as there will be no virtual option.
The Pre-Submittal Meeting agenda includes critical discussion items such as the RFQ submission format, required deliverables, and scoring criteria. A PDF copy of the presentation will be uploaded to ProcureWare following the Pre-Submittal Meeting for reference.
B. Communications
Carefully examine the RFQ documents and report any errors, omissions, discrepancies, or clauses requiring clarification. Do not rely on oral responses to requests for clarification.
(1) Requests for Clarification: All requests for clarification should be clearly communicated and submitted in written form through ProcureWare.
(2) Addenda: The Authority reserves the right to amend this RFQ at any time up until the due date. Any amendments to, or interpretations of, the RFQ shall be described in written addenda posted on ProcureWare. All addenda shall become part of the RFQ and will be deemed acknowledged by Successful Proposer once the addenda are posted to ProcureWare. If the Authority determines that the addenda may require significant changes to proposal preparation, the deadline for submitting proposals may be postponed by the number of days the Authority deems sufficient to revise the proposals.
6/5/2026 RFQ: FY 2027 - 2028 6
Any new due date shall be included in the addenda.
(3) Deadline for Questions: All questions must be made in writing and submitted via
ProcureWare by 12:00 pm on Monday, July 20, 2026.
(4) RFQ/SOQ Communications:
(a) Communication in connection with the RFQ and selection process clarification is permitted only for the purpose of obtaining a copy of this RFQ and related forms or to submit a written question or request for clarification as outlined in Section 5.B.
(b) During the selection process, submitting Firms or their representatives are prohibited from communicating with any Authority officials, Board Members, or employees except as identified above regarding the RFQ, from the time the RFQ is released until the notification of qualified Firms is posted.
(c) This prohibition on communication includes “thank you” letters, phone calls, emails (unless as described through Section 5.B.1), and any contact that results in the direct or indirect discussion of the RFQ and/or SOQ submittal by Firms.
(d) Be aware that a violation of this provision by the submitting Firm and/or their representative could lead to the disqualification of the submitting firm’s SOQ.
SECTION 6: SOQ RESOURCES
The following are available to download from ProcureWare.
(1) RFQ – Request for Qualifications, FY 2027-2028
(2) CIP – FY 2027-2028 Capital Improvement Projects
(3) ESA Templates – Engineering Services Agreement Templates
SECTION 7: SOQ SUBMITTAL FORMAT AND SPECIFICATIONS
The following should be included in the submittal.
(1) SOQs: 1 per Category - 11 x 17, 3-page PDF, up to twelve categories.
(2) QMP: 1 per Firm – 8 ½ x 11 PDF, signed and dated by Executive Officer, no page limitation or formatting requirements, covers entire submission.
(3) Appendix 1 – Resumes: 1 per Firm – 8 ½ x 11, no page limit for individual resumes.
(4.A.(1).(a).(viii))
Attachment A - RFQ Categories RFQ: FY 2027 – 2028 7
ATTACHMENT A
RFQ Categories FY 2027 – 2028
The following categories generally include, but are not limited to, project planning, design, and construction-support services, unless otherwise indicated.
Primary Categories
P1 Water Treatment
Water supply treatment and other related facilities: this may include process expansions, optimization of water treatment processes, rehabilitation of corroded or obsolete equipment, regulatory-driven improvements, and treatment plant master plans.
P2 Water Supply Pipeline and Distribution System, Valves and Meter Stations
Raw and finished water pipelines; transmission and distribution systems, including hydraulic modeling and system analysis; design of appurtenances, including valves, air-release/vacuum valves, and blow-offs; meter stations and flow-measurement facilities; interconnections with existing systems; corrosion protection; evaluation of trenchless and open-cut installation methods; permitting, and all necessary support services.
P3 Ground Storage Tanks (New and Rehabilitation)
Ground storage tanks for water and wastewater systems: services may include structural, mechanical, and electrical upgrades; repairs to roof and tank components; recoating; installation of mixing systems and pumps; piping and valve improvements; control system upgrades; and removal or replacement of cathodic protection systems. It also includes all associated site work and ancillary improvements needed to ensure safe and efficient operation.
P4 Wastewater Treatment
Improvements or rehabilitation to wastewater treatment plants, including process expansions, optimization of wastewater treatment processes, rehabilitation of corroded or obsolete equipment, odor mitigation, regulatory-driven improvements, and treatment plant master plans.
P6A Wastewater Pipeline – 60-inch and Under
Gravity wastewater pipelines 60 inches in diameter and smaller, including alignment studies, hydraulic analysis, streambank analysis, condition assessment of existing systems, pipeline rehabilitation methods, manhole design and rehabilitation, odor and corrosion control, trenchless technologies evaluations, permitting, and all necessary support services.
P6B Wastewater Pipeline – 66-inch and Over
Large-diameter gravity wastewater pipelines 66 inches in diameter and greater, including alignment studies, hydraulic analysis, streambank analysis, condition assessment of existing systems, pipeline rehabilitation methods, manhole design and rehabilitation, odor and corrosion control, trenchless technologies evaluation, permitting, and all necessary support services.
P7 Wastewater Lift Station and Force Main
Wastewater lift station and force mains, including installation or rehabilitation of wastewater lift stations, pump selection and system hydraulics, force main design, surge and transient analysis, electrical and control systems, SCADA integration, standby power systems, odor control systems, structural and site design, rehabilitation and upgrades of existing facilities, permitting, and all necessary support services.
Attachment A - RFQ Categories RFQ: FY 2027 – 2028 8
P8 Roadway and Stormwater Drainage Design
Development of new or rehabilitation of existing access roads, entry and exit roadways serving TRA facilities; scope may encompass drainage improvements, installation or relocation of corridor utilities, security infrastructure such as gates and surveillance systems, permitting support, and evaluation and mitigation of environmental impacts associated with the project.
P9A Riverine Modeling (Hydraulics and Hydrology)
Hydrologic and hydraulic evaluations associated with rivers, streams, floodplains, watersheds, reservoirs, sediment transport, flooding, and related infrastructure, including modeling, analysis, planning, assessment, mapping, and technical support associated with flow conditions, flooding, drainage, sediment transport and deposition, watershed response, infrastructure performance, and operational or regulatory needs.
P9B Bank Stabilization, Erosion Control, and Scour Analysis
Evaluation of erosion, scour, and sediment dynamics that may affect pipelines and related Authority infrastructure. Identification and assessment of existing or potential erosion risks along pipeline corridors, at crossings, and near appurtenances, including geomorphic and hydraulic evaluations, scour and sediment modeling analyses, stabilization recommendations, and development of conceptual or final stabilization measures intended to protect Authority-owned infrastructure. Typical solutions may include grade control structures, bank stabilization, armoring, channel realignment, and other structural or nature-based approaches. May also include hydraulic and sediment transport modeling, permitting support, and construction-phase services.
P9C Surface Water Quality Modeling
Development, application, and evaluation of surface water quality models and related technical analyses for rivers, reservoirs, lakes, estuaries, and watershed systems, including modeling, data analysis, monitoring support, scenario evaluations, planning studies, and technical support associated with water quality, environmental conditions, operational objectives, regulatory requirements, or watershed management activities.
P9D Watershed Modeling (Water Quality)
Watershed-scale modeling, analysis, and technical support associated with hydrology, water quality, sediment transport, land-use change, watershed management, and related environmental or operational objectives, including development, calibration, and application of watershed models such as SWAT, HAWQS, or similar modeling platforms to evaluate watershed conditions, runoff, pollutant loading, erosion and sediment transport, best management practices, and potential future scenarios.
P10A Collection System Master Planning, Wastewater Hydraulic Modeling, Flow Monitoring, Asset Management, and Wastewater System Evaluation
Wastewater collection system master planning, hydraulic modeling, flow monitoring, asset management, and system evaluation services. Services may involve system analysis, infiltration and inflow (I/I) assessment, flow and depth monitoring, population and demand projections, and development of capital improvement plans. Services may also include model development, calibration, and peer review; implementation and optimization of asset management systems; and condition assessments of system assets, including evaluation of odor and H₂S impacts, to support rehabilitation planning and system performance improvements.
P10C Distribution System Master Planning, Water System Hydraulic Modeling, and Asset Management
Attachment A - RFQ Categories RFQ: FY 2027 – 2028 9
Distribution system master planning, hydraulic modeling, and asset management services for water systems, including system analysis, flow and pressure monitoring, water age assessment, population and demand projections, and development of capital improvement plans and operational recommendations.
Services may also involve the development, calibration, and peer review of hydraulic models, as well as the implementation and optimization of asset management systems, with preferred experience with tools such as InfoWorks WS Pro, InfoAsset Manager, and Maximo.
P11 Reservoir Dams, Levees, and Gates
Reservoir dams, levees, and gate systems, including project management, construction administration, inspection, quality assurance, and regulatory coordination. Services may also involve review of contractor submittals, RFIs, and change orders; site visits and progress monitoring; testing of structural components; and construction documentation and closeout support to ensure compliance, safety, and long-term operational integrity.
P12 Wastewater Metering Stations
Wastewater metering facilities, including flow measurement equipment selection (e.g., magnetic, ultrasonic, or flume systems), vault and structural design, instrumentation and controls integration, SCADA connectivity, data acquisition and reporting systems, calibration and testing, retrofits of existing metering infrastructure, permitting, and all necessary support services.
P13 Operational Process Studies (Water and Wastewater)
Evaluation to optimize water and wastewater treatment processes to improve performance and efficiency while maintaining regulatory compliance. Services may include process assessments, data and capacity analysis, pilot testing, modeling, and troubleshooting of treatment systems, as well as development of operational strategies, standard procedures, and process control recommendations to enhance reliability and reduce costs.
P14 Water and Wastewater Pressure Pipeline Inspections
Includes inspection of pressurized water and wastewater pipelines, including but not limited to C301, C303, L301, E301, and PVC. Inspections may be performed while the pipelines are in service or out of service.
Specialty Categories
S1 Materials Testing and Geotechnical Engineering Consulting
Materials testing services during the construction of water and wastewater pipeline and treatment plant projects, with test reports uploaded and labeled correctly in the Owner’s construction administration software, Projectmates. This category also includes geotechnical engineering and soil-boring investigations when not performed under another category.
S2 Electrical and Instrumentation
Improvements or additions to electrical power, instrumentation, and control systems in water and wastewater facilities, including power distribution, emergency and backup generation, and UPS systems.
Services may also involve developing process control systems (e.g., SCADA and automation) and coordinating with electrical utilities.
S3 Land Surveying – Subsurface Utility Engineering (SUE)
Surveying services to support project design and construction in accordance with the Texas Engineering and Land Surveying Practice Acts and Rules, including preparation of legal descriptions and easements, construction staking, settlement monitoring, horizontal and vertical control points, boundary, easement, Attachment A - RFQ Categories RFQ: FY 2027 – 2028 10 and rights-of-way determination, topographic surveys, borehole staking, CAD support, and Subsurface Utility Engineering (SUE) for mapping underground utilities.
S6 Regulatory Consulting
Regulatory support services for TRA wastewater and drinking water facilities, including preparation, review, and coordination of TPDES permit applications, renewals, and amendments, as well as modeling.
Services also include support for pretreatment programs, compliance with TCEQ Public Water System requirements and National Primary Drinking Water Regulations, and other federal and state requirements such as water reuse, odor control, stormwater, spill prevention, air quality, hazardous waste, PFAS, and related compliance needs.
S7 Railway Engineering
Railway infrastructure supporting water and wastewater facilities, including track alignment, rail spurs, sidings, crossings, drainage, and structural elements for material transport. Services may also involve coordination with rail operators and regulatory agencies, preparation of construction documents, site access planning, and support during permitting and construction to ensure safe, compliant, and efficient integration with utility operations.
S8 Structural Engineering
Evaluation of water and wastewater infrastructure, including tanks, basins, buildings, foundations, and pipe support. Services may involve condition assessments, structural and environmental load analysis, preparation of construction documents, and development of repair or retrofit solutions to ensure assets are safe, durable, and compliant with applicable codes and standards.
S9 Construction Project Management/Construction Management/Construction Inspection (PM/CM/CI)
Professional services for managing, administering, and inspecting construction projects for water and wastewater facilities, including project management, scheduling, cost control, and coordination among contractors and stakeholders. Services may also involve construction administration, on-site inspection, quality assurance and control, review of submittals and pay applications, progress documentation, compliance monitoring, and project closeout support to ensure projects are delivered safely, on time, within budget, and in accordance with design and regulatory requirements.
S10 Ports and Harbors
Port, harbor, and waterfront infrastructure supporting water and wastewater operations, including docks, piers, bulkheads, outfalls, intake structures, and shoreline stabilization. Services may also involve dredging coordination, marine and hydraulic analysis, permitting, and construction support to ensure safe, reliable, and efficient operation of utility assets in navigable waterways.
S11 Large-Scale Dredging Operations, Engineering, and Related Support Services
Large-scale dredging projects for water and wastewater systems, including sediment analysis, dredging methods, and construction documentation. Services may also involve regulatory coordination, permitting, material disposal or reuse, and the design of disposal or dewatering facilities, as well as construction oversight and monitoring to maintain channels, reservoirs, and critical infrastructure affected by sedimentation, while ensuring compliance and operational efficiency.
S12 Hydrogeological Engineering
Hydrogeologic investigations related to groundwater resources, aquifers, and groundwater-surface water interactions. Services may include groundwater modeling, review and evaluation of Groundwater Availability Models (GAMs), monitoring and data collection, aquifer assessments, water quality
Attachment A - RFQ Categories RFQ: FY 2027 – 2028 11 evaluations, geologic and geotechnical analysis related to groundwater conditions, watershed and basin studies, GIS analysis and mapping, technical reporting, permitting support, and water resource planning and management activities.
S13 Parks and Recreational Planning
Long-range planning, design support, and technical expertise for the development and management of recreational amenities on TRA-owned land. Services may include master planning, feasibility studies, public engagement, coordination with regional partners and permitting agencies, concept-level design, and implementation support, while balancing public access with environmental stewardship, flood management, water quality protection, and operational sustainability.
S14 Breakwaters and Shoreline Stabilization
Supports the protection of TRA-managed shorelines, banks, and access points from erosion, wave impacts, and shoreline loss while maintaining environmental and operational functions. Qualified firms will provide planning and design support for stabilization approaches that improve long-term resilience and the usability of TRA assets (e.g., boat ramps, bulkheads). Potential projects may include shoreline erosion assessments, breakwater and shoreline concepts, and stabilization measures to protect boat ramps and launch areas from wave action, reduce sediment buildup, and enhance boater safety/navigation. Services may also include public engagement, coordination with regional partners, and permitting agencies.
S15 Multi-Sensor Inspection (MSI) and Closed-circuit Television (CCTV)
Multi-sensor inspection (MSI) and CCTV evaluation of gravity sewer pipelines using LiDAR for cross-sectional measurements and video coded to National Association of Sewer Service Companies (NASSCO) Pipelines Assessment Certification Programs (PACP) standards. Services determine pipe deflection and ovality, typically for newly installed pipelines prior to activation.
System Project Name Description ServiceCategory
(CP) 2027 2028
CRWS Elm Fork Erosion Improvements Located in the cities of Dallas and Irving, this project consists of approximately four acres of bank stabilization and erosion control improvements along the Elm Fork of the Trinity River south of the City of Dallas's Frasier Dam.
S1 Materials Testing and Geotechnical Engineering
Consulting MTSA
CRWS Grapevine Coppell Interceptor This project will convey Grapevine, DFW Airport, and Coppell flows to CRWS via the Elm Fork Interceptor System and consists of approximately 41,600 linear feet of interceptor to be installed to accommodate projected flows.
Construction is anticipated to occur in multiple phases to be determined during the initial study and preliminary design phase.
P6A Wastewater Pipeline – 60 inch & Under
PD
CRWS CRWS West Fork Interceptor Rehab, 7315W-6511W (CAC-3A)
This project will include the rehabilitation or replacement of approximately 20,100 linear feet (LF) of 78-inch unlined RCP in the West Fork Interceptor System, north of Green Oaks Boulevard and west of State Highway 360 in the city of Arlington. This project will also included the replacement of approximately 450 LF of 15-inch lined vitried clay pipe (VCP) known as Segment WF-5. WF-5 extends from just east of the intersection of Cooper Street and Beady Road to just northwest of the intersection of Sunlight Drive and Eldoro Drive. In addition, an evaluation of meter station MS12_0W will be included within this project to determine if replacement is required.
P6B Wastewater Pipeline – 66 inch & Over
PD
CRWS CRWS Elm Fork Interceptor Rehab, 2705E-
1530E (CAC-9)
CAC-9 includes rehabilitation or replacement of approximately 6,600 LF of unlined reinforced concrete pipe ranging in size from 42- to 90-inches in diameter, parallel to Elm Fork of the Trinity River. CAC-9 begins north of W.
Northwest Highway and continues south to MS8.0E to the west of Tom Braniff Drive (near city limits between Irving and Dallas).
P6B Wastewater Pipeline – 66 inch & Over
PD
CRWS CRWS Elm Fork Int. Rehab 1A & 1B, 2500E-
2254E (CAC-10)
CAC-10 includes the rehabilitation or replacement of approximately 15,600 linear feet of 90-inch unlined reinforced concrete pipeline. CAC-10 is located adjacent to the Elm Fork of the Trinity River from just north of the intersection of Tom Braniff Road and State Highway (SH) 114 to Proctor Street south of SH 183 in the city of Irving, near Dallas city limits.
P6B Wastewater Pipeline – 66 inch & Over
PD
CRWS Meter Stations Groups 3-5, Package 1 This project consists of the construction of the following meter station (MS) facilitiess as identified during preliminary design of the Meter Stations Groups 3- 5 project: MS8_0B (Irving), MS8_3W (Grand Prairie), MS9_0J (Grand Prairie), MS16_5W (Euless), and MS17_0W (Bedford). This project will also consist of the replacement of 1,200 linear feet of 10- to 15-inch interceptor adjacent to MS17_0W, known as Segment 09WF-18. Segment 09WF-18 is located in the City of Euless and extends south from the intersection of Preswick Street and Pipeline Road along Princeton Place.
S1 Materials Testing and Geotechnical Engineering
Consulting
MTSA
CRWS Elm Fork Interceptor Rehab & Replacement, Phase 2B and 3A, CAC-8A
This project includes the replacement of the existing unlined RCP located in the city of Carrollton along the Luna Road corridor between Valwood Parkway and Beltline Road (Phase 2B) and along the Beltline Road corridor between Luna Road and Hutton Drive (Phase 3A) with a new interceptor. Phase 2B consists of approximately 7,000 LF of pipeline up to 78 inches in diameter. Phase 3A consists of approximately 2,700 LF of pipeline up to 48-inches in diameter.
Phases 2B and 3A are part of the overall program management of CAC 7, 8A, and 8B.
S1 Materials Testing and Geotechnical Engineering
Consulting
MTSA
CRWS CRWS Elm Fork Interceptor Rehab & Replacement, Phase 3B, CAC-8B
This project includes the replacement of the existing unlined RCP along the Hutton Drive corridor between Valley View Lane and Beltline Road with a new interceptor. Phase 3B consists of approximately 12,500 linear feet of pipeline up to 54 inches in diameter. This project also includes the replacement of meter station (MS) facility, MS16_5E (Carrollton). Phase 3B is part of the overall program management of CAC 7, 8A, and 8B.
S1 Materials Testing and Geotechnical Engineering
Consulting
MTSA
CRWS CRWS Elm Fork Interceptor Rehab & Replacement, Phase 4A, CAC-7
This project includes rehabilitation or replacement of approximately 6,000 linear feet of 72-inch unlined RCP. Phase 4A is located in the city of Carrollton and is part of the program management for CAC 7, 8A, and 8B.
P6B Wastewater Pipeline – 66 inch & Over FD
CRWS Little Bear Creek Interceptor, Segment
LBC_16
The scope of this project includes the rehabilitation or replacement of approximately 7,800 LF of 12- to 15-inch VCP and meter station MS 12_6B (BC_16) due to poor condition. This project takes place in the cities of Grapevine and Euless.
S1 Materials Testing and Geotechnical Engineering
Consulting MTSA
CRWS Collection System - Condition Assessment This project includes the biennial condition assessment program within the CRWS collection system. The condition assessment will monitor corrosion within the system to enhance ongoing preventative maintenance efforts and identify areas of concern for the Capital Improvement Program.
P10A Collection System Master Planning, Wastewater Hydraulic Modeling, Flow Monitoring, Asset Management, and Wastewater System
Evaluation
ST
ATTACHMENT B
Capital Improvement Projects for Fiscal Years 2027 - 2028 This list represents anticipated CIP projects for FY 2027–2028 that have not yet been procured and is provided for informational purposes only as part of the RFQ.
As the Capital Improvement Program is dynamic, project scopes, schedules, and priorities are subject to change. Projects may be added, removed, or rescheduled at any time based on funding, needs, or emerging priorities.
Attachment B - CIP Project List RFQ: FY 2027 - 2028 12
CRWS Phase IV Solids Expansion (CMAR) CRWS utilizes a four-step process for solids treatment: Thickening, Pre-dewatering, Thermal Hydrolysis/Anaerobic Digestion (THP/AD), and Post-dewatering. Primary sludge is thickened in gravity thickeners and combined with waste activated sludge from secondary clarifiers, which is thickened via gravity belt thickeners (GBTs). The blended sludge is pre-dewatered by centrifuges, treated through the Thermal Hydrolysis Process (THP), anaerobically digested, and then dewatered in the post-dewatering building using belt filter presses. This will result in the generation of Class A biosolids which enables various options for beneficial reuse.
S1 Materials Testing and Geotechnical Engineering
Consulting
MTSA
CRWS Hydrocyclones: Pilot Hydrocyclones is a treatment technology that leverages centrifugal forces to separate solids particles of varying densities from liquids of slurries. It allows for selective separation of suspended solids improving sludge settleability. The piloting of the technology will determine the feasibility of implementing hydrocyclones full-scale to help manage increased solids loading in secondary treatment.
S1 Materials Testing and Geotechnical Engineering
Consulting
MTSA
CRWS Phase IV Liquids Expansion to 205 MGD
(CMAR)
This project provides additional secondary treatment capacity without the need for additional final clarifiers. The first MBR phase will add 16 MGD of secondary treatment capacity to the existing system. It will include a fine screen facility and blower and chemical feed buildings associated with MBR technology.
Additional cloth filters, RAS interconnection capabilities between PS 13A and 13B, and step feed improvements are also included.
S1 Materials Testing and Geotechnical Engineering
Consulting
MTSA
CRWS Plant Wide Fiber Optics Rehabilitation The current fiber in the plant has aged and needs replacement. This improvement will replace existing fiber optics throughout the plant with Industrial grade single mode fiber optic cable for better reliability and provide more data bandwidth.
S2 Electrical & Instrumentation
PD/FD
CRWS Analytical Lab - Civil Package for Gravity Drain Relocation
The Plant underdrain pipes is currently in conflict with the proposed analytical lab foundation. This project is to relocate utilities and underdrain pipes and also to construct additional parking for the Plant.
S1 Materials Testing and Geotechnical Engineering
Consulting
MTSA
DCRWS Cowboy Lift Station Rehabilitation This project includes improvements to the existing Cowboy Lift Station (LS_1GB), including the addition of a flow meter at the site to provide better operational data to the Plant.
P7 Wastewater Lift Station and Force Main PD
DCRWS Dewatering Improvements The project is expanding the DCRWS dewatering capacity and adding additional odor control. The existing biosolids dewatering consists of two centrifuges that dewater secondary sludge, which are currently operating at capacity with no redundancy. Additional dewatering capacity is necessary to meet the new biosolids projections. Enhanced odor control measures are also included in the scope of improvements.
S1 Materials Testing and Geotechnical Engineering
Consulting
MTSA
DCRWS Odor Control Rehabilitation Phase 4 It is anticipated that the next level of odor control at the plant will consist of covering the anaerobic zones in the aeration basins. To verify the need, conduct a round of odor sampling and monitoring to indicate which basins are contributing to offsite odors. Perform an air dispersion model to identify recommendations for improvements. Design a cover for the anaerobic zones and upgrade the bioscrubber system for the additional air volume.
P4 Wastewater Treatment
PD
DCRWS Peak Flow Tank Nos. 3 and 4 This project increases the peak flow storage capacity with two additional 8-MG tanks to ease construction constraints of future expansions and help mitigate increasing peak flows.
P4 Wastewater Treatment
PD/FD
DCRWS DCRWS Entry Roadway Reconstruction Traffic entering the Plant has increased due to construction activities associated with the Plant expansions, improvements to the existing entry road are necessary to maintain safety at the Union Pacific crossing and enhance ingress and egress to the plant.
S1 Materials Testing and Geotechnical Engineering
Consulting MTSA
DCRWS Plant Expansion to 24.4 MGD The purpose of this project is to expand the treatment capacity of the DCRWS plant from 19.4 to 24.4 MGD. The project includes the following process expansions: increased influent pumping capability, addition of a drum screen facility, installation of additional grit removal equipment, primary filters, aeration basin, MBR trains, and UV disinfection equipment.
S1 Materials Testing and Geotechnical Engineering
Consulting MTSA
HRWSS HRWSS High Service Transmission Improvements - Phase 1
This is the first of four phases for the High Service Transmission Improvements project to replace the existing 30-inch HRWSS transmission pipeline. The existing pipeline has reached the end of its remaining useful life. Phase 1 includes approximately 11,900 LF of 42-inch transmission main. This project is part of the overall program management of the Raw Water and High Service Transmission Improvements.
P2 Water Supply Pipeline and Distribution System
Valves and Meter Stations
FD
HRWSS HRWSS Tenaska Clarified Water Pump Station and Storage Tank Improvements
This project will replace all three existing pumps at the Clarified Water Pump Station at the HRWSS treatment plant and the 750,000 gallon ground storage tank. The project also includes electrical, piping and chemical injection modifications
S1 Materials Testing and Geotechnical Engineering
Consulting MTSA
Attachment B - CIP Project List RFQ: FY 2027 - 2028 13
HRWSS HRWSS Raw Water Intake Improvements This project will consist of improvements to the raw water intake structure and pump station that convey raw water to the Huntsville Regional Water Treatment Plant. The existing pump station and intake structure will not be adequate to convey future flows. This project is part of the overall program management of the Raw Water and High Service Transmission Improvements.
S1 Materials Testing and Geotechnical Engineering
Consulting MTSA
LLP Phase 2 Stilling Basin Improvements
(CMAR)
This project includes the installation of a reinforced concrete surface for the stilling basin, baffle blocks, and weir wall, and extending the east and west training walls from the end sill to the weir wall. Double matted reinforced concrete
S1 Materials Testing and Geotechnical Engineering
Consulting MTSA
MCRWS MCRWS Collection System Master Plan (I/I), Phase III
The Phase III project updates the MCRWS Collection System Master Plan Phase II. The project includes gathering and analyzing flow and rainfall data representative of recently completed construction projects. Update of population growth trends to include adjustments to the basin service area.
Update of the hydraulic model calibration and Capital Improvement Plan.
P10A Collection System Master Planning, Wastewater Hydraulic Modeling, Flow Monitoring, Asset Management, and Wastewater System
Evaluation
ST
MCRWS Treatment Plant Master Plan Update The last master plan was completed in 2020. This update will re-evaluate plant capacity based on new population and flow projections from the most recent Collection System Master Plan, along with any other changes in the system since the last master plan or that are anticipated to result in future projects for MCRWS. The Process Control System at the plant will be evaluated as well.
P4 Wastewater Treatment
ST
MCRWS Alternate Access Roadway An additional roadway will improve plant access and allow for a more centralized administration building.
S1 Materials Testing and Geotechnical Engineering
Consulting
MTSA
MCRWS Operations/Administration Building Additional working space for laboratory and staff. This building is being packaged separately from the 10 MGD expansion due to the urgency of the expansion and having that project advertised first.
S1 Materials Testing and Geotechnical Engineering
Consulting
MTSA
ROCRWS ROCRWS Collection System Master Plan (I/I), Phase IV
ROCRWS Collection System Master Plan, Phase IV update to the ROCRWS Infiltration and Inflow (I/I) Assessment Phase III includes updates to service areas, population and flow projections from customer cities; flow monitoring, rainfall and I/l analysis; update and re-calibration of the hydraulic model; and development of capital improvement projects.
P10A Collection System Master Planning, Wastewater Hydraulic Modeling, Flow Monitoring, Asset Management, and Wastewater System
Evaluation
ST
ROCRWS Red Oak Creek Interceptor Rehabilitation, Segment 40RO-2
The 40RO-2 project consists of approximately 9,700 LF of relief interceptor to replace the existing 27-inch unlined RCP. The existing pipe is in poor condition due to corrosion, and is undersized and unable to convey projected wastewater flows. The pipeline will be replaced with a 42- to 48-inch pipe, and the project includes a tunneled crossing under I-35E, State Highway 342 and the BNSF railroad.
S1 Materials Testing and Geotechnical Engineering
Consulting
MTSA
ROCRWS Red Oak Creek Interceptor Rehabilitation, Segments RO-3.5 and RO-4
The RO-3.5 and RO-4 project consists of approximately 19,400 linear feet of unlined reinforced concrete pipe replacement. The existing pipe is in poor condition due to corrosion, and is undersized and unable to convey projected wastewater flows. Replacement of the two segments (RO-3.5 and RO-4), will consist of approximately 19,400 linear feet of 27- to 30-inch pipe, as well as replacement of meter station MSCH1_0.
S1 Materials Testing and Geotechnical Engineering
Consulting
MTSA
ROCRWS DeSoto Glenn Heights Interceptor, RBC-4, Phase 1
The first construction package for the DeSoto/Glenn Heights Interceptor, RBC-4 Project.
S1 Materials Testing and Geotechnical Engineering
Consulting
MTSA
ROCRWS DeSoto Glenn Heights Interceptor, RBC-4, Phase 2
The second construction package for the DeSoto/Glenn Heights Interceptor, RBC-4 Project .
S1 Materials Testing and Geotechnical Engineering
Consulting
MTSA
TCWSP 36-inch Cheek-Sparger Water Line and Road Improvements
The Cheek-Sparger Water Line Improvements will replace 21,000 linear feet of existing 27- to 36-inch pipeline that is in poor condition. The Project will also provide the required increased capacity through 2060 as identified in the 2016 TCWSP master plan update. The Project coincides with the City of Colleyville’s (City) roadway improvements project along Cheek-Sparger Road. The Project is to be constructed prior to or in conjunction with the City’s roadway improvements in order to minimize disruption to the roadway corridor.
S1 Materials Testing and Geotechnical Engineering
Consulting
MTSA
TCWSP Distribution System – Condition Assessment
Project includes the development of a biennial condition assessment program within the TCWSP system. The condition assessment will monitor corrosion within the system to enhance ongoing preventative maintenance efforts and identify areas of concern for the Capital Improvement Program.
P14 Pressure Pipeline Inspections
ST
TCWSP Meter Stations Improvements Project - PD/FD below, same year as MTSA?
Bedford South/ Euless South are the two oldest meter stations in the water distribution system. The meters have exceeded the expected service life. The meter station is in need for rehabilitation and meter replacement. Euless Pipeline Meter Station with valve location that is too close to the flow meter that impacts the accuracy of the meter readings.
S1 Materials Testing and Geotechnical Engineering
Consulting MTSA
Attachment B - CIP Project List RFQ: FY 2027 - 2028 14
TCWSP Meter Stations Improvements Project Bedford South/ Euless South are the two oldest meter stations in the water distribution system. The meters have exceeded the expected service life. The meter station is in need for rehabilitation and meter replacement.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .