The HUB - Solar and Energy Infrastructure Project.pdf
PDF 949 KB Posted
- Solicitation number
- 27-001SB
- Issued by
- Riverside County, California
About this file
This Request for Proposals (RFP) No. 27-001SB is issued by the City of Corona Economic Development Department in California for comprehensive feasibility, design, engineering, installation, and maintenance services for solar and energy infrastructure at The HUB, a City-owned mixed-use development property acquired on December 24, 2024. The project encompasses five phases: Phase 1 (Feasibility Assessment and Conceptual Design) including site assessment, solar resource analysis, structural evaluation, electrical infrastructure assessment, feasibility study for solar carports, rooftop systems, battery energy storage systems (BESS), microgrid readiness, and EV charging integration, plus financial modeling for power purchase agreements (PPA) and direct ownership/financing models; Phase 2 (Design and Engineering) involving detailed civil, structural, electrical, and mechanical plans, construction drawings, utility coordination, and permitting; Phase 3 (Installation and Construction) covering procurement, installation, compliance with prevailing wage and apprenticeship requirements, and system commissioning; Phase 4 (Operations, Maintenance, and Monitoring) providing O&M plans, system monitoring, and annual reporting; and Phase 5 (Financial Advisory and Ongoing Support) offering PPA management and regulatory guidance. A non-mandatory pre-proposal meeting is scheduled for 10:00 AM on Thursday, August 13, 2026, via Microsoft Teams with RSVP required by 4:00 PM on Wednesday, August 12. Written questions are due by 5:00 PM on Thursday, August 20, 2026, with City responses due Thursday, August 27, 2026. Proposals must be submitted electronically via PlanetBids no later than 2:00 PM on Thursday, September 17, 2026. Proposal evaluation is scheduled to be completed by Thursday, October 1, 2026, with tentative consultant interviews on Thursday, October 8, 2026, contract negotiations on Thursday, October 15, 2026, consultant selection on Monday, October 19, 2026, City Council approval on Wednesday, November 4, 2026, and Notice to Proceed on Monday, November 9, 2026. The initial contract term extends from a start date to be determined upon execution through a completion date to be specified in the agreement, with renewal terms possible by mutual written consent.
Proposals will be evaluated on a 100-point scale based on completeness of response (pass/fail), firm qualifications and relevant experience (25 points), technical approach and methodology (30 points), financial proposal and value (25 points), project schedule and phasing strategy (10 points), and references and past performance (10 points). Highest-ranked consultants may be invited to interviews, which will provide an additional 100 points based on presentation, technical content, project manager and key team qualifications, communication skills, project understanding, and flexibility. The consultant must submit a separate fee proposal detailing hourly rates, labor hours by task, and a maximum not-to-exceed fee for all services. Payment terms are Net 30 Days unless otherwise negotiated. All contractors must comply with California Prevailing Wage Laws, including DIR registration requirements under SB 854, and must employ registered apprentices where applicable. Within ten days of award notification, the selected consultant must provide certificates of insurance evidencing General Liability ($1,000,000 occurrence/$2,000,000 aggregate), Automobile Liability ($1,000,000), Workers' Compensation as required by California law with Employer's Liability ($1,000,000), and Professional Liability/Errors and Omissions ($1,000,000 per claim/$2,000,000 aggregate) with appropriate endorsements naming the City as additional insured. A Payment (Labor and Materials) Bond equal to 100 percent of the total proposal price is also required within ten days of award. Consultants must obtain a City of Corona Business License prior to contract award and maintain it throughout the contract term. The City reserves the right to reject any or all proposals, withdraw the RFP at any time, and negotiate with consultants or select the most qualified consultant without further discussions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. 27-001SB “Advertising Notice”
THE HUB – SOLAR AND ENERGY INFRASTRUCTURE PROJECT
August 3, 2026
SUBJECT: REQUEST FOR PROPOSALS (RFP) NO. 27-001SB
The City of Corona Economic Development (City) invites qualified proposals for:
Parties interested in obtaining a copy of this RFP No. 27-001SB may do so by registering with PlanetBids as a City of Corona vendor by visiting the PlanetBids Vendor Portal:
https://www.planetbids.com/portal/portal.cfm?CompanyID=39497. Registered vendors can download a copy of this RFP No. 27-001SB and supporting documents at no cost and receive addenda and other notifications when issued.
A non-mandatory pre‑proposal meeting will be held at 10:00 AM on Thursday, August 13, 2026, via Microsoft Teams. All consultants must RSVP no later than 4:00 PM on Wednesday, August 12, by emailing Scott Briggs at Scott.Briggs@CoronaCA.gov and providing the name, email address, and phone number of the personnel who will attend the meeting. A meeting link will be emailed upon confirmation of registration.
Attendance at the pre‑proposal meeting is not mandatory but is recommended to use this meeting to become familiar with the project requirements.
Closing: Proposals shall be submitted electronically before 2:00 PM, Thursday, September 17, 2026 through the PlanetBids Vendor Portal. It is the consultant’s responsibility to allow sufficient time to complete and upload its proposal, including all documentation required by this RFP, prior to the stated deadline. Electronic submission cannot be completed unless the consultant properly uploads all required documents.
The City will only consider electronic proposals that have been transmitted successfully and issued a time stamped confirmation number from PlanetBids indicating the proposal was successfully transmitted. Transmission of proposals by any other means will not be accepted. Consultants are solely responsible for informing themselves with respect to proper usage of the PlanetBids online bid management system, for ensuring the capability of their computer system to upload the required documents and for the reliability of their internet service. Failure of the consultant to successfully transmit an electronic proposal shall be at the consultant’s sole risk and no relief will not be given for late or improperly submitted proposals.
Consultants experiencing technical difficulties with the proposal transmission process should contact PlanetBids Support at (818) 992-1771. Consultants that continue to experience difficulty with the PlanetBids system should contact the City of Corona Purchasing Division at (951) 736-https://www.planetbids.com/portal/portal.cfm?CompanyID=39497
RFP No. 27-001SB “Advertising Notice”
2274. Neither the City nor PlanetBids make any guarantees or assurances as to the timely availability of assistance or resolution of any given issue prior to the proposal submission date and time.
The services under this RFP are subject to the payment of not less than prevailing wages pursuant to Chapter 1 (beginning at Section 1720 et seq.) of Part 7 of Division 2 of the California Labor Code, as well as Title 8, Section 16000 et seq. of the California Code of Regulations (“Prevailing Wage Laws”). The Director of the Department of Industrial Relations (“DIR”) has determined the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the Agreement which will be awarded to the successful consultant, copies of which are on file and will be made available to any interested party upon request from the City or online at http://www.dir.ca.gov/dlsr. A copy of these rates shall be posted by the successful consultant at the job site.
Pursuant to SB 854, which amended the Prevailing Wage Laws, certain categories of services are subject to compliance monitoring and enforcement by the DIR. Beginning March 1, 2015, with very limited exceptions no consultant or subconsultant may be listed on a proposal for these contracts unless registered with the DIR pursuant to Labor Code section 1725.5. Beginning April 1, 2015, no consultant or subconsultant may be awarded a contract unless registered with the DIR pursuant to Labor Code section 1725.5. The DIR registration number for each consultant and subconsultant must be identified on the consultant’s proposal - failure to identify this number could result in the proposal being rejected as non-responsive. It is each Consultant’s responsibility to ensure that they have fully complied with SB 854. The City will report all necessary contracts to the DIR as required by the Prevailing Wage Laws.
The Services required under this RFP will be performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and Consultant shall comply with the provisions of Section 1777.5 of the California Labor Code with respect to the employment of properly registered apprentices upon public works when Consultant employs workmen in an apprenticeable craft or trade.
Issuance of this RFP and/or receipt of proposals does not commit City to award a contract.
Signed, Scott Briggs Lead Purchasing Specialist City of Corona | Finance Department 400 S. Vicentia Ave., Suite 320 | Corona, CA 92882 Phone: 951.736.2369 | Email: scott.briggs@coronaca.gov Website: www.coronca.gov http://www.dir.ca.gov/dlsr http://www.coronca.gov/
RFP No. 27-001SB Section I. “Invitation”
August 3, 2026
SUBJECT: REQUEST FOR PROPOSALS (RFP) No. 27-001SB
SECTION I
INVITATION
The City of Corona Economic Development Department (City) invites proposals from qualified consultants for:
Please read this entire RFP package and include all requested information and forms in your proposal. Proposals must be signed by an authorized agent of the company submitting a proposal in order to be considered responsive.
**IMPORTANT** PLEASE REVIEW THE CITY’S INSURANCE
REQUIREMENTS AND FORMS LOCATED IN SECTION V
(PROPOSAL CONTENT AND FORMS) AND VII (FORM OF AGREEMENT)
SUBSECTION 3.2.10 INSURANCE, ET SEQ**
Tentative RFP Schedule (Subject to change at City’s discretion)
1. Issue RFP ............................................................................................. Monday, August 3, 2026
2. Pre-Proposal Meeting.................................................... 10:00 AM, Thursday, August 13, 2026
3. Written Questions from Consultant Due.......................... 5:00 PM, Thursday, August 20, 2026
4. Responses from City Due ................................................................ Thursday, August 27, 2026
5. Proposals Due ........................................................... 2:00 PM, Thursday, September 17, 2026
6. Proposal Evaluation Completed ........................................................Thursday, October 1, 2026
7. Tentative Consultant Interviews .......................................................Thursday, October 8, 2026
8. Contract Negotiations .....................................................................Thursday, October 15, 2026
9. Consultant Selection ........................................................................ Monday, October 19, 2026
10. Council Approval ...................................................................... Wednesday, November 4, 2026
11. Notice to Proceed ........................................................................... Monday, November 9, 2026
RFP No. 27-001SB Section I. “Invitation”
Table of Contents
SECTION I ........................................................................................................................ Invitation SECTION II ............................................................................................................RFP Instructions SECTION III ..................................................................................................Evaluation and Award SECTION IV ...................................................................... Project Description and Scope of Work SECTION V ......................................................................................... Proposal Content and Forms SECTION VI ................................................................................................ RFP Acknowledgment SECTION VII .................................................................................................... Form of Agreement
RFP No. 27-001SB Section II. “RFP Instructions”
SECTION II.
RFP INSTRUCTIONS
A. Pre-proposal Meeting
A non-mandatory pre‑proposal meeting will be held at 10:00 AM on Thursday, August 13, 2026, via Microsoft Teams. All consultants must RSVP no later than 4:00 PM on Wednesday, August 12, by emailing Scott Briggs at Scott.Briggs@CoronaCA.gov and providing the name, email address, and phone number of the personnel who will attend the meeting. A meeting link will be emailed upon confirmation of registration.
Attendance at the pre‑proposal meeting is not mandatory but is recommended to use this meeting to become familiar with the project requirements.
B. Proposal Format
The proposal should consist of the following sections, at minimum. Supplemental information beneficial to the proposal is acceptable as attachments or Appendices if directly applicable. Consultants are encouraged to be concise with the company background and experience sections and focus on experience delivering schedule-driven engineering design services.
1. Qualifications, Related Experience and References
2. Proposed Staffing and Project Organization
3. Work Plan and Approach
4. Key Constraints
5. Schedule
6. Labor Hour Estimate and Fee Proposal, submit as a separate file. Do not include in the same file with Consultant’s technical proposal. (Break down job classification and type of costs by amount and/or rates)
C. Examination of Proposal Documents
By submitting a proposal, consultants represent they have thoroughly examined and become familiar with the work required under this RFP, have reviewed the project location, understand the project objectives and are capable of performing quality work to achieve the City’s objectives.
D. Addenda
Substantive City changes to the requirements will be made by written addendum. Any written addenda issued pertaining to this RFP shall be incorporated into the terms and conditions of any resulting Purchase Order and/or Agreement. Copies of all Addenda will be furnished through the City’s electronic bidding system, PlanetBids, no later than 72 hours prior to the proposal Due Date and Time. Consultants shall access any and all Addenda from the electronic bidding system’s Addenda & Email tab for this RFP. The City shall not be bound to any modifications to or deviations from the requirements set forth in this RFP as the result of oral instruction.
All registered vendors with a PlanetBids status of either bidder or non-bidder that have downloaded a copy of this RFP and supporting documents will be notified by a system generated email from PlanetBids when an Addendum has been issued. It is the sole responsibility of consultants to ensure they have received all addenda prior to submitting a proposal. To this end, consultants should contact the City’s Purchasing Division prior to the proposal due date to verify receipt of all Addenda issued. Consultants shall acknowledge receipt of all Addenda when submitting their electronic proposals.
E. Clarifications
1. Examination of Documents
Should a consultant require clarifications to this RFP, the Consultant shall notify the City in writing in accordance with Section E.2 below. Should it be found that the point in question is not clearly and fully set forth in the RFP, the City shall issue a written addendum clarifying the matter.
2. Submitting Requests
Consultants shall submit all questions, clarifications or comments through the City’s PlanetBids electronic bidding system:
https://www.planetbids.com/portal/portal.cfm?CompanyID=39497 utilizing the Questions & Answers tab. All Consultant questions must be submitted no later than 5:00 PM, Thursday, August 20, 2026. Please note the City’s electronic bidding system will not allow inquiries to be submitted after this date and time.
3. City Responses
a. Responses from the City will be communicated in writing by way of addendum in accordance with Section D above. The City shall not be bound to any modifications to or deviations from the requirements set forth in this RFP as the result of any oral instruction.
b. The Tentative Schedule may change at any time. Any and all changes to the Tentative Schedule will be made by way of addendum. If an Addendum is issued less than 72 hours before the proposal due date and time, the proposal due date will be extended.
F. Submission of Proposals
1. Date and Time
All proposals shall be submitted no later than 2:00 PM, Thursday, September 17, 2026.
https://www.planetbids.com/portal/portal.cfm?CompanyID=39497
2. Electronic Submission
Proposals shall be submitted electronically using the City’s PlanetBids Vendor Portal.
The City’s electronic bidding system will not allow proposals to be submitted after the due date and time. It is the consultant’s responsibility to allow sufficient time to complete and submit their proposal, including all documentation required by this RFP, prior to the stated deadline. Electronic submission cannot be completed unless the consultant properly uploads all required documents. Only electronic proposals will be accepted; hard copy proposals will be rejected as nonresponsive and returned unopened without exception.
3. Acceptance of Proposals
a. The City reserves the right to accept or reject any and all proposals, or any item or part thereof, or to waive any informalities or irregularities in a proposal.
b. The City reserves the right to withdraw this RFP at any time without prior notice, and the City makes no representations that any contract will be awarded to any consultant responding to this RFP.
c. The City reserves the right to postpone proposal opening for its own convenience.
G. Proposal Withdrawal
Electronic proposals may be withdrawn by consultant prior to the date and time set forth in Section F.1 above. After that time, consultants may not withdraw their proposals for a period of ninety (90) days from the Proposal Submittal Deadline. At no time may the successful consultant(s) withdraw their proposal(s).
H. Pre-Contractual Expenses
Pre-contractual expenses are defined as expenses incurred by the consultant in:
1. Preparing its proposal in response to this RFP;
2. Submitting the proposal to City;
3. Negotiating with City on any matter related to the proposal; or
4. Any other expenses incurred by the consultant prior to date of award, if any.
The City shall not, in any event, be liable for any pre-contractual expenses incurred by consultant in the preparation of its proposal. Consultant shall not include any such expenses as part of its proposal.
I. Contract Award
Issuance of this RFP and receipt of proposals does not commit the City to award a contract.
The City reserves the right to postpone proposal opening for its own convenience, to accept or reject any or all proposals received in response to this RFP, to request additional information from consultants as appropriate, to negotiate with other than the highest-ranked consultant(s) should negotiations with the highest-ranked consultant(s) be terminated, or to cancel all or part of this RFP.
J. Contract Term
NOT APPLICABLE.
K. Acceptance of Order
The successful consultant(s) will be required to accept a Purchase Order and execute a written Agreement (see Section VII, Form of Agreement) in accordance with and including as a part thereof the published notice of Request for Proposals and this Request for Proposals, including all requirements, conditions and specifications contained herein, with no exceptions other than those specifically listed in the written purchase order and/or Agreement.
L. Company Performance
It is the intent of the City to create a long-term working partnership with the selected firm.
The City’s Representative will complete a Vendor Performance Evaluation Form on a periodic basis. An example of this type of form can be reviewed in Section V and will be the basis for periodic assessments by the City to establish contract performance metrics.
M. City of Corona Business License
The successful consultant(s) and any sub-consultants are required to obtain a City of Corona Business License prior to contract award and to maintain the license for the entire term of the Agreement. The Business License is not a prerequisite for submission of a proposal. Inquiries regarding the City Business License may be answered by calling 951- 736-2275 or by visiting the City’s website:
https://www.coronaca.gov/government/departments-divisions/finance/business-license-info.
N. Prevailing Wage
Refer to Section VII. Form of Agreement, Section 3.3.5 for Prevailing Wage requirements.
O. Insurance Requirements
Within ten (10) consecutive calendar days after the notice of award, the Consultant to whom a contract is awarded from this request for proposals shall furnish the City, through its third-party insurance partner, Exigis, certificates of insurance and endorsements evidencing coverage as specified in Section VII. Form of Agreement, Section 3.2.10 Insurance, et seq. and naming the City of Corona, its directors, officials, officers, employees, volunteers and agents as additional insureds by written endorsement. Failure to do so may, in the sole discretion of the City, result in the forfeiture of the Contract Award.
https://www.coronaca.gov/government/departments-divisions/finance/business-license-info https://www.coronaca.gov/government/departments-divisions/finance/business-license-info
Consultants are encouraged to have their insurance provider(s) review the insurance requirements, pursuant to the Form of Agreement, to ensure the specified minimum coverage limits, endorsements and other requirements can be met.
Consultants must review, complete and sign the Acknowledgment of Insurance Requirements Check Sheet included in Section V and return with their proposal. Any exceptions or deviations to the City’s insurance requirements must be submitted to the City during the Questions and Answer period. Consultants are cautioned that exceptions or deviations from the RFP insurance requirements may cause their proposal to be rejected as non-responsive.
P. Safety Requirements/Violations
Safety at the Project sites during performance of the work is of paramount concern to the City. Accordingly, consultants must not have committed any serious violations within the last two (2) years or any willful violations within the last five (5) years of federal or state OSHA regulations. Consultants must identify the number of OSHA violations on the CONSULTANT’S SAFETY RECORD form. Any serious or willful violation may render a proposal as non-responsive. We strongly encourage full disclosure since failure to identify all violations on the CONSULTANT’S SAFETY RECORD form may result in rejection of the proposal as non-responsive or the Consultant as non-responsible following a hearing. A citation properly appealed through OSHA is not considered to be a violation until the matter is closed and considered final by OSHA. The City still expects this information to be disclosed by the consultant, with an explanation and documentation showing that the matter is properly under appeal with OSHA and not considered closed or final. Failure to be forthcoming with this information may result in rejection of the proposal as non-responsive.
Q. Payment (Labor and Materials Bond Requirements)
Within ten (10) consecutive calendar days after the notice of award, the consultant to whom a contract is awarded shall deliver to the City a Payment (Labor and Materials) Bond in the form supplied by the City and included in the RFP documents. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business in the State of California and satisfactory to the City.
The Payment (Labor and Materials) Bond shall be for one hundred percent (100%) of the Total Proposal Price. The City does not require original, embossed corporate seals on any bonds. However, the City reserves the right at any time to demand an original bond with an embossed corporate seal, and consultant shall supply such bond within seven (7) calendar days of any such request.
R. Negative History
Consultant must include in its Proposal a complete disclosure of any alleged significant prior or on-going contract failures, any civil or criminal litigation or investigation pending which involves the firm or in which the firm has been judged guilty or liable within the last five (5) years.
If there is no negative history to disclose, the firm must affirmatively state in its Proposal, there is no negative history to report.
Failure to comply with the terms of this provision may disqualify any proposal. The City reserves the right to reject any proposal based upon the firm's prior documented history with the City or with any other party, which documents, without limitation, unsatisfactory performance, adversarial or contentious demeanor, significant failures to meet contract milestones or other contractual failures.
S. Conflict of Interest Statement
The nature of the proposed services for this RFP may lead to a conflict of interest for firms that are currently under contract with the City or those that may seek contract opportunities in the future. The City considers the following situations as potential conflicts of interest that will not be allowed:
The prime consultant or principal partners in a joint venture arrangement for this RFP will be prohibited from competing for future design (defined by the City as Project Approval and Environmental Document (PA&ED) or Plans, Specifications and Estimate (PS&E)) or construction management contracts related to this project.
A sub-consultant that provides more than one-third of the total scope of services (as measured by overall budget) or more than one-third of the full-time equivalent (FTE) for project manager and key positions will be prohibited from competing for future design (PA&ED or PS&E) or construction management contracts.
The prime consultant or principles in a joint venture, or a sub-consultant that provides more than one-third of the total scope of services or more than one-third of the FTEs for project manager or key positions, will be prohibited from competing for future (PA&ED or PS&E) or construction management contracts as a major sub-consultant. City staff will determine the definition of major sub-consultant for future contracts on a case-by-case basis.
The City recognizes that consulting firms that currently hold design contracts may wish to compete as a prime consultant or major sub-consultant for this contract. The City will allow such firms to compete for this contract, however, if successful, those firms will be prohibited from competing for future design or construction management services contracts for this project. Additionally, for firms with existing design contracts, the named principle-in-charge and project manager for those contracts are prohibited from filling key positions in the project management contract.
Consultants shall disclose any financial, business or other relationship with the City that may have an impact upon the outcome of the contract or the construction projects. The Consultant shall also list current clients who may have a financial interest in the outcome of this contract or the construction project that will follow. Consultants shall disclose any financial interest or relationship with any construction company that might submit a bid on any of the listed transportation projects.
T. Public Records
Responses (proposals) to this Request for Proposal (RFP) and the documents constituting any contract entered into thereafter become the exclusive property of the City and shall be subject to the California Public Records Act (Government Code Section 6250 et seq.). The City’s use and disclosure of its records are governed by this Act.
Those elements in each proposal which proposer considers to be trade secrets, as that term is defined in Civil Code Section 3426.1(d), or otherwise exempt by law from disclosure, should be prominently marked as “TRADE SECRET”, “CONFIDENTIAL”, or “PROPRIETARY” by proposer. The City will use its best efforts to inform proposer of any request for disclosure of any such document. The City shall not in any way be liable or responsible for the disclosure of any such records including, without limitation; those so marked if disclosure is deemed to be required by law or by an order of the Court.
In the event of litigation concerning disclosure of information the proposer considers exempt from disclosure, the City will act as a stakeholder only, holding the information until otherwise ordered by a court or other legal process. If the City is required to defend an action arising out of a Public Records Act request for any of the contents of a proposer’s proposal marked “Confidential”, “Proprietary”, or “Trade Secret”, proposer shall defend and indemnify the City from all liability, damages, costs, and expense, including attorneys’ fees, in any action or proceeding arising under the Public Records Act.
To insure confidentiality, proposers are instructed to upload separate files for all “Confidential,” “Proprietary,” or “Trade Secret” data when submitting their proposal documents. The file names shall include the words “Confidential”, “Proprietary” or “Trade Secret". Because the proposal documents are available for review by any person after award of a contract resulting from an RFP, the City shall not in any way be held responsible for disclosure of any “Confidential,” Proprietary,” or “Trade Secret” documents that are not uploaded as separate files and include “Confidential”, “Proprietary” or “Trade Secret" as part of the file name.
U. Special Provisions for Services
1. Accessibility. Consultant shall fully inform himself regarding any peculiarities and limitations of the spaces available for the performance of work under this contract.
Consultant shall exercise due and particular caution to determine that all parts of his work are made quickly and easily accessible.
2. Authority of the City of Corona. Subject to the power and authority of the City as provided by law in this contract, the City shall in all cases determine the quantity, quality, and acceptability of the work, materials and supplies for which payment is to be made under this contract. The City shall decide questions that may arise relative to the fulfillment of the contract or the obligations of the consultant hereunder.
3. Changes in Work. The City may, at any time work is in progress, by written order and without notice to the sureties, make alterations in the terms of work as shown in the specifications, require the performance of extra work, decrease the quantity of work, or make such other changes as the City may find necessary or desirable. The consultant shall not claim forfeiture of contract by reasons of such changes by the City. Changes in work and the amount of compensation to be paid to the consultant for any extra work as so ordered shall be determined in accordance with the unit prices quoted.
4. Contract Incorporation. This contract embodies the entire contract between the City and the Consultant. The parties shall not be bound by or be liable for any statement, representation, promise, inducement or understanding of any kind or nature not set forth herein. No changes, amendments, or modifications of any of the terms or conditions of the contract shall be valid unless reduced to writing and signed by both parties. The complete contract shall include the entire contents of the RFP solicitation, all addenda, all of Consultant’s successful submittal, supplemental agreements, change orders, performance bond(s), and any and all written agreements which alter, amend or extend the contract.
5. Rejection of Work. Consultant agrees that the City has the right to make all final determinations as to whether the work has been satisfactorily completed.
V. Labor Compliance:
1. Certified Payroll Records:
In accordance with California Prevailing Wage Laws, Consultant shall keep accurate payroll records. The payroll records shall show the name, address, social security number, work classification, straight time and overtime hours worked, and actual wages paid to each applicable worker employed by consultant in connection with the work. The payroll records shall be certified and made available for inspection at all reasonable hours in accordance with the California Prevailing Wage Laws.
The certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement (DLSE) of the DIR or shall contain the same information as the forms provided by the DSLE. The record of wages paid shall be certified by the Consultant and submitted with each progress payment request. Consultant shall redact the street address and all but the last four digits in the employee’s social security number prior to submitting the certified payroll records to the City.
2. Apprentices:
Consultant shall comply with the provisions of Section 1777.5 of the California Labor Code with respect to the employment of properly registered apprentices upon public works when Consultant employs workmen in an apprenticeable craft or trade. The primary responsibility for compliance with said section for all apprenticeable occupations shall be with Consultant.
Within 10 days of award or no later than receipt of the Notice to Proceed, Consultant shall submit a copy of the completed Division of Apprenticeship Standards Public Works Contract Award – DAS 140 form to the City. Consultant shall submit copies of completed Division of Apprenticeship Standards Requests for Dispatch of an Apprentice – DAS 142 forms with the progress payment request immediately following submission to the appropriate Apprenticeship Committee in the craft or trade of the public work.
RFP No. 27-001SB Section III. “Evaluation & Award”
SECTION III.
EVALUATION AND AWARD
The City is soliciting firms and/or individuals who have established knowledge, experience with waterline rehabilitation projects, and expertise in all aspects of the services requested in this RFP.
Following is what the City considers important in evaluating the proposals and the assembled teams for a successful project. Minimum requirements are as follows:
A. EVALUATION CRITERIA
Each consultant proposal will be reviewed by the Selection Committee and graded individually by each City employee participant, with a final grade being assigned collectively by the Selection Committee. The following weighting and points will be assigned to the Proposal for evaluation purposes:
TABLE 1
Criteria Max Points Rating
Completeness of Response 0 Pass or Fail
Firm Qualifications and Relevant Experience 25
Technical Approach and Methodology 30
Financial Proposal and Value 25
Project Schedule and Phasing Strategy 10
References and Past Performance 10
Total 100
1. Completeness of Response (Pass/Fail) - 0
a) Responses to this RFP must be complete. Reponses that do not include the proposal content requirements identified within this RFP and subsequent addenda and do not address each of the items listed below will be considered incomplete, be rated a Fail in the Evaluation Criteria and will receive no further consideration.
2. Firm Qualifications and Relevant Experience – 25 points
a) Strength, stability, and financial responsibility of the firm;
b) Technical competence, experience, and reputation of firm’s consultants in providing similar services, both in terms of magnitude of work and cost of construction;
c) Demonstrated knowledge of the scope of work required, capability of performing specific tasks outlined in the RFP;
d) Adequacy of staff to provide required services.
e) Reputation of firm in providing similar services; and
f) Demonstrated experience with municipal solar projects, energy storage systems, EV charging infrastructure, and power purchase agreement (PPA) or direct ownership financing models.
3. Technical Approach and Methodology – 30 points
a) Depth and thoroughness of Consultant's understanding of the Project and the City's requirements;
b) Identification and understanding of Project issues and challenges;
c) Quality and logic of work plan;
d) Logic of Project organization and appropriateness of resource estimate and labor distribution among the tasks;
e) Adequacy of system or process for managing cost and budget;
f) Adequacy of system or process for managing project schedule;
g) Adequacy of system or process for communicating with the City;
h) Proposed approach to solar feasibility assessment, system design, energy storage integration, and EV charging infrastructure; and
i) Approach to placemaking and design integration consistent with The HUB's mixed-use revitalization vision.
4. Financial Proposal and Value – 25 points
a) Appropriate number of hours budgeted for Project tasks;
b) Reasonableness of the Consultant's hourly rates, labor hours, and fee required to perform the work in relation to the scope of work and other proposals received;
c) The total fee will be judged for value and used as the basis of comparison between the proposals submitted;
d) Quality and comprehensiveness of PPA option pricing and terms;
e) Quality and comprehensiveness of direct ownership/financing option with cost projections; and
f) Lifecycle cost analysis methodology.
5. Project Schedule and Phasing Strategy – 10 points
a) Reasonableness and achievability of the proposed project schedule;
b) Logical sequencing and phasing of project tasks;
c) Identification of critical milestones and dependencies; and
d) Demonstrated ability to meet or exceed the City's desired timeline.
6. References and Past Performance – 10 points
a) Quality and relevance of references provided;
b) Demonstrated track record of successful completion of similar projects;
c) Client satisfaction and feedback from references; and
d) Evidence of ability to deliver projects on time and within budget.
B. EVALUATION PROCEDURE
An Evaluation Committee comprised of City staff, and may include personnel from stakeholder agencies, will be appointed to review all proposals in accordance with the above criteria
During the evaluation period, the City may do any or all of the following:
A. Generate a “short list” and conduct interviews with the top candidates;
B. Conduct on-site visits and/or tours of the candidates’ places of business; and C. Conduct negotiations with the most qualified candidate(s).
Consultants should be aware, however, that award may be made without consultant visits, project visits, interviews, or further discussions or negotiations.
Interviews – The City may interview the highest scoring proposals based on the evaluation criteria from Table 1.
Interview Evaluation Criteria:
The Interview will provide a maximum total of one hundred (100) points in addition to the maximum 100 points identified in Table 1. The available scoring for the Interview is as follows:
Category Points
Presentation 15 Technical Content 25 Project Manager and Key Team Members 20 Communication Skills 10 Project Understanding 20 Flexibility to Accommodate City Needs 10
Total Maximum Points 100
C. AWARD
Consultants are to submit a separate fee proposal with their technical proposal. Upon review and scoring of all proposals, the City will begin negotiations with the highest ranked Consultant. Should the City be unable to negotiate a satisfactory contract with the highest ranked Consultant, the City retains the right to terminate negotiations and open negotiations with the next highest ranked Consultant.
In addition, negotiations may or may not be conducted with consultants; therefore, the proposal submitted should contain your most favorable terms and conditions, since the selection and award may be made without discussion with any consultant.
City staff will submit a recommendation to City Council for consideration and approval of the proposal(s) evaluated by staff to be the most qualified for this project. The City anticipates making final selections and awards on or about Monday, October 19, 2026.
D. NOTIFICATION OF RANKINGS
Consultants that submit proposals may be notified in writing of the proposals rankings using the City’s on-line bidding platform after approval of the City’s authorized contracting party.
Consultants who were not selected as part of the top ranked list may obtain an explanation concerning the strengths and weaknesses of their Proposal after the contract has been awarded or the City rejects all proposals. Unsuccessful consultants who wish to be debriefed, must request the debriefing in writing and the City must receive it within three
(3) days of notification of list approval.
E. IMPLEMENTATION
A kick-off meeting will be held after contract award. Consultant’s Principal in Charge, Project Manager, and key team members will meet with City staff and the Design Engineer’s Project staff to conduct introductions, discuss the scope of services, meetings, project needs and implementation process.
Following the kick-off meeting, a formal Notice-to-Proceed (NTP) may be issued after the agreement is fully executed and all insurance documents and contents of all required documents have been received and approved by the City.
RFP No. 27-001SB Section IV. “Project Description and Scope of Work”
SECTION IV.
PROJECT DESCRIPTION AND SCOPE OF SERVICES
A. City of Corona Overview The City of Corona is a growing and economically vibrant community in Riverside County, focused on strategic investment in public assets and downtown revitalization.
A key component of this effort is The HUB (formerly South Mall)—a City-owned collection of commercial properties and public spaces intended to function as a centralized destination for dining, entertainment, and community activation.
B. Project Background The City of Corona acquired The HUB on December 24, 2024, and is actively repositioning the site as a dynamic mixed-use destination.
The HUB is not a single parcel, but a collection of properties and addresses, including but not limited to:
- 725 S. Main Street
The site includes multiple buildings, surface parking lots, outdoor patio areas, and pedestrian zones.
The City of Corona reserves the right to reject any or all proposals, negotiate scope and pricing, and expand services to additional City-owned sites.
The City is not responsible for costs incurred prior to contract execution.
C. Services Requested:
The City of Corona is seeking qualified firms to provide comprehensive feasibility, design, engineering, installation, and maintenance services for solar and energy infrastructure across The
HUB.
Phase 1 – Feasibility Assessment and Conceptual Design
1. Conduct a comprehensive site assessment including solar resource analysis, structural evaluation of existing and planned structures, electrical infrastructure assessment, and utility interconnection analysis.
2. Prepare a feasibility study evaluating solar carport structures, patio cover solar installations, rooftop solar systems, battery energy storage systems (BESS), microgrid readiness, and EV charging station integration.
3. Develop conceptual design alternatives that integrate solar and energy infrastructure with The HUB's placemaking and architectural vision.
4. Prepare financial modeling including PPA option analysis, direct ownership/financing models, lifecycle cost analysis, available incentives and rebates, and projected energy savings and return on investment.
5. Present findings and recommendations to City staff and stakeholders.
Phase 2 – Design and Engineering
1. Prepare detailed design and engineering documents including civil, structural, electrical, and mechanical plans for the selected solar and energy infrastructure systems.
2. Develop construction drawings and technical specifications suitable for permitting and construction.
3. Coordinate with utility providers for interconnection requirements and agreements.
4. Obtain all necessary permits and approvals from applicable agencies.
5. Prepare a detailed construction cost estimate and project schedule.
Phase 3 – Installation and Construction
1. Procure all materials, equipment, and systems required for installation.
2. Perform installation of solar photovoltaic systems, battery energy storage systems, EV charging stations, and all associated electrical infrastructure.
3. Coordinate construction activities with ongoing HUB development and operations to minimize disruption.
4. Ensure compliance with all applicable building codes, electrical codes, fire codes, and utility requirements.
5. Comply with all prevailing wage, DIR registration, apprenticeship, and bonding requirements.
6. Commission all installed systems and perform acceptance testing.
7. Provide as-built documentation.
Phase 4 – Operations, Maintenance, and Monitoring
1. Develop and implement a comprehensive operations and maintenance (O&M) plan for all installed systems.
2. Provide system monitoring, performance reporting, and warranty management services.
3. Perform routine and preventative maintenance activities.
4. Respond to system faults, alarms, and service requests within agreed-upon response times.
5. Provide annual performance reports to the City.
Phase 5 – Financial Advisory and Ongoing Support
1. Provide ongoing financial advisory services related to PPA management, energy credit tracking, incentive compliance, and utility rate analysis.
2. Advise the City on emerging technologies, system expansion opportunities, and regulatory changes affecting the solar and energy infrastructure.
3. Support the City with grant applications and other funding opportunities related to energy infrastructure.
Project Location Map
Attachments - Meter Readings
Interval Data Meter Readings Doc Address
56278 725 S Main Street 56277 675 S Main Street 56276 650 S Main Street 56275 601 S Main Street 56271 106 E Sixth Street 56273 122 E Sixth Street
RFP No. 27-001SB Section V. “Proposal Content and Forms”
SECTION V
PROPOSAL CONTENT AND FORMS
A. PRESENTATION
Proposals shall be specific to this project. Lengthy narrative is discouraged and presentation should be brief and concise.
1. Cover Letter
Proposals shall contain the following in a cover letter:
a. Identification of consultant, including name, address. telephone number and
DIR Registration Number, if applicable;
b) Proposed working relationship between consultant and subconsultants, if applicable;
c) Acknowledgment of receipt of all RFP addenda, if any;
d) Name, title, address, telephone number and email address of consultant’s contact person during the proposal evaluation period;
e) A statement that the cost of printing, mileage, telephone, mailing and other expenses incidental to the performance of the main items of the engineering design services to be rendered are included in the hourly rates schedule of said fee proposal and that there will be no additional charges.
f) A statement to the effect that the proposal shall remain valid for a period of not less than 90 days from the date of submittal;
g. Signature of a person authorized to bind consultant to the terms of the proposal;
and
h. Identification of proposed sub-consultants, including legal company name, and contact person’s name, address, phone number. Working relationship between Consultant and subcontractors, if applicable.
i. Complete disclosure of any alleged significant prior or ongoing contract failures, any civil or criminal litigation or investigation pending which involves the Consultant or in which the Consultant has been judged guilty or liable
Following the cover letter, proposals should address the following items in turn:
2. Qualifications, Related Experience and References
This section of the proposal should establish Consultant’s ability to satisfactorily perform the required work by reasons of: experience in performing work of a similar nature; demonstrated competence in the services to be provided; professional and educational qualifications, strength and stability of the firm, staffing capability, work load, record of meeting schedules on similar projects; and supportive client references.
Consultant shall:
a. Provide a brief profile of the firm, including the types of services offered, year founded, form of organization (corporation, partnership, sole proprietorship) number, size and location of offices and number of employees;
b. Provide a general description of the firm’s financial condition; identify any conditions (e.g., bankruptcy, pending litigation, planned office closures, impending merger) that may impede consultant’s ability to complete the project;
c. Describe samples of work and the firm’s experience in performing work of a similar nature to that described in this RFP, and highlight the participation in such work by the key personnel proposed for assignment to this project;
d. Identify sub-consultants by company name, address, contact person, telephone number, project function, ***DIR registration number*** and describe consultant’s experience working with each sub-consultant; and
e. Provide a minimum of 3 references from the projects cited as related experience. References shall include the name, title, address, telephone number, and email address of the person(s) at the client organization most knowledgeable about the work performed. Consultant may also supply references from other work not cited in this section as related experience.
3. Proposed Staffing and Project Organization
This section of the proposal should establish the qualifications and involvement of the proposed project staff. Consultant shall:
a. Describe your firm’s organization chart, identify who will have overall responsibility for the work, and include the lines of authority between team members up to the senior level. Provide education, experience and applicable professional credentials of proposed project staff.
b. Furnish brief resumes, not more than two pages, and at least three references, for key personnel.
c. Identify key personnel proposed to perform the work in the specified tasks and include major areas of sub-consultant work.
d. Include a project organization chart which clearly delineates communication/reporting relationships among the project staff.
e. Provide education, experience, and applicable professional credentials of proposed subcontractors.
f. Include a statement that key personnel will be available to the extent proposed for the duration of the project acknowledging that no person designated as “key” to the project shall be removed or replaced without the prior written concurrence of the City.
4. Work Plan
Consultant shall provide a narrative which addresses the Scope of Services and shows consultant’s understanding of the City’s needs and requirements. Consultant shall:
a. Describe the approach to completing the tasks specified in the Scope of Services.
b. Outline sequentially the activities that would be undertaken in completing the tasks and specify who would perform them.
c. Furnish a schedule for completing the tasks in terms of elapsed weeks from the commencement date.
d. Provide a resource estimate of labor resources, utilizing a table projecting the labor-hour allocation to the project by individual task.
e. Identify methods that consultant will use to ensure quality control as well as budget and schedule control for the project.
f. Describe fully any deliverables that will be due un the contract, based on the Scope of Work.
Consultant may also propose enhancement or procedural or technical innovations to the Scope of Services which do not materially deviate from the objectives or required content of the project.
5. Safety:
a. Completed Consultant’s Safety Record Form (attached)
b. Describe the safety measures you plan to put in place to assure the City that all applicable OSHA regulations will be adhered to with the inclusion of an Injury and Illness Prevention Program.
6. Exceptions/Deviations
State any exceptions to or deviations from the requirements of this RFP on the RFP Acknowledgement Form where indicated. Where Consultant wishes to propose alternative approaches to meeting the City’s technical requirements, these should be thoroughly explained. Consultants are cautioned that exceptions or deviations from RFP requirements may cause their proposal to be rejected as non-responsive.
7. Time Extensions
There will be no time extensions for routine delays in Project development design, plan check, or permit processing. These must be anticipated in your fee. Time extensions will only be authorized in writing as a change order to the contract when due to major changes in Scope of Services, unavailability of essential information or delays by others.
8. Alternative Work Schedule
The Consultant should discuss the Project schedule and the ability to meet or exceed the milestones given. In the event it is determined that there are major deficiencies in the work schedule or that the work can be accomplished in less time, an alternative work schedule may be submitted along with an appropriate explanation in the Schedule Section of the proposal. City is under no obligation to consider such an alternative schedule.
9. Labor Hour Estimate and Fee Proposal
Consultants are to submit a fee proposal with their technical proposal. The fee proposal must be submitted as a separate file and uploaded into PlanetBids as the Cost File. The fee proposal must not be included within the Technical Proposal file. After ranking of the consultants by qualifications, the City will review the cost proposals and begin negotiations with the highest ranked consultant. If agreement cannot be reached, then negotiations proceed to the next most qualified consultant. The goal of negotiations is to agree on a final contract that delivers the services, or products required at a fair and reasonable cost to the City. Consultant shall provide the following in their fee proposal:
a. An hourly rate schedule (labeled as Exhibit “C” Compensation) and an hourly…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .