TE-B - Bldg Dimensions - Lightning Protection.pdf
PDF 1 MB Posted
- Attached to
- Lightning Protection System Maintenance
- Solicitation number
- W91QF4-21-Q-0010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TE A - Facilities List - Lightning Protection.pdf | ||
| 20201218_RFQ_W91QF4-21-Q-0010_Lightning_Protection.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lightning Protection Inspection and Testing
Facility List and Measurements Measurements do not account for roof slopes
• 52 – CAC Headquarters
• 102 -
• 132 – Hangar & Control Tower
• 286 -
• 314 -
• 336 -
• 399 -
• 466 -
• 467 -
• 472 -
• 474 -
• 1148, 1149, 1150 & 1151 – Bn HQ’s and COF’s
• 1155, 1156 & 1157 – Bde HQ and Tactical Vehicle Maintenance (TEMF)
Smokestack Bell Tower
20 70
Bldg 52 – 31,556 sf w/bell tower
Bldg 102 – 9,560 sf
Bldg 132 Hangar with Control Tower – 38,976 sf
Control tower
Bldg 286 - 9,561 sf
Bldg 314 – 16,084 sf
Bldg 336 – 100 sf smokestack only
Smoke stack
Bldg 399 – 300 sf smokestack only
Bldg 466 – 8,929 sf
Bldg 467 – 8,830 sf
Bldg 472 – 6,966 sf
Bldg 474 – 225 sf smokestack only
Bldg 1148 – 9,991 sf Bldg 1149 – 48,176 sf
Bldg 1150 – 48,176 sf Bldg 1151 – 9,991 sf
Bldg 1155 – 10,864 sf Bldg 1156 – 18,752 sf Bldg 1157 – 18,752 sf
1156 & 1157 are tactical vehicle motor pool maintenance facilities and are secured
| Lightning Protection Inspection and Testing |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |