TE 06 - Deliverables List.pdf

PDF 153 KB Posted

Attached to
HVAC System Cleaning Federal contract opportunity
Solicitation number
PANMCC23P0000003466
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This document outlines deliverables and reporting requirements for an HVAC system cleaning contract. The contractor must provide regular status reports, training certificates for employees, safety plans, inspection reports, and other documentation according to the specified schedule and distribution requirements. Key deliverables include a dust suppression plan within 30 days of award, accident reports and damage reports provided verbally and in writing, and quality control documentation submitted throughout the contract period and upon completion. The contract will be awarded by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood for HVAC system cleaning services.

View the file

Other files for this federal contract opportunity

Other files attached to HVAC System Cleaning, newest first.
File Type Posted
4-HVAC Cleaning PWS.docx DOCX document
Attachment 03.pdf PDF
4-HVAC Cleaning PWS.docx DOCX document
TE 03 - Contractor Badge Request Form.pdf PDF
TE 02 - Barrack Facilities List.pdf PDF
Attachment 02.pdf PDF
Attachment 04.pdf PDF
Attachment 01.pdf PDF
TE 05 - Installation Environmental Compliance.pdf PDF
TE 04 - Fort Bliss Hazardous Waste Management Plan.pdf PDF
TE 01 - Installation Mapping.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HVAC System Cleaning Contract TE 06 – Deliverables List

Deliverable Frequency # of Copies Medium/Format Distribution

A001 (Overarching PWS, para 1.8) Dust Suppression Plan

Within thirty (5) business days after contract award.

One (1) Electronic Copy

MS Word or .PDF

KO or designated Government representative/COR

A002 (Overarching PWS, para 2.3.2) Accident Report

Initial: Verbal report within one (1) hour of each such occurrence Updates: Written report within five (5) business days of occurrence

Typed original plus one (1) copy of DA Form

DA Form 285 Technical Report of U.S. Army Ground Accident (or equivalent reporting form)

KO or designated Government representative/COR

A003 (Overarching PWS, para 2.4.1) Post Award Conference/Perfor mance Evaluation Meeting Minutes

Within two (2) business days after the meeting

One (1) representative/COR

A004 (Overarching PWS, para 2.4.3) Key Personnel - Resumes and organization chart.

Initial: within five (5) business days of contract award.

Updates: All changes/updates shall be accepted by the KO

One (1) Electronic representative/COR

A005 (Overarching PWS, para 2.4.5) Corrective Action Plan

Within two (2) business days or at a mutually agreed upon date.

One (1) Electronic representative/COR

A006 (Overarching PWS, para. 2.5.2) Work Status Weekly Report

Weekly, every Friday by 1500.

One (1) Electronic Copy

MS Word, .PDF or Excel Spreadsheet representative/COR

A007 (Overarching PWS, Para 2.5.3) Damage Report

Initial: Verbal report immediately of each such occurrence Updates: Written report within twenty-four (24)

One (1) Electronic representative/COR hours of occurrence.

A008 (Overarching PWS, para 2.14.4) Contractor Owned Vehicles and Trailers List

Upon request from KO or COR , within two (2) business days or at a mutually agreed upon date.

One (1) Electronic representative/COR

A009 (Overarching PWS, para 2.15.1) AT Level 1 Training and Certificates

Training: Must be completed within five (5) business days after contract start date or employee start date. Annually thereafter.

Certificate: Within one (1) business day of completion.

One (1) representative/COR

A010 (Overarching PWS, Para. 2.15.2) iWATCH Training and Certificates

Training: Must be completed within five (5) business days after contract start date or employee start date. Annually thereafter.

Certificate: Within one (1) business day of completion.

One (1) Electronic representative/COR

A011 (Overarching PWS, para 2.15.3) OPSEC Training and Certificates

Training: Must be completed within five (5) business days after contract start date or employee start date. Annually thereafter.

Certificate: Within one (1) business day of completion.

One (1) Electronic

A012 (Overarching PWS, Para. 2.16.1) Safety Plan

Within fifteen (15) calendar days of after contract award.

Any revisions within five (5) business days prior to effective date.

One (1) Electronic representative/COR

A013 (Overarching PWS, Para. 2.16.3) Fire and Safety Hazards Reporting.

Immediately upon discovery.

One (1) Electronic Copy

Coordinate with COR KO or designated Government representative/COR

A014 (Overarching PWS, Para. 2.17.1) State Licenses and Certifications

NLT five (5) days after contract award.

One (1) Electronic Copy

.PDF KO or designated Government representative/COR

A015 (Overarching PWS, para. 2.18.3) HAZCOM Training and Certificates

Training: Must be completed within five (5) business days after contract start date or employee start date. Annually thereafter.

Certificate: Within one (1) business day of completion.

One (1) Electronic representative/COR

A016 (Overarching PWS, para. 2.19.1) Labor Dispute Contingency Plan

Within fifteen (15) calendar days of after contract award.

One (1) Electronic representative/COR

A017 (Overarching PWS, 3.2) Quality Control Plan

Within fifteen (15) calendar days of after contract award.

Any proposed changes within five

(5) business days.

One (1) Electronic Copy

MS Word, Excel or

.PDF

A018 (Overarching PWS, para. 3.2.1) Quality Control Files

Files will be turned over to the Government upon completion or termination of contract.

All hard copy and electronic files.

Coordinate with COR KO or designated Government representative/COR

A019 (Overarching PWS, para. 5.1) Pre-Cleaning Inspection Report

Within one (1) business day after completing inspection.

One (1) Electronic Copy

MS Word or .PDF KO or designated Government representative/COR

A020 (Overarching PWS, para. 5.4) Final Inspection Report

Within one (1) business day after completing inspection.

One (1) Electronic Copy

MS Word or .PDF KO or designated