This is a sources sought notice for HVAC system cleaning services at Fort Bliss, Texas. The notice provides a point of contact and meeting details for an upcoming site visit on December 13, 2022 at 1:00PM at Building 20235 to review the attached performance work statement and answer questions. The performance work statement outlines the required HVAC cleaning services but is not included here. The soliciting agency is the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood. No response date, award date, or pricing terms are mentioned.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 4-HVAC Cleaning PWS.docx | DOCX document | |
| Attachment 03.pdf | ||
| 4-HVAC Cleaning PWS.docx | DOCX document | |
| TE 03 - Contractor Badge Request Form.pdf | ||
| TE 02 - Barrack Facilities List.pdf | ||
| Attachment 02.pdf | ||
| TE 06 - Deliverables List.pdf | ||
| Attachment 01.pdf | ||
| TE 05 - Installation Environmental Compliance.pdf | ||
| TE 04 - Fort Bliss Hazardous Waste Management Plan.pdf | ||
| TE 01 - Installation Mapping.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USACE / NAVFAC / AFCEC / NASA UFGS-02 85 00 (November 2018)
Change 1 - 05/22
Preparing Activity: NAVFAC Superseding UFGS-02 85 00.00 20 (May 2011)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated April 2022
SECTION TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 85 00
MOLD REMEDIATION
11/18, CHG 1: 05/22
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 AIHA
1.2.2 AIHA EMLAP
1.2.3 AFU
1.2.4 Categories of Water
1.2.5 Certified Industrial Hygienist (CIH)
1.2.6 Complete Interior Building Demolition (Complete Gut)
1.2.7 Containment
1.2.7.1 Source Containment
1.2.7.2 Limited Containment
1.2.7.3 Full Containment
1.2.7.4 Unoccupied Building Containment
1.2.7.5 Cleaning Containment
1.2.8 Decontamination Unit (Airlock)
1.2.9 Dehumidifier
1.2.10 Detergent
1.2.11 Disinfectants or Biocide Sanitizing Solutions
1.2.12 EPA
1.2.13 Fungal Growth Structures
1.2.14 Fungicidal Agents, (EPA)
1.2.15 HEPA Filter
1.2.16 HVAC
1.2.17 Industrial Hygienist (IH)
1.2.18 Microbial Remediation Supervisor
1.2.19 Non-Porous Material
1.2.20 Occupied Spaces (Areas)
1.2.21 Personal Protective Equipment (PPE)
1.2.22 Poly
1.2.23 Porous Material
1.2.24 Pressure Differential Measuring Instrument
1.2.25 Semi-porous Material
SECTION 02 85 00 Page 1
1.2.26 Ventilation System Mold Remediator Qualifications (VSMR)
1.2.27 Work Area
1.3 REQUIREMENTS
1.3.1 Description of Work
1.3.2 Security Requirements
1.4 SUBMITTALS
1.4.1 Preconstruction Submittals
1.4.1.1 Preliminary Visual Assessment Report
1.4.1.2 Microbial Remediation Plan
1.4.1.3 Respiratory Protection Program
1.4.1.4 Worker Records
1.4.1.5 Certified Industrial Hygienist (CIH)/Industrial Hygienist
(IH) Qualifications
1.4.1.6 Microbial Remediation Supervisor Qualifications
1.4.2 Product Data
1.4.3 IH Daily Reports
1.4.4 Submittals at Completion of Remediation Work
1.5 RECORD KEEPING
1.5.1 Daily Project Log
PART 2 PRODUCTS
2.1 DISINFECTANTS, BIOCIDES, SANITIZING SOLUTIONS AND FUNGICIDAL
AGENTS, (EPA)
2.2 HAZARD COMMUNICATION
PART 3 EXECUTION
3.1 EQUIPMENT
3.1.1 Respirators
3.1.2 Protective Clothing
3.1.3 Warning Signs and Labels
3.1.4 Dehumidifiers
3.1.5 Air Filtration Units (AFU)
3.1.6 Vacuum Cleaners Equipped with HEPA Filters
3.2 GENERAL REQUIREMENTS
3.2.1 Pre-Microbial Remediation Work Conference
3.2.2 Containment Entry / Exit Procedure
3.3 REMOVAL PROCEDURES
3.3.1 Protection of Existing Work Areas
3.3.2 Remediation of Fungally Contaminated Building Materials
3.3.3 Remediation Procedures
3.3.3.1 Remediation of Non-Porous Materials
3.3.3.2 Semi-Porous Materials (Unfinished Wood)
3.3.3.3 Semi-Porous Materials
3.3.3.4 Porous Materials
3.4 DETAILED SEQUENCE OF WORK FOR MOLD REMOVAL UNDER CONTAINMENT
3.4.1 Preparation for Remediation Work
3.4.2 Demolition
3.4.3 Post-Demolition Inspection
3.4.4 Cleaning after Demolition, and Cleaning of Settled Spores from
Porous / Non-Porous Materials
3.5 DUCT AND HVAC SYSTEM CLEANING
3.5.1 Contractor Qualifications
3.5.2 Inspection
3.5.3 HVAC Microbial Remediation
3.6 FIRE PROTECTION
3.7 CONSTRUCTION BARRIERS
3.8 QUALITY ASSURANCE / QUALITY CONTROL REQUIREMENTS
SECTION 02 85 00 Page 2
3.8.1 Contractor Qualifications
3.8.2 Waste Management and Removal
3.8.3 Post-Remediation Inspection
3.8.3.1 Clearance
3.9 CLEAN-UP AND DISPOSAL
3.9.1 Disposal of Material
3.9.2 Material Packaging
3.9.3 Building Exit (Waste Disposal)
3.9.4 Hazardous Material
3.10 APPENDICES
ATTACHMENTS:
Microbial Assessment Visual Field Report Form
-- End of Section Table of Contents --
SECTION 02 85 00 Page 3
USACE / NAVFAC / AFCEC / NASA UFGS-02 85 00 (November 2018)
Change 1 - 05/22
Preparing Activity: NAVFAC Superseding UFGS-02 85 00.00 20 (May 2011)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated April 2022
SECTION 02 85 00
MOLD REMEDIATION
11/18, CHG 1: 05/22
NOTE: This section covers the requirements for the demolition, cleaning, removal, and disposal of mold contaminated materials.
Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable item(s) or insert appropriate information.
Remove information and requirements not required in respective project, whether or not brackets are present.
NOTE: To download UFGS Forms, Graphics, and Tables, go to: http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/forms-graphics-tables
Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).
NOTE: The Contracting Officer shall furnish the Contractor, in the contract documents, an initial Microbial Assessment Survey with containment categories and remediation methods specified for each work area and material within the work area.
The Contracting Officer's initial Microbial Assessment Survey specified below shall be furnished and certified by a qualified assessor authorized by the Contracting Officer to do such work. The initial survey shall be included in the solicitation documents at the end of this specification section.
SECTION 02 85 00 Page 4
The Contracting Officer shall ensure that in the initial survey a cost analysis that identifies the potential for replacement of the contaminated items versus remediation is provided. This information shall not be shared with the contractor.
The Contracting Officer must require that the microbial assessor provide documentation proving that the assessor meets at least one of the following criteria:
1. Bachelor's degree from an accredited university or college with a major in engineering, architecture, building construction, occupational health, microbiology, occupational safety, or a related natural or physical science. Additionally, two years experience in conducting microbial investigations is required.
2. Associates degree from an accredited university or college with a concentration in environmental, natural or physical sciences. Additionally, four years experience in conducting microbial investigations is required.
3. Certification as an industrial hygienist (CIH) as certified by the American Board of Industrial Hygienists, safety professional (CSP) as certified by the Board of Certified Safety Professionals or engineer (PE). Additionally, one year experience in conducting microbial investigations is required.
4. Certification by the American Council for Accredited Certification (ACAC) as a Council-Certified Indoor Environmental Consultant (CIEC), Council-Certified Indoor Environmentalist (CIE), Council-Certified Microbial Consultant (CMC), Council-Certified Microbial Investigator (CMI), Council-Certified Residential Mold Inspector (CRMI), Council-Certified Microbial Remediation Supervisor (CMRS) or Council-Certified Microbial Remediator
(CMR).
The procedures detailed in this specification are intended to be used for mold remediation projects in buildings occupied by the general population. This specification section may be a starting point for a project specification covering the requirements for removal of mold contaminated materials in facilities where sensitive populations will re-occupy the facility after remediation. Designer/Specifier will consult with the customer to determine if sensitive populations are present in the facility.
Sensitive populations as used here include those with health deficiencies such as people with immune deficiencies. Facilities where they are found include hospital wings and medical clinics.
SECTION 02 85 00 Page 5
Children in day care centers or senior citizens in nursing homes are also examples of sensitive populations.
For application to such sensitive facilities, the requirements for clearance and verification of removal of mold contaminated materials must meet the more stringent sampling requirements of Appendix B.
Prior to completing these specifications for facilities with sensitive populations, designer/specifier should consult with doctors, infection control, and risk management staff, Government Industrial Hygienist and Occupational, and Environmental Medicine Physician from the supporting Military Treatment Facility (MTF) familiar with or responsible for operation of the facilities.
Information regarding the types of mold found growing in the spaces may be used by the medical staff to determine the level of risk of the population, and help determine the requirements for verification of the remediation project.
Review and repair, if necessary, of HVAC and Building Envelope systems to prevent moisture incursions which could create conditions suitable for future mold growth must be included as part of any mold remediation project, but are not included as part of this specification.
The following information shall be shown on the project drawings:
The project drawings shall clearly show the location and extent of mold contamination and the materials to be removed.
NOTE: The Designer should include unit price items to address mold remediation. Include unit price items for removal and cleaning (e.g., drywall removal, ceiling tile removal, carpet removal, non-porous surface cleaning, semi-porous surface cleaning). Estimate the quantity and specify as unit price items in Section 00 21 13, INSTRUCTIONS TO BIDDERS or Section 01 20 00 Price and Payment Procedures per standard practice of the activity preparing the contract.
NOTE: The work may involve a historic property.
The designer must coordinate review of the proposed work with the appropriate cultural resources manager (CRM) and cultural resource laws and regulations, as part of the environmental review and permitting
SECTION 02 85 00 Page 6 process. Consultation with stakeholders, including the state historic preservation office, may be required, and work involving historic properties will likely be required to confirm to the Secretary of the Interior's Standards for the Treatment of Historic Properties (usually at the REHABILITATION level). See https://www.nps.gov/tps/standards/four-treatments/treatment-rehabilitation.htm
PART 1 GENERAL
1.1 REFERENCES
NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.
Use the Reference Wizard's Check Reference feature when you add a Reference Identifier (RID) outside of the Section's Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizard's Check Reference feature to update the issue dates.
References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN COLLEGE OF RADIOLOGY (ACR)
ACR MRI Accreditation Program Requirements, Latest Edition
AMERICAN INDUSTRIAL HYGIENE ASSOCIATION (AIHA)
AIHA IMOM08-679 (2008) Recognition, Evaluation, and Control of Indoor Mold
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP Z9.2 (2018) Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems
SECTION 02 85 00 Page 7
INSTITUTE OF INSPECTION, CLEANING, AND RESTORATION CERTIFICATION
(IICRC)
ANSI/IICRC S520 (2015) Standard and Reference Guide for Professional Mold Remediation
IICRC S100 (2015) S100 Standard and R100 Reference Guide for Professional Cleaning of Textile Floor Covering
IICRC S500 (2015) Standard and Reference Guide for Professional Water Damage Restoration
NAVY AND MARINE CORPS PUBLIC HEALTH CENTER (NMCPHC)
IHFOM, CH 13, Sec. 3 (2015) Mold Cleanup, Remediation, and Clearance Sampling
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
29 CFR 1926.59 Hazard Communication
29 CFR 1926.62 Lead
29 CFR 1926.1101 Asbestos
29 CFR 1926.1126 Chromium
29 CFR 1926.1127 Cadmium
UNDERWRITERS LABORATORIES (UL)
UL 586 (2009; Reprint Dec 2017) UL Standard for Safety High-Efficiency Particulate, Air Filter Units
1.2 DEFINITIONS
1.2.1 AIHA
American Industrial Hygiene Association.
1.2.2 AIHA EMLAP
American Industrial Hygiene Association's Environmental Microbiology Laboratory Accreditation Program
1.2.3 AFU
Air filtration unit with High Efficiency particulate air (HEPA) filtered vacuum and exhaust ventilation equipment with a filter system capable of collecting and retaining microbial contamination ASSP Z9.2. Filters must retain 99.97 percent of particles 0.3 microns 0.000012 inches or larger as indicated in UL 586.
SECTION 02 85 00 Page 8
1.2.4 Categories of Water
Category 1 Water: Water that originates from a sanitary water source and does not pose a substantial risk from dermal, ingestion, or inhalation exposure. IICRC S500
Category 2 Water: Water that contains significant contamination and has the potential to cause discomfort or sickness if contacted or consumed by humans. Can contain potentially unsafe levels of microorganisms or nutrients for microorganisms as well as other organic or inorganic matter. IICRC S500
Category 3 Water: Water that is grossly contaminated and can cause significant adverse reactions to humans if contacted or consumed.
IICRC S500
1.2.5 Certified Industrial Hygienist (CIH)
An individual that has been certified by the American Board of Industrial Hygiene (ABIH), with professional qualifications and experience as required for an industrial hygienist, as presented in the definition of "Industrial Hygienist."
1.2.6 Complete Interior Building Demolition (Complete Gut)
Interior finishes of the building have been removed to expose basic structural elements.
1.2.7 Containment
Physical separation and engineering controls required to prevent contamination of undamaged materials and occupied areas. The level of containment varies depending on the extent of the contamination.
1.2.7.1 Source Containment
Use when the contaminated surface area is less than 0.93 square meters 10 square feet, in both residential and non-residential buildings. At a minimum, source containment will include the following (ANSI/IICRC S520):
a. Isolation of Work Areas. Install polyethylene barriers to isolate the areas or material to be demolished / remediated from non-remediation areas.
b. Floor protection. Maintain protection for finished floors through all construction activities.
c. HEPA vacuum to control dust created during the demolition. Hold HEPA vac intake at source of dust.
1.2.7.2 Limited Containment
Use when contaminated surface area is between 0.93 square meters and 9.3 square meters 10 square feet and 100 square feet per room in both residential and non-residential buildings. At a minimum, limited containment includes the following (ANSI/IICRC S520):
a. Containment. For residential buildings, a containment includes the entire room where work is being performed. The containment does not
SECTION 02 85 00 Page 9 extend past the extents of the room unless there are instances of contamination extending from one room to the next. For non-residential buildings, the containment includes the area to be remediated, plus enough additional area to allow for all equipment and work activities.
b. Isolation of Work Areas. Install polyethylene barriers to isolate the areas to be demolished / remediated.
c. Floor protection. Maintain protection for finished floors through all construction activities.
d. Air Filtration / Pressurization Control. Install AFUs with HEPA filters in the containment. Configure the AFUs with splitters / diverters to allow some of the air to recirculate within the containment. Discharge the remainder of the air directly to the outside to maintain an overall negative pressure in the containment of 5 pascals 0.02 inch water column minimum to 10 pascals 0.04 inch water column maximum relative to the outside and other adjacent spaces not undergoing remediation(AIHA IMOM08-679). AFUs must filter a minimum of four air changes per hour and a maximum of six air changes per hour
(ANSI/IICRC S520).
e. Protection for all items remaining in the containment. Protective devices must prevent physical damage (e.g., scratches and dents) and must provide a positive seal to prevent dust from settling in or on the items.
NOTE: The designer/specifier must consider the need for a decontamination air lock system.
[ f. Decontamination. Construct a decontamination airlock for entry into and exit from the work area. HEPA vacuum the sealed bags of contaminated debris within the airlock. When possible, locate the decontamination airlock so that the sealed bags can be passed directly from the airlock to the outside, through a door or window.
] g. Containment Entrance. Install a triple-flap poly "door" to be used during demolition to provide a good separation between containment and occupied areas of the house / building.
h. HVAC System. Seal off all supply and return vents. HVAC may need to be shut down to ensure proper seal of the vents.
1.2.7.3 Full Containment
Use when contaminated surface area is greater than 9.3 square meters 100 square feet in both residential and nonresidential buildings. At a minimum, full containment includes the following(ANSI/IICRC S520):
a. Containment. For residential buildings, a containment includes the entire room where work is being performed. The containment does not extend past the extents of the room unless there are instances of contamination extending from one room to the next. For non-residential buildings, the containment includes the area to be remediated, plus enough additional area to allow for all equipment and work activities.
SECTION 02 85 00 Page 10
b. Isolation of Work Areas. Construct polyethylene barriers to isolate the areas to be demolished / remediated.
c. Floor protection. Maintain protection for finished floors through all construction activities.
d. Air Filtration / Pressurization Control. Install AFUs with HEPA filters in the containment. Configure the AFUs with splitters / diverters to allow some of the air to recirculate within the containment. Discharge the remainder of the air directly to the outside to maintain an overall negative pressure in the containment of 5 pascals 0.02 inch water column minimum to 10 pascals 0.04 inch water column maximum relative to the outside and other adjacent spaces not undergoing remediation (AIHA IMOM08-679). AFUs must filter a minimum of four air changes per hour and a maximum of six air changes per hour
(ANSI/IICRC S520).
e. Protection for all items remaining in the containment. Protective devices must prevent physical damage (e.g., scratches and dents) and must provide a positive seal to prevent dust from settling in or on the items.
f. Decontamination. Construct a decontamination airlock for entry into and exit from the work area. HEPA vacuum the sealed bags of contaminated debris within the airlock. When possible, locate the decontamination airlock so that the sealed bags can be passed directly from the airlock to the outside, through a door or window.
g. Containment Entrance. Install a triple-flap poly "door" at the entrance to the airlock, and between the airlock and the work area during demolition to provide a good separation between containment and occupied areas of the house / building.
h. HVAC System. Seal off all supply and return vents. HVAC may need to be shut down to ensure proper seal of the vents.
1.2.7.4 Unoccupied Building Containment
Use when a building is unoccupied and large amounts of mold growth are present throughout the building:
a. Containment. The containment consists of the entire building.
Install AFUs with HEPA filters in the building. Configure the AFUs to recirculate within the active remediation area. AFUs must filter a minimum of four air changes per hour and a maximum of six air changes per hour based on the size of the area undergoing active remediation (
ANSI/IICRC S520).
b. Isolation of Work Areas. Install polyethylene barriers to isolate remediation areas from non-remediation areas. AFU discharge may be used to positively pressurize non-remediation areas from areas undergoing remediation to prevent the movement of spores into "clean" areas.
c. Floor Protection. Maintain protection for finished floors through all construction activities.
d. Protection for all items remaining in the containment. Protective
SECTION 02 85 00 Page 11 devices must prevent physical damage (e.g., scratches and dents) and must provide a positive seal to prevent dust from settling in or on the items.
e. Decontamination. Construct a decontamination airlock for entry into and exit from the building.
f. Containment Entrance. Install a triple-flap poly "door" to be used during demolition to provide a good separation between containment and non-remediation areas of the house / building.
g. HVAC System. Seal off all supply and return vents. HVAC may need to be shut down to ensure proper seal of the vents.
1.2.7.5 Cleaning Containment
For items being salvaged, set up a temporary containment structure to clean items removed from the containment. At a minimum, the cleaning area must contain:
a. Two chambers. Construct walls with polyethylene. Clean the items in the first chamber. Store the clean items in the second chamber.
b. Air Filtration / Pressurization Control Cleaning Chamber. Install AFUs with HEPA filters in the cleaning chamber. Configure the AFUs with splitters / diverters to allow some of the air to recirculate within the containment. Discharge the remainder of the air directly to the outside to maintain an overall negative pressure in the containment of 5 pascals 0.02 inch water column minimum to 10 pascals
0.04 inch water column (maximum) relative to the storage chamber (
AIHA IMOM08-679).
c. Air Filtration, Storage Chamber. Install AFUs with HEPA filters in the storage chamber. Configure the AFUs to allow air to recirculate within the chamber. AFUs must provide air filtration at a rate of between four and six air changes per hour (ANSI/IICRC S520).
d. Containment Entrance. Install a triple-flap poly "door" at the entrance to the cleaning chamber, between the cleaning and storage chambers, and at the exit of the storage chamber to provide a good separation between the chambers.
1.2.8 Decontamination Unit (Airlock)
An enclosed area adjacent to, and connected to, a regulated work area. It consists of various rooms that are used for the decontamination of workers, equipment, and materials.
1.2.9 Dehumidifier
Mechanism or machine to remove moisture from the air.
1.2.10 Detergent
A cleaning agent. The term refers to a prepared compound that may include surfactants, builders, dry solvents, softeners, etc, but does not include true soap.
SECTION 02 85 00 Page 12
1.2.11 Disinfectants or Biocide Sanitizing Solutions
One of three groups of antimicrobials registered by the EPA for public health uses. The EPA considers an antimicrobial to be a disinfectant when it destroys or irreversibly inactivates infectious or other undesirable organisms, but not necessarily their spores.
1.2.12 EPA
U.S. Environmental Protection Agency.
1.2.13 Fungal Growth Structures
Portions of fungi indicating active fungal growth is present on a surface.
These include spores, conidiophores, hyphae, hyphal fragments, and mycelium.
1.2.14 Fungicidal Agents, (EPA)
An EPA registered fungicide that inhibits the spread and growth of mold with the ability to withstand moist and humid conditions.
1.2.15 HEPA Filter
A High Efficiency Particulate Air (HEPA) filter capable of trapping and retaining 99.97 percent of all particulate larger than 0.3 microns
0.000012 inches.
1.2.16 HVAC
Heating, Ventilating, and Air Conditioning (System).
1.2.17 Industrial Hygienist (IH)
An individual designated and provided by the Contractor that is a professional qualified by education, training, and experience to anticipate, recognize, evaluate, and develop controls for occupational and indoor air quality hazards. Education must include a minimum 12 semester hours or quarter hour equivalent of chemistry and 18 additional semester hours or quarter hour equivalent of courses in any combination of chemistry, physics, engineering, health physics, environmental health, biostatistics, biology, physiology, toxicology, epidemiology, or industrial hygiene. The Industrial Hygienist must be a CIH or under the supervision of a Certified Industrial Hygienist.
1.2.18 Microbial Remediation Supervisor
NOTE: State Certification requirements for mold remediation contractors and supervisors must be met. Modify and supplement the certification requirements specified in this paragraph if not equal to state requirements.
Individual responsible for the execution of the microbial remediation work as defined by the scope of work. This individual must have documented training in microbial remediation and have at least three years experience in microbial remediation work. Remediation contractor's on-site
SECTION 02 85 00 Page 13 supervisor must have one of the following certifications:
Council-Certified Microbial Remediator (CMR), or Council-Certified Microbial Remediation Supervisor (CMRS) as certified by the American Council for Accredited Certification, or Applied Microbial Remediation Specialist (AMRS), Institute of Inspection, Cleaning, and Restoration Certification (IICRC) or Contracting Officer approved equivalent.
1.2.19 Non-Porous Material
A material that does not absorb nor is easily penetrated by liquids, especially water. Generally, non-porous materials have a permeable factor of less than one. Some examples are metal, glass, plastic, ceramic tile.
1.2.20 Occupied Spaces (Areas)
The phrase "occupied space" within this specification refers to spaces that are occupied by unprotected non-remediation personnel while work is in progress. It also refers to areas adjacent to work areas that are not currently undergoing remediation.
1.2.21 Personal Protective Equipment (PPE)
Any material or device worn to protect a worker from exposure to, or contact with, any harmful material or force. PPE must be cleaned or disposed of prior to removal from the remediation work area.
1.2.22 Poly
Polyethylene sheet with a minimum thickness of 0.15 millimeter 6 mils ( IHFOM, CH 13, Sec. 3).
1.2.23 Porous Material
Permeable materials having the physical properties that allow liquids or gasses to pass through. These materials include but are not limited to the following: gypsum wall board, insulation, wallpaper, ceiling material, carpet, padding, paper goods (i.e., cardboard boxes, loose paper, books), stuffed furniture, wicker, fabrics.
1.2.24 Pressure Differential Measuring Instrument
Device used to measure the relative pressure difference between the work area/containment and areas outside the work area. For mold remediation, the device must measure accurately in the 0 to 10 Pascal 0 to 0.04 inch of water range.
1.2.25 Semi-porous Material
A material that can absorb liquids if exposed over long periods of time.
These materials include but are not limited to wood, concrete, linoleum, vinyl wall covering, wooden or hardboard furniture, plaster.
1.2.26 Ventilation System Mold Remediator Qualifications (VSMR)
An individual certified by the North American Duct Cleaning Association (NADCA) to clean HVAC systems.
SECTION 02 85 00 Page 14
1.2.27 Work Area
The area where remediation operations are actively performed and controlled to prevent the spread of dust / spores and entry by unauthorized personnel. A work area is the space, group of spaces, or the building, as defined by the Microbial Assessment Survey.
1.3 REQUIREMENTS
1.3.1 Description of Work
NOTE: Specify the form, condition and approximate quantity square meters square feet of mold contaminated material to be controlled in the first blank, the type of material in the second blank, and the location of the material in the third blank.
Example: "The mold contaminated material removal work includes the demolition and removal of 270 square meters 3,000 square feet of gypsum wallboard located on the first floor of the structure." The use of this section in the contract specification means that known mold contaminated material is involved. Estimate the quantity and specify as unit price items Contract's price schedule or Section 01 20 00 PRICE AND PAYMENT PROCEDURES per standard practice of the activity preparing the contract.
The Contracting Officer will furnish the Contractor, in the contract documents, an initial Microbial Assessment Survey with containment categories and remediation methods specified for each work area and material within the work area.
a. The Contracting Officer's initial Microbial Assessment Survey specified below must be furnished and certified by a qualified assessor authorized by the Contracting Officer to do such work. The initial survey is included in the solicitation documents at the end of this specification section.
b. Provide mold remediation work including the handling and control of mold contaminated materials and the resultant procedures and equipment required to protect workers, the environment and occupants of the building or area, or both, from contact with mold products and spores. The work also includes the disposal of any mold contaminated materials generated by the work. The mold removal work includes the demolition and removal of [_____] of [_____] located [_____]. Provide containment and engineering control techniques as outlined in this specification. All mold contaminated material removal work must be supervised by a microbial remediation supervisor as specified herein.
c. No work in this specification section can be provided by any person, contractor, or contracting entity involved in the preparation of the contract documents of which this specification section is a part.
d. The following microbial remediation specifications apply to the cleaning / removal and disposal of fungally-contaminated porous, semi-porous and non-porous surfaces within various types of structures. The level of containment and requirements for cleaning
SECTION 02 85 00 Page 15 and remediation of materials will depend on the condition of the space and materials being remediated.
NOTE: The following paragraph directs the Contractor to inspect the premises and develop a work plan based on the amount of mold contaminated materials found. Depending on the source of the moisture (flood, rainwater leaks), the amount of mold growth in the building may have increased since the Government-provided initial survey of the building. If there is a significant increase in the amount of work required of the Contractor, the Contracting Officer will likely have to modify the contract.
e. Immediately after award of the contract, prepare a preliminary visual assessment report using the standard microbial assessment form (Appendix A) to document the differences in the pre-remediation condition of the work areas as compared to the government provided Microbial Assessment Survey.Coordinate inspection with contracting officer. Only address the differences between the pre-remediation condition of the work areas and the government provided Microbial Assessment Survey. If required to indicate the differences, include the HVAC systems inspection required elsewhere in this specification section. Submit this written pre-remediation condition report to the Contracting Officer for approval and instructions to proceed.
f. After approval of the preliminary visual assessment report and having instructions from the Contracting Officer to proceed, prepare a microbial remediation plan for approval by the Contractor's Certified Industrial Hygienist. Include an assessment of the risk for people occupying areas adjoining the remediation area while remediation work is occurring in the microbial remediation plan . Upon the Contractor's CIH approval of the plan, submit the plan to the Contracting Officer for approval.
g. The Contractor's CIH or IH must monitor the site on a daily basis while remediation work is in progress, identifying work and work practices that are not in compliance with the approved microbial remediation plan, and performing all inspections required by this specification. The Contracting Officer may require the removal of any individual for non-compliance with quality requirements specified in the contract.
h. This specification section includes the protocol regarding proper disposal of the removed building material components from within the work site.
i. Use proper cleaning procedures, engineering controls, and apply best management practices to remove microbial growth and spore fallout from all surfaces and building materials to minimize the further release of microbial spores. Address semi-porous and nonporous surfaces within the facility in each cleaning phase of the project. Damp wipe and HEPA vacuum all surfaces, at a minimum. Remove and dispose of porous building materials that are supporting microbial growth.
SECTION 02 85 00 Page 16
1.3.2 Security Requirements
Prior to granting access to any work area (i.e., building, area, room, or space) for mold remediation work, a determination must be made by the government agency whether classified or controlled unclassified information (paper material or electronic media) or equipment is contained in the work area(s).
It may be necessary depending on the sensitivity of the work area or the information contained in the area to authorize the Government activity or tenant command responsible for the work area to provide their own appropriately cleared military or government personnel to properly remove or secure any classified or controlled unclassified information, electronic media or equipment located in their work area(s). Prior authorization would be required and the area would need to be evaluated to ensure it is safe for personnel to enter and all personnel must utilize the required PPE to safely enter the work area.
a. If Contractor personnel require access to classified information or spaces to perform mold remediation work, the Government must issue the Contractor facility a Facility Clearance Level (FCL) (Contract Security Classification Specification) prior to the initiation of the work under the contract. If the Contractor facility does not possess a valid FCL issued by the Defense Security Service (DSS), the Government will be required to submit a sponsorship request to DSS requesting that the Contractor be processed for and issued a current FCL at the appropriate level.
b. Access to classified information (paper material, electronic media, and equipment) must only be granted to authorized and appropriately cleared government and U.S. contractor personnel that possess a personnel security clearance commensurate with the level of information contained in the work area that requires a mold remediation effort.
c. Access to Controlled Unclassified information (i.e., For Official Use Only, Sensitive but Unclassified, Privacy Act Information, Export Controlled unclassified) can be granted to DOD cleared contractors, consultants and grantees that are conducting official business for the DOD or DON. Non-cleared U.S. contractor personnel who only require access to controlled unclassified information can be granted access if they get a favorable trustworthiness determination on an individual Favorable Tier 1 investigation and fingerprint result submitted on their behalf by the government agency issuing the contract.
d. Classified information and controlled unclassified information must be safeguarded / secured, reproduced, and destroyed in accordance with
SECNAV M-5510.36.
1.4 SUBMITTALS
NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list, and corresponding submittal items in the text, to reflect only the submittals required for the project. The Guide Specification technical editors have classified those items that require Government approval, due to their complexity
SECTION 02 85 00 Page 17 or criticality, with a "G." Generally, other submittal items can be reviewed by the Contractor's Quality Control System. Only add a "G" to an item if the submittal is sufficiently important or complex in context of the project.
For Army projects, fill in the empty brackets following the "G" classification, with a code of up to three characters to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: "AE" for Architect-Engineer; "DO" for District Office (Engineering Division or other organization in the District Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project Office. Codes following the "G" typically are not used for Navy, Air Force, and NASA projects.
The "S" classification indicates submittals required as proof of compliance for sustainability Guiding Principles Validation or Third Party Certification and as described in Section 01 33 00 SUBMITTAL
PROCEDURES.
Choose the first bracketed item for Navy, Air Force, and NASA projects, or choose the second bracketed item for Army projects.
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are [for Contractor Quality Control approval.][for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.] Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
NOTE: The submittals required for each project are very dependent upon the removal method to be used.
Edit the submittals paragraph accordingly.
SD-01 Preconstruction Submittals
Ventilation System Mold Remediator Qualifications (VSMR); G[, Preliminary Visual Assessment Report; G[, [_____]]
Microbial Remediation Plan; G[, [_____]]
Respiratory Protection Program; G[, [_____]]
Worker Records;
Certified Industrial Hygienist (CIH)/Industrial Hygienist (IH) Qualifications; G[, [_____]]
Microbial Remediation Supervisor Qualifications; G[, [_____]]
SECTION 02 85 00 Page 18
SD-03 Product Data
Disinfectants or Biocide Sanitizing Solutions; G[, [_____]]
Fungicidal Agents, (EPA); G[, [_____]]
Personal Protective Equipment (PPE); G[, [_____]]
Pressure Differential Measuring Instrument;
Safety Data Sheets (SDS) for All Materials; G[, [_____]]
Dehumidifiers;
Air Filtration Units;
SD-06 Test Reports
IH Daily Reports; G[, [_____]]
SD-11 Closeout Submittals
Submittals at Completion of Remediation Work; G[, [_____]]
1.4.1 Preconstruction Submittals
Within 10 days from the award of the contract and prior to the start of the work, submit to the Contracting Officer six copies of the following items for review and permanent file.
1.4.1.1 Preliminary Visual Assessment Report
A written report to document the pre-remediation condition of the work areas compared to the government provided Microbial Assessment Survey and the results of the HVAC systems inspection.
1.4.1.2 Microbial Remediation Plan
Submit a job-specific,[ detailed][ abbreviated] plan Approved by the Contractor's CIH to the Contracting Officer for final approval prior to start of work. The plan must address the following items at a minimum:
a. Description of materials to be remediated, providing location and quantities (map if available), and methods to be used for remediation.
b. Products: Disinfectants, detergents, biocides, sanitizing solutions, and fungicidal agents, (EPA).
c. Containment procedures to include description and locations of engineering controls and decontamination unit to include entry and exit procedures (provide sketch of floor plan showing location of containment barriers and decontamination units). Include locations of AFUs and AFU discharges to the outside.
d. Description of personal protective equipment to be used during the remediation.
e. Construction barricades and barriers in occupied areas.
SECTION 02 85 00 Page 19
f. HVAC Shut down and start-up procedures.
g. HVAC Evaluation and remediation procedures.
h. Moisture and relative humidity control procedures and equipment.
i. Packaging and disposal procedures.
j. Safety Precautions to include lockout / tag-out, fall protection, confined space entry procedures, and fire protection.
k. Description of the method to be employed to control cross contamination of areas not in the work area. Include a risk assessment related to the suitability of people to occupy areas adjoining the remediation area while remediation activities are ongoing.
l. IH Quality Control procedures to include visual inspection.
m. Procedures to control, abate, and dispose of Asbestos Containing Materials (ACM), Presumed Asbestos Containing Materials (PACM) and Lead Based Paint (LBP) coincident with microbial remediation. ACM, PACM, and LBP must be identified before work begins; Identify the presence, location, and quantity of ACM,PACM, and LBP therein pursuant to paragraphs (g),(k)(1) of 29 CFR 1926.1101 and for lead
29 CFR 1926.62.
1.4.1.3 Respiratory Protection Program
Provide written copy of Contractor's Respiratory Protection program.
1.4.1.4 Worker Records
Provide the following documents for all workers, including supervisory personnel. If new workers are added to the crew, provide the same documentation for them.
Employee Instruction and Release Form: Provide documentation showing that each employee has been instructed on the following items:
a. Use and fit of respirators (for employees entering and working in the containment).
b. Protective clothing.
c. Protective measures.
d. Safety and Emergency Egress Procedures.
e. Site specific fall protection plan and training.
f. Microbial remediation hazards and practices including engineering controls and isolation. Training should include "hands on" training for microbial remediation supervisors.
g. Workers' release forms stating the potential hazards involved with the scope of the work.
SECTION 02 85 00 Page 20
Worker Training Certification: Submit copies of training certificates for each employee indicating that the employee has received training at the appropriate level for the work prescribed in the description of work.
1.4.1.5 Certified Industrial Hygienist (CIH)/Industrial Hygienist (IH) Qualifications
Submit the name, address, and telephone number of the Certified Industrial Hygienist (CIH) and Industrial Hygienist (IH). Provide copies of board certificates, resume to document field experience, and evidence that the CIH and IH have successfully completed training in microbial investigation and remediation.
1.4.1.6 Microbial Remediation Supervisor Qualifications
Onsite supervisor must have one of the following certifications:
Certified Microbial Remediator (CMR), Certified Microbial Remediation Supervisor (CMRS), or Applied Microbial Remediation Specialist (AMRS).
Submit copies of supervisory training certificates.
1.4.2 Product Data
Within 10 days of contract award, submit product data for items identified for use in Microbial Remediation Plan.
1.4.3 IH Daily Reports
Prepare a written IH Daily Report for each day that microbial remediation work is being accomplished. Submit the IH Daily Report to the Contracting Officer by 1000 hours of the following day. The IH Daily Report at a minimum must include measurements of differential pressure and temperature and relative humidity in work areas, and detail any non-compliance issues observed.
1.4.4 Submittals at Completion of Remediation Work
Within 14 days of completion, provide the following information:
a. Daily Project Logs.
b. IH Daily Reports.
c. Photographic Logs.
d. Contractor's Industrial Hygienist Report certifying the microbial remediation is complete.
1.5 RECORD KEEPING
A Daily Project Log must form a permanent record of the project. Secure and maintain these logs and any other required documentation as part of the permanent project file.
1.5.1 Daily Project Log
The Microbial Remediation Supervisor must maintain a Daily Project Log.
The Daily Project Log must be used each day of the project to document the following information.
SECTION 02 85 00 Page 21
a. Date.
b. Name of Microbial Remediation Supervisor.
c. Name of Industrial Hygienist monitoring work area.
d. Number of workers on site.
e. Equipment utilized.
f. Brief description of daily work activities.
g. Listing of any non-compliance noted, emergencies, stop work orders (with detailed explanation),[ exhaust system pressure differential recordings] and descriptions of any other significant events.
PART 2 PRODUCTS
2.1 DISINFECTANTS, BIOCIDES, SANITIZING SOLUTIONS AND FUNGICIDAL AGENTS,
(EPA)
NOTE: Designer/specifier must make a determination if biocides will be used for remediation activities. Edit the paragraph below to reflect the determination.
Must be EPA Registered for the use detailed in the Microbial Remediation Plan and used in accordance with the manufacturer's specifications..
Provide SDS sheets to the Contracting Officer for any chemicals that will be used during the performance of the work for approval.
2.2 HAZARD COMMUNICATION
Adhere to all parts of 29 CFR 1926.59 and provide the Contracting Officer with a copy of the Safety Data Sheets (SDS) for all materials brought to the site.
PART 3 EXECUTION
3.1 EQUIPMENT
Provide manufacturer's certificate of compliance for all equipment used to contain the microbial contamination.
3.1.1 Respirators
Select respirators from those approved by the National Institute for Occupational Safety and Health (NIOSH), Department of Health and Human Services. Provide personnel engaged in set-up, pre-cleaning, cleanup, handling, and removal of contaminated materials with the appropriate respiratory protection as specified in 29 CFR 1910.134. Microbial remediation plan must consider Table 17.1 in AIHA IMOM08-679 "Recognition, Evaluation, and Control of Indoor Mold", which lists the minimum levels of respiratory protection based on the activity and size of the remediated area.
SECTION 02 85 00 Page 22
3.1.2 Protective Clothing
Provide all workers with protective clothing as appropriate for the work being accomplished, as required by the Microbial Remediation Plan.
3.1.3 Warning Signs and Labels
Provide bilingual warning signs printed in English and [_____] at all approaches to the work areas IICRC S500. Locate signs at such a distance that personnel may read the sign and take the necessary protective steps required before entering the area. Warning signs may be in the form of continuous plastic tape. The warning signs must have black characters on a yellow background.
WARNING
DO NOT ENTER
MICROBIAL REMEDIATION WORK IN PROGRESS
Alternate wording for the warning signs will be approved by the Contracting Officer.
3.1.4 Dehumidifiers
Install and use dehumidifiers as needed during the remediation to maintain relative humidity below 60 percent in the work area. Drain the condensate water to a permanent drain, or empty as needed to prevent water overflowing from the dehumidifiers. IHFOM, CH 13, Sec. 3
3.1.5 Air Filtration Units (AFU)
Install and use AFUs with HEPA filters, and manufacturer specified pre-filters, as part of the exhaust ventilation system to develop and maintain the specified desired air pressure differential inside the enclosed work area relative to the outside areas. Acquire and pay for any licenses needed for use of any equipment, including but not limited to, air pressure differential systems and air filtration systems.
a. Replace HEPA filters and pre-filters for AFUs as required to maintain pressurization performance requirements during demolition and cleaning. Do not reuse filters. Bag used filters at a minimum in clear 0.15 millimeter 6 mil (IHFOM, CH 13, Sec. 3) polyethylene bags within the containment and disposed as contaminated waste.
NOTE: Some air from the AFUs may be allowed to recirculate into the remediation area only. The intent is to maintain the work area under a negative pressure relative to non-work areas. Excessive negative pressure will allow outside air to infiltrate into the building, either into the work area directly, or into other areas of the building.
In humid climates, this outside air may bring in large amounts of moisture, and cause additional mold growth. Air discharged from the AFU may not be supplied to an occupied area.
b. Discharge air from any AFUs located in the work area containment to the outside environment when creating a negative pressure containment
SECTION 02 85 00 Page 23 to create a negative pressure relative to the outside and adjacent work areas not undergoing active remediation of 5 pascals 0.02 inch H2O to 10 pascals 0.04 inch H20 AIHA IMOM08-679. Discharge air in excess of that required for creating the proper negative pressure to the work area. The AFUs must provide four to six air changes per hour in the work area (ANSI/IICRC S520). Under no circumstances may air from AFUs discharge to an occupied area. Coordinate location of window sashes or doors required for discharge openings with the Contracting Officer. Exhaust discharge openings may be constructed of plywood, and the seals around such opening must be airtight.
c. Seal all exhaust and intake openings in AFUs with one layer of 0.15 millimeters 6 mil (IHFOM, CH 13, Sec. 3) polyethylene sheeting when not in use.
3.1.6 Vacuum Cleaners Equipped with HEPA Filters
Provide vacuum cleaners equipped with HEPA filters designed for continuous operation in order to complete the work in a timely and efficient manner.
a. Provide nozzle attachments as required to adequately remove all dust.
As a minimum, nozzle attachments must include crevice and extended bristle brush nozzles. Any vacuum that is not equipped with a HEPA filter must not be used at anytime.
b. Provide sufficient vacuum cleaners equipped with HEPA filters designed for continuous operation in the work area during microbial remediation inside the containment area.
c. Provide additional vacuum cleaners equipped with HEPA filters in the enclosed work area during remediation or cleaning work as required by the size (area) of the containment and to maintain timely progress of the work.
3.2 GENERAL REQUIREMENTS
3.2.1 Pre-Microbial Remediation Work Conference
Meet with the Contracting Officer prior to beginning work to discuss in detail the…