Attachment 01.pdf

PDF 311 KB Posted

Attached to
HVAC System Cleaning Federal contract opportunity
Solicitation number
PANMCC23P0000003466
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This document includes HVAC system design plans and specifications for a federal contract opportunity for HVAC system cleaning services. The opportunity is a sources sought notice issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood. Interested parties are invited to attend a mandatory site visit on December 13, 2022 at 1:00PM at Building 20235 on Fort Bliss, Texas to inspect the HVAC systems and ask any questions. Questions may also be asked after the site visit. The Performance Work Statement and its attachments included in the file provide additional details on the required HVAC system cleaning scope of work.

View the file

Other files for this federal contract opportunity

Other files attached to HVAC System Cleaning, newest first.
File Type Posted
4-HVAC Cleaning PWS.docx DOCX document
TE 03 - Contractor Badge Request Form.pdf PDF
TE 02 - Barrack Facilities List.pdf PDF
Attachment 02.pdf PDF
TE 06 - Deliverables List.pdf PDF
Attachment 04.pdf PDF
Attachment 03.pdf PDF
4-HVAC Cleaning PWS.docx DOCX document
TE 05 - Installation Environmental Compliance.pdf PDF
TE 04 - Fort Bliss Hazardous Waste Management Plan.pdf PDF
TE 01 - Installation Mapping.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BEDROOM BBEDROOM A

CLOSET

CLOSET

BATH

KITCHEN

CORRIDORCORRIDOR

6x12-7

6x

-7

HV

AC

OUTLE

T AIR

7" F

LE

X

DU

CT

8 x 10 DUCT 8 x 1

D

U C T

8 x 8 DUCT8 x 8 DUCT

4x

-6

7" FLEX DUCT

6" FLEX DUCT

HA

RD

P

IP

E

7" FLEX DUCT

x

R

A x

8 D

UC

T

16 x 8 DUCT

1'-9 3/8"

SOFFIT1'-2 1/2"

SOFFIT

2'-6 3/4"

SOFFIT

BALANCE

BALANCE

4'-5 3/8"

DRP CLG

7'-2 3/8"

DRP. CLG.

BALANCE

BALANCE

TOWEL BAR

6x12-6

6x12-6

6x12-6

6x12-6

6x12-7

HA

RD

P

IP

E 2'-1 1/2"

SOFFIT

2'-3 5/8"

SOFFIT

2'-6"

3'-0"

TOW

EL BAR

Lx

Hx

W

SO

FF

IT

S

1st. FLOOR

2nd. FLOOR

2'- 0"

4" PVC

2'- 0"

4" PVC

3" M

AX

BEDROOM BBEDROOM A

CLOSET

CLOSET

BATH

KITCHEN

CORRIDORCORRIDOR

6x12-7

6x

-7

HV

AC

OUTLE

T AIR

7" F

LE

X

DU

CT

8 x 10 DUCT 8 x 1

D

U C T

8 x 8 DUCT8 x 8 DUCT

4x

-6

7" FLEX DUCT

6" FLEX DUCT

HA

RD

P

IP

E x

R

A x

8 D

UC

T

16 x 8 DUCT

1'-9 3/8"

SOFFIT 1'-1"

SOFFIT

2'-6 1/4"

SOFFIT

BALANCE

BALANCE

4'-5 3/8"

DRP CLG

7'-2 3/8"

DRP. CLG.

BALANCE

BALANCE

TOWEL BAR

6x12-6

6x12-6

6x12-6

6x12-6

6x12-7

HA

RD

P

IP

E

2'-1 1/2"

SOFFIT

2'-3 5/8"

SOFFIT

2'-6"

3'-0"

TOW

EL BAR

Lx

Hx

W

SO

FF

IT

S

1 1/2"

8"

1 1/2"

1'-0"

1'-8

1'-4

R/A BOX

NOTE: 24ga. Metal box with 1/4" insulation.

KEY NOTES

SHEET NOTES

SHEET NUMBER

UN

IT

H

VA

C

PL

AN

S

BU

IL

DI

NG

/ 6

ZM8.01

1st FLOOR BLD.64 & 66

TYPICAL UNIT 'B', 'D' & 'E' PLAN

3/8

1' -0

A. Typical for exterior units also.

B. NOTE: HVAC shall set on box built by HVAC or supplied by HVAC contractor.

See R/A BOX detail on this sheet.

C. All ducts are to be balanced at the register grill.

D. First floor bath fan ducts are shown, see sheets S5.08 and S5.09 for second floor bath fan duct layout.

E. Note return air grill sizes 30 x 10 in soffit location and 20 x 14 in wall loations.

F. All supply diffusers are Bi-directional.

FIRE PROTECTION KEY NOTES

01. Install smoke stop sealant at all wire and duct penetrations of all walls, floor and ceiling assemblies.

ALL UNITS

CONDENSATE DRAIN AND LINE SET PIPE

Jo b

Da te:

Ma de by

Dw g b y:

Re vis ion s

/11 /08

Sc ale

Da te:

DE

SC

RI

PT

IO

N:

2nd FLOOR BLD.64 & 66

TYPICAL UNIT 'B', 'D' & 'E' PLAN

1. Soffit locations for heat duct runs. Drop complete ceiling in closet behind HVAC CL.

in standard units.

2. Metal duct required for running through mate wall.

3. 3/4" Condensate drain

4. 4" PVC Pipe for running HVAC linsets inside.

Pipe should not extend no farther than 3" above roof decking. This is installed at the floor and ceiling (between floors) and should be a 2' long pipe. This is installed at the ceiling \roof also with a 2' long pipe.

See detail (4) on this sheet.

5. Low-Leakage Control Damper & Clg. Access.

6. 4" Metal duct for HVAC fresh air.

7. 4" Ridged bath fan duct. See sheets S5.05, S5.06, S5.07, S5.08 & S5.09.

8. 4" Ridged HVAC fresh air duct to 2nd floor Mechanical Room. See Sheets: S5.05,

9. Ridged 90° elbows on all 6" and 7" flex duct.

10. Ridged 90° elbowed collar.

11. Junction box for roof top HVAC heat pump.

12. Temp. Sensor shall be mounted between panel box and bedroom door jamb at

13. Grill and jump box for bedroom return air.

14. Coil 8' of 24v Wire in Mech. Closet from Temp. Sensor for field connection to Htg.

15. Over-the-door vent, direct fins in grill towards bedroom door.

16.

55" A.F.F. (by others).

Unit by others.

F alc on D riv e, Su ite

De So to T

X, Ph on e:

2)

8-

Fa x:

(9

) 2

-9

BR

IG

AD

E

CO

MB

AT

T

EA

M

CO

MP

LE

X

BC

T-

U

N A

C C

O M

P A

N

IE

D E

N

LI

S

TE

D P

E R

S O

N N

E L

H O

U S

IN

G

FO

R

T B

LI

S

S

E

LP

A S

O , T

E X

A S

D E

S

IG

N P

A C

K A

G E

D E

S

IG

N C

O M

P

LE

TE

R.

W

G.

S.

2/0 1/0

RD

W

RE

V_ 2 (

W ar rio r R ev iew

A

B

S5.06, S5.07, S5.08 & S5.09.

17. Bathroom Ceiling Exhaust Fan.

A

A

A

A

2/0 1/0

RD

W (C ld

- A

) L

LC

D inc or po ra tio n & P lan A dju stm en t

18. 6x6x4 Metal Tee for duct to 1st Floor & 6" Duct to LLCD in 2nd Flr Mechanical Room, then 6" duct from LLCD out roof, See DTL.

19. 4" Ridgid Duct & 90 deg Elbow out roof.

20. 70 cfm make-up Std Wall Grill (SWD) to

Corridor. Refer to Sheet ZE9.05 for Grill locations in Building Corridors.

B

B

3/6 /09

SB

(C ld

- B

) H

VA

C Pl an A dju stm en t & no tes

C

4-

-1

RC

(C ld

- C

) R ev ise d d im en sio n

File details come from the government source that posted it. Updated .