TARTA_Government_Station_Cost_Proposal_Schedulefinal.xlsx

XLSX spreadsheet 56 KB Posted

Attached to
Demolition & Site Restoration: Former Government Station
Solicitation number
2026-REQ-059
Issued by
Lucas County, Ohio

About this file

This is a cost proposal schedule for the Demolition & Site Restoration: Former Government Station project in Ohio, submitted by TARTA (Transit Authority Rapid Transit Authority). The project encompasses comprehensive demolition and site restoration services, including removal of a glass-and-steel canopy structure, complete demolition of a restroom building, mechanical system disconnection and removal, masonry work including new wall construction and fencing installation, and final site grading and restoration. The scope of work is organized into primary cost categories: mobilization and site protection; canopy work involving glazing removal, structural steel disassembly, and hauling; building demolition with interior fixture removal and waste hauling; mechanical disconnection and utility capping; masonry construction and fencing; site restoration and grading; and environmental controls including dust and noise management. The cost proposal schedule details line items with unit quantities, unit costs, and total costs across these categories, with provisions for overhead and profit, contingency allowances, and metal scrap salvage credits to the owner.

The cost proposal includes a base bid structure with an alternate pricing option for full masonry wall replacement and an allowance for unforeseen conditions. Project scheduling information is included with designated start and end dates for major tasks. A Project Labor Agreement (PLA) is required if the total project cost exceeds $100,000. The proposal structure allows for transparent cost allocation across mobilization, labor, materials, disposal, and administrative elements, with specific provisions for environmental compliance and waste management throughout the demolition and restoration process.

View the file

Other files

File Type Posted
FederalClauses_10.16.2025.pdf PDF
Declaration_of_Non-Collusion_SH.pdf PDF
Lobbying_Certifcation_.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Proposal

Cost CategoryDetailed Scope ItemUnitQuantityUnit Cost ($)Total Cost ($)
MobilizationMobilization & DemobilizationLS
MobilizationSite Protection (fencing, signage, barriers)LS
MobilizationTraffic / Pedestrian ControlLS
Canopy WorkGlazing Removal & DisposalSF
Canopy WorkStructural Steel DisassemblyTon
Canopy WorkHauling & Disposal of SteelLS
Building DemolitionRestroom Building DemolitionSF
Building DemolitionInterior Fixture RemovalLS
Building DemolitionWaste Hauling & DisposalTon
MechanicalDisconnect & Remove HeaterEA
MechanicalUtility Cap & PatchingLS
MasonryNew Masonry Wall ConstructionLF
MasonryFencing InstallationLF
Site RestorationFinal Grading & CleanupLS
Site RestorationSurface RestorationLS
EnvironmentalDust & Noise ControlLS
EnvironmentalWaste Management / RecyclingLS
EnvironmentalPermits & FeesLS
OtherOverhead & ProfitLS
OtherContingencyLS

Credits Metal Scrap Salvage Credit (to Owner) LS

TOTAL BASE BID
ALTERNATE 1 – Full Masonry Wall Replacement
ERROR:#VALUE!ALLOWANCE – Unforeseen Conditions

Schedule Task Start Date End Date

File details come from the government source that posted it. Updated .