T3145 Rebid Method of Operation 12.9.2025.docx

DOCX document 29 KB Posted

Attached to
Contract RFP/NJCOOP NJ|25-FLEET-125371
Contract number
25-FLEET-125371
Issued by
New Jersey

About this file

This document is a Method of Operation contract for a Statewide Automatic Brine Production Plant Systems procurement issued by the State of New Jersey's Division of Purchase and Property. The contract was awarded to VariTech Industries, with the contract number 25-FLEET-125371, effective from December 11, 2025 through December 10, 2029, with the potential for up to three one-year extensions.

The contract covers the procurement of automatic brine production plant systems, including brine storage tanks, manufacturer's parts, options, attachments, extended warranties, technical support, and installation and maintenance services. The primary system is the VariTech Brine Boss/Blend Boss, with delivery timelines ranging from 90 to 240 days after receipt of order. The contract does not include Public Works requirements, and using agencies are not bound to minimum or maximum order quantities. The pricing is set as Freight On Board (F.O.B.) Destination, and deliveries are subject to specific state holiday restrictions and must be coordinated with using agencies at least 48 hours in advance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

METHOD OF OPERATION

December 9, 2025

25DPP01106, T3145 - Automatic Brine Production Plant Systems – Statewide - REBID

Effective Dates: December 11, 2025 through December 10, 2029 with the possibility of up to three (3) one-year extensions, with no single extension exceeding one year.

BACKGROUND:

The State of New Jersey Division of Purchase and Property has awarded the Contract to the below Contractor for an Automatic Brine Production Plant Systems and to provide parts, maintenance, and repair services for said systems.

The State awarded the Statewide Contract to one responsive Bidder that submitted a Quote that met the category definition and requirements of the Bid Solicitation.

Contractors
Contract Number
VariTech Industries
25-FLEET-125371

IMPORTANT INFORMATION FOR STATE AGENCIES:

This contract does not contain a Public Works requirement, since the Using Agency will be responsible for all Make Ready Work prior to the delivery and Installation of the brine production plant system.

Delivery:

Contractor deliveries for all contracted automatic brine production plant systems shall be made within the delivery timeframes noted on the State-Supplied Price Sheet and in strict accordance with the instructions from the Using Agency. Prices for items in Quotes shall be submitted Freight On Board (F.O.B.) Destination.

When there is a discrepancy between the delivery days listed in the General Tab in NJSTART and the State-Supplied Price Sheet, the State-Supplied Price Sheet delivery days shall govern.

The Contractor must deliver products to Using Agencies on an as-needed basis. The Contractor shall make arrangements for delivery of products upon receipt of a purchase order. The delivery location will be specified in the purchase order.

The Contractor shall be responsible for all delivery, unloading, staging, storage and installation of all products and materials. The Contractor shall notify the State agency a minimum of 48 hours prior to shipment so that the necessary arrangements can be made. The Using Agency will provide specific delivery authorization prior to the authorized delivery date.

All deliveries must be made as instructed by the Using Agency, during working hours, except on legal holidays.

Deliveries shall not be made on the following State observed holidays, which may be updated from time to time:

· New Year’s Day;

· Martin Luther King Jr. Day;

· Presidents Day;

· Good Friday;

· Memorial Day;

· Juneteenth;

· Independence Day;

· Labor Day;

· Columbus Day;

· Election Day;

· Veterans Day;

· Thanksgiving Day; and

· Christmas Day.

Using Agencies may specify alternate delivery sites and /or hours, when necessary.

The State of New Jersey will not be bound to any minimum, average or maximum order quantities for the term of the Contract.

The Contractor shall contact the Using Agency location prior to each delivery, advising estimated date and time of arrival, product to be delivered, and estimated quantity.

The Contractor shall package and protect all material so that they are delivered to the Using Agency in an undamaged condition. The State reserves the right to reject any material which is damaged or delivered or received in an otherwise unacceptable condition. Any charges incurred due to damaged materials shall be the responsibility of the Contractor.

AWARD SUMMARY:

Price Line Number
Item Description
Brand or Manufacturer Proposed for Award
Delivery Days After Receipt of Order (ARO)
1
Automatic Brine Production Plant System
VariTech Brine Boss/Blend Boss
240 Days
2
Brine Storage Tanks (Each)
Snyder Industries
90 Days
3
Manufacturer's Options and Attachments
4
Manufacturer's Parts Associated with Installation, Maintenance, and Repairs
5
Extended Warranties
6
One Additional Set of Parts, Service, and Operation & Maintenance Manuals
7
Technical Support (Hourly Rate) - Operators and Mechanics Training
8
Non-Prevailing Wage Hourly Rates for Installation Services
9
Non-Prevailing Wage Hourly Rates for Maintenance and Repair Services

File details come from the government source that posted it. Updated .