T2881 Final PS North 10.1.2026~5.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Contract RFP/PSBE/COOP NJ|26-GNSV2-145230
Contract number
26-GNSV2-145230
Issued by
New Jersey

About this file

Contract Summary

This document is a final price schedule for contract T2881 covering the period from October 1, 2026, through May 31, 2027. The contract involves a state and local procurement process with pricing information for goods or services provided by an identified contractor to a government agency or consortium of state and local jurisdictions.

The price schedule establishes pricing terms for the contract period with specific line items, unit costs, and total contract values. The document includes detailed breakdowns of costs associated with deliverables or services, pricing adjustments if applicable, and payment terms. Additional details regarding any set-asides, option periods, renewal provisions, and the funding sources and amounts are presented within the price schedule structure. This contract represents a commitment of state and local resources for the specified goods or services delivery through the contract period ending May 31, 2027.

View the file

Other files

File Type Posted
T2881 Att 1 Combined SSTC 6.3.2025.pdf PDF
T2881 Att 4 Procedure for Background Checks.pdf PDF
T2881 Final PS Central 10.1.2026~5.xlsx XLSX spreadsheet
T2881 - Method of Operation 10.1.2026~1.docx DOCX document
T2881 Att 3 Reim~1.xlsx XLSX spreadsheet
T2881 Bid Amendment 1_1.21.26~1.docx DOCX document
T2881 Final Bid Solicitation 10.1.2026~5.docx DOCX document
T2881 Final PS South 10.1.2026~5.xlsx XLSX spreadsheet
Timeless_OA_Redacted_Signed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 North Region - State Supplied Price Sheet Bid Solicitation #26DPP01192 - T2881 - Water Damage Restoration Services - Statewide

Bidder Name:
Refer to Bid Solicitation Section 3.23 for Bidder instructions. The Bidder shall provide pricing in the yellow highlighted cells below. The Bidder must not alter the price schedule in any manner.
Line No.Item DescriptionUnit of MeasureYear 1
Unit CostYear 2
Unit CostYear 3

Unit Cost

North Region Labor
1North Region: Percentage Mark-Up for Labor Supplies and MaterialsPCNT
2North Region: Project Manager - All-Inclusive Hourly Rate - Regular Time
As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet InstructionsHOURLY
3North Region: Project Manager - All- Inclusive Hourly Rate - Overtime
As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet InstructionsHOURLY
4North Region: Supervisor -All-Inclusive Hourly Rate - Regular Time
As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet InstructionsHOURLY
5North Region: Supervisor - All-Inclusive Hourly Rate - Overtime
As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet InstructionsHOURLY
6North Region: Water Restoration Technician - All-Inclusive Hourly Rate - Regular Time
As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet InstructionsHOURLY
7North Region: Water Restoration Technician - All-Inclusive Hourly Rate - Overtime
As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet InstructionsHOURLY
8North Region: Laborer - All-Inclusive Hourly Rate - Regular Time
As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet InstructionsHOURLY
9North Region: Laborer - All-Inclusive Hourly Rate - Overtime
As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet InstructionsHOURLY
10North Region: Carpenter Foreman - All-Inclusive Hourly Rate - Regular Time
As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet InstructionsHOURLY
11North Region: Carpenter Foreman - All-Inclusive Hourly Rate - Overtime
As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet InstructionsHOURLY
12North Region: Carpenter Journeyman -All-Inclusive Hourly Rate - Regular Time
As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet InstructionsHOURLY
13North Region: Carpenter Journeyman - All-Inclusive Hourly Rate - Overtime
As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet InstructionsHOURLY
14North Region: Carpenter Apprentice - All-Inclusive Hourly Rate - Regular Time
As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet InstructionsHOURLY
15North Region: Carpenter Apprentice - All-Inclusive Hourly Rate - Overtime
As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet InstructionsHOURLY
$ 10.00.
North Region Equipment
Extraction, Drying, Air Filtration & Cooling EquipmentUnit of MeasureYear 1 Unit CostYear 2 Unit CostYear 3 Unit Cost
16Air Mover/Carpert BlowersHOURLY
17Dehumidifier (200 cfm refrigerant)HOURLY
18Dehumidifier (3,500 cfm dessicant)HOURLY
19Dehumidifier (4,500 - 5,000 cfm dessicant)HOURLY
20Dehumidifier (9,000 - 10,000 cfm dessicant)HOURLY
21Dehumidifier (15,000 cfm dessicant)HOURLY
22Dehumidifier (DX Unit 20/30 ton)HOURLY
23Dehumidifier (DX Unit 60 ton)HOURLY
24Extraction Unit (Portable)HOURLY
25Extraction Unit (Trailer)HOURLY
26HEPA Filtration Unit (Air Scrubber)HOURLY
27Inject-dry UnitHOURLY
Power and Distribution Equipment RentalUnit of MeasureYear 1 Unit CostYear 2 Unit CostYear 3 Unit Cost
28Electrical Distribution Panel (120 AMPS)HOURLY
29Generator (Portable)HOURLY
3060 KW Generator (with enviro fuel tank)HOURLY
3175 KW Generator (with enviro fuel tank)HOURLY
32125 KW Generator (with enviro fuel tank)HOURLY
33200 KW Generator (with enviro fuel tank)HOURLY
34500 KW Generator (with enviro fuel tank)HOURLY
351,000 KW Generator (with enviro fuel tank)HOURLY
36Air CompressorHOURLY
37Carpet Cleaning MachineHOURLY
38Carpet Tilt/DemolitionHOURLY
39Saw - DemoHOURLY
40Saw - Power MiterHOURLY
Transportation Rental FeeUnit of MeasureYear 1 Unit CostYear 2 Unit CostYear 3 Unit Cost
41Trailer, Enclosed (12-16 feet)HOURLY
42Trailer, Flat BedHOURLY
43Trailer, FreezerHOURLY
44Truck, MovingHOURLY
45Truck, PickupHOURLY
46Van, Box (12 -16 feet)HOURLY
47Van, Box (17-20 feet)HOURLY
48Van, Passenger (up to 10 people)HOURLY
49Vehicle Pickup, SUV or carHOURLY
50Truck and Driver for water disposalHOURLY
Miscellaneous EquipmentUnit of MeasureYear 1 Unit CostYear 2 Unit CostYear 3 Unit Cost
51Bobcat, SmallHOURLY
52Floor Cleaning System (walk behind)HOURLY
53Light, Tower Mobile (400 W diesel)HOURLY
54Oven, Convection Convection Drying (ULT)HOURLY
55Oven, Vacuum (large)HOURLY
56Ozone GeneratorHOURLY
57Pump, Sump/FloodHOURLY
58Scaffolding SectionHOURLY
59Sprayer, Airless H.P.HOURLY
60Steam CleanerHOURLY
61Vacuum, HEPAHOURLY
62Vacuum, UprightHOURLY
63Vacuum, Wet/DryHOURLY
64Washer, High Pressure (hot)HOURLY
65Portable Holding Tank (550 gallon)HOURLY
66Portable Holding Tank (1,000 gallon)HOURLY
67North Region - Rental Equipment: All Inclusive Percentage Mark-Up for Rental EquipmentPCNT

Sheet2

Sheet3

Sheet4

Sheet5

File details come from the government source that posted it. Updated .