About this file
This is a state-supplied price sheet for Bid Solicitation #26DPP01192 (T2881) for Water Damage Restoration Services on a statewide basis. The document establishes pricing requirements for the Central Region and is designed for bidders to complete with their proposed unit costs across three contract years. The solicitation references personnel categories and pricing instructions contained in the bid solicitation document sections 4.6 and 3.23.
The contract covers labor services including project managers, supervisors, water restoration technicians, laborers, and carpenter positions (foreman, journeyman, and apprentice) at both regular and overtime hourly rates, with a separate percentage markup line for labor supplies and materials. Equipment pricing encompasses extraction and drying equipment (air movers, dehumidifiers of various capacities, extraction units, HEPA filtration, and inject-dry units), power and distribution equipment (electrical panels and generators ranging from portable to 1,000 KW capacity), transportation rentals (trailers, trucks, vans, and vehicles), and miscellaneous equipment (including bobcats, cleaning systems, ovens, pumps, scaffolding, and holding tanks). All equipment is priced on an hourly rental basis. An additional percentage markup line applies to all rental equipment. Pricing is structured with separate unit cost columns for Year 1, Year 2, and Year 3 of the contract, with all prices to be entered in the yellow-highlighted cells by the bidder.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| T2881 - Method of Operation 10.1.2026~3.docx | DOCX document | |
| T2881 Att 4 Procedure for Background Checks.pdf | ||
| T2881 Att 1 Combined SSTC 6.3.2025.pdf | ||
| T2881 Att 3 Reim~1.xlsx | XLSX spreadsheet | |
| T2881 Bid Amendment 1_1.21.26~1.docx | DOCX document | |
| T2881 Final Bid Solicitation 10.1.2026~2.docx | DOCX document | |
| T2881 Final PS North 10.1.2026~2.xlsx | XLSX spreadsheet | |
| T2881 Final PS South 10.1.2026~2.xlsx | XLSX spreadsheet | |
| AQ_OA_Redacted_Countersigned.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Central Region - State Supplied Price Sheet Bid Solicitation #26DPP01192 - T2881 - Water Damage Restoration Services - Statewide
| Bidder Name: | ||||
| Refer to Bid Solicitation Section 3.23 for Bidder instructions. The Bidder shall provide pricing in the yellow highlighted cells below. The Bidder must not alter the price schedule in any manner. | ||||
| Line No. | Item Description | Unit of Measure | Year 1 | |
| Unit Cost | Year 2 | |||
| Unit Cost | Year 3 |
Unit Cost
| Central Region Labor | ||
| 1 | Central Region: Percentage Mark-Up for Labor Supplies and Materials | PCNT |
| 2 | Central Region: Project Manager - All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 3 | Central Region: Project Manager - All- Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 4 | Central Region: Supervisor -All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 5 | Central Region: Supervisor - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 6 | Central Region: Water Restoration Technician - All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 7 | Central Region: Water Restoration Technician - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 8 | Central Region: Laborer - All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 9 | Central Region: Laborer - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 10 | Central Region: Carpenter Foreman - All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 11 | Central Region: Carpenter Foreman - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 12 | Central Region: Carpenter Journeyman -All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 13 | Central Region: Carpenter Journeyman - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 14 | Central Region: Carpenter Apprentice - All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 15 | Central Region: Carpenter Apprentice - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |||||
| $ 10.00 | . | |||||
| Central Region Equipment | ||||||
| Extraction, Drying, Air Filtration & Cooling Equipment | Unit of Measure | Year 1 Unit Cost | Year 2 Unit Cost | Year 3 Unit Cost | ||
| 16 | Air Mover/Carpert Blowers | HOURLY | ||||
| 17 | Dehumidifier (200 cfm refrigerant) | HOURLY | ||||
| 18 | Dehumidifier (3,500 cfm dessicant) | HOURLY | ||||
| 19 | Dehumidifier (4,500 - 5,000 cfm dessicant) | HOURLY | ||||
| 20 | Dehumidifier (9,000 - 10,000 cfm dessicant) | HOURLY | ||||
| 21 | Dehumidifier (15,000 cfm dessicant) | HOURLY | ||||
| 22 | Dehumidifier (DX Unit 20/30 ton) | HOURLY | ||||
| 23 | Dehumidifier (DX Unit 60 ton) | HOURLY | ||||
| 24 | Extraction Unit (Portable) | HOURLY | ||||
| 25 | Extraction Unit (Trailer) | HOURLY | ||||
| 26 | HEPA Filtration Unit (Air Scrubber) | HOURLY | ||||
| 27 | Inject-dry Unit | HOURLY | ||||
| Power and Distribution Equipment Rental | Unit of Measure | Year 1 Unit Cost | Year 2 Unit Cost | Year 3 Unit Cost | ||
| 28 | Electrical Distribution Panel (120 AMPS) | HOURLY | ||||
| 29 | Generator (Portable) | HOURLY | ||||
| 30 | 60 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 31 | 75 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 32 | 125 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 33 | 200 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 34 | 500 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 35 | 1,000 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 36 | Air Compressor | HOURLY | ||||
| 37 | Carpet Cleaning Machine | HOURLY | ||||
| 38 | Carpet Tilt/Demolition | HOURLY | ||||
| 39 | Saw - Demo | HOURLY | ||||
| 40 | Saw - Power Miter | HOURLY | ||||
| Transportation Rental Fee | Unit of Measure | Year 1 Unit Cost | Year 2 Unit Cost | Year 3 Unit Cost | ||
| 41 | Trailer, Enclosed (12-16 feet) | HOURLY | ||||
| 42 | Trailer, Flat Bed | HOURLY | ||||
| 43 | Trailer, Freezer | HOURLY | ||||
| 44 | Truck, Moving | HOURLY | ||||
| 45 | Truck, Pickup | HOURLY | ||||
| 46 | Van, Box (12 -16 feet) | HOURLY | ||||
| 47 | Van, Box (17-20 feet) | HOURLY | ||||
| 48 | Van, Passenger (up to 10 people) | HOURLY | ||||
| 49 | Vehicle Pickup, SUV or car | HOURLY | ||||
| 50 | Truck and Driver for water disposal | HOURLY | ||||
| Miscellaneous Equipment | Unit of Measure | Year 1 Unit Cost | Year 2 Unit Cost | Year 3 Unit Cost | ||
| 51 | Bobcat, Small | HOURLY | ||||
| 52 | Floor Cleaning System (walk behind) | HOURLY | ||||
| 53 | Light, Tower Mobile (400 W diesel) | HOURLY | ||||
| 54 | Oven, Convection Convection Drying (ULT) | HOURLY | ||||
| 55 | Oven, Vacuum (large) | HOURLY | ||||
| 56 | Ozone Generator | HOURLY | ||||
| 57 | Pump, Sump/Flood | HOURLY | ||||
| 58 | Scaffolding Section | HOURLY | ||||
| 59 | Sprayer, Airless H.P. | HOURLY | ||||
| 60 | Steam Cleaner | HOURLY | ||||
| 61 | Vacuum, HEPA | HOURLY | ||||
| 62 | Vacuum, Upright | HOURLY | ||||
| 63 | Vacuum, Wet/Dry | HOURLY | ||||
| 64 | Washer, High Pressure (hot) | HOURLY | ||||
| 65 | Portable Holding Tank (550 gallon) | HOURLY | ||||
| 66 | Portable Holding Tank (1,000 gallon) | HOURLY | ||||
| 67 | Central Region - Rental Equipment: All Inclusive Percentage Mark-Up for Rental Equipment | PCNT |