The document is a construction contract plan from the Delaware Department of Transportation (DelDOT) for the Community Transportation Fund, New Castle VII, 2025, with contract number T202503107. The project involves various roadway improvement locations throughout New Castle County, including 19 specific sites such as Albertson Park, Beech Hill, Limestone Acres, and Sheridan Square. General improvements include 2-inch mill and overlay operations, speed hump replacements, speed table installations, piano key crosswalks, and associated infrastructure work like curb repairs, sidewalk installations, drainage inlet adjustments, and pavement striping. The contract is dated January 29, 2025, with an approval for advertisement on February 4, 2025.
The contract includes comprehensive material estimates for each location, with total quantities spanning excavation, concrete and asphalt pavement work, curb and sidewalk installations, traffic control, and erosion management. The total project involves approximately 55,900 square yards of pavement milling, 3,780 tons of superpave type C carbonate stone, 301 linear feet of speed humps, and extensive sidewalk and curb work. Funding appears to be from the Community Transportation Fund, with no federal aid listed. The project will require significant traffic management, including 2,838 hours of flagging, multiple arrow panels, truck-mounted attenuators, and detailed striping and signage work across the various project locations in New Castle County.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
January 29, 2025
2/4/2025
(CAD) PAGE 1 OF 53
Tim Hackett Sticky Note Accepted set by Tim Hackett
DEPARTMENT OF TRANSPORTATION
CONTRACT NUMBER- T202503107 (CAD) PAGE 2 OF 53
CONTRACT IS FOR VARIOUS LOCATIONS THROUGHOUT NEW CASTLE COUNTY.
LOCATION MAP
CONTRACT NUMBER- T202503107 (CAD) PAGE 3 OF 53
CONTRACT NUMBER- T202503107 (CAD) PAGE 4 OF 53
CONTRACT IS FOR VARIOUS LOCATIONS THROUGHOUT NEW CASTLE COUNTY.
Hammond Pl
CONTRACT NUMBER- T202503107 (CAD) PAGE 5 OF 53
CONTRACT IS FOR VARIOUS LOCATIONS THROUGHOUT NEW CASTLE COUNTY.
Regent Circle
CONTRACT NUMBER- T202503107 (CAD) PAGE 6 OF 53
CONTRACT NUMBER- T202503107 (CAD) PAGE 7 OF 53
CONTRACT NUMBER- T202503107 (CAD) PAGE 8 OF 53
CONTRACT NUMBER- T202503107 (CAD) PAGE 9 OF 53
CONTRACT NUMBER- T202503107 CANAL (CAD) PAGE 10 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
GENERAL CONTRACT PLAN NOTES
SECTION 100
1. THIS PROJECT IS TO BE CONSTRUCTED IN ACCORDANCE WITH THE DELAWARE DEPARTMENT
OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION
DATED JANUARY 2024 AND THE DELAWARE DEPARTMENT OF TRANSPORTATION STANDARD
CONSTRUCTION DETAILS DATED 2024, INCLUDING ALL REVISIONS UP TO THE DATE OF
ADVERTISEMENT.
2. THE PURPOSE OF THIS CONTRACT IS TO MAKE GENERAL IMPROVEMENTS TO ROADS AND/OR
STREETS WITHIN THE DISTRICT HEREIN SPECIFIED. DEPENDING ON FUND AVAILABILITY, THE
DEPARTMENT RESERVES THE RIGHT TO ADD OR DELETE LOCATIONS AND/OR QUANTITIES FOR
THIS CONTRACT. SUCH ADDITIONS OR DELETIONS SHALL NOT BE CAUSE FOR AN INCREASE OR
DECREASE IN ANY CONTRACT UNIT BID PRICES. NO ITEM PRICES ARE TO BE RENEGOTIATED DUE TO EITHER AN INCREASE OR DECREASE IN QUANTITY USAGE RESULTING FROM SAID ADDITIONS
OR DELETIONS.
3. THE CONTRACTOR SHALL PROVIDE WRITTEN NOTICE TO RESIDENTS AND BUSINESSES AT
LEAST 48 HOURS, BUT NO MORE THAN 96 HOURS, PRIOR TO ALL PHASES OF CONTRACT WORK
INCLUDING BUT NOT LIMITED TO: SAWCUTTING FOR P.C.C. OPERATIONS, P.C.C. REMOVAL AND
REPLACEMENT, PAVEMENT MILLING, AND PAVING. THIS NOTICE SHALL BE GIVEN TO ALL
RESIDENTS AND BUSINESSES WHOSE PROPERTY IS ADJACENT TO THE STREET ON WHICH WORK IS TO BE PERFORMED. FAIILURE TO GIVE PROPER NOTICE WILL RESULT IN A SUSPENSION OF WORK REQUIRING NOTICE, UNTIL PROPER NOTICE IS PROVIDED. UPON COMPLETION OF DISTRIBUTING
WRITTEN NOTICES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER.
4. LOCATION LISTINGS INDICATE GENERAL LIMITS OF CONSTRUCTION, MAJOR TYPES OF
IMPROVEMENTS, AND ESTIMATED QUANTITIES. DURING THE BIDDING PERIOD, ANY QUESTIONS
PERTAINING TO LOCATIONS SHALL BE DIRECTED TO THE CONTRACT ADMINISTRATOR. AFTER THE AWARD, SUCH QUESTIONS SHALL BE REFERRED TO THE APPROPRIATE DISTRICT ENGINEER OR HIS
REPRESENTATIVE.
5. THIS CONTRACT WILL HAVE CLEAR “START BY” DATE AND TIME ALLOCATED FOR
COMPLETION. FAILURE TO COMPLETE THE CONTRACT IN THE SPECIFIED TIME SHALL CONSTITUTE
“FAILURE TO PURSUE THE WORK” AND SUBJECTS THE CONTRACTOR TO LIQUIDATED DAMAGES
AS OUTLINED IN SUBSECTION 108.8 OF THE STANDARD SPECIFICATIONS.
6. THE CONTRACTOR SHALL SUBMIT THE REQUIRED COPIES OF A DETAILED PROGRESS
SCHEDULE (PSC) AS OUTLINED IN STANDARD SPECIFICATION 108.4 PRIOR TO THE
PRECONSTRUCTION MEETING. DETAILS SHALL INCLUDE A DESCRIPTION OF EACH WORK
ACTIVITY, THE PLANNED DAYS OF WORK, MULTIPLE CREWS OR SHIFTS, AND SCHEDULED
WORKING HOURS. DURING THE CONTRACT, THE CONTRACTOR SHALL SUBMIT TWO-WEEK (OR AS
REQUIRED) "LOOK AHEAD" SCHEDULES TO THE AREA ENGINEER/ MANAGER NO LATER THAN
CONTRACT NUMBER- T202503107 CANAL (CAD) PAGE 11 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
GENERAL CONTRACT PLAN NOTES
NOON OF EACH THURSDAY. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL
CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED.
ADDITIONAL WORK:
7. THE DEPARTMENT RESERVES THE RIGHT TO INCREASE OR DECREASE THE QUANTITIES OF THE ITEMS SPECIFIED IN THIS CONTRACT. SUCH ADDITIONS SHALL NOT BE CAUSE FOR AN INCREASE OR DECREASE IN ANY CONTRACT UNIT BID PRICES AND/OR LUMP SUM ITEMS IF THE INCREASE IN
QUANTITES DOES NOT REQUIRE REMOBILZATON.
8. THE DEPARTMENT RESERVES THE RIGHT TO ADD LOCATONS TO THIS CONTRACT. SPECIFIC
WORK WILL BE ASSIGNED BY THE DEPARTMENT VIA WORK ORDERS AND THE DEPARTMENT WILL
MAKE EVERY ATTEMPT TO MINIMIZE THE DISTANCE BETWEEN SUCCESSIVE LOCATIONS. THE
CONTRACTOR MAY SUBMIT A REQUEST FOR ADDITIONAL MOT AND MOBILIZATION IN
CONJUNCTION WITH ADDED LOCATIONS. THIS REQUEST WILL BE CONSIDERED ON THE BASIS OF
EACH ADDITIONAL LOCATION. THE REQUEST FOR INITIAL EXPENSE/MOBILIZATION SHALL NOT
EXCEED THE AMOUNT OF THE BID PRICE FOR 763000, DIVIDED BY THE NUMBER OF ORIGINAL
CONTRACT LOCATIONS. THE REQUEST FOR MOT SHALL NOT EXCEED THE AMOUNT OF THE BID
PRICE FOR 801500, DIVIDED BY THE NUMBER OF ORIGINAL CONTRACT LOCATIONS. FOR OPEN END
CONTRACTS WITHOUT ORIGINAL LOCATIONS, BID ITEMS 763544-763552 SHALL BE FULL
COMPENSATION FOR MOBILIZATION AND MOT.
EACH WORK ORDER ISSUED WILL HAVE CLEAR “START BY” DATE AND TIME ALLOCATED TO
COMPLETE SAID WORK ORDER. ONCE TIME (CALENDAR DAYS) HAS BEEN ASSIGNED TO A WORK
ORDER AND ISSUED, THE CONTRACTOR HAS 2 BUSINESS DAYS, NOT INCLUDING THE DAY OF
ISSUANCE, TO DISPUTE THE TIME QUANTITY AND PROVIDE ADDITIONAL BACKUP
DOCUMENTATION FOR WHY THE TIME QUANTITY IS NOT SUFFICIENT. A DETAILED BREAKDOWN
OF LABOR/MATERIALS/EQUIPMENT ALONG WITH THE CONTRACTORS TIME ESTIMATE WILL BE
REQUIRED; THIS INFORMATION MUST BE RECEIVED BY THE DEPARTMENT BY THE END OF THE 2ND
BUSINESS DAY OR THE DEPARMENT WILL CONSIDER THE CONTRACTOR IN AGREEMENT WITH THE
TIME ESTIMATE. THE ENGINEER WILL EVALUATE ANY REQUEST FOR MODIFICATION TO THE TIME
ESTIMATE AND AT THEIR SOLE DISCRETION DETERMINE IF ADDITIONAL TIME IS GRANTED.
DISPUTING TIME QUANTITY DOES NOT CONSTITUTE A DELAY IN COMMENCEMENT OF A WORK
ORDER. ISSUANCE OF EACH WORK ORDER CONSTITUTES THE NOTICE TO PROCEED WITH THE
WORK DESCRIBED. FAILURE TO COMPLETE A WORK ORDER IN THE SPECIFIED TIME SHALL
CONSTITUTE “FAILURE TO PURSUE THE WORK” AND SUBJECTS THE CONTRACTOR TO LIQUIDATED DAMAGES AS OUTLINED IN SUBSECTION 108. 9 OF THE STANDARD SPECIFICATIONS BASED ON THE
TOTAL VALUE OF THAT PARTICULAR WORK ORDER.
UPON ISSUANCE OF EACH WORK ORDER, THE CONTRACTOR SHALL SUBMIT THE REQUIRED COPIES OF A DETAILED PROGRESS SCHEDULE AS OUTLINED IN STANDARD SPECIFICATION 108.4 WITHIN 5
CONTRACT NUMBER- T202503107 CANAL (CAD) PAGE 12 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
GENERAL CONTRACT PLAN NOTES
CALENDAR DAYS OF THE ISSUANCE OF WORK ORDER. DURING THE CONTRACT, THE CONTRACTOR
SHALL SUBMIT TWO‐WEEK (OR AS REQUIRED) “LOOK AHEAD” SCHEDULES TO THE AREA
ENGINEER NO LATER THAN NOON OF EACH THURSDAY. DETAILS SHALL INCLUDE A DESCRIPTION
OF EACH WORK ACTIVITY, THE PLANNED DAYS OF WORK, MULTIPLE CREWS OR SHIFTS, AND
SCHEDULED WORKING HOURS. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL
CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED. THE PROGRESS SCHEDULE
MUST ALSO BE UPDATED AND SUBMITTED TO THE DEPARTMENT AS CHANGES OR DELAYS OCCUR
IN THE CONTRACT.
SECTION 400
9. UNLESS SPECIFIED, OVERLAY WIDTHS SHALL MATCH EXISTING WIDTHS.
10. THE COST OF CLIPPING BACK THE EDGES OF THE ROADWAY, SHOULDERS, AND THE FIRST 3'
OF UNPAVED DRIVEWAY ENTRANCES, PICKING UP AND DISPOSING OF WASTE AND EXCESS
MATERIAL, AND CLEANING THE EXISTING PAVEMENT PRIOR TO AN OVERLAY SHALL BE
INCIDENTAL TO SECTION 401XXX. PREPARING UNPAVED DRIVEWAY ENTRANCES BEYOND THE
FIRST 3' SHALL BE PAID UNDER THE APPROPRIATE CONTRACT ITEMS: 202000 AND/OR 30100X.
11. ALL PAVING, INCLUDING TURN LANES AND INTERSECTIONS, IS TO BE COMPLETED CURB TO
CURB WITHIN SEVEN (7) CALENDAR DAYS FROM THE TIME THE AREA WAS MILLED. THIS
RESTRICTION APPLIES TO EACH DAYS PAVEMENT MILLING OPERATION, NOT AN ENTIRE PROJECT LOCATION. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL OTHER CONTRACT WORK
WITH TIME CHARGES CONTINUING TO BE ASSESSED.
12. IN ADDITION TO ITEM 401506 SPEED HUMP BEING UTILIZED FOR NEW SPEED HUMPS, IT SHALL
ALSO INCLUDE REMOVE AND REPLACE SPEED HUMPS. UNLESS NOTED OTHERWISE, SPEED HUMPS
SHALL BE MEASURED AND REPLACED AT THE SAME HEIGHT PRIOR TO CONSTRUCITON BUT SHALL NOT EXCEED 4”. ALL SIGNING AND STRIPING SHALL CONFORM TO THE LATEST EDITION OF THE
DE MUTCD.
AT REMOVE AND REPLACE LOCATIONS, 401506 SHALL BE PAID AND THE REMOVAL SHALL BE
INCIDENTAL TO THIS ITEM. SPEED HUMPS REMOVED AS PART OF THE MILLING/PAVING
OPERATION, SCHEDULED TO BE PUT BACK, SHALL BE REPLACED WITHIN SEVEN (7) DAYS OF
COMPLETION OF PAVING. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL OTHER
CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED. PAYMENT FOR THIS ITEM
SHALL INCLUDE PERMANENT STRIPING AND DELINEATOR POSTS. IF PERMANENT STRIPING
CONTRACT NUMBER- T202503107 CANAL (CAD) PAGE 13 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
GENERAL CONTRACT PLAN NOTES
CANNOT BE PLACED THE SAME DAY AS THE SPEED HUMP PLACEMENT, TEMPORARY STRIPING
SHALL BE APPLIED THE SAME DAY.
13. PAVING WILL INCLUDE INTERSECTING STREETS FROM P.C. TO P.C.: MILLING AND PAVING OF
INTERSECTING STREETS WILL NOT BE CONSIDERED FOR ENTRANCE, DRIVEWAY AND
INTERSECTING STREET PAVEMENT SURCHARGE, NOR WILL DRIVEWAYS AND ENTRANCES.
14. FOR BITUMINOUS CONCRETE PATCH:• FOR DRIVEWAY APRONS (BEHIND CURB) PLACE 2 LIFTS OF 2” BITUMINOUS CONCRETE TYPE C.• FOR FINISHED PATCHES IN FRONT OF CURB, PLACE 2 LIFTS OF 2” BITUMINOUS CONCRETE TYPE C.• FOR TEMPORARY PATCHES IN FRONT OF CURB, PLACE 2 LIFTS OF 2” OF BITUMINOUS CONCRETE TYPE C OR AS DIRECTED BY THE AREA ENGINEER.• THE ENGINEER MAY CHANGE TYPE OF BITUMINOUS CONCRETE AND DEPTHS AT THEIR
DISCRETION.
SECTION 500
15. ITEM 501001 PCC PAVEMENT, 8” IS DESIGNATED FOR NOW-DEFUNCT ITEM 701004 PCC VALLEY
GUTTER-8”. WHEN REPLACING VALLEY GUTTERS, PLEASE REFER TO CONTRACT PLAN DETAILS.
DOWEL BARS, WIRE MESH REINFORCEMENT, BITUMINUOUS SEAL, AND EXPANSION, PCC
SAWCUTS, AND GABC UNDER THE PCC ARE INCIDENTAL TO VALLEY GUTTER ITEM (501001).
SECTION 600
16. DRAINAGE INLET GRATES ADJACENT TO THE ROAD, WITHIN THE PROJECT LIMITS, WHICH ARE
NOT TYPE 1 SHALL BE REPLACED WITHIN 7 DAYS OF PAVING. THE NEED FOR ANY GRATE
MODIFICATIONS OR FOR NEW FRAMES SHALL BE DETERMINED BY THE ENGINEER. ALL REPLACED
GRATES/ FRAMES SHALL BE DELIVERED TO THE CANAL DISTRICT MAINTENANCE YARD, OR AS
DIRECTED WITH THE COST OF DELIVERY INCIDENTAL TO 602100/602101, REPLACING DRAINAGE INLETS GRATES/FRAMES. FINAL PAYMENT FOR REPLACED GRATES/ FRAMES SHALL NOT BE MADE
UNTIL RECEIPT OF DELIVERED MATERIALS IS PRODUCED, SIGNED BY A DELDOT MAINTENANCE
YARD SUPERVISOR.
17. CATCH BASINS WITH A MANHOLE SHALL BE CONVERTED TO A STANDARD CATCH BASIN AT
THE DISCRETION OF THE ENGINEER. A 6” COVERSLAB WITH REBAR 6-8” ON CENTER AND MINIMUM
OF 6” OF TOPSOIL ON TOP SHALL REPLACE MANHOLE. PAYMENT FOR ADDITIONAL WORK SHALL
CONTRACT NUMBER- T202503107 CANAL (CAD) PAGE 14 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
GENERAL CONTRACT PLAN NOTES
BE PAID AN ADDITIONAL QUANTITY OF 0.5 THE BID AMOUNT FOR ITEM 602130 OR 602131.
18. WHEN ENCOUNTERING DELDOT STORMWATER MANHOLES WITHIN LIMITS OF PAVING, THOSE
MANHOLES WILL BE ADJUSTED AND UPDATED AT THE DISCRETION OF THE ENGINEER. ITEMS
602102/602103 SHALL BE FULL COMPENSATION (FURNISH AND INSTALLING) THE NEW LIDS AND
FRAMES.
19. WHEN ENCOUNTERING NEW CASTLE COUNTY SANITARY MANHOLES WITHIN THE LIMITS OF
PAVING, THOSE MANHOLES WILL BE ADJUSTED AND UPDATED AT THE DISCRETION OF THE
ENGINEER. THE LIDS AND FRAMES ARE PROVIDED BY NEW CASTLE COUNTY AT NO COST TO THE CONTRACTOR. OBTAINING, STORING, DELIVERING, AND PLACING THESE NEW LIDS AND FRAMES
SHALL BE INCIDENTAL TO THE ADJUSTMENT ITEM 602132.
ANY ADJUSTMENTS TO THE AFOREMENTIONED MUNICIPALLY OWNED FACILITIES SHALL BE DONE
IN ACCORDANCE WITH THE RESPECTIVE AGENCIES STANDARD SPECIFICATIONS, AS
CONSTRUCTION WARRANTS.
• THE COUNTY REQUIRES A FULL BEARING OF BRICK BENEATH ALL ADJUSTED SANITARY
MANHOLE CASTINGS.• THE COUNTY ACCEPTS THE USE OF 1-1/2” TO 3” PRECAST P.C.C. RINGS FOR THEIR MANHOLE
ADJUSTMENTS, UPON APPROVAL OF THE CONTRACTOR’S SOURCE OF MATERIALS
SUBMISSION.
SECTION 700
20. BUTT JOINTS SHALL BE CONSTRUCTED AT ALL INTERSECTING BITUMINOUS CONCRETE ROADS
AND ANY OTHER LOCATIONS AS DIRECTED BY THE ENGINEER. BUTT JOINTS AT RAILROAD
CROSSINGS AND AT BRIDGE OR DRAINAGE STRUCTURES NOT TO BE RESURFACED SHALL BE AS
PER THE INCLUDED PLAN DETAIL. BUTT JOINTS CUT PRIOR TO THE DAY OF PAVEMENT OVERLAY SHALL BE RAMPED WITH BITUMINOUS CONCRETE TRM, IN MILLING AREAS, INCIDENTAL TO THE ITEM 762004 BUTT JOINT. ONLY BITUMINOUS CONCRETE WILL BE ALLOWED FOR THIS PURPOSE.
BUTT JOINTS IN FULL MILL AREAS SHALL BE INCIDENTAL TO THE PAVEMENT MILLING ITEM
(760010). SAWCUTS FOR BUTT JOINTS SHALL BE INCIDENTAL TO THE BUTT JOINT ITEM. ALL
BITUMINOUS CONCRETE TRM SHALL BE REMOVED PRIOR TO THE PAVING OPERATION.
21. THE USE OF MILLINGS AND GABC IN THE TRAVEL WAY, TEMPORARY TRAVEL WAY, HIGH
VOLUME ENTRANCES AND ACCESS RAMP FOR THE PURPOSE OF PROVIDING A TEMPORARY
ROADWAY SURFACE, POTHOLE REPAIR, TAPERED EDGE FOR UTILITIES, BUTT JOINTS, AND
LONGITUDINAL DROP-OFFS (MILLING AND PAVING OPERATIONS) IS PROHIBITED UNLESS IT IS OTHERWISE DESIGNATED TO BE USED IN THE CONTRACT PLANS. USE COLD PATCH, BITUMINOUS
CONCRETE, BITUMINOUS CONCRETE WEDGE, OR TAPER MILL, AS NOTED IN THE CONTRACT
DOCUMENTS OR APPROVED BY THE ENGINEER. PAYMENT FOR COLD PATCH, BITUMINOUS
CONTRACT NUMBER- T202503107 CANAL (CAD) PAGE 15 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
GENERAL CONTRACT PLAN NOTES
CONCRETE, OR BITUMINOUS CONCRETE WEDGE SHALL BE INCIDENTAL TO THE BITUMINOUS
CONCRETE MILLING ITEM.
MILLINGS OR GABC SHALL BE USED AT THE FOLLOWING LOCATIONS WHERE ACCESS TO A
BUSINESS RESIDENCE, OR EDGE DROP OFF NEEDS TO BE MAINTAINED UNLESS OTHERWISE NOTED IN THE PLANS OR DIRECTED BY THE ENGINEER TO USE BITUMINOUS CONCRETE OR COLD PATCH.
ALL MILLING AND GABC WILL BE ROLLED AND COMPACTED TO HELP PREVENT THE MATERIAL
FROM UNRAVELING.
A. DRIVEWAYS
B. ENTRANCES
C. LOW VOLUME ACCESS RAMPS (IDENTIFIED IN THE CONTRACT DOCUMENTS)
D. EDGE DROP-OFFS ADJACENT TO LIVE ROADWAY (LANE, SHOULDER, OR TURN LANE) AND
THE PROPOSED ROAD CONSTRUCTION
E. EDGE OF ROADWAY DROP-OFF
GRADING AND MAINTAINING BASE COURSE THAT IS BEING USED FOR ROADWAY WEDGE/FILLET
BETWEEN TRAVEL LANES AND PAVEMENT BOX, EDGE OF TRAVEL WAY, DRIVEWAY OR ENTRANCE
ACCESS SHALL BE INCIDENTAL TO ITEM NO. 801XXX - MAINTENANCE OF TRAFFIC. THE BASE
COURSE MATERIAL SHALL BE PLACED AT NO GREATER THAN THE SLOPE SPECIFIED IN TABLE 6G-
1 AND SHALL BE COMPACTED. EXCESS BASE COURSE MATERIAL SHALL BE PUSHED AHEAD AND
USED IN THE NEXT SEGMENT AND SHALL BE INCIDENTAL TO THE PARTICULAR BASE COURSE PAY
ITEM. NO SEPARATE PAYMENT SHALL BE MADE FOR MILLINGS OR GABC TEMPORARY ROADWAY
MATERIAL (TRM) USED TO PROTECT EDGE DROP-OFFS, UNLESS THE MATERIAL IS EVENTUALLY
UTILIZED AS PART OF A PERMANENT ROADWAY AT WHICH TIME THE MATERIAL WOULD BE PAID
FOR UNDER THE RESPECTIVE CONTRACT MATERIAL ITEM. VERTICAL DIFFERENCES SHALL BE
CORRECTED IN ACCORDANCE WITH TABLE 6G-1 OF THE DELAWARE MUTCD.
22. AFTER PAVEMENT MILLING, ALL TRANSVERSED VERTICAL DIFFERENCES, RAISED EDGES OF MANHOLES, DRAINAGE INLETS, WATER VALVE BOXES, ETC. SHALL BE RAMPED WITH BITUMINOUS CONCRETE TRM AT A 20:1 OR FLATTER SLOPE PRIOR TO OPENING THE ROADWAY TO TRAFFIC AND SHALL BE INCIDENTAL TO PAVEMENT MILLING. PAVEMENT MILLINGS OR COLD PATCH MATERIAL
WILL NOT BE ALLOWED FOR THIS PURPOSE.
ALL ADJUSTMENTS SHALL BE MADE NOT MORE THAN SEVEN (7) CALENDAR DAYS PRIOR TO THE
PLACEMENT OF THE FINAL COURSE OF BITUMINOUS CONCRETE, UNLESS DIRECTED BY THE
ENGINEER. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL OTHER CONTRACT WORK
WITH TIME CHARGES CONTINUING TO BE ASSESSED.
CONTRACT NUMBER- T202503107 CANAL (CAD) PAGE 16 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
GENERAL CONTRACT PLAN NOTES
ALL BITUMINOUS CONCRETE TRM SHALL BE REMOVED PRIOR TO THE PAVING OPERATIONS. IF THE
CONTRACTOR ELECTS TO ADJUST MANHOLES, DRAINAGE INLETS AND WATER VALVES AFTER THE
FINAL COURSE OF PAVING, THIS WORK MUST BE COMPLETED WITHIN SEVEN (7) CALENDAR DAYS
OF THE FINAL COURSE OF BITUMINOUS CONCRETE. FAILURE TO COMPLY WILL RESULT IN A
SUSPENSION OF ALL OTHER CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE
ASSESSED.
23. THE CONTRACTOR SHALL TAKE CARE IN REMOVING PAVEMENT AROUND UTILITIES, BUTT
JOINTS, CURBS, ETC. SO THAT EXISTING PAVEMENT BEYOND THE SPECIFIED DEPTHS IS NOT
DAMAGED. ANY DAMAGE CAUSED BY THE CONTRACTOR'S OPERATIONS MAY RESULT IN PLACING
LEVELING COURSES AT THE CONTRACTOR'S EXPENSE. THE REMOVAL AND CLEAN UP OF THE HOT
MIX RESIDUE WEDGE REMAINING AFTER MILLING OPERATIONS SHALL BE INCIDENTAL TO THE
MILLING ITEM. THE REMOVAL OF EXISTING RAISED PAVEMENT MARKERS (RPM'S) SHALL BE
INCIDENTAL TO THE APPLICABLE MILLING AND/OR RECLAMATION ITEMS.
24. TAPER MILLING IS INTENDED FOR MILLING IN THE AREA OF FIXED STRUCTURES (I.E. CURBS, MANHOLES, ETC.) THE MILLED DEPTH AT THE STRUCTURE SHALL BE THE DEPTH OF THE PROPOSED OVERLAY AND 0” AT A DISTANCE OF +/- 6 ½ FEET FROM THE STRUCTURE. THE COMPUTED DEPTH
FOR PAYMENT PURPOSES IS THE AVERAGE OF THE TWO DEPTHS.
25. ON THIS CONTRACT FULL MILL AREAS WILL UTILIZE ITEM 760010 PAVEMENT MILLING,
BITUMINUOUS CONCRETE PAVEMENT (SY-IN). UNLESS OTHERWISE NOTED, ALL MILLING
LOCATIONS ARE EXPECTED TO BE MILLED AT A 2” DEPTH. FOR AVERAGE MILLING DEPTHS OF
0.5”TO AN AVERAGE MILLING DEPTH OF 2.25”, THE FULL MILL AREAS WILL BE PAID AT AN
AVERAGE 2”.
26. MILLING OF BITUMINOUS PAVEMENT IN PREPARTION FOR OVERLAY IS TO INCLUDE MILLING
EXISTING CONCRETE PATCHES AND/OR COMPOSITE PAVING AND SHOULD BE CONSIDERED
INCIDENTAL TO ITEM 760010, PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT.
27. ALL MILLED MATERIAL SHALL REMAIN THE PROPERTY OF THE CONTRACTOR UNLESS
OTHERWISE STATED.
28. AT LOCATIONS THAT HAVE PCC REPLACEMENT, PAVING MUST BE COMPLETED WITHIN 90
CALENDAR DAYS FROM THE START OF THE PCC REPLACEMENT. BETWEEN OCTOBER 15TH AND
NOVEMBER 30TH, PAVING MUST BE COMPLETED WITHIN 30 CALENDAR DAYS FROM THE START OF
THE PCC REPLACEMENT. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL OTHER
CONTRACT NUMBER- T202503107 CANAL (CAD) PAGE 17 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
GENERAL CONTRACT PLAN NOTES
CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED.
29. UPRIGHT PCC CURB UTILIZED FOR GRADE RETENTION 8” OR HIGHER WILL BE PAID AS 701013, TYPE 1-8 CURB.
30. EXCAVATION UP TO 2' IN FRONT OF CURB, ADA FACILITIES, AND DRAINAGE INLETS WILL BE INCIDENTAL TO THE CORRESPONDING ITEMS (701XXX, 705XXX, AND 602XXX). HOT MIX PLACED IN FRONT OF CURB WILL BE PAID UNDER ITEM 401XXX. USE OF CONCRETE AS FILL IN FRONT OF CURB WILL NOT BE ACCEPTED UNLESS DIRECTED BY THE ENGINEER. AT EACH LOCATION, BACKFILLING
SHALL BE PERFORMED IMMEDIATELY UPON REMOVAL OF FORMS FOR CURB OR SIDEWALK.
TOPSOIL, SEEDING, SEALING OF VALLEY GUTTERS, REMOVING OF FORMS, AND PARGING OF CATCH BASINS, SHALL BE COMPLETED WITHIN SEVEN (7) CALENDAR DAYS OF COMPLETION OF THE ITEM OF WORK. ITEM 908001, TOPSOIL, SHALL BE USED AS BACKFILL MATERIAL BEHIND CURB AND
AROUND SIDEWALK OR/AS DIRECTED BY THE ENGINEER. TOPSOIL SHALL BE SCREENED/SIFTED
SO AS NO MATERIAL GREATER THAN .5" SHOULD BE PRESENT IN MATERIAL USED FOR BACKFILL.
EXCAVATED MATERIAL, NOT NEEDED ON THE PROJECT, SHALL BE REMOVED FROM THE
CONTRACT AT THE CONTRACTORS EXPENSE. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION
OF ALL OTHER CONTRACT WORK WITH THE CHARGES CONTINUING TO BE ASSESSED.
31. AS DIRECTED BY THE ENGINEER, THE CONTRACTOR SHALL PARTIALLY SAW AND FILL
EXISTING CRACKED CURB AND/OR SIDEWALK WITH AN APPROVED SEALER. THIS WORK WILL BE
INCIDENTAL TO ITEM 762001 SAWCUT - CONCRETE FULL DEPTH.
32. PERTAINING TO PCC CURB REMOVAL & PATCHING, SAWCUTTING IS TO BE PERFORMED PRIOR
TO THE REMOVAL OF BITUMINOUS CONCRETE UNLESS APPROVAL IS GIVEN BY THE ENGINEERS
REPRESENTATIVE.
33. BEFORE THE START OF A DAY’S PAVEMENT MILLING OR PAVING OPERATIONS AND WHERE
THERE IS EXISTING STRIPING, THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE PROOF THAT SUFFICIENT APPROVED STRIPING MATERIALS ARE ON HAND TO ENSURE STRIPING IS COMPLETE
BEFORE TRAFFIC IS RETURNED TO THE ROADWAY.
34. LANE CLOSURES ON 3-DIGIT MAINTENANCE ROADS ARE PERMITTED ONLY BETWEEN THE
HOURS OF 9:00 AM AND 3:00 PM, MONDAY - FRIDAY. ANY VARIANCE SHALL REQUIRE DISTRICT
SAFETY OFFICERS APPROVAL.
35. ITEM 710370 STEEL CASING PIPE-4” IS DESIGNATED FOR NOW-DEFUNCT ITEM 718000 ROOF DRAIN. WHEN REPLACING OR EXTENDING ROOF DRAINS, SUMP PUMP DRAINS, ETC. FROM RIGHT- OF-WAY TO CURBLINE, ITEM 710370 WILL BE UTILIZED REGARDLESS OF PIPE MATERIAL OR SIZE.
36. GAS VALVE, MONUMENT BOX, AND LAMPHOLE ADJUSTMENTS WILL BE PAID AS 710002,
WATER VALVE ADJUSTMENTS.
CONTRACT NUMBER- T202503107 CANAL (CAD) PAGE 18 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
GENERAL CONTRACT PLAN NOTES
37. REMOVAL OF ANY UNSUITABLE MATERIALS INCLUDING ROOTS AND VEGETATIVE MATTER
DISCOVERED WITHIN OR DIRECTLY BELOW THE TEMPLATE OF PCC / GRANITE CURB, PEDESTRIAN FACILITIES, AND/OR PCC / BRICK SIDEWALKS SHALL BE INCIDENTAL TO THE CORRESPONDING
ITEM.
38. TRASH, RUBBISH, DEBRIS, OR BRUSH THAT HAMPERS REPAIR/MAINTENANCE WORK IN THIS
CONTRACT (AS DETERMINED BY THE ENGINEER), SHALL BE REMOVED WITHIN THE PROJECT
LIMITS AND SHALL BE INCIDENTAL TO PAY ITEM 763000 (INITIAL EXPENSE/DEMOBILATION).
39. CLEARING AND GRUBBING INCLUDES OBTAINING WIDTH AND HEIGHT REQUIREMENTS FOR
PAR AND CLEARING OF SIGHT DISTANCE (INCLUDING EXISTING FACILITIES AND SIGNS).
CLEARING AND GRUBBING OF TREES, SHRUBS AND OTHER VEGETATION LESS THAN 6” IN
DIAMETER SHALL BE INCIDENTAL TO ITEM 763000 (INITIAL EXPENSE/DEMOBILIZATION).
40. GRASS AND SOIL AREAS WITHIN THE STATE RIGHT-OF-WAY AND ADJACENT PRIVATE
PROPERTY THAT HAS BEEN DAMAGED DURING CONTRACT OPERATIONS SHALL BE RESTORED WTH
TOPSOIL, SEED AND MULCH AT THE CONTRATOR’S EXPENSE. WORK SHALL BE EXECUTED IN
ACCORDANCE WITH THE REQUIREMENTS FOR ITEM 908001 (TOPSOIL), ITEM 908016 (PERMANENT GRASS SEEDING SUBDIVSION), AND ITEM 908020 (EROSION CONTROL BLANKET MULCH). REPAIRS MUST BE COMPLETED WITHIN SEVEN (7) CALENDAR DAYS OF NOTIFICAITON. FAILURE TO COMPLY
WILL RESULT IN A SUSPENSION OF ALL OTHER CONTRACT WORK WITH TIME CHARGES
CONTINUING TO BE ASSESSED.
SECTION 800
41. MESSAGE BOARDS SHALL BE PLACED 10 DAYS IN ADVANCE OF THE WORK AND SHALL
REMAIN IN PLACE FOR 5 DAYS AFTER THE START OF WORK. LOCATIONS OF MESSAGE BOARDS
AND MESSAGES DISPLAYED SHALL BE REVIEWED AND APPROVED BY THE DISTRICT SAFETY
OFFICER.
42. AT EACH LOCATION, THE CONTRACTOR SHALL NOTE ALL EXISTING PAVEMENT MARKINGS
AND SUBMIT A DRAWING WHICH DEPICTS THE STRIPING PATTERN TO THE DEPARTMENT PRIOR TO
THE START OF ANY WORK AT THE LOCATION.
AT THE END OF EACH DAY’S OPERATION AND BEFORE TRAFFIC IS RETURNED TO UNRESTRICTED
ROADWAY USE, TEMPORARY MARKINGS SHALL BE UTILIZED AT LOCATIONS THAT REQUIRE
PERMANENT MARKING. TEMPORARY PAVEMENT STRIPING MUST MATCH PERMANENT PAVEMENT
STRIPING IN ALL REGARDS.
CONTRACT NUMBER- T202503107 CANAL (CAD) PAGE 19 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
GENERAL CONTRACT PLAN NOTES
TEMPORARY PAVEMENT MARKINGS SHALL BE PAID AT THE APPLICABLE CONTRACT UNIT PRICE.
THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE TEMPORARY MARKINGS IN GOOD
CONDITION SUCH THAT THE PAVEMENT IS PROPERLY DELINEATED AT ALL TIMES. ANY
REFRESHING OF THE TEMPORARY MARKINGS WILL BE AT THE CONTRACTOR’S EXPENSE.
FINAL PAVEMENT MARKINGS SHALL CONFORM TO ALL EXISTING PATTERNS AND SHALL BE
PLACED WITHIN FIVE (5) CALENDER DAYS (MAXIMUM) AFTER PLACEMENT OF THE FINAL COURSE OF BITUMINOUS CONCRETE. IF THE CONTRACTOR FAILS TO DOCUMENT THE EXISTING PAVEMENT
MARKINGS IN AN ACCEPTABLE MANNER, HE SHALL BE REQUIRED TO PROVIDE AT HIS OWN
EXPENSE, A NEW PAVEMENT MARKING PLAN SIGNED AND SEALED BY A PROFESSIONAL ENGINEER
REGISTERED IN THE STATE OF DELAWARE.
ANY ERRONEOUS MARKING WILL NOT BE PAID FOR AND SHALL BE CORRECTED IMMEDIATELY AT
THE CONTRACTOR’S EXPENSE. ERRONEOUS MARKINGS OR SHADOWS THAT EXCEED ONE (1) INCH
IN WIDTH SHALL BE REMOVED BY EITHER SAND OR WATER BLASTING. NO OTHER REMOVAL
METHODS WILL BE ALLOWED. A FLAT BLACK PAINT OR DRIVEWAY SEALER SHALL BE APPLIED IN
THE AREA OF THE REMOVED MARKING TO MASK THE REPAIR. ANY DAMAGE TO THE PAVEMENT
CAUSED BY REMOVAL OF ERRONEOUS MARKINGS SHALL BE REPAIRED / REPLACED TO THE
SATISFACTION OF THE ENGINEER. FAILURE TO COMPLY WILL RESULT IN SUSPENSION OF ALL
OTHER CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED.
43. THE CONTRACTOR, WITH THE ENGINEER, SHALL INVENTORY ALL SIGNS ON ALL ROADS
SUBJECT TO IMPROVEMENTS. NECESSARY SIGNS SHALL BE MAINTAINED IN OPERATION DURING
CONSTRUCTION AND ANY OTHER SIGNS SHALL BE PROPERLY STORED WITH THE CONTRACTOR,
WHO SHALL BE RESPONSIBLE FOR LOSS OR DAMAGE. IMMEDIATELY PRIOR TO FINAL INSPECTION, THE CONTRACTOR AND ENGINEER SHALL AGAIN INVENTORY THE TRAFFIC SIGNS AND ACCOUNT
FOR ANY LOST OR DAMAGED SIGNS. LOST OR DAMAGED SIGNS, AT THE DISCRETION OF THE
ENGINEER SHALL BE REPLACED IN KIND AT THE CONTRACTOR’S EXPENSE.
44. REGULATORY SIGNS REMOVED MUST BE REINSTALLED THE SAME DAY. IN ABSENCE OF A
SIGN SCHEDULE, INSTALLATION OR REMOVAL OF TRAFFIC SIGN(S) AND SIGN POST(S) WILL BE PAID AS 819018. THIS ITEM WILL BE PAID ONE TIME PER POST AFTER FINAL INSTALLATION.
45. A FORMAL DETOUR WILL NOT BE NECESSARY ON THIS CONTRACT. THE CONTRACTOR MUST
MAINTAIN LOCAL TRAFFIC WITHIN THE PROJECT LIMITS UTILIZING FLAGGERS. MAINTENANCE OF
TRAFFIC DURING LANE CLOSURES AND/OR LANE SHIFTS SHALL CONFORM TO TYPICAL
APPLICATIONS OF THE DELAWARE MUTCD. ANY VARIANCE SHALL REQUIRE DISTRICT SAFETY
CONTRACT NUMBER- T202503107 CANAL (CAD) PAGE 20 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
GENERAL CONTRACT PLAN NOTES
OFFICERS APPROVAL.
46. BEFORE WORK IS DONE AT ANY LOCATION, THE APPROPRIATE DISTRICT SAFETY OFFICER
MUST APPROVE THE MOT FOR THAT LOCATION TWO WEEKS IN ADVANCE. ANY ANTICIPATED
IMPACT TO TRAFFIC SIGNALS MUST BE REVIEWED BY THE DELDOT TRAFFIC SECTION PRIOR TO
CONSTRUCTION. THEY CAN BE CONTACTED AT 302-659-4061.
47. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN, INCLUDING PEDESTRIAN AND
BICYCLE FACILITIES, FOR ALL DEVICES THAT WILL BE UTILIZED BEFORE THE START OF THE PRE-
CONSTRUCTION MEETING. ALL TRAFFIC CONTROL DEVICES SHALL BE IN NEW OR REFURBISHED
CONDITION, SHALL BE IN COMPLIANCE WITH THE MANUAL FOR ASSESSING SAFETY HARDWARE
(MASH) CERTIFICATIONS, AND ON DELDOTS APPROVED PRODUCTS LIST (APL). THE DEVICES
SHALL BE APROVED BY THE SAFETY SECTION PRIOR TO USE AND SHALL BE MAINTAINED IN GOOD
CONDITION FOR THE DURATION OF THE CONTRACT.
48. ALL WORK SHALL BE PERFORMED IN A MANNER THAT WILL REASONABLY PROVIDE THE
LEAST PRACTICABLE OBSTRUCTION TO ALL ROAD USERS, INCLUDING VEHICULAR, PEDESTRIAN
AND BICYCLE TRAFFIC, AND SHALL CONFORM TO THE REQUIREMENTS OF THE 2011 DELAWARE
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, PART 6, INCLUDING ALL REVISIONS UP TO THE
DATE OF ADVERTISEMENT FOR BIDS.
49. CURB RAMP AND/OR SIDEWALK CONSTRUCTION (NOT INCLUDING MEDIAN ISLANDS) SHALL
BE COMPLETED DURING A SINGLE OPERATION. THE RAMP/SIDEWALK SHALL BE REMOVED AND
PLACED BACK THE SAME NIGHT/DAY AND OPEN TO PEDESTRIAN TRAFFIC THE FOLLOWING DAY.
THE USE OF A MONOLITHIC POUR SHALL BE PERMITTED WITH A BOND BREAKER TO BE PLACED
AT THE BACK OF THE CURB AND EDGE OF SIDEWALK. IF THE CURB RAMP/SIDEWALK CANNOT BE
COMPLETED IN A SINGLE OPERATION THE EXCAVATED AREA MUST BE TEMPORARILY
BACKFILLED TO GRADE WITH COMPACTED MILLING MATERIAL ONLY. THIS TEMPORARY
MATERIAL WILL BE INCIDENTAL TO THE CURB RAMP ITEM. THE DRESSING UP OF THE AREA BEING PAID AS A CURB RAMP WITH TOPSOIL AND SEED WILL BE PAID AT CONTRACT UNIT PRICES. THE
CONTRACTOR SHALL MAINTAIN ACCESS TO AND ALONG PEDESTRIAN FACILITIES AT ALL TIMES
DURING CONSTRUCTION. EARTH, STONE AND GRAVEL SURFACES ARE NOT ACCEPTABLE FOR
PROVIDING PEDESTRIAN ACCESS. IF CURB RAMP CANNOT BE COMPLETED IN A SINGLE OPERATION AND PEDESTRIAN ROUTES ARE CLOSED OR BLOCKED, ALTERNATE PEDESTRIAN ACCESS SHALL BE
PROVIDED USING TA-28 AND/OR TA-29 OF THE 2011 DELAWARE MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES OR TO THE SATISFACTION OF THE ENGINEER. PEDESTRIAN DETOUR ROUTES
OR ALTERNATE PEDESTRIAN FACILITIES SHALL CONSIST OF ADA COMPLIANT FACILITIES TO THE LEVEL OF WHICH EXISTS ON THE PEDESTRIAN ROUTE. THE COST FOR ANY PROVISIONS SHALL BE
INCIDENTAL TO ITEM 801500 - MAINTENANCE OF TRAFFIC - ALL INCLUSIVE.
PEDESTRIAN MAINTENANCE OF TRAFFIC: THIS WORK SHALL CONSIST OF PROVIDING AND
MAINTAINING AN ACCESSIBLE PEDESTRIAN ROUTE THROUGHOUT THE PROJECT’S LIMITS IN
CONTRACT NUMBER- T202503107 CANAL (CAD) PAGE 21 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
GENERAL CONTRACT PLAN NOTES
ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT OF 1990 (ADA) TITLE II, PARAGRAPH 35.130.
THE CONTRACTOR SHALL BE REQUIRED TO REVIEW EACH CURB RAMP LOCATION AND SUBMIT
THE APPROPRIATE MAINTENANCE OF TRAFFIC DETAIL AND DEVICES TO THE ENGINEER FOR EACH
LOCATION AT LEAST 2-WEEKS BEFORE CONSTRUCTION FOR REVIEW, COMMENT, AND APPROVAL
BY THE DISTRICT SAFETY OFFICER.
THE FOLLOWING CONSIDERATIONS SHALL BE TAKEN INTO ACCOUNT WHEN ADDRESSING
ACCESSIBLE PEDESTRIAN MAINTENANCE OF TRAFFIC:
• ALL PEDESTRIANS, INCLUDING PERSONS WITH DISABILITIES, SHALL BE PROVIDED WITH A
REASONABLY SAFE, CONVENIENT AND ACCESSIBLE PATH THAT REPLICATES AS MUCH AS
PRACTICABLE THE EXISTING PEDESTRIAN FACILITIES.• MAINTAIN ACCESS TO ALL BUSINESS AND RESIDENTS AT ALL TIMES.• PROVIDE PEDESTRIAN ACCESS THRU OR AROUND THE WORK ZONE. IF A DETOUR IS CHOSEN
THE CONTRACTOR MUST SUBMIT THE DETOUR ROUTE TO THE ENGINEER FOR REVIEW AND
APPROVAL. THE DETOUR ROUTE MUST MEET OR EXCEED THE CURRENT CONDITIONS.• WORK SHOULD BE PHASED SO THAT ALL AREAS OF AN INTERSECTION/SIDEWALK PATH ARE
NOT UNDER CONSTRUCTION AT THE SAME TIME UNLESS A CLEAR PATH IS PROVIDED AND
IDENTIFIED.• TRAFFIC CONTROL DEVICES AND OTHER CONSTRUCTION MATERIALS AND FEATURES
SHALL NOT INTRUDE INTO THE USABLE WIDTH OF THE SIDEWALK, TEMPORARY PATHWAY
OR OTHER PEDESTRIAN FACILITY.• SIGNS AND OTHER DEVICES MOUNTED LOWER THAN 7 FT ABOVE THE TEMPORARY
PEDESTRIAN PATHWAY SHALL NOT PROJECT MORE THAN 4 IN. INTO ACCESSIBLE
PEDESTRIAN ROUTE.• A SMOOTH, CONTINUOUS HARD SURFACE SHALL BE PROVIDED THROUGHOUT THE ENTIRE
LENGTH AND WIDTH OF THE PEDESTRIAN ROUTE THROUGHOUT CONSTRUCTION. THERE
SHALL BE NO CURBS OR VERTICAL ELEVATION CHANGES GREATER THAN ¼ IN. IN GRADE
OR TERRAIN THAT COULD CAUSE TRIPPING OR BE A BARRIER TO WHEELCHAIR USE.
SECTION 900
50. EROSION CONTROL MULCH BLANKET SHALL BE USED IN ALL DISTURBED AREAS UNLESS
DIRECTED OTHERWISE BY THE ENGINEER.
ADDITIONAL PROJECT NOTES
CONTRACT NUMBER- T202503107 CANAL (CAD) PAGE 22 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
GENERAL CONTRACT PLAN NOTES
51. UNDERGROUND UTILITIES MAY BE PRESENT AT ALL LOCATIONS. THEREFORE, ALL
STANDARD PRACTICES AND PROCEDURES REGARDING UTILITIES SHALL BE FOLLOWED. THE
CONTRACTOR SHALL CONTACT MISS UTILITY OF DELAWARE PRIOR TO STARTING WORK. THE
CONTRACTOR IS RESPONSIBLE FOR THE SUPPORT AND PROTECTION OF ALL UTILITIES WHEN
EXCAVATING WHICH SHALL BE INCIDENTAL TO THE RESPECTIVE EXCAVATION ITEM(S). THE
CONTRACTOR IS RESPONSIBLE FOR ENSURING PROPER CLEARANCES, INCLUDING SAFETY
CLEARANCES, FROM OVERHEAD UTILITIES FOR CONSTRUCTION EQUIPMENT. THE CONTRACTOR
IS ADVISED TO CHECK THE SITE FOR ACCESS PURPOSES FOR THEIR EQUIPMENT AND MAKE
ARRANGEMENTS DIRECTLY WITH THE UTILITY COMPANIES FOR FIELD ADJUSTMENTS FOR
ADEQUATE CLEARANCES, IF NECESSARY.
52. NO UTILITY RELOCATION INVOLVEMENT IS ANTICIPATED. SHOULD ANY CONFLICTS BE
ENCOUNTERED DURING CONSTRUCTION REQUIRING ADJUSTMENT AND/OR RELOCATION OF THE
AGENCIES’ EXISTING FACILITIES, THE NECESSARY RELOCATION WORK SHALL BE ACCOMPLISHED
BY THE RESPECTIVE AGENCIES’ FORCES, AS DIRECTED BY THE DISTRICT ENGINEER. ANY
ADJUSTMENTS AND/OR RELOCATIONS OF MUNICIPALLY OWNED FACILITIES SHALL BE DONE BY
THE STATE’S CONTRACTOR IN ACCORDANCE WITH THE RESPECTIVE AGENCIES’ STANDARD
SPECIFICATIONS AS DIRECTED BY THE DISTRICT ENGINEER.
53. NO ENVIRONMENTAL PERMITS ARE REQUIRED FOR THIS WORK PROVIDED NO
JURISDICTIONAL WETLANDS OR WATERS ARE IMPACTED. IF THERE IS ANY QUESTION AS TO
WHETHER OR NOT A WATER OR WETLAND IS JURISDICTIONAL, CONTACT THE DEL DOT
ENVIRONMENTAL SECTION AT 302-760-2264.
54. IT IS ANTICIPATED THAT ALL WORK WILL OCCUR WITHIN DELDOT’S EXISTING RIGHT OF WAY OR EASEMENT AREAS. SHOULD THE NEED OCCUR TO TRESPASS ONTO PRIVATE PROPERTY; IT WILL
BE THE RESPONSIBILITY OF THE PROJECT MANAGER TO SECURE SUCH TRESPASS NEEDS.
55. NO WORK NEAR OR WITHIN RAILROAD RIGHT-OF-WAY IS ANTICIPATED. IF ANY RAILROAD
PROPERTY OR FACILITIES ARE NEAR OR WITHIN THE PROPOSED LIMITS OF WORK OR IF THE
PROPOSED WORK ENCROACHES UPON THE RAILROAD’S RIGHT-OF-WAY, THE CONTRACTOR SHALL
BE RESPONSIBLE FOR OBTAINING THE REQUIRED CLEARANCES AND INSURANCES FOR EACH
INVOLVED RAILROAD IN ACCORDANCE WITH THE APPROPRIATE DELDOT MAINTENANCE OF
RAILROAD TRAFFIC ITEM. DELDOT’ S RAILROAD SECTION MANAGER MUST BE CONTACTED AT
(302) 760-2183 TO COORDINATE THE EXECUTION OF THE APPROPRIATE AGREEMENTS AND
AUTHORIZATIONS REQUIRED FROM ANY RAILROAD COMPANY INVOLVED, INCLUDING
COORDINATION FOR RAILROAD FLAGGING, IF NECESSARY.
CONTRACT NUMBER- T202503107 CANAL (CAD) PAGE 23 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
GENERAL CONTRACT PLAN NOTES
56. THE PROJECT MANAGER SHALL BE RESPONSIBLE FOR COORDINATING WITH THE TRAFFIC
SECTION RELATING TO ANY IMPACTS TO TRAFFIC SECTION FACILITIES (INCLUDING BUT NOT
LIMITED TO TRAFFIC LOOPS, JUNCTION WELLS ETC.) AT LEAST 4 WEEKS IN ADVANCE OF THE START OF THE ACTIVITY. PRIOR TO INITIATING ANY WORK ON THIS CONTRACT (OR SITES), THE PROJECT MANAGER SHALL BE RESPONSIBLE FOR PREPARING AND SUBMITTING FOR APPROVAL OF THE SAFETY SECTION, A MAINTENANCE OF TRAFFIC PLAN. SUFFICIENT TIME SHALL BE PROVIDED
FOR THE REVIEW AND APPROVAL OF THE PLAN. THE MAINTENANCE OF TRAFFIC PLAN SHALL
INCLUDE PROPOSED TIME RESTRICTIONS ON THE CLOSURE OF TRAVEL LANES SUBJECT TO THE
APPROVAL OF THE SAFETY SECTION. TRAFFIC LOOPS MUST BE PUT BACK WITHIN 7 DAYS OF
PAVING, FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL OTHER CONTRACT WORK
WITH TIME CHARGES CONTINUING TO BE ASSESSED.
57. THE DEPARTMENT RESERVES THE RIGHT TO REQUEST AN EXTENSION OF THIS CONTRACT,
WITH THE AGREEMENT OF THE CONTRACTOR, AT THE CURRENT CONTRACT PRICES.
Jan 2025
DELAWARE DEPARTMENT OF TRANSPORTATION
CONTRACT NUMBER- T202503107 (CAD) PAGE 24 OF 53
CANAL Contract is for various locations throughout New Castle County.
DETAILS SHEET
A
5 - 3/4 " (19mm) Diam. x 16" (400mm) DOWELS; FOR 8' (2.4m) WIDE VALLEY GUTTER. 2 - 3/4
" (19mm) Diam. x 16" (400mm) DOWELS; FOR 4' (1.2m) WIDE VALLEY GUTTER. PLAN
A
W
DUMMY
JOINT
S
JOINT
CONSTRUCTION
SECTION A-A
W
D
W/2
CONSTRUCTION JOINT
DUMMY JOINT
BUTT JOINT
BITUM. SEAL
BITUM. SEAL
C L
4" (100mm)
8" (20
0m m)
3" (75 mm
1/8 R
(3m m
1/)8 " (3mm R
THIS HALF OF DOWEL
PAINTED AND GREASED.
3" (75mm) 3/8 "
(10mm)
8" (20
0m m)
2 5 /8
(67 mm
3/8 " (9mm)
1)/ R 8 "
(3m m
5/8 " (15mm) CORK
EXPANSION
MATERIAL
DUMMY
JOINT
36"(900mm) R
36"
(900mm) R
5/8 " (15mm) CORK
EXPANSION
MATERIAL
WIDTH
W
DEPTH
D
OFFSET
S
8' (2.4m)
4' (1.2m)
3" (75mm)
1 1/2 " (38mm)
16" (405mm)
23 1/2 " (585mm)
6" (150mm) x 12" (300mm) W6 x W6
WIRE MESH REINFORCEMENT.
3" (75mm) 3"
(75 mm
) 3" (75mm)
8" (200mm) P.C.C.
6" (150mm) G.A.B.C.TYPE B
P.C.C. VALLEY GUTTER
STREET
3/4 " (19mm) Diam. x 16" (400mm) DOWEL 20" (500mm) O.C.
CONTRACT NUMBER- T202503107 (CAD) PAGE 25 OF 53
CANAL Contract is for various locations throughout New Castle County.
DETAILS SHEET
SPEED HUMP
CONTRACT NUMBER- T202503107 (CAD) PAGE 26 OF 53
CANAL Contract is for various locations throughout New Castle County.
DETAILS SHEET
ADJUSTING AND REPAIRING MANHOLE
N.T.S.
REMOVE AND DISPOSE OF EXISTING FRAME AND COVER AS DIRECTED BY
OWNER IF NOT UTILIZED IN THE ADJUSTMENT.
PLACE NEW OR EXISTING FRAME AND COVER (AS REQUIRED).
TO CORRECT ELEVATION, RECOLLAR AND PLACE BITUMINOUS CONCRETE
PATCH. NEW FRAME AND COVER (IF REQUIRED) TO BE PROVIDED BY
OWNER.
REMOVE BITUMINOUS CONCRETE AND
CONCRETE COLLAR FROM AROUND
MANHOLE. 12"
(300 mm)
(40 0 m m)IF REQUIRED, PLACE CONTINUOUS
SPLIT BRICK TO ADJUST FRAME TO
EXISTING GRADE.
ALL JOINTS IN ADJUSTED BRICKWORK
SHALL BE COMPLETELY FILLED WITH
CEMENT MORTAR.
NOTE: MANHOLES IN CONCRETE ROADWAYS SHALL BE SAWCUT FULL DEPTH TO THE SPECIFIED DIMENSION PRIOR
TO ANY ADJUSTMENT BEING MADE. THE SAWCUTTING SHALL BE INCIDENTAL TO ITEM 602132.
t
I I l I
24'-0"
6'-0"
EXI
srI
N G l I
PAVElfENT
__f
LINEAR
=-.i "'
SECTION A-A
TYPICAL SPEEO TABLE
FLAT
SECTION A- A
UNEAR SPEED TABLE
SECTIONB-B
TYPICAL PAVEMENT NATCH
LINEAR
'jl----------------,=,,.., =,-,---------------�-------�------------�--�--�-Nl-�--�-------�---1
I �==========================::::t::::==========================: SPEED TABLE DETAILS SIGNING AND
!ht----------------<---------------< AND SECTIONS MARKING PIAN
I b ..
WSTINGt PAVE#EMr p
T~ ..,., 1'-6• GRIND EXISITNG PAVE#ENT 18"
IIJDE BY r DEEP AROUND THE fflk=1:'¥Lt'J.3F TABLE
DELAWARE DEPARTMENT OF TRANSPORTATION
(CAD) PAGE 27 OF 53CONTRACT NUMBER-
CANAL Contract is for various locations throughout New Castle County.
DETAILS SHEET
SPEED TABLE
T202503107
CONTRACT T202503107
CANAL
(CAD) PAGE 28 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
LOCATION 1 ALBERTSON PARK - ELDER DR FROM 2224 ELDER DR TO 2224 ELDER DR
LENGTH 3.6576 m 12.0000 L.F.
GENERAL IMPROVEMENTS
REPLACE SPEED HUMP
COMMENTS:
MAT ERIAL ESTIMATE FOR LOCATION 1
401506 SPEED HUMP 32.00 L.F.
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WI DE 64.00 L.F.
811001 FLAGGER, NEW CASTLE COUNTY 19.00 HOUR
811013 FLAGGER, NEW CASTLE COUNTY, OVERTIME 2.00 HOUR
CANAL
(CAD) PAGE 29 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
LOCATION 2 BEECH HILL - BEECH HILL DRIVE FROM BRIDGE TO BROOKRIDGE LANE
(INCLUDE INT)
LENGTH 338.3280 m 1110.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
MAT ERIAL ESTIMATE FOR LOCATION 2
211001 REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT, CURB AND SIDE WALK 244.00 S.Y.
301001 GABC 21.00 C.Y.
301002 GABC, PATCHING 46.00 C.Y.
401005 SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE) 550.00 TON
401029 SUPERPAVE TYPE C, PG 64-22, PATCHING 36.00 TON
401030 SUPERPAVE TYPE B, PG 64-22, PATCHING 75.00 TON
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WI DE 130.00 L.F.
602130 ADJUSTING AND REPAIRING EXISTING DRAINAGE INLET 3.00 EACH
602132 ADJUSTING AND REPAIRING EXISTING MANHOLE 3.00 EACH
701019 I.PCC CURB AND GUTTER, TYPE 2 80.00 L.F.
701023 I.PCC CURB AND GUTTER, TYPE 3-8 500.00 L.F.
705001 PCC SIDEWALK, 4" 232.00 S.F.
705002 PCC SIDEWALK, 6" 464.00 S.F.
760010 PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT 8,400.00 SY-IN
762000 SAW CUTTING, BITUMINOUS CONCRETE 870.00 L.F.
762001 SAW CUTTING, CONCRETE, FULL DEPTH 102.00 L.F.
811001 FLAGGER, NEW CASTLE COUNTY 317.00 HOUR
811013 FLAGGER, NEW CASTLE COUNTY, OVERTIME 32.00 HOUR
905004 INLET SEDIMENT CONTROL, DRAINAGE INLET 3.00 EACH
908001 TOPSOIL 23.00 TON
908016 PERMANENT GRASS SEEDING, SUBDIVISION 139.00 S.Y.
908020 EROSION CONTROL BLANKET MULCH 139.00 S.Y.
CANAL
(CAD) PAGE 30 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
LOCATION 3 BREIDABLIK - BEETHOVEN DRIVE FROM 32 BEETHOVEN DR. TO CUL -DE-
SAC
LENGTH 207.2640 m 680.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
LIMIT IS LARGE ROCK IN YARD @ #32.
MAT ERIAL ESTIMATE FOR LOCATION 3
202000 EXCAVATION AND EMBANKMENT 18.00 C.Y.
211001 REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT, CURB AND SIDE WALK 90.00 S.Y.
301001 GABC 6.00 C.Y.
301002 GABC, PATCHING 15.00 C.Y.
401005 SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE) 350.00 TON
401029 SUPERPAVE TYPE C, PG 64-22, PATCHING 51.00 TON
401030 SUPERPAVE TYPE B, PG 64-22, PATCHING 50.00 TON
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WI DE 75.00 L.F.
602130 ADJUSTING AND REPAIRING EXISTING DRAINAGE INLET 2.00 EACH
602131 ADJUSTING AND REPAIRING EXISTING DOUBLE DRAINAGE INLET 1.00 EACH
701019 I.PCC CURB AND GUTTER, TYPE 2 250.00 L.F.
705001 PCC SIDEWALK, 4" 100.00 S.F.
705002 PCC SIDEWALK, 6" 200.00 S.F.
760010 PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT 5,200.00 SY-IN
762000 SAW CUTTING, BITUMINOUS CONCRETE 375.00 L.F.
762001 SAW CUTTING, CONCRETE, FULL DEPTH 38.00 L.F.
811001 FLAGGER, NEW CASTLE COUNTY 182.00 HOUR
811013 FLAGGER, NEW CASTLE COUNTY, OVERTIME 20.00 HOUR
905004 INLET SEDIMENT CONTROL, DRAINAGE INLET 5.00 EACH
908001 TOPSOIL 10.00 TON
908016 PERMANENT GRASS SEEDING, SUBDIVISION 60.00 S.Y.
908020 EROSION CONTROL BLANKET MULCH 60.00 S.Y.
CANAL
(CAD) PAGE 31 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
LOCATION 4 BROOKLAND TERRACE - BEECH AVENUE FROM CENTRE ROAD ROU TE
SR141 (JOINT NEAR INLETS) TO DEAD END
LENGTH 106.6800 m 350.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
MAT ERIAL ESTIMATE FOR LOCATION 4
401005 SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE) 100.00 TON
401029 SUPERPAVE TYPE C, PG 64-22, PATCHING 1.00 TON
401030 SUPERPAVE TYPE B, PG 64-22, PATCHING 13.00 TON
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WI DE 24.00 L.F.
602132 ADJUSTING AND REPAIRING EXISTING MANHOLE 1.00 EACH
760010 PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT 1,400.00 SY-IN
762000 SAW CUTTING, BITUMINOUS CONCRETE 275.00 L.F.
802003 ARROW PANELS TYPE C 2.00 EA-DY
808002 PROVIDE AND MAINTAIN TRUCK MOUNTED ATTENUATOR, TYPE II 2.00 EA-DY
811001 FLAGGER, NEW CASTLE COUNTY 39.00 HOUR
811013 FLAGGER, NEW CASTLE COUNTY, OVERTIME 6.00 HOUR
CANAL
(CAD) PAGE 32 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
LOCATION 5 CHAPEL HILL - DECKER DRIVE FROM BALANGER ROAD (INCLUDE INT TO
SPEED HUMP) TO ARONIMINK DRIVE (INCLUDE INT)
LENGTH 131.0640 m 430.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
INCLUDE BOTH INT. 4 RAMPS @ BALANGER. 6-8 RAMPS @ ARONIMINK.
MAT ERIAL ESTIMATE FOR LOCATION 5
211001 REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT, CURB AND SIDE WALK 181.00 S.Y.
301001 GABC 19.00 C.Y.
301002 GABC, PATCHING 41.00 C.Y.
401005 SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE) 170.00 TON
401029 SUPERPAVE TYPE C, PG 64-22, PATCHING 32.00 TON
401030 SUPERPAVE TYPE B, PG 64-22, PATCHING 20.00 TON
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WI DE 74.00 L.F.
602132 ADJUSTING AND REPAIRING EXISTING MANHOLE 1.00 EACH
701013 PCC CURB, TYPE 1-8 20.00 L.F.
701019 I.PCC CURB AND GUTTER, TYPE 2 500.00 L.F.
705001 PCC SIDEWALK, 4" 200.00 S.F.
705002 PCC SIDEWALK, 6" 400.00 S.F.
705008 PEDESTRIAN CONNECTION, TYPE 1 300.00 S.F.
705009 PEDESTRIAN CONNECTION, TYPE 2, 3, AND/OR 4 2,000.00 S.F.
705013 TRUNCATED DOME DETECTABLE WARNING SURFACE 100.00 S.F.
760010 PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT 2,700.00 SY-IN
762000 SAW CUTTING, BITUMINOUS CONCRETE 750.00 L.F.
762001 SAW CUTTING, CONCRETE, FULL DEPTH 75.00 L.F.
811001 FLAGGER, NEW CASTLE COUNTY 241.00 HOUR
811013 FLAGGER, NEW CASTLE COUNTY, OVERTIME 26.00 HOUR
817002 PERMANENT PAVEMENT STRIPING, SYMBOL/LEGEND, ALKYD-THERMOPLASTI C 632.00 S.F.
817004 TEMPORARY MARKINGS, PAINT, SYMBOL/LEGEND 632.00 S.F.
908001 TOPSOIL 60.00 TON
908016 PERMANENT GRASS SEEDING, SUBDIVISION 360.00 S.Y.
908020 EROSION CONTROL BLANKET MULCH 360.00 S.Y.
CANAL
(CAD) PAGE 33 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
LOCATION 6 KIRKWOOD GARDENS - HAMMOND PL FROM 2404 HAMMOND PL TO 2416
HAMMOND PL
LENGTH 7.3152 m 24.0000 L.F.
GENERAL IMPROVEMENTS
REPLACE AND RAISE 2 SPEED HUMPS TO 4"
COMMENTS:
REPLACE AND RAISE 2 SPEED HUMPS TO 4"
MAT ERIAL ESTIMATE FOR LOCATION 6
401506 SPEED HUMP 50.00 L.F.
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WI DE 100.00 L.F.
811001 FLAGGER, NEW CASTLE COUNTY 30.00 HOUR
811013 FLAGGER, NEW CASTLE COUNTY, OVERTIME 3.00 HOUR
CANAL
(CAD) PAGE 34 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
LOCATION 7 LANCASTER VILLAGE - ATKINS AVENUE FROM HOUSE #200 TO TAFT
AVENUE
LENGTH 170.6880 m 560.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
MAT ERIAL ESTIMATE FOR LOCATION 7
202000 EXCAVATION AND EMBANKMENT 11.00 C.Y.
211001 REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT, CURB AND SIDE WALK 66.00 S.Y.
301001 GABC 7.00 C.Y.
301002 GABC, PATCHING 7.00 C.Y.
401005 SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE) 200.00 TON
401029 SUPERPAVE TYPE C, PG 64-22, PATCHING 21.00 TON
401030 SUPERPAVE TYPE B, PG 64-22, PATCHING 25.00 TON
401506 SPEED HUMP 22.00 L.F.
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WI DE 195.00 L.F.
501001 PCC PAVEMENT, 8" 48.00 S.Y.
701019 I.PCC CURB AND GUTTER, TYPE 2 50.00 L.F.
705001 PCC SIDEWALK, 4" 20.00 S.F.
705002 PCC SIDEWALK, 6" 40.00 S.F.
710002 ADJUST WATER VALVE BOXES 3.00 EACH
760010 PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT 2,800.00 SY-IN
762000 SAW CUTTING, BITUMINOUS CONCRETE 219.00 L.F.
762001 SAW CUTTING, CONCRETE, FULL DEPTH 22.00 L.F.
811001 FLAGGER, NEW CASTLE COUNTY 110.00 HOUR
811013 FLAGGER, NEW CASTLE COUNTY, OVERTIME 13.00 HOUR
908001 TOPSOIL 6.00 TON
908016 PERMANENT GRASS SEEDING, SUBDIVISION 35.00 S.Y.
908020 EROSION CONTROL BLANKET MULCH 35.00 S.Y.
CANAL
(CAD) PAGE 35 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
LOCATION 8 LIMESTONE ACRES - BAILEY DRIVE FROM LIMESTONE ROAD (CIHM) TO
DARNAY LANE (INCLUDE INT)
LENGTH 156.9720 m 515.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
2 RAMPS @ IVANHOE. 2 RAMPS @ DARNAY.
MAT ERIAL ESTIMATE FOR LOCATION 8
202000 EXCAVATION AND EMBANKMENT 25.00 C.Y.
211001 REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT, CURB AND SIDE WALK 163.00 S.Y.
301001 GABC 15.00 C.Y.
301002 GABC, PATCHING 23.00 C.Y.
401005 SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE) 220.00 TON
401029 SUPERPAVE TYPE C, PG 64-22, PATCHING 71.00 TON
401030 SUPERPAVE TYPE B, PG 64-22, PATCHING 50.00 TON
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WI DE 239.00 L.F.
501001 PCC PAVEMENT, 8" 55.00 S.Y.
602130 ADJUSTING AND REPAIRING EXISTING DRAINAGE INLET 1.00 EACH
701013 PCC CURB, TYPE 1-8 8.00 L.F.
701018 I.PCC CURB AND GUTTER, TYPE 1-8 40.00 L.F.
701019 I.PCC CURB AND GUTTER, TYPE 2 250.00 L.F.
705001 PCC SIDEWALK, 4" 116.00 S.F.
705002 PCC SIDEWALK, 6" 232.00 S.F.
705008 PEDESTRIAN CONNECTION, TYPE 1 120.00 S.F.
705009 PEDESTRIAN CONNECTION, TYPE 2, 3, AND/OR 4 800.00 S.F.
705013 TRUNCATED DOME DETECTABLE WARNING SURFACE 40.00 S.F.
760010 PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT 3,200.00 SY-IN
762000 SAW CUTTING, BITUMINOUS CONCRETE 600.00 L.F.
762001 SAW CUTTING, CONCRETE, FULL DEPTH 60.00 L.F.
802003 ARROW PANELS TYPE C 5.00 EA-DY
808002 PROVIDE AND MAINTAIN TRUCK MOUNTED ATTENUATOR, TYPE II 5.00 EA-DY
811001 FLAGGER, NEW CASTLE COUNTY 187.00 HOUR
811013 FLAGGER, NEW CASTLE COUNTY, OVERTIME 20.00 HOUR
CANAL
(CAD) PAGE 36 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
LOCATION 8 LIMESTONE ACRES - BAILEY DRIVE FROM LIMESTONE ROAD (CIHM) TO
DARNAY LANE (INCLUDE INT)
LENGTH 156.9720 m 515.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
2 RAMPS @ IVANHOE. 2 RAMPS @ DARNAY.
MAT ERIAL ESTIMATE FOR LOCATION 8
905004 INLET SEDIMENT CONTROL, DRAINAGE INLET 1.00 EACH
908001 TOPSOIL 32.00 TON
908016 PERMANENT GRASS SEEDING, SUBDIVISION 192.00 S.Y.
908020 EROSION CONTROL BLANKET MULCH 192.00 S.Y.
CANAL
(CAD) PAGE 37 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
LOCATION 9 LIMESTONE ACRES - GRIFFIN DRIVE FROM MUGGLETON ROAD (NORTH
END) TO KIRKWOOD HWY (CIHM)
LENGTH 487.6800 m 1600.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
2 RAMPS @ MUGGLETON(NORTH). 2 RAMPS @ MUGGLETON(SOUTH). 4 RAMPS @
PICKWICK.
MAT ERIAL ESTIMATE FOR LOCATION 9
202000 EXCAVATION AND EMBANKMENT 35.00 C.Y.
211001 REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT, CURB AND SIDE WALK 289.00 S.Y.
301001 GABC 24.00 C.Y.
301002 GABC, PATCHING 45.00 C.Y.
401005 SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE) 650.00 TON
401029 SUPERPAVE TYPE C, PG 64-22, PATCHING 146.00 TON
401030 SUPERPAVE TYPE B, PG 64-22, PATCHING 50.00 TON
401506 SPEED HUMP 115.00 L.F.
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WI DE 763.00 L.F.
501001 PCC PAVEMENT, 8" 50.00 S.Y.
602100 DRAINAGE INLET GRATE(S) 1.00 EACH
602101 DRAINAGE INLET FRAME(S) 1.00 EACH
602130 ADJUSTING AND REPAIRING EXISTING DRAINAGE INLET 7.00 EACH
602132 ADJUSTING AND REPAIRING EXISTING MANHOLE 9.00 EACH
701013 PCC CURB, TYPE 1-8 36.00 L.F.
701019 I.PCC CURB AND GUTTER, TYPE 2 650.00 L.F.
705001 PCC SIDEWALK, 4" 260.00 S.F.
705002 PCC SIDEWALK, 6" 520.00 S.F.
705008 PEDESTRIAN CONNECTION, TYPE 1 240.00 S.F.
705009 PEDESTRIAN CONNECTION, TYPE 2, 3, AND/OR 4 1,600.00 S.F.
705013 TRUNCATED DOME DETECTABLE WARNING SURFACE 80.00 S.F.
710002 ADJUST WATER VALVE BOXES 1.00 EACH
710370 STEEL CASING PIPE, 4" 20.00 L.F.
760010 PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT 10,200.00 SY-IN
762000 SAW CUTTING, BITUMINOUS CONCRETE 1,255.00 L.F.
CANAL
(CAD) PAGE 38 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
LOCATION 9 LIMESTONE ACRES - GRIFFIN DRIVE FROM MUGGLETON ROAD (NORTH
END) TO KIRKWOOD HWY (CIHM)
LENGTH 487.6800 m 1600.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
2 RAMPS @ MUGGLETON(NORTH). 2 RAMPS @ MUGGLETON(SOUTH). 4 RAMPS @
PICKWICK.
MAT ERIAL ESTIMATE FOR LOCATION 9
762001 SAW CUTTING, CONCRETE, FULL DEPTH 117.00 L.F.
802003 ARROW PANELS TYPE C 2.00 EA-DY
808002 PROVIDE AND MAINTAIN TRUCK MOUNTED ATTENUATOR, TYPE II 2.00 EA-DY
811001 FLAGGER, NEW CASTLE COUNTY 590.00 HOUR
811013 FLAGGER, NEW CASTLE COUNTY, OVERTIME 65.00 HOUR
817002 PERMANENT PAVEMENT STRIPING, SYMBOL/LEGEND, ALKYD-THERMOPLASTI C 50.00 S.F.
817003 TEMPORARY MARKINGS, PAINT, 4" 600.00 L.F.
817004 TEMPORARY MARKINGS, PAINT, SYMBOL/LEGEND 50.00 S.F.
817042 PERMANENT PAVEMENT STRIPING, EPOXY RESIN PAINT, WHITE/YE LLOW, 6" 600.00 L.F.
905004 INLET SEDIMENT CONTROL, DRAINAGE INLET 8.00 EACH
908001 TOPSOIL 63.00 TON
908016 PERMANENT GRASS SEEDING, SUBDIVISION 377.00 S.Y.
908020 EROSION CONTROL BLANKET MULCH 377.00 S.Y.
CANAL
(CAD) PAGE 39 OF 53
COMMUNITY TRANSPORTATION FUND, NEW CASTLE VII, 2025
LOCATION 10 LIMESTONE ACRES - REGENT CIRCLE FROM TAPLEY LANE TO CUL- DE-SAC
LENGTH 54.8640 m 180.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
MAT ERIAL ESTIMATE FOR LOCATION 10
202000 EXCAVATION AND EMBANKMENT 14.00 C.Y.
211001 REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT, CURB AND SIDE WALK 95.00 S.Y.
301001 GABC 10.00 C.Y.
301002 GABC, PATCHING 13.00 C.Y.
401005 SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE) 120.00 TON
401029 SUPERPAVE TYPE C, PG 64-22, PATCHING 40.00 TON
401030 SUPERPAVE TYPE B, PG 64-22, PATCHING 25.00 TON
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WI DE 145.00 L.F.
501001 PCC PAVEMENT, 8" 40.00 S.Y.
701013 PCC CURB, TYPE 1-8 4.00 L.F.
701019 I.PCC CURB AND GUTTER, TYPE 2 150.00 L.F.
705001 PCC SIDEWALK, 4" 60.00 S.F.
705002 PCC SIDEWALK, 6" 120.00 S.F.
705008 PEDESTRIAN CONNECTION, TYPE 1 60.00 S.F.
705009 PEDESTRIAN CONNECTION, TYPE 2, 3, AND/OR 4 400.00 S.F.
705013 TRUNCATED DOME DETECTABLE WARNING SURFACE 20.00 S.F.
710370 STEEL CASING PIPE,…