Attachment__7_-_Submital_Register_CEFOP_Popayan.pdf
PDF 180 KB Posted
- Attached to
- Fusion and Operations Center (CEFOP) Construction - Popayan Colombia Federal contract opportunity
- Solicitation number
- SWHARC15R0009
About this file
Attachment 7 Register Updated
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 39 PAGES
CEFOP BUILDING
01 32 16.00 20 SD-01 Preconstruction Submittals 1.3Construction schedule
Submittal Register 01 33 00 SD-01 Preconstruction Submittals
1.6Submittal Register 01 50 00 SD-01 Preconstruction Submittals
1.4Construction site plan 01 78 00 SD-03 Product Data
As-Built Record of Equipment and Materials
1.5.1Warranty Management Plan 1.5.4Warranty Tags
Spare Parts Data SD-08 Manufacturer’s Instructions
1.4Preventative Maintenance 1.4Condition Monitoring (Predictive
Testing) 1.4Inspection 1.5.1Instructions
SD-10 Operation and Maintenance Data
1.6Operation and Maintenance Manuals
SD-11 Closeout Submittals 1.3.1Record Drawings
02 41 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 39 PAGES
02 41 00 1.8 GExisting Conditions SD-07 Certificates
1.2.1 GDemolition Plan
1.6 GNotification
03 11 13.00 10 SD-02 Shop Drawings
3.1.1 GFormwork
SD-03 Product Data 1.2Design 2.1Form Materials 2.1.6Form Releasing Agents
SD-04 Samples
1.4 GSample Panels
SD-06 Test Reports 3.5Inspection
3.4.1 GFormwork Not Supporting Weight
of Concrete SD-07 Certificates Fiber Voids
03 20 00.00 10 SD-02 Shop Drawings 3.1Reinforcement
SD-03 Product Data 1.3.1Welding
Butt-Splices Material
SD-04 Samples Reinforcement Bars
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 39 PAGES
03 20 00.00 10 SD-06 Test Reports Material Tests, Inspections, and Verifications
SD-07 Certificates 2.3Reinforcing Steel
03 30 00 SD-02 Shop Drawings 1.6.2.1Fabrication Drawings 1.6.2.2Formwork 1.6.2.2Formwork 1.6.2.1Special Construction
1.6.2.3 GReinforcing steel
SD-03 Product Data 2.4.7Materials for curing concrete 2.4.9Joint sealants 2.4.8Joint filler 2.4.1Cement 2.4.1.1Portland Cement 2.3.2Ready-Mix Concrete 2.4.6Vapor barrier 2.6Bonding Materials 2.3.3Concrete Curing Materials 2.5Reinforcement 1.6.2.1Reinforcement Materials 2.4.10Epoxy bonding compound 2.4.9.3Waterstops
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 39 PAGES
03 30 00 3.13.2Waterstops 2.1.1Wood Forms 2.4.11Biodegradable Form Release
Agent SD-04 Samples
1.6.5.1Slab finish sample 2.4.9.3Dumbbell Type 2.4.9.3Rubber 2.4.9.3Polyvinylchloride (PVC)
SD-05 Design Data
2.3.1 Gmix design
1.6.1.1Calculations
SD-06 Test Reports
1.6.4.1 GConcrete mix design
1.6.4.2Aggregates 3.9.2.1Tolerance report 3.11.2.3Compressive strength tests 2.8.4Slump 2.8.1Air Entrainment
SD-07 Certificates 1.6.3.1Curing concrete elements 1.6.3.3Finishing plan 1.6.3.6Material Safety Data Sheets 2.5.5Steel Bar
04 20 00 SD-02 Shop Drawings 1.4.4Detail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 39 PAGES
04 20 00 SD-03 Product Data 2.4.2Cement 2.5Water-Repellant Admixture
SD-04 Samples 2.2Concrete Masonry Units (CMU) 2.7Anchors, Ties, and Bar
Positioners 2.10Expansion-Joint Materials 2.8Joint Reinforcement 1.4.2Portable Panel
SD-05 Design Data 2.4.3Pre-mixed Mortar 1.2.1.1Unit Strength Method
SD-06 Test Reports 3.15.1Field Testing of Mortar 3.15.2Field Testing of Grout 3.15.3Prism tests 1.4.3Masonry Inspector Qualifications 3.15.4Single-Wythe Masonry Wall
Water Penetration Test SD-07 Certificates
2.2Concrete Masonry Units (CMU) 2.4.1Admixtures for Masonry Mortar
05 05 23 SD-03 Product Data 1.5Welding Procedure Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 39 PAGES
05 05 23 1.5.5Welder, Welding Operator, and Tacker Qualification
1.5.6Inspector Qualification 1.5.2Previous Qualifications 1.5.3Pre-qualified Procedures
SD-06 Test Reports 3.2Quality Control 3.3.1Nondestructive Examination 1.5.1Certified Welding Procedure
Specifications (WPS) 1.5.1Certified Procedure Qualification
Records (PQR) 1.5.1Certified Welder Performance
Qualifications (WPQ) 05 12 00 SD-02 Shop Drawings
1.5.2.1Erection Plan 1.5.1Fabrication drawings
SD-03 Product Data 2.4Shop primer 2.3.1Welding electrodes and rods 2.2.5Load indicator washers
SD-06 Test Reports 2.4Class B coating 2.2Bolts, nuts, and washers
SD-07 Certificates 2.1Steel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 39 PAGES
05 12 00 2.2Bolts, nuts, and washers 1.5.2.2Welding procedures and qualifications 05 50 13 SD-02 Shop Drawings
2.7structural steel door frames 2.3Access doors and panels 2.4Cover plates and frames
SD-03 Product Data 2.3Access doors and panels 2.4Cover plates and frames
Control-joint covers 2.7Structural steel door frames
05 50 14 SD-02 Shop Drawings 1.3.2Detail Drawings
SD-03 Product Data 2.2.2.1Welding of Structural Steel 2.3.4Structural Steel Welding Repairs
Materials Orders 2.1.1Materials List
Shipping Bill SD-06 Test Reports
2.3Tests, Inspections, and Verifications
SD-07 Certificates 1.3.1Qualification of Welders and
Welding Operators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 39 PAGES
06 20 00 SD-02 Shop Drawings 1.3Detail Drawings
SD-03 Product Data 2.1.13Siding
2.1.13.9Epoxy-Aggregate Panels 2.1.13.7Wood
SD-04 Samples 2.1.13Siding
2.4Wood Shingles 2.1.13.9Moldings 2.3Fascias and Trim
SD-07 Certificates 1.4Certificates of grade 1.4Certificates of compliance
07 21 16 SD-03 Product Data 2.1Blanket insulation
SD-08 Manufacturer’s Instructions 3.3.1Insulation
07 41 63 SD-01 Preconstruction Submittals 1.5.1Qualification of Manufacturer 1.5.3Qualification of Manufacturer 1.5.1Qualification of Installer
SD-02 Shop Drawings 1.5.1Roofing Panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 39 PAGES
07 41 63 1.5.1Flashing and Accessories 1.5.1Gutter/Downspout Assembly
SD-03 Product Data 1.5.1Factory Color Finish 1.5.1Sub-girts and Formed Shapes 1.5.1Closure Materials 1.5.1Insulation 1.5.1Pressure Sensitive Tape 1.5.1Sealants and Caulking 1.5.1Galvanizing Repair Paint 1.5.1Aluminized Steel Repair Paint 1.5.1Accessories
SD-04 Samples 1.5.1Roofing Panels 2.2.2Fasteners 2.4.1Metal Closure Strips 1.5.1Insulation 1.5.1Manufacturer s color charts and chips SD-05 Design Data
1.5.1Wind design analysis SD-07 Certificates
2.2.2Fasteners 1.5.1Enamel Repair Paint
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 39 PAGES
07 41 63 1.5.1Installation of Roof panel assemblies
SD-11 Closeout Submittals 1.8Warranty 1.5.1Instructions 1.5.1Material Safety Data Sheets
07 60 00 SD-02 Shop Drawings 3.1.7Gutters 3.1.8Downspouts 3.1.11Flashing at roof penetrations 3.1.9Eave flashing
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SD-07 Certificates 3.3.6Sealant
08 11 13 SD-02 Shop Drawings 2.1Doors 2.1Doors 2.4Frames 2.4Frames 2.3Accessories 2.5Weatherstripping
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 39 PAGES
08 11 13 2.1Doors 2.4Frames 2.3Accessories
08 51 13 SD-02 Shop Drawings 2.1Windows 1.10Fabrication Drawings
SD-03 Product Data 2.1Windows 2.2.2.1Hardware 2.2.4Screens 2.2.2Accessories 1.11.4Thermal performance
SD-04 Samples 1.4.2.1Finish Sample 1.4.2.2Window Sample
SD-10 Operation and Maintenance Data
2.1Windows 08 71 00 SD-02 Shop Drawings
1.3Hardware schedule 2.3.5Keying system
SD-03 Product Data 2.3Hardware items
SD-08 Manufacturer’s Instructions 3.1Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 39 PAGES
08 71 00 SD-10 Operation and Maintenance Data
1.3Hardware Schedule SD-11 Closeout Submittals
1.4Key Bitting 08 81 00 SD-03 Product Data
1.3Glazing Accessories SD-04 Samples
2.3.1Glazing Compound 2.3.2.1Sealant
08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers
SD-03 Product Data 2.2Metal Wall Louvers
SD-04 Samples 1.4Wall louvers 1.5Wall louvers
09 06 90 SD-04 Samples 2.2Color Schedule
09 24 23 SD-02 Shop Drawings 3.2Lath
SD-03 Product Data 3.4Proportions and Mixing
SD-04 Samples 2.2Colored Stucco Finish Coat
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 39 PAGES
09 24 23 1.3Sample Panel 09 26 00 SD-03 Product Data
2.1.4Gypsum base 2.1.5Gypsum veneer plaster
09 29 00 SD-03 Product Data 2.1.3Water-Resistant Gypsum
Backing Board 2.1.1Gypsum Board 2.1.7Accessories
SD-07 Certificates 2.1Asbestos Free Materials
SD-08 Manufacturer’s Instructions Material Safety Data Sheets
SD-10 Operation and Maintenance Data Manufacturer maintenance instructions
Waste Management SD-11 Closeout Submittals
2.1.1Gypsum Board Adhesives
09 30 00 SD-02 Shop Drawings 1.4Detail Drawings
SD-03 Product Data 2.1Tile 2.2Setting-Bed
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 39 PAGES
09 30 00 2.4Mortar, Grout, and Adhesive Certification
SD-04 Samples 2.1Tile
Accessories Marble Thresholds
2.4Grout SD-07 Certificates
2.1Tile 2.4Mortar, Grout, and Adhesive
09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings
SD-03 Product Data Acoustical Ceiling Systems Certification
SD-04 Samples 2.1Acoustical Units
09 90 00 SD-02 Shop Drawings 3.11Piping identification 3.11stencil
SD-03 Product Data Certification
2.1Coating 2.1Manufacturer's Technical Data
Sheets SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 39 PAGES
09 90 00 1.9Color 1.4.2Textured Wall Coating System 1.4.3Sample Textured Wall Coating
System Mock-Up SD-07 Certificates Applicator's qualifications
1.4.1.2Qualification Testing SD-08 Manufacturer’s Instructions Application instructions
3.7.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1Coatings:
10 28 13 SD-03 Product Data
2.1.2Finishes 2.2Accessory Items
SD-04 Samples 2.1.2Finishes 2.2Accessory Items
SD-07 Certificates 2.2Accessory Items
10 44 16 SD-02 Shop Drawings 2.1Fire Extinguishers
Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 39 PAGES
10 44 16 2.4Cabinets 2.5Wall Brackets
SD-03 Product Data 2.1Fire Extinguishers
Accessories 2.5Wall Brackets
SD-04 Samples 2.1Fire Extinguisher 2.5Wall Brackets
Accessories SD-07 Certificates
2.1Fire Extinguishers 2.1Manufacturer's Warranty with
Inspection Tag 12 21 00 SD-02 Shop Drawings
3.3Installation SD-03 Product Data
2.1Window Blinds 3.3Installation
Certification SD-04 Samples
2.1Window Blinds SD-06 Test Reports
2.1Window Blinds SD-08 Manufacturer’s Instructions
2.1Window Blinds
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 39 PAGES
12 21 00 SD-10 Operation and Maintenance Data
2.1Window Blinds 12 36 00 SD-02 Shop Drawings
2.2Fabrication 3.1Installation Drawings
SD-03 Product Data Synthetic resin Tile
SD-04 Samples 2.2Countertop 2.2Backsplash, 2.4Accessories and Hardware 2.1Manufacturer's Standard Color
Charts SD-08 Manufacturer’s Instructions
2.1Manufacturer's Instructions 13 48 00 SD-03 Product Data
3.1Bracing 1.3Equipment Requirements
22 00 00 SD-02 Shop Drawings 3.6.1Plumbing System
SD-03 Product Data 2.4Fixtures 2.4.2Flush valve urinals 2.4.3Flush tank water closets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 39 PAGES
22 00 00 Wall hung lavatories 2.4.4Countertop lavatories
Kitchen sinks Service sinks Water heaters Shower Faucets
3.6.1Plumbing System SD-06 Test Reports
3.6Tests, Flushing and Disinfection SD-07 Certificates
1.3Materials and Equipment 2.1.1Bolts
SD-10 Operation and Maintenance Data
3.6.1Plumbing System 23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data
2.7.1.1Axial Flow Fans 2.7.1.2Ceiling Exhaust Fans
2.8.1 GRoom Fan-Coil Units
1.4.6Test Procedures
1.2.1.2 GDiagrams
SD-06 Test Reports
3.9 GPerformance Tests
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 39 PAGES
23 00 00 3.2Manufacturer's Installation Instructions
3.11.2Operation and Maintenance Training
SD-10 Operation and Maintenance Data
3.11.1Operation and Maintenance Manuals
2.7.1.1 GAxial Flow Fans
2.7.1.2 GCeiling Exhaust Fans
2.8.1 GRoom Fan-Coil Units
23 05 48.00 40 SD-02 Shop Drawings 1.2Installation Drawings 1.2Outline Drawings
SD-03 Product Data 1.2Equipment and Performance
Data 2.3Isolators
SD-06 Test Reports Type of Isolator Type of Base Allowable Deflection Measured Deflection
23 07 00 SD-03 Product Data GPipe Insulation Systems
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 39 PAGES
23 07 00 2.2.1.2 GThermal Insulation SD-08 Manufacturer’s Instructions
GPipe Insulation Systems GDuct Insulation Systems
23 23 00 SD-02 Shop Drawings
2.2 GRefrigerant Piping System
SD-03 Product Data 2.2Refrigerant Piping System
1.3.1 GQualifications
3.4 GRefrigerant Piping Tests
3.1Verification of Dimensions
SD-06 Test Reports 3.4Refrigerant Piping Tests
SD-07 Certificates
2.1 GService Organization
SD-10 Operation and Maintenance Data
1.5Maintenance 23 34 23.00 40 SD-02 Shop Drawings
1.5Shop Drawings 3.1Installation Drawings 1.5Record Drawings
SD-03 Product Data 1.1Equipment and Performance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 39 PAGES
23 34 23.00 40 1.5Equipment and Performance Data
1.1Manufacturer's Catalog Data 1.5Manufacturer's Catalog Data 2.2Housing 2.3Fan 2.5Motor 2.6Bases 2.7Roof Curbs 2.8Dampers 2.9Screens 2.10Sound Baffles
SD-06 Test Reports 3.2Tests
23 81 00.00 20 SD-02 Shop Drawings 2.3.2Field-assembled refrigerant piping 1.3.2Control system wiring diagrams
SD-03 Product Data 2.1Air conditioners 2.3Refrigerant piping and accessories SD-06 Test Reports
3.5.3Start-up and initial operational tests
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 39 PAGES
23 81 00.00 20 2.1Air conditioners 2.3Refrigerant piping and accessories SD-10 Operation and Maintenance Data
2.1Air conditioners SD-11 Closeout Submittals
1.3.4Posted operating instructions 23 82 02.00 10 SD-02 Shop Drawings
1.4Drawings SD-03 Product Data
2.1Materials and Equipment 1.6Spare Parts 3.4Posted Instructions 3.1Verification of Dimensions
Coil Corrosion Protection 3.6System Performance Tests
3.4 GDemonstrations
SD-06 Test Reports
3.5 GRefrigerant Tests, Charging, and
Start-Up
3.6 GSystem Performance Tests
SD-07 Certificates 2.1Materials and Equipment 2.1.1Service Organization
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 39 PAGES
23 82 02.00 10 SD-10 Operation and Maintenance Data
3.4Operation and Maintenance Manuals
26 05 00.00 40 SD-01 Preconstruction Submittals 2.1Material, Equipment, and Fixture
Lists SD-03 Product Data
2.1.1Conduits and Raceways 2.1.3Wire and Cable 3.2.1.9Splices and Connectors 2.1.4Switches 2.1.5Receptacles 2.1.6Outlets, Outlet Boxes, and Pull
Boxes 2.1.8Circuit Breakers 2.1.7Panelboards 2.1.9Lamps and Lighting Fixtures 2.1.12Dry-Type Distribution
Transformers SD-06 Test Reports
3.3Continuity Test 3.3Phase-Rotation Tests 3.3Insulation Resistance Test
SD-07 Certificates 1.4Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 39 PAGES
26 05 00.00 40 SD-08 Manufacturer’s Instructions Part 2Manufacturer's Instructions
26 11 16 SD-02 Shop Drawings 1.5.1.1Unit Substation Drawings 1.5.1.2Transformer drawings
SD-03 Product Data 1.5.1.1Fuse curves 2.2Secondary unit substation 2.2.3transformer (dry-type)
SD-06 Test Reports 3.6.1Acceptance checks and tests
SD-07 Certificates 1.5.2Paint coating system 1.5.3Transformer Losses
SD-09 Manufacturer’s Field Reports
2.6.2Load Interrupter Switch production tests
2.6.4transformer routine and other tests (liquid-filled)
SD-10 Operation and Maintenance Data
2.2Unit substations SD-11 Closeout Submittals
1.6.1Assembled Operation and Maintenance Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 39 PAGES
26 11 16 2.6.1Equipment test schedule 26 20 00 SD-02 Shop Drawings
2.12 GPanelboards
2.20 GWireways
SD-03 Product Data
2.11 GReceptacles
2.12.3 GCircuit breakers
2.10 GSwitches
GTransformers
2.13 GEnclosed circuit breakers
2.15.1 GCATV outlets
2.16.3 GGrounding Busbar
2.22 GSurge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.4 GGrounding system test
GTransformer tests
3.5.3 GGround-fault receptacle test
SD-09 Manufacturer’s Field Reports Transformer factory tests
SD-10 Operation and Maintenance Data
1.5.1 GElectrical Systems
26 24 16.00 40 SD-02 Shop Drawings
2.1.1Detail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 39 PAGES
26 24 16.00 40 2.1.1Outline Drawings SD-03 Product Data
1.3Panelboards 2.1.1Panelboards
SD-06 Test Reports 3.2Continuity Tests 3.2Insulation Tests
SD-07 Certificates 1.4Statements
SD-08 Manufacturer’s Instructions 1.3Panelboards 2.1.1Panelboards
26 28 01.00 10 SD-03 Product Data 2.10Fault Current Analysis 2.10Protective Device Coordination
Study 2.1Equipment 1.4.1System Coordinator 3.3.5Protective Relays 3.2Installation
SD-06 Test Reports 3.3Field Testing
SD-07 Certificates 1.6Devices and Equipment
26 28 21.00 40 SD-02 Shop Drawings 2.1Connection Diagrams
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 39 PAGES
26 28 21.00 40 2.1Fabrication Drawings 2.1Installation Drawings
SD-03 Product Data 2.1Equipment and Performance
Data 2.3.1Contacts 2.3.2Indicating Lights 2.3.3Terminal Board 2.2.2Enclosures 2.5Accessories
SD-06 Test Reports 1.3Qualification Testing 1.3Operation Tests
SD-08 Manufacturer’s Instructions 2.3.2Automatic Transfer Switch
26 32 14.00 10 SD-02 Shop Drawings 1.4.3Detailed Drawings 3.10Acceptance
SD-03 Product Data 2.4Manufacturer's Catalog 3.9Instructions 1.4.2Experience 3.2General Installation 3.1Site Visit
SD-05 Design Data 2.8Sound Limitations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 39 PAGES
26 32 14.00 10 2.14Generator 2.5.4Integral Main Fuel Storage Tank
Power Factor 2.7.2Heat Exchanger 2.18.5Time-Delay on Alarms 2.7Cooling System 1.2.5Vibration Isolation
SD-06 Test Reports 3.5.6Performance Tests 3.5Onsite Inspection and Tests
SD-07 Certificates 1.2.5Vibration Isolation 3.4Prototype Tests 1.2.6Reliability and Durability 2.11Emissions 2.8Sound limitations 2.14.1Current Balance 2.3Materials and Equipment 2.27Factory Inspection and Tests 3.5.4Inspections 2.7Cooling System
SD-10 Operation and Maintenance Data
1.6.1Operation Manual 1.6.2Maintenance Manual 1.6.3Extra Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 39 PAGES
26 32 33.00 10 SD-02 Shop Drawings 1.2UPS System 3.2Installation
SD-03 Product Data 1.2.4Performance Requirements 1.7Spare Parts
3.5 GField Training
SD-06 Test Reports 2.12Factory Testing 3.3Field Supervision, Startup and
Testing SD-10 Operation and Maintenance Data
3.5Operating and Maintenance Manuals
26 51 00.00 40 SD-03 Product Data
2.2.1 GFluorescent Lighting Fixtures
2.2.1.1 GFluorescent Electronic Ballasts
GFluorescent Electromagnetic Ballasts
2.2.1.2 GFluorescent Lamps
1.3.1 GEnergy Efficiency Data
GEnclosed and Gasketed Vapor-Tight Fixtures
2.4.1 GLowering Devices
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 39 PAGES
26 51 00.00 40 GLighting Fixtures SD-07 Certificates
GEnergy Star Documentation SD-10 Operation and Maintenance Data
1.3.1Operational Service 26 56 00 SD-01 Preconstruction Submittals
GPhotometric Plan SD-02 Shop Drawings
1.5.1.1 GLuminaire drawings
SD-03 Product Data
2.2 GFluorescent, Luminaires
2.2.2 GLuminaire Light Sources
2.2.3 GLuminaire Ballasts,
2.3.1 GPhotocell
SD-05 Design Data
1.5.2 GDesign Data for luminaires
SD-06 Test Reports 3.2Operating test
SD-07 Certificates GLuminaire Useful Life Certificate
SD-10 Operation and Maintenance Data
1.6.1Electronic Ballast Warranty Operational Service
27 10 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 39 PAGES
27 10 00 1.6.1.1 GTelecommunications drawings
1.6.1.2 GTelecommunications Space
Drawings SD-03 Product Data
2.4 GTelecommunications cabling
2.5.5 GPatch panels
2.6 GTelecommunications
outlet/connector assemblies GEquipment support frame
SD-06 Test Reports
3.5.1 GTelecommunications cabling
testing SD-07 Certificates
1.6.2.1 GTelecommunications Contractor
1.6.2.2 GKey Personnel
1.6.2.3 GManufacturer Qualifications
1.6.3 GTest plan
SD-09 Manufacturer’s Field Reports
2.12.1 GFactory reel tests
SD-10 Operation and Maintenance Data
1.10.1 GTelecommunications cabling and
pathway system
SD-11 Closeout Submittals
1.10.2 GRecord Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 39 PAGES
27 41 16 SD-02 Shop Drawings Shop and Integration Drawings
1.3.3As-built Drawings SD-03 Product Data Product Data Video Wall Video Wall Support System Video Wall Controller Video Switcher Audio Switcher Speakers Microphones wired and wireless Monitors
SD-05 Design Data Design Data
SD-06 Test Reports Test Reports Integration Plan Final acceptance test and operational test procedure
SD-10 Operation and Maintenance Data Maintenance Manuals
SD-11 Closeout Submittals 1.3.3As-built Drawings
Training Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 39 PAGES
28 23 23.00 10 SD-02 Shop Drawings 1.4.2.4Graphics 1.3.3As-built Drawings
SD-03 Product Data 1.4CCTV Technical Data Packages 3.6.9Software Updates
SD-06 Test Reports 1.4.2Performance Verification Test 1.3.2Test Procedures and Reports
SD-08 Manufacturer’s Instructions 1.4.3Group V Technical Data Package
SD-10 Operation and Maintenance Data
1.4.2.1Operation and Maintenance Manuals
3.4.2Operator's Training Report SD-11 Closeout Submittals
1.4.2.3Data Entry 28 31 00.00 10 SD-02 Shop Drawings
1.6.5Detail Drawings SD-03 Product Data
2.4Storage Batteries 1.2.2Low Battery Voltage 1.5Spare Parts
1.7 GTechnical Data and Computer
Software
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 39 PAGES
28 31 00.00 10 3.6Training 3.7Testing
SD-06 Test Reports 3.7Testing
SD-07 Certificates 1.2Equipment 1.6.1Qualifications
SD-10 Operation and Maintenance Data
1.4Operating and Maintenance Instructions
1.7Technical Data and Computer Software
31 00 00 SD-01 Preconstruction Submittals
3.5 GShoring
SD-03 Product Data 3.9Utilization of Excavated Materials
SD-06 Test Reports 3.17Testing 2.1Borrow Site Testing
SD-07 Certificates 3.17Testing
31 11 00 SD-03 Product Data 3.6.1Nonsaleable Materials
31 23 00.00 20 SD-06 Test Reports 1.6Borrow Site Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 39 PAGES
31 23 00.00 20 3.11.2.1Fill and backfill 3.11.2.2Select material 3.11.2.3Porous fill 3.11.2.4Density tests 3.11.2.5Moisture Content Tests
31 60 00 SD-03 Product Data 3.2.1.1Tools
32 92 23 SD-03 Product Data 2.3Fertilizer
SD-06 Test Reports Topsoil composition tests
SD-07 Certificates 2.1sods
33 11 00 SD-03 Product Data 2.1.1Piping Materials 2.1Water distribution main 2.2Water service line
Corporation stops 2.1.2.2Valve boxes 2.2.2.2Valve boxes
SD-06 Test Reports 2.2.2.4Disinfection
SD-07 Certificates 2.1Water distribution main 2.2Water service line
Displacement Type Meters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 39 PAGES
33 11 00 Compound Type Meters SD-08 Manufacturer’s Instructions
1.3Delivery, storage, and handling Installation
33 30 00 SD-01 Preconstruction Submittals Existing Conditions
SD-02 Shop Drawings 1.4.1Drawings 2.3.1Precast concrete manhole 2.3.3.1Frames, covers, and gratings
SD-03 Product Data 2.1Pipeline materials
SD-06 Test Reports 2.4Reports
SD-07 Certificates Gaskets
33 40 00 SD-03 Product Data 3.3Placing Pipe
SD-04 Samples 2.1Pipe for Culverts and Storm
Drains SD-07 Certificates
2.1.1Resin Certification 3.7Pipeline Testing 3.6.5Determination of Density 2.3.5Frame and Cover for Gratings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 39 PAGES
33 70 02.00 10 SD-02 Shop Drawings
1.4.1 GDetail Drawings
1.4.2 GAs-Built Drawings
SD-03 Product Data
2.2 GNameplates
2.1 GMaterial and Equipment
3.2 GInstallation Requirements
SD-06 Test Reports Factory Tests
3.9Field Testing 3.9.8Operating Tests 3.3.1.4Cable Installation
SD-07 Certificates 2.1Material and Equipment 3.10.2Installation Engineer
SD-10 Operation and Maintenance Data
3.10.1Operation and Maintenance Manuals
33 71 01.00 40 SD-03 Product Data
2.6 GConductors
2.5 GInsulators
2.2.1 GConcrete poles
2.17 GNameplates
GPole top switch GRecloser
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 39 PAGES
33 71 01.00 40 GSectionalizer
2.12 GCutouts
2.14 GTransformer
GMetering equipment GMeters
2.11 GSurge arresters
2.7Guy strand 2.9Anchors
SD-05 Design Data
2.2.1 GConcrete poles
SD-06 Test Reports GField Test Plan
3.6 GField Quality Control
1.5.3 GGround resistance test reports
SD-07 Certificates
2.2.1 GConcrete poles
2.14.1 GTransformer Losses
SD-09 Manufacturer’s Field Reports
2.18.2 Groutine and other tests
SD-10 Operation and Maintenance Data
1.6.1 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
2.18.1 GTransformer test schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 39 PAGES
33 71 02 SD-03 Product Data Low voltage cable Low voltage cable terminations Sealing Material
2.11.2Manhole frames and covers 2.11.3Handhole frames and covers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .