Attachment__2_-_CEFOP_POPAYAN_BID_CHART.pdf

PDF 32 KB Posted

Attached to
Fusion and Operations Center (CEFOP) Construction - Popayan Colombia Federal contract opportunity
Solicitation number
SWHARC15R0009
Issued by
Department of State Office of Acquisition Management

About this file

Attachment 2 Bid Chart Updated

View the file

Other files for this federal contract opportunity

Other files attached to Fusion and Operations Center (CEFOP) Construction - Popayan Colombia, newest first.
File Type Posted
Attachment__3_-_POPAYAN_CEFOP_DRAWINGS-SMALL.pdf PDF
AmendmentA002-AttachmentA.doc DOC document
AmendmentA002-SF30.doc DOC document
AmendmentA001SF30-Q-A.doc DOC document
Attachment__7_-_Submital_Register_CEFOP_Popayan.pdf PDF
SWHARC-15-R-0009_SF_1442_CEFOP_Popayan.pdf PDF
Attachment__1_-_CEFOP_Popayan_Specifications.pdf PDF
FS-102.pdf PDF
Contractor_Questions_-_CEFOP_Popayan_-_Final.doc DOC document
Attachment__3_-_POPAYAN_CEFOP_DRAWINGS-SMALL.pdf PDF
Attachment__8_-_SAMRegistration.pdf PDF
Attachment__6_-_PastPerformance.pdf PDF
CEFOP_Popayan_-_Solicitation_SWHARC15R0009_draft_June_02_2015.docx DOCX document
Attachment__2_-_CEFOP_POPAYAN_BID_CHART.pdf PDF
Attachment__4_-_BondsandInsurance.pdf PDF
Attachment__5_-_FirmandProjectInformation.pdf PDF
Attachment___1.PDF PDF
SWHARC-15-R-0009_SF_1442_CEFOP_Popayan.pdf PDF
cover_letter_SWHARC-15-R-0009.docx DOCX document
Attachment__7_-_Submital_Register_CEFOP_Popayan.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT: CEFOP BUILDING

Place: POPAYAN, CAUCA Date: 4/30/2015

BASE BID

ITEM DESCRIPTION MATERIAL

UNIT

MATERIAL

QUANTITY

MATERIAL

UNIT COST LABOR UNIT LABOR

QUANTITY

LABOR UNIT

COST

EQUIPMENT

UNIT

EQUIPMENT

QUANTITY

EQUIPMENT

UNIT COST TOTAL COST TOTAL COST BY CHAPTER

A. GENERAL REQUIREMENTS $ 0.00

1 GENERAL REQUIREMENTS $ 0.00

01 32 16 Construction Progress Documentation $ 0.00 $ 0.00

01 33 00 Submittal Procedures $ 0.00 $ 0.00

01 50 00 Temporary Facilities and Controls $ 0.00 $ 0.00

01 78 00 Execution and Closeout Requirements $ 0.00 $ 0.00

B. CEFOP BUILDING $ 0.00

2 EXISTING CODITIONS $ 0.00

02 41 00 Demolition $ 0.00 $ 0.00

3 CONCRETE $ 0.00

03 11 13.00 10 Structural Cast-in-Place Concrete Forming $ 0.00

$ 0.00

03 20 00.00 10 Concrete Reinforcing $ 0.00 $ 0.00

03 30 00 Cast-in-Place Concrete $ 0.00 $ 0.00

4 MASONRY $ 0.00

04 20 00 Masonry $ 0.00

$ 0.00

5 METALS $ 0.00

05 05 23 Welding, Structural $ 0.00

$ 0.00

05 12 00 Structural Steel $ 0.00 $ 0.00

05 50 13 Miscellaneous Metal Fabrications $ 0.00 $ 0.00

05 50 14 Structural Metal Fabrications $ 0.00 $ 0.00

6 WOODS, PLASTICS AND COMPOSITES $ 0.00

06 10 00 Rough Carpentry $ 0.00

$ 0.00

06 20 00 Finish Carpentry $ 0.00 $ 0.00

7 THERMAL AND MOISTURE PROTECTION $ 0.00

07 21 16 Mineral Fiber Blanket Insulation $ 0.00

$ 0.00

07 41 63 Fabricated Roof Panel Assemblies $ 0.00 $ 0.00

07 60 00 Flashing and Sheet Metal $ 0.00 $ 0.00

07 92 00 Joint Sealants $ 0.00 $ 0.00

OFICIAL BREAKDOWN CHART

ITEM DESCRIPTION MATERIAL

UNIT

MATERIAL

QUANTITY

MATERIAL

UNIT COST LABOR UNIT LABOR

QUANTITY

LABOR UNIT

COST

EQUIPMENT

UNIT

EQUIPMENT

QUANTITY

EQUIPMENT

UNIT COST TOTAL COST TOTAL COST BY CHAPTER

8 OPENINGS $ 0.00

08 11 13 Steel Doors and Frames $ 0.00

$ 0.00

08 51 13 Aluminum Windows $ 0.00 $ 0.00

08 71 00 Door Hard Ware $ 0.00 $ 0.00

08 81 00 Glazing $ 0.00 $ 0.00

08 91 00 Metal Wall louvers $ 0.00 $ 0.00

9 FINISHES $ 0.00

09 06 90 Color Schedule $ 0.00

$ 0.00

09 24 23 Stucco $ 0.00 $ 0.00

09 26 00 Veneer Plaster $ 0.00 $ 0.00

09 30 00 Ceramic Tile $ 0.00 $ 0.00

09 51 00 Acoustical Ceilings $ 0.00 $ 0.00

09 90 00 Paints and Coatings $ 0.00 $ 0.00

10 SPECIALTIES $ 0.00

10 28 13 Toilet Accessories $ 0.00

$ 0.00

10 44 16 Fire Extinguishers $ 0.00 $ 0.00

12 FURNISHINGS $ 0.00

12 21 00 Window Blinds $ 0.00

$ 0.00

12 36 00 CounterTops $ 0.00 $ 0.00

13 SPECIAL CONSTRUCTION $ 0.00

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT $ 0.00

$ 0.00

22 PLUMBING $ 0.00

22 00 00 PLUMBING GENERAL PURPOSE $ 0.00

$ 0.00

23 HEATING, VENTILATING, AND AIR CONDITIONING $ 0.00

23 00 00 Air Supply, Distribution, Ventilation and Exhaust Systems $ 0.00

$ 0.00

23 03 00.00 20 Basic Mechanical Materials and Methods $ 0.00 $ 0.00

23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment $ 0.00

$ 0.00

23 07 00 Thermal Insulation for Mechanical Systems $ 0.00 $ 0.00

23 23 00 Refrigerant Piping $ 0.00

MATERIAL

QUANTITY

MATERIAL

UNIT COST LABOR UNIT LABOR

QUANTITY

LABOR UNIT

COST

EQUIPMENT

UNIT

EQUIPMENT

QUANTITY

EQUIPMENT

UNIT COST TOTAL COST TOTAL COST BY CHAPTER

23 34 23.00 40 HVAC Power Ventilators $ 0.00 $ 0.00

23 81 00.00 20 Unitary Air Conditioning Equipment $ 0.00 $ 0.00

23 82 02.00 10 Unitary Heating and Cooling Equipment $ 0.00 $ 0.00

26 Electrical $ 0.00 26 00 00 Basic Electrical Materials and Methods $ 0.00

$ 0.00

26 05 00 Common Work Results for Electrical $ 0.00 $ 0.00

26 09 13 Power Monitoring System $ 0.00 $ 0.00

26 11 16 Secondary Unit Substations $ 0.00 $ 0.00

26 20 00 Interior Distribution System $ 0.00 $ 0.00

26 24 16 Pannelboards $ 0.00 $ 0.00

26 28 01 Coordinated Power System Protection $ 0.00 $ 0.00

26 28 21.00 40 Automatic Transfer Switches (ATS) $ 0.00 $ 0.00

26 32 14.00 10 Diesel-Generator Set $ 0.00 $ 0.00

26 32 33.00 10 Uninterruptible Power Supply (UPS) System Above 15 KVA Capacity $ 0.00

$ 0.00 $ 0.00 $ 0.00

26 51 00.00 40 Interior Lighting $ 0.00 $ 0.00

26 56 00 Exterior Lighting $ 0.00 $ 0.00

27 Communications $ 0.00 27 10 00 Building Telecommunications Cabling System $ 0.00

$ 0.00

27 41 16 Integrated Audio-Video Systems and Equipment $ 0.00 $ 0.00

28 Electronic Safety and Security $ 0.00 28 20 01.00 10 Electronic Security System $ 0.00

$ 0.00

28 23 23.00 10 Closed Circuit Television Systems $ 0.00 $ 0.00

28 31 00.00 10 Fire Detection and Alarm System. Direct Current Loop. $ 0.00

MATERIAL

QUANTITY

MATERIAL

UNIT COST LABOR UNIT LABOR

QUANTITY

LABOR UNIT

COST

EQUIPMENT

UNIT

EQUIPMENT

QUANTITY

EQUIPMENT

UNIT COST TOTAL COST TOTAL COST BY CHAPTER

C. EXTERIOR WORKS $ 0.00

31 Earthwork $ 0.00

31 00 00 Earthwork $ 0.00 $ 0.00

31 11 00 Clearing and Grubbing $ 0.00 $ 0.00

31 23 00.00 20 Excavation and Fill $ 0.00 $ 0.00

31 60 00 Foundation Preparation $ 0.00 $ 0.00

32 Exterior Improvements $ 0.00 32 92 23 Sodding $ 0.00

$ 0.00

33 Utilities $ 0.00 33 11 00 Water Distribution $ 0.00

$ 0.00

33 30 00 Sanitary Sewer $ 0.00 $ 0.00

33 40 00 Storm Drainage Utilities $ 0.00 $ 0.00

33 70 02.00 10 Electrical Distribution System, Underground $ 0.00 $ 0.00

33 71 01.00 40 Overhead Transmission and Distribution $ 0.00 $ 0.00

33 71 02 Underground Electrical and Telecomunications Distribution $ 0.00 $ 0.00

D. MARKUPS $ 0.00

D TOTAL DIRECT COST PHYSICAL ADECUATION WORKS $ 0.00

D Administration % $ 0.00 D Unforenseens % $ 0.00 D Profit % $ 0.00 D TAX(Over the profit value) % $ 0.00 T TOTAL COSTS (Base bid) $ $ 0.00

File details come from the government source that posted it. Updated .