Submittals AF 66.pdf
PDF 234 KB Posted
- Attached to
- OHARNG CJAG ITAM Trail Phase 5 Solicitation
- Solicitation number
- W91364-22-B-0005
About this file
This document contains a schedule of material submittals and federal contract opportunity solicitation for a construction project to improve a trail on an Army National Guard installation. The material submittal schedule lists 24 items requiring shop drawings, manufacturer data, or test results to be submitted by the contractor and approved by the government civil engineer. It also provides submission and response due dates. The federal contract opportunity is a sealed bid solicitation to improve approximately 17,000 feet of an existing trail at Camp James A. Garfield Joint Military Training Site in Ohio. The project scope includes earthwork, fence demolition, culvert installation and site restoration. The opportunity is a 100% service-disabled veteran-owned small business set-aside with a magnitude between $500,000 to $1,000,000 and a 300-day contract duration. Site visits are scheduled for August 8th and 15th and bids are due in-person with questions by August 18th and answers posted by August 22nd.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF FORM 66 (Computer Generated) PAGE 1 of 3
PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALS Group 7 ITAM Maneuver Trail
- Phase 5
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE
OF SUBMITTAL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SC
HE
DU
LE
S, L
IS
TI
NG
S, R
EP
OR
TS
, P
LA
NS
TE
CH
NI
CA
L
DA
TA
TE
ST
R
EP
OR
TS
FI
EL
D
RE
PO
RT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR
NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
REMARKS
APPROVED DIS-
APPROVED
1 grass seed x must meet specs defined in SOW
2 fertilizer x must meet specs defined in SOW
3 culverts (24" RCP) x x x must show manufacturer's spec.
4 24" half-height headwall x x x must show manufacturer's spec.
5 stone - #304 aggregate base x must show manufacturer's spec.
6 stone - #617 aggregate base x must show manufacturer's spec.
7 stone - D rock x must show manufacturer's spec.
8 sand x must show manufacturer's spec.
9 filter sock x x must meet specs shown in construction drawings
10 ECM x x must meet specs shown in construction drawings
11 silt fence x x must meet specs shown in construction drawings
3922022
AF FORM 66 (Computer Generated) PAGE 2 of 3
SCHEDULE OF MATERIAL SUBMITTALS Group 7 ITAM Maneuver Trail
- Phase 5
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE
OF SUBMITTAL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SC
HE
DU
LE
S, L
IS
TI
NG
S, R
EP
OR
TS
, P
LA
NS
TE
CH
NI
CA
L
DA
TA
TE
ST
R
EP
OR
TS
FI
EL
D
RE
PO
RT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR
NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
REMARKS
APPROVED DIS-
APPROVED
12 rock check dam x must meet specs shown in construction drawings
13 rock const/ entrance x must meet specs shown in construction drawings
14 dumpsters x show location on updated ESC drawings
15 fuel x show location on updated ESC drawings
16 porta-johns x show location on updated ESC drawings
17 Barricades/sign x show location on updated ESC drawings
18 Construction schedule x x Within 1 week of Notice to Proceed
19 As-Built Drawings x within 60 days of finish of project
20 PM
21 Site Superintendent
033000 Compressive Strength Test Results x
23 033000 Concrete Mix Design x
033000 Shop Drawings - Reinforcing Steel x
3922022
AF FORM 66 (Computer Generated) PAGE 3 of 3
SCHEDULE OF MATERIAL SUBMITTALS Group 7 ITAM Maneuver Trail
- Phase 5
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE
OF SUBMITTAL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SC
HE
DU
LE
S, L
IS
TI
NG
S, R
EP
OR
TS
, P
LA
NS
TE
CH
NI
CA
L
DA
TA
TE
ST
R
EP
OR
TS
FI
EL
D
RE
PO
RT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR
NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
REMARKS
APPROVED DIS-
APPROVED
312300 Field Density Test Results and Lab Reports x x
3922022
Reinforced Concrete Pipe X X X
012200 Environmental Work Plan
Grp 7 ITAM Ph2 (CK)
File details come from the government source that posted it. Updated .