Request for Information Form.pdf

PDF 69 KB Posted

Attached to
OHARNG CJAG ITAM Trail Phase 5 Solicitation
Solicitation number
W91364-22-B-0005
Issued by

About this file

This solicitation is for a construction project to improve an existing trail at Camp James A. Garfield Joint Military Training Site in Ohio. The Army National Guard seeks bids to construct approximately 17,000 feet of trail as part of Phase 5 of the ITAM Trail project, including earthwork, fence demolition, culvert installation, and site restoration. This is a 100% Service-Disabled Veteran Owned Small Business set-aside with a small business size standard of $39.5 million. The magnitude of construction is estimated between $500,000 and $1 million. The contract duration will be 300 days after notice to proceed. Site visits are scheduled for August 8 and 15, 2022, and bids must be submitted in person at the bid opening. All questions are due by August 18, 2022, and answers will be posted to SAM.gov by August 22, 2022.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NUMBER:

REQUEST FOR INFORMATION

RFI NUMBER:

PROJECT NUMBER / CONTRACT TITLE:

PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:

SUBJECT/TITLE OF RFI:

DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:

PHONE: FAX: COST IMPACT:

YES NO

DATE SUBMITTED: RESPOND BY:

INFORMATION REQUESTED

By: Date:

RESPONSE

By: Date:

COR Concurrence: Date:

CO Concurrence: Date:

The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.

CONTRACT NUMBER:
RFI NUMBER:
PROJECT NUMBER CONTRACT TITLE:
PRIME CONTRACTOR:
SUBCONTRACTORSUPPLIER:
SUBJECTTITLE OF RFI:
DRAWINGS:
DETAILS:
SPECIFICATION:
CPM ACTIVITY:
PHONE:
FAX:
COST IMPACT: Off
DATE SUBMITTED:
RESPOND BY:
INFORMATION REQUESTED:
By:
Date:
RESPONSE:
By_2:
Date_2:
COR Concurrence:
Date_3:
CO Concurrence:
Date_4:

File details come from the government source that posted it. Updated .