Subcontractor_Listing.pdf
PDF 224 KB Posted
- Attached to
- Modular Offices/Trailers for Police Range
- Solicitation number
- 2026-IFB-LM-0466
- Issued by
- Los Angeles County, California
About this file
This is a Subcontractor Listing form for the City of Pasadena, California's procurement of modular office units/trailers for the Pasadena Police Department. The form requires contractors to identify all subcontractors who will perform work on the project, with designated sections for listing subcontractor names, addresses, and descriptions of work. Additionally, the form mandates that if shoring design is required as part of the project, the Civil or Structural Engineer responsible for designing the shoring must be listed separately, whether that engineer is employed directly by the contractor or is a subcontractor. If no shoring is required for the project, contractors must indicate "NONE" in the designated section.
The form provides space for up to seven subcontractors and up to six engineers involved in shoring design, with corresponding fields for addresses and work descriptions for each entry. This documentation requirement ensures transparency in the supply chain and allows the City of Pasadena to verify the qualifications and experience of all entities involved in delivering and installing the three modular office units/trailers. The form does not specify pricing terms, award dates, or contract duration details, as it functions solely as a disclosure and tracking document for subcontractor information.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontractor Listing/Shoring Design
SUBCONTRACTOR LISTING
Names (s) Address Description of Work
SHORING DESIGN
If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.
Engineer Names (s) Address Description of Work
| Names s 1: |
| Names s 2: |
| Names s 3: |
| Names s 4: |
| Names s 5: |
| Names s 6: |
| Names s 7: |
| Address 1: |
| Address 2: |
| Address 3: |
| Address 4: |
| Address 5: |
| Address 6: |
| Address 7: |
| Description of Work 1: |
| Description of Work 2: |
| Description of Work 3: |
| Description of Work 4: |
| Description of Work 5: |
| Description of Work 6: |
| Description of Work 7: |
| Engineer Names s 1: |
| Engineer Names s 2: |
| Engineer Names s 3: |
| Engineer Names s 4: |
| Engineer Names s 5: |
| Engineer Names s 6: |
| Address 1_2: |
| Address 2_2: |
| Address 3_2: |
| Address 4_2: |
| Address 5_2: |
| Address 6_2: |
| Description of Work 1_2: |
| Description of Work 2_2: |
| Description of Work 3_2: |
| Description of Work 4_2: |
| Description of Work 5_2: |
| Description of Work 6_2: |
File details come from the government source that posted it. Updated .