Subcontractor_Listing.pdf
PDF 224 KB Posted
- Attached to
- Tree Trimming, Vegetation Management, and Emergency Response Services for Power Line Clearance
- Solicitation number
- 2025-IFB-LM-0704
- Issued by
- Los Angeles County, California
About this file
The document is a Subcontractor Listing/Shoring Design form for the Pasadena Water and Power (PWP) Tree Trimming, Vegetation Management, and Emergency Response Services contract. The form provides space for contractors to list subcontractors and engineers responsible for shoring design, if applicable. It is part of a five-year contract solicitation for power line clearance services, with contractors required to perform tree trimming, tree removal, and vegetation management throughout the city of Pasadena.
The form itself does not contain specific pricing details or contract terms, but is part of a bid submission process where contractors must document their subcontractors and potential shoring design needs. The contract requires strict adherence to OSHA 1910.269 and California Code of Regulations safety standards, with the primary goal of maintaining electrical infrastructure safety, preventing outages, and mitigating wildfire risks. The contract will be awarded to the lowest responsive and responsible bidder who meets the minimum qualification requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontractor Listing/Shoring Design
SUBCONTRACTOR LISTING
Names (s) Address Description of Work
SHORING DESIGN
If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.
Engineer Names (s) Address Description of Work
| Names s 1: |
| Names s 2: |
| Names s 3: |
| Names s 4: |
| Names s 5: |
| Names s 6: |
| Names s 7: |
| Address 1: |
| Address 2: |
| Address 3: |
| Address 4: |
| Address 5: |
| Address 6: |
| Address 7: |
| Description of Work 1: |
| Description of Work 2: |
| Description of Work 3: |
| Description of Work 4: |
| Description of Work 5: |
| Description of Work 6: |
| Description of Work 7: |
| Engineer Names s 1: |
| Engineer Names s 2: |
| Engineer Names s 3: |
| Engineer Names s 4: |
| Engineer Names s 5: |
| Engineer Names s 6: |
| Address 1_2: |
| Address 2_2: |
| Address 3_2: |
| Address 4_2: |
| Address 5_2: |
| Address 6_2: |
| Description of Work 1_2: |
| Description of Work 2_2: |
| Description of Work 3_2: |
| Description of Work 4_2: |
| Description of Work 5_2: |
| Description of Work 6_2: |
File details come from the government source that posted it. Updated .