STUBBS HALL SPECS.docx
DOCX document 14 KB Posted
- Attached to
- Stubbs Hall Window Replacement
- Solicitation number
- PE-58800-RFQ-2026-000000016
- Issued by
- Columbia County, Georgia
About this file
This document is a bid specification for the Stubbs Hall Window Replacement project, detailing a comprehensive window replacement scope. The project involves replacing 56 total windows, including (30) 48"x136" windows, (25) 48"x109" windows, and (1) 144"x136" window, with specifications for converting current windows to storefront-style installations. All work requires field verification and owner approval, with black frames to match newer windows on the building's south section. The specification mandates spandrel glass on top and bottom of the storefront to conceal internal finishes, and five windows will require smooth CMU finish and painting in place of sheetrock.
The bid includes specific performance requirements, with a 5% bid bond and performance and payment bonds required. The project emphasizes complete exterior waterproofing and interior finish uniformity, including area dusting and cleaning. While specific pricing, funding sources, and precise bidding dates are not detailed in this document, the specifications provide clear technical requirements for potential contractors to understand the full scope of the window replacement project at Stubbs Hall.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stubbs Hall Window Replacement
Bid Information:
5% Bid Bond Performance and Payment Bonds required
56 windows total:
(30) 48”x136”
(25) 48”x109”
(1) 144”x136”
Scope of work:
All work is to be field verified and approved by owner.
Converting current windows to Storefront. Black Frames on all new windows to match newer windows on south section of the building. Spandrel glass is required on Top and Bottom of storefront to hide internal finishes.
5 windows will require smooth CMU finish and painting in place of sheetrock.
All exterior is to be finished watertight. All interior finishes are to be uniform with existing walls and areas dusted and cleaned.