About this file
This construction plan document is prepared by SAI Consulting Engineers for the City of Pittsburgh's Department of Mobility and Infrastructure and details the Streets Run Channel Repair Project located in the 31st Ward of Pittsburgh, Allegheny County, Pennsylvania. The project is a stream channel remediation effort designed to repair previously constructed work found to be in violation of original permits and to improve overall stream function and stability. The scope includes excavation of stream channel areas designated for rock riprap placement, removal of existing grouted rock and placement of new Class R-6 and Class R-7 grouted rock riprap, removal of gravel bars, and repair of scour holes along Streets Run, a perennial warm water fishes protected stream. The construction plan encompasses 18 sheets including title sheets, general notes, summary of quantities, stream channel plan and sections, stream channel cross sections, and detailed erosion and sediment pollution control specifications. The project requires coordination with multiple utility companies including Comcast Cable, Pennsylvania American Water, Verizon, Peoples Natural Gas, Duquesne Light Company, and Pittsburgh Water and Sewer Authority. The contractor must contact PA One Call System, Inc. at 1-800-242-1776 at least three to ten working days prior to excavation based on project complexity.
The contractor is responsible for providing all engineering and survey services necessary to locate and construct items as shown on contract drawings at no additional cost to the city. Environmental controls are critical requirements, including temporary water pollution and soil erosion controls, air pollution control measures, noise minimization, and maintenance of the project area during construction. The contractor shall not perform night, holiday, or weekend work except when ordered by the city or at the city's request, with any such work reimbursable to the city at established labor and material rates. Work must comply with City of Pittsburgh Standard Specifications for Materials and Construction, Pennsylvania Department of Transportation publications, and current standards. The project involves significant environmental due diligence with clean fill verification requirements and coordination with the Allegheny County Conservation District and Pennsylvania Department of Environmental Protection. Erosion and sediment pollution control implementation begins with pre-construction notification and a mandatory on-site meeting at least seven business days prior to any disturbance activities, with a total limit of disturbance of 0.7 acres and 0.1 acres within the floodplain.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Streets_Run_Channel_Repair_Project.pdf | ||
| Streets_Run_-_Bid_Sheet_and_Special_Provisions_rev_(1).pdf | ||
| PA_PREVAILING_WAGES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIST OF PUBLIC UTILITIES
INDEX OF DRAWINGS
VICINITY MAP
SOURCE: GOOGLE MAPS
LOCATION MAP
SOURCE: GOOGLE MAPS
SCALE
3 MILE1.50
SCALE
1000 FEET5000
SITE
SITE
STREETS RUN CHANNEL REPAIR PROJECT
DEPARTMENT OF MOBILITY AND INFRASTRUCTURE
CITY OF PITTSBURGH
\\svr-pgh-data-01\Data\Client\PGH_Client\20005-004-Streets_Run_CAP\CADD\Roadway\PSE\CNTTL01.dgn 5/28/2026
DRAWN BY
CHECKED BY
PREPARED BY:
DATE:
APPROVED BY: DATE
MUNICIPAL TRAFFIC ENGINEER
CHIEF ENGINEER
ASSISTANT DIRECTOR OF PLANNING, POLICY, AND PERMITTING
DEPUTY DIRECTOR, DEPARTMENT OF MOBILITY AND INFRASTRUCTURE
DIRECTOR, DEPARTMENT OF MOBILITY AND INFRASTRUCTURE
CITY OF PITTSBURGH
TITLE SHEET
SCALE: AS NOTED
Consulting Engineers
1350PennAvenue,Suite 300,Pittsburgh, PA 15222-4211
DATE
ACCESSION NO.
CASE NO.:
ALLEGHENY COUNTY, PENNSYLVANIA
31ST WARD - CITY OF PITTSBURGH
STREETS RUN CHANNEL REPAIR PROJECT
DAVID.SCHADE@COMCAST.COM
MR. DAVID SCHADE
PITTSBURGH, PA 15238
610 EPSILON DRIVE
COMCAST CABLE
LUCIAN.CAPPETTA@AMWATER.COM
MR. LUCIAN CAPPETTA
BETHEL PARK, PA 15102
560 HORNING ROAD
PENNSYLVANIA AMERICAN WATER
VICTOR.S.WOOD@VERIZON.COM
MR. VICTOR WOOD
PITTSBURGH, PA 15212
FLOOR 2
15 EAST MONTGOMERY PLACE
VERIZON PA
JUSTIN.R.HAUPT@PEOPLES-GAS.COM
MR. JUSTIN HAUPT
MONONGAHELA, PA 15063
1291 WEST MAIN STREET
PEOPLES NATURAL GAS COMPANY
KPARISON@DUQLIGHT.COM
MS. KYLIE PARISON
PITTSBURGH, PA 15233
2825 NEW BEAVER AVENUE
DUQUESNE LIGHT COMPANY
JTEWELL@PGH20.COM
MR. JOE TEWELL
PITTSBURGH, PA 15222
1200 PENN AVENUE
PENN PLAZA I
PITTSBURGH WATER AND SEWER AUTHORITY
CITY OF PITTSBURGH
AND INFRASTRUCTURE
DEPARTMENT OF MOBILITY
POLLUTION CONTROL PLAN
EROSION AND SEDIMENT 11-18SHEETS
SECTIONS
STREAM CHANNEL CROSS 9-10SHEETS
PLAN
STREAM CHANNEL REPAIRS 8SHEET
SECTIONS
STREAM CHANNEL PLAN AND 4-7SHEETS
SUMMARY OF QUANTITIES3SHEET
GENERAL NOTES2SHEET
TITLE SHEET1SHEET
RML
KDF
MAY 2026
6/2/26
N/A
N/A
06/02/2026
CONTRACT SPECIFICATIONS
MAINTENANCE OF PROJECT AREA
NIGHT, HOLIDAY AND WEEKEND WORK
EXISTING PUBLIC FACILITIES AND UTILITIES (PA ONE-CALL)
ENVIRONMENTAL CONTROL
GENERAL NOTES
212 AND 213; CURRENT CITY OF PITTSBURGH STANDARDS FOR CONSTRUCTION.
EDITION AND SUPPLEMENTS THERETO; THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION PUBLICATION NO.
1978; THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION PUBLICATION 408/2026 SPECIFICATION, CURRENT
DATED MARCH 1962; SUPPLEMENTAL SPECIFICATIONS FOR CONCRETE PAVEMENT AND BASE COURSE DATED MARCH
CONSTRUCTION, DATED NOVEMBER 1938 AND JULY 1955 WITH SUPPLEMENTS THERETO AND REVISIONS THEREOF
THE CONTRACT DOCUMENTS; THE CITY OF PITTSBURGH STANDARD SPECIFICATIONS FOR MATERIALS AND
ALL WORK TO BE COMPLETED AND MATERIAL FURNISHED UNDER THIS CONTRACT SHALL BE IN ACCORDANCE WITH
CONTRACT AND THE JOB CLASSIFICATION.
COSTS INCURRED BY THE CITY OF PITTSBURGH EMPLOYEES AT THE RATE OF COMPENSATION DETERMINED BY THE
THE PERIODS, THE CONTRACTOR SHALL REIMBURSE THE CITY OF PITTSBURGH FOR ALL LABOR AND MATERIAL
CONTRACTOR WITH THE APPROVAL OF THE CITY. WHEN THE CONTRACTOR IS GIVEN PERMISSION TO WORK DURING
WORK DURING THE ABOVE PERIODS EXCEPT WHEN ORDERED BY THE CITY AND/OR AT THE REQUEST OF THE
NIGHT WORK, CITY OF PITTSBURGH HOLIDAYS AND WEEKEND WORK- THE CONTRACTOR SHALL NOT PERFORM ANY
CONTROL SHALL BE INCIDENTAL TO THE UNIT PRICES BID FOR THE VARIOUS CONTRACT ITEMS.
PAYMENT FOR COSTS INVOLVED IN MAINTAINING AIR POLLUTION, SOIL EROSION CONTROL, AND NOISE
OTHER THAN REGULAR WORKING HOURS OR AT SPECIFIED PERIODS ONLY.
AGENCIES HAVING JURISDICTION, CERTAIN NOISE PRODUCING WORK MAY HAVE TO BE PERFORMED DURING
NOISE UNLESS OTHERWISE STIPULATED IN THE CONTRACT SPECIFICATIONS. WHERE REQUIRED BY
INTAKE AND EXHAUST LINES. WHEREVER PRACTICAL, ELECTRICITY SHALL BE USED FOR POWER TO REDUCE
INTAKE LINES. ALL GAS OR OIL OPERATED EQUIPMENT SHALL BE EQUIPPED WITH SILENCERS OR MUFFLER
TYPE DESIGNED TO REDUCE NOISE TO A MINIMUM. COMPRESSORS SHALL BE EQUIPPED WITH SILENCERS ON
EQUIPMENT DESIGNED TO OPERATE WITH THE LEAST POSSIBLE NOISE AND WHEN GRINDING SHALL BE OF A
NOISE CAUSED BY CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL PROVIDE WORKING MACHINERY AND
NOISE CONTROL - THE CONTRACTOR SHALL USE EVERY EFFORT AND EVERY MEANS POSSIBLE TO MINIMIZE 3.
BITUMENS, CALCIUM CHLORIDE OR OTHER HARMFUL MATERIALS.
(E) TAKE SUFFICIENT PRECAUTIONS TO PREVENT POLLUTION OF STREAMS WITH FUELS, OILS,
(D) USE SOUND JUDGEMENT IN LOCATING STORAGE AREAS AND FUEL DEPOTS.
WATERSHED AREA.
(C) DO NOT EXPOSE ANY EMPLOYEES KNOWN TO HAVE SERIOUS WATER-BOURNE ILLNESS TO THE
(B) LOCATE TOILETS PROPERLY.
(A) MINIMIZE THE AMOUNT OF EXPOSED ERODIBLE EARTH.
THE CONTRACTOR SHALL EXERCISE ADDITIONAL PRECAUTIONS AS FOLLOWS:
CONTROL WATER POLLUTION.
TEMPORARY CONTROL MEASURES AS DIRECTED BY THE ENGINEER DURING THE LIFE OF THE CONTRACT TO
TEMPORARY WATER POLLUTION AND SOIL EROSION CONTROLS - THE CONTRACTOR SHALL PROVIDE 2.
APPROVED DUST CONTROL PALLIATIVES AS DIRECTED.
PROJECT. WORK AREAS CAUSING FUGITIVE DUST SHALL BE TREATED WITH CALCIUM CHLORIDE OR OTHER
DWELLINGS ARE LOCATED AND IN AREAS WHERE TRAFFIC PATTERNS MAY INTERSECT THE CONSTRUCTION
SHALL TAKE PRECAUTIONS TO MINIMIZE FUGITIVE DUST. PARTICULARLY IN AREAS WHERE OCCUPIED
NO BURNING IN ANY MANNER WILL BE PERMITTED ON THIS PROJECT. IN ADDITION, THE CONTRACTOR
OR REGULATIONS ISSUED PURSUANT TO THE CLEAN AIR ACT OF 1970.
AIR POLLUTION CONTROL - THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE STANDARDS, ORDERS, 1.
IN THE PROJECT AREA DURING THE DEVELOPMENT OF THIS PROJECT.
THE FOLLOWING CONTROLS SHALL BE ADHERED TO IN AN EFFORT TO MAINTAIN THE QUALITY OF THE ENVIRONMENT
TRIBUNALS HAVING AUTHORITY OR JURISDICTION OVER THE WORK, MATERIAL, EMPLOYEES OR CONTRACT.
ALL ORDERS OR DECREES WHICH HAVE BEEN OR MAY BE PROMULGATED OR ENACTED BY ANY LEGAL BODIES OR
ANY MANNER AFFECTING THE CONDUCT OF THE WORK OR APPLYING TO EMPLOYEES ON THE PRODUCT, AS WELL AS
AND LOCAL LAWS, ORDINANCES AND REGULATIONS CONCERNING ENVIRONMENTAL AND/OR POLLUTION CONTROLS IN
THE CONTRACTOR SHALL AT ALL TIMES OBSERVE, COMPLY WITH, AND POST AS REQUIRED, ALL FEDERAL, STATE
ITEMS OF WORK.
ACCOUNT OF SUCH OBSTRUCTIONS AND DIFFICULTIES SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS
ENCOUNTERED IN THE PROSECUTION OF THE WORK UNDER THIS CONTRACT AND ANY ADDITIONAL EXPENSE INCURRED ON
LINES IN THE PROJECT AREA. THE CONTRACTOR SHALL DETERMINE THE OBSTRUCTIONS AND DIFFICULTIES TO BE
VARIATIONS FOUND DURING CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE ALL UTILITY
OTHERS, THE EXISTENCE OF WHICH IS PRESENTLY UNKNOWN. THE CITY WILL NOT BE RESPONSIBLE FOR ANY
RECORDS. THEREFORE, THEIR LOCATIONS AND SIZES MUST BE CONSIDERED APPROXIMATE ONLY. THERE MAY BE
UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE AS-BUILT PLANS AND
UTILITY COMPANIES, SCHEDULING WORK IN SUCH A MANNER THAT NEEDLESS CONFLICT WILL BE AVOIDED.
PRECAUTIONS TO PREVENT DAMAGE TO ALL UTILITIES. THE CONTRACTOR SHALL ARRANGE AND COOPERATE WITH
RESPECTIVE OWNERS, UNLESS OTHERWISE NOTED ON THESE PLANS. THE CONTRACTOR SHALL EXERCISE ALL
ANY OR ALL WORK REQUIRED FOR PUBLIC OR PRIVATE UTILITIES WILL BE DONE BY AND AT THE EXPENSE OF THEIR
ALL OVERHEAD LINES, NOTIFY AND COMPLY WITH THE APPLICABLE UTILITY COMPANY'S CLEARANCE REQUIREMENTS.
PROVISIONS OF PA ACT 287 OF 1974 AS AMENDED BY ACT 187 OF 1996. THE CONTRACTOR SHALL ALSO IDENTIFY
UTILITIES, THE CONTRACTOR MUST CONTACT THE PA ONE CALL SYSTEM, INC. (1-800-242-1176) AND COMPLY WITH
THREE WORKING DAYS PRIOR TO ANY EXCAVATION OR DEMOLITION WORK IN THE VICINITY OF UNDERGROUND
PROPERTY OWNERS
Tiffany J Rouse
Tiffany J Rouse
Duquesne Light Company
Shirley H Lang
John E & Helen E Dominici
Kevin Boory
CMC Diversified Holdings LLC
John R & Anna Lewis
Richard H & Audrey S Grieser
Hays Land Company
PROPERTY LINES:
BOUNDARY.
BE CONSULTED IN THE EVENT OF NEEDING TO KNOW THE EXACT PLACEMENT, SIZE, AND SHAPE OF A PARCEL
REPRESENTATION OF THE PROPERTY'S LOCATION, NOT THE LEGAL DESCRIPTION. A LAND SURVEYOR SHOULD
BOUNDARY IS THE PROPERTY DEED. THE PARCEL DATA REPRESENTED SHOULD BE VIEWED AS A GRAPHICAL
PROPERTY SURVEY. ACCORDING TO PENNSYLVANIA LAW, THE LEGAL DESCRIPTION FOR A PROPERTY
THE PARCEL BOUNDARY INFORMATION SHOULD NOT BE INTERPRETED OR ACCEPTED AS AN INDIVIDUAL
THE GIS DATA OR FITNESS FOR USE OF THE INFORMATION.
MAKES NO WARRANTY WHATSOEVER, NEITHER EXPRESSED NOR IMPLIED, WITH RESPECT TO THE ACCURACY OF
PROPERTY INFORMATION WAS OBTAINED FROM ALLEGHENY COUNTY GIS DATA. THE COUNTY OF ALLEGHENY
GENERAL NOTES:
Baltimore & Ohio RR Company
John & Merlinda Heinold
TWL Integration LLC
Joseph C Balistrieri Jr
CITY OF PITTSBURGH
KEEP PROJECT AREA CLEAN TO THE SATISFACTION OF THE CITY REPRESENTATIVE DURING CONSTRUCTION.
ADDITIONAL INFORMATION IS AVAILABLE AT www.pa1call.org/PA811/Public/.
CONTRACTOR'S SERIAL NO. FOR CITY OF PITTSBURGH
MUST CONTACT THE PA ONE CALL SYSTEM, INC., PHONE 1-800-242-1776
THREE TO TEN WORKING DAYS PRIOR TO EXCAVATION BASED ON THE COMPLEXITY OF THE PROJECT, THE CONTRACTOR
Dawn M Kotuce
Angela G Swisher
Courtland L Kenley
THE ROCK RIPRAP AS INDICATED OR DIRECTED.
RIPRAP. EXCAVATE THESE AREAS, INCLUDING STREAMBED MATERIAL, TO PROVIDE THE GEOMETRY FOR
CLASS 1 EXCAVATION IS FOR EXCAVATION REQUIRED FOR AREAS DESIGNATED FOR PLACEMENT OF ROCK 8.
CONSTRUCT ITEMS AS SHOWN ON THE CONTRACT DRAWINGS AT NO ADDITIONAL COST TO THE CITY.
THE CONTRACTOR SHALL PROVIDE ALL ENGINEERING AND SURVEY SERVICES NECESSARY TO LOCATE AND 7.
STRUCTURES FOR PROPER LAYOUT OF THE ROCK RIPRAP REPAIRS.
THE CONTRACTOR IS RESPONSIBLE FOR LOCATING EXISTING TOPOGRAPHIC FEATURES AND EXISTING 6.
TOPOGRAPHIC FEATURES OR PROPOSED CONSTRUCTION FEATURE.
SURVEY HAS BEEN PERFORMED TO LOCATE OR VERIFY THE LOCATION OR ELEVATION OF ANY
EXISTING TOPOGRAPHIC FEATURES SHOWN ARE BASED ON AERIAL MAPPING ONLY. SUPPLEMENTAL FIELD 5.
STATION. ALL STATIONS ARE APPROXIMATE.
BASELINE SHOWN IS NOT A GEOMETRICALLY DEFINED BASELINE AND IS FOR GENERAL REFERENCE BY 4.
TRANSPORTATION (PENNDOT) PUBLICATION 408/2026 AND SPECIAL PROVISIONS.
PROVIDE MATERIAL AND WORKMANSHIP IN ACCORDANCE WITH THE PENNSYLVANIA DEPARTMENT OF 3.
AND EARTH EXCAVATION ACTIVITIES.
PROTECT EXISTING RESIDENTIAL STRUCTURES FROM DAMAGE, DIRT AND DEBRIS DURING CONSTRUCTION 2.
TEMPORARY REROUTING OF UTILITIES AS NEEDED.
DUE TO CONSTRUCTION OPERATIONS AND PROVIDE SUPPLEMENTAL SUPPORT FOR UTILITIES OR
SEWER, STORM SEWER, WATER, GAS AND OVERHEAD ELECTRIC LINES. PROTECT UTILITIES FROM DAMAGE
COORDINATE CONSTRUCTION ACTIVITIES WITH UTILITY COMPANIES OPERATING UNDERGROUND SANITARY 1.
CONTRACT SPECIFICATIONS
MAINTENANCE OF PROJECT AREA
NIGHT, HOLIDAY AND WEEKEND WORK
EXISTING PUBLIC FACILITIES AND UTILITIES (PA ONE-CALL)
ENVIRONMENTAL CONTROL
GENERAL NOTES
212 AND 213; CURRENT CITY OF PITTSBURGH STANDARDS FOR CONSTRUCTION.
EDITION AND SUPPLEMENTS THERETO; THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION PUBLICATION NO.
1978; THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION PUBLICATION 408/2026 SPECIFICATION, CURRENT
DATED MARCH 1962; SUPPLEMENTAL SPECIFICATIONS FOR CONCRETE PAVEMENT AND BASE COURSE DATED MARCH
CONSTRUCTION, DATED NOVEMBER 1938 AND JULY 1955 WITH SUPPLEMENTS THERETO AND REVISIONS THEREOF
THE CONTRACT DOCUMENTS; THE CITY OF PITTSBURGH STANDARD SPECIFICATIONS FOR MATERIALS AND
ALL WORK TO BE COMPLETED AND MATERIAL FURNISHED UNDER THIS CONTRACT SHALL BE IN ACCORDANCE WITH
CONTRACT AND THE JOB CLASSIFICATION.
COSTS INCURRED BY THE CITY OF PITTSBURGH EMPLOYEES AT THE RATE OF COMPENSATION DETERMINED BY THE
THE PERIODS, THE CONTRACTOR SHALL REIMBURSE THE CITY OF PITTSBURGH FOR ALL LABOR AND MATERIAL
CONTRACTOR WITH THE APPROVAL OF THE CITY. WHEN THE CONTRACTOR IS GIVEN PERMISSION TO WORK DURING
WORK DURING THE ABOVE PERIODS EXCEPT WHEN ORDERED BY THE CITY AND/OR AT THE REQUEST OF THE
NIGHT WORK, CITY OF PITTSBURGH HOLIDAYS AND WEEKEND WORK- THE CONTRACTOR SHALL NOT PERFORM ANY
CONTROL SHALL BE INCIDENTAL TO THE UNIT PRICES BID FOR THE VARIOUS CONTRACT ITEMS.
PAYMENT FOR COSTS INVOLVED IN MAINTAINING AIR POLLUTION, SOIL EROSION CONTROL, AND NOISE
OTHER THAN REGULAR WORKING HOURS OR AT SPECIFIED PERIODS ONLY.
AGENCIES HAVING JURISDICTION, CERTAIN NOISE PRODUCING WORK MAY HAVE TO BE PERFORMED DURING
NOISE UNLESS OTHERWISE STIPULATED IN THE CONTRACT SPECIFICATIONS. WHERE REQUIRED BY
INTAKE AND EXHAUST LINES. WHEREVER PRACTICAL, ELECTRICITY SHALL BE USED FOR POWER TO REDUCE
INTAKE LINES. ALL GAS OR OIL OPERATED EQUIPMENT SHALL BE EQUIPPED WITH SILENCERS OR MUFFLER
TYPE DESIGNED TO REDUCE NOISE TO A MINIMUM. COMPRESSORS SHALL BE EQUIPPED WITH SILENCERS ON
EQUIPMENT DESIGNED TO OPERATE WITH THE LEAST POSSIBLE NOISE AND WHEN GRINDING SHALL BE OF A
NOISE CAUSED BY CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL PROVIDE WORKING MACHINERY AND
NOISE CONTROL - THE CONTRACTOR SHALL USE EVERY EFFORT AND EVERY MEANS POSSIBLE TO MINIMIZE 3.
BITUMENS, CALCIUM CHLORIDE OR OTHER HARMFUL MATERIALS.
(E) TAKE SUFFICIENT PRECAUTIONS TO PREVENT POLLUTION OF STREAMS WITH FUELS, OILS,
(D) USE SOUND JUDGEMENT IN LOCATING STORAGE AREAS AND FUEL DEPOTS.
WATERSHED AREA.
(C) DO NOT EXPOSE ANY EMPLOYEES KNOWN TO HAVE SERIOUS WATER-BOURNE ILLNESS TO THE
(B) LOCATE TOILETS PROPERLY.
(A) MINIMIZE THE AMOUNT OF EXPOSED ERODIBLE EARTH.
THE CONTRACTOR SHALL EXERCISE ADDITIONAL PRECAUTIONS AS FOLLOWS:
CONTROL WATER POLLUTION.
TEMPORARY CONTROL MEASURES AS DIRECTED BY THE ENGINEER DURING THE LIFE OF THE CONTRACT TO
TEMPORARY WATER POLLUTION AND SOIL EROSION CONTROLS - THE CONTRACTOR SHALL PROVIDE 2.
APPROVED DUST CONTROL PALLIATIVES AS DIRECTED.
PROJECT. WORK AREAS CAUSING FUGITIVE DUST SHALL BE TREATED WITH CALCIUM CHLORIDE OR OTHER
DWELLINGS ARE LOCATED AND IN AREAS WHERE TRAFFIC PATTERNS MAY INTERSECT THE CONSTRUCTION
SHALL TAKE PRECAUTIONS TO MINIMIZE FUGITIVE DUST. PARTICULARLY IN AREAS WHERE OCCUPIED
NO BURNING IN ANY MANNER WILL BE PERMITTED ON THIS PROJECT. IN ADDITION, THE CONTRACTOR
OR REGULATIONS ISSUED PURSUANT TO THE CLEAN AIR ACT OF 1970.
AIR POLLUTION CONTROL - THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE STANDARDS, ORDERS, 1.
IN THE PROJECT AREA DURING THE DEVELOPMENT OF THIS PROJECT.
THE FOLLOWING CONTROLS SHALL BE ADHERED TO IN AN EFFORT TO MAINTAIN THE QUALITY OF THE ENVIRONMENT
TRIBUNALS HAVING AUTHORITY OR JURISDICTION OVER THE WORK, MATERIAL, EMPLOYEES OR CONTRACT.
ALL ORDERS OR DECREES WHICH HAVE BEEN OR MAY BE PROMULGATED OR ENACTED BY ANY LEGAL BODIES OR
ANY MANNER AFFECTING THE CONDUCT OF THE WORK OR APPLYING TO EMPLOYEES ON THE PRODUCT, AS WELL AS
AND LOCAL LAWS, ORDINANCES AND REGULATIONS CONCERNING ENVIRONMENTAL AND/OR POLLUTION CONTROLS IN
THE CONTRACTOR SHALL AT ALL TIMES OBSERVE, COMPLY WITH, AND POST AS REQUIRED, ALL FEDERAL, STATE
ITEMS OF WORK.
ACCOUNT OF SUCH OBSTRUCTIONS AND DIFFICULTIES SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS
ENCOUNTERED IN THE PROSECUTION OF THE WORK UNDER THIS CONTRACT AND ANY ADDITIONAL EXPENSE INCURRED ON
LINES IN THE PROJECT AREA. THE CONTRACTOR SHALL DETERMINE THE OBSTRUCTIONS AND DIFFICULTIES TO BE
VARIATIONS FOUND DURING CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE ALL UTILITY
OTHERS, THE EXISTENCE OF WHICH IS PRESENTLY UNKNOWN. THE CITY WILL NOT BE RESPONSIBLE FOR ANY
RECORDS. THEREFORE, THEIR LOCATIONS AND SIZES MUST BE CONSIDERED APPROXIMATE ONLY. THERE MAY BE
UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE AS-BUILT PLANS AND
UTILITY COMPANIES, SCHEDULING WORK IN SUCH A MANNER THAT NEEDLESS CONFLICT WILL BE AVOIDED.
PRECAUTIONS TO PREVENT DAMAGE TO ALL UTILITIES. THE CONTRACTOR SHALL ARRANGE AND COOPERATE WITH
RESPECTIVE OWNERS, UNLESS OTHERWISE NOTED ON THESE PLANS. THE CONTRACTOR SHALL EXERCISE ALL
ANY OR ALL WORK REQUIRED FOR PUBLIC OR PRIVATE UTILITIES WILL BE DONE BY AND AT THE EXPENSE OF THEIR
ALL OVERHEAD LINES, NOTIFY AND COMPLY WITH THE APPLICABLE UTILITY COMPANY'S CLEARANCE REQUIREMENTS.
PROVISIONS OF PA ACT 287 OF 1974 AS AMENDED BY ACT 187 OF 1996. THE CONTRACTOR SHALL ALSO IDENTIFY
UTILITIES, THE CONTRACTOR MUST CONTACT THE PA ONE CALL SYSTEM, INC. (1-800-242-1176) AND COMPLY WITH
THREE WORKING DAYS PRIOR TO ANY EXCAVATION OR DEMOLITION WORK IN THE VICINITY OF UNDERGROUND
PROPERTY OWNERS
Tiffany J Rouse
Tiffany J Rouse
Duquesne Light Company
Shirley H Lang
John E & Helen E Dominici
Kevin Boory
CMC Diversified Holdings LLC
John R & Anna Lewis
Richard H & Audrey S Grieser
Hays Land Company
PROPERTY LINES:
BOUNDARY.
BE CONSULTED IN THE EVENT OF NEEDING TO KNOW THE EXACT PLACEMENT, SIZE, AND SHAPE OF A PARCEL
REPRESENTATION OF THE PROPERTY'S LOCATION, NOT THE LEGAL DESCRIPTION. A LAND SURVEYOR SHOULD
BOUNDARY IS THE PROPERTY DEED. THE PARCEL DATA REPRESENTED SHOULD BE VIEWED AS A GRAPHICAL
PROPERTY SURVEY. ACCORDING TO PENNSYLVANIA LAW, THE LEGAL DESCRIPTION FOR A PROPERTY
THE PARCEL BOUNDARY INFORMATION SHOULD NOT BE INTERPRETED OR ACCEPTED AS AN INDIVIDUAL
THE GIS DATA OR FITNESS FOR USE OF THE INFORMATION.
MAKES NO WARRANTY WHATSOEVER, NEITHER EXPRESSED NOR IMPLIED, WITH RESPECT TO THE ACCURACY OF
PROPERTY INFORMATION WAS OBTAINED FROM ALLEGHENY COUNTY GIS DATA. THE COUNTY OF ALLEGHENY
GENERAL NOTES:
Baltimore & Ohio RR Company
John & Merlinda Heinold
TWL Integration LLC
Joseph C Balistrieri Jr
CITY OF PITTSBURGH
KEEP PROJECT AREA CLEAN TO THE SATISFACTION OF THE CITY REPRESENTATIVE DURING CONSTRUCTION.
ADDITIONAL INFORMATION IS AVAILABLE AT www.pa1call.org/PA811/Public/.
CONTRACTOR'S SERIAL NO. FOR CITY OF PITTSBURGH
MUST CONTACT THE PA ONE CALL SYSTEM, INC., PHONE 1-800-242-1776
THREE TO TEN WORKING DAYS PRIOR TO EXCAVATION BASED ON THE COMPLEXITY OF THE PROJECT, THE CONTRACTOR
Dawn M Kotuce
Angela G Swisher
Courtland L Kenley
THE ROCK RIPRAP AS INDICATED OR DIRECTED.
RIPRAP. EXCAVATE THESE AREAS, INCLUDING STREAMBED MATERIAL, TO PROVIDE THE GEOMETRY FOR
CLASS 1 EXCAVATION IS FOR EXCAVATION REQUIRED FOR AREAS DESIGNATED FOR PLACEMENT OF ROCK 8.
CONSTRUCT ITEMS AS SHOWN ON THE CONTRACT DRAWINGS AT NO ADDITIONAL COST TO THE CITY.
THE CONTRACTOR SHALL PROVIDE ALL ENGINEERING AND SURVEY SERVICES NECESSARY TO LOCATE AND 7.
STRUCTURES FOR PROPER LAYOUT OF THE ROCK RIPRAP REPAIRS.
THE CONTRACTOR IS RESPONSIBLE FOR LOCATING EXISTING TOPOGRAPHIC FEATURES AND EXISTING 6.
TOPOGRAPHIC FEATURES OR PROPOSED CONSTRUCTION FEATURE.
SURVEY HAS BEEN PERFORMED TO LOCATE OR VERIFY THE LOCATION OR ELEVATION OF ANY
EXISTING TOPOGRAPHIC FEATURES SHOWN ARE BASED ON AERIAL MAPPING ONLY. SUPPLEMENTAL FIELD 5.
STATION. ALL STATIONS ARE APPROXIMATE.
BASELINE SHOWN IS NOT A GEOMETRICALLY DEFINED BASELINE AND IS FOR GENERAL REFERENCE BY 4.
TRANSPORTATION (PENNDOT) PUBLICATION 408/2026 AND SPECIAL PROVISIONS.
PROVIDE MATERIAL AND WORKMANSHIP IN ACCORDANCE WITH THE PENNSYLVANIA DEPARTMENT OF 3.
AND EARTH EXCAVATION ACTIVITIES.
PROTECT EXISTING RESIDENTIAL STRUCTURES FROM DAMAGE, DIRT AND DEBRIS DURING CONSTRUCTION 2.
TEMPORARY REROUTING OF UTILITIES AS NEEDED.
DUE TO CONSTRUCTION OPERATIONS AND PROVIDE SUPPLEMENTAL SUPPORT FOR UTILITIES OR
SEWER, STORM SEWER, WATER, GAS AND OVERHEAD ELECTRIC LINES. PROTECT UTILITIES FROM DAMAGE
COORDINATE CONSTRUCTION ACTIVITIES WITH UTILITY COMPANIES OPERATING UNDERGROUND SANITARY 1.
\\svr-pgh-data-01\Data\Client\PGH_Client\20005-004-Streets_Run_CAP\CADD\Roadway\PSE\CNGEN01.dgn 5/28/2026
SCALE
DATE
SHEET NO. ACCESSION NO.
CASE NO.
AS NOTED
CITY OF PITTSBURGH
OF 18
AND INFRASTRUCTURE
DEPARTMENT OF MOBILITY
PREPARED BY:
Consulting Engineers
1350PennAvenue,Suite 300,Pittsburgh, PA 15222-4211
REGISTERED
No. PE079411
SEAN GREGORY MCKEEVER
STREETS RUN CHANNEL REPAIR PROJECT
MAY 2026
SUMMARY OF QUANTITIES
SUMMARY OF QUANTITIES
\\svr-pgh-data-01\Data\Client\PGH_Client\20005-004-Streets_Run_CAP\CADD\Roadway\PSE\CNSUM01.dgn 5/28/2026
SCALE
DATE
SHEET NO. ACCESSION NO.
CASE NO.
AS NOTED
CITY OF PITTSBURGH
OF 18
AND INFRASTRUCTURE
DEPARTMENT OF MOBILITY
PREPARED BY:
Consulting
SEAN GREGORY MCKEEVER
STREETS RUN CHANNEL REPAIR PROJECT
W
+10 +20 +30 +40 +50 +60 +70 +80
+90
+00 +10
+20 +30
+40
+50
+60
+70
+80
+90
Gabions
3 Sty.
Frame
C O
N C
A
L L
Mac.
Drive
2 Sty . Fra me
Wood Ret. Wall
C A
L E
R
S T
R E
E T
B A
L D
W I
O
A D
GARAGE
STREETS RUN 145
\\svr-pgh-data-01\Data\Client\PGH_Client\20005-004-Streets_Run_CAP\CADD\Roadway\PSE\CNDET01.dgn 5/28/2026
SCALE
DATE
SHEET NO. ACCESSION NO.
CASE NO.
AS NOTED
CITY OF PITTSBURGH
OF 18
AND INFRASTRUCTURE
DEPARTMENT OF MOBILITY
PREPARED BY:
Consulting
SEAN GREGORY MCKEEVER
STREETS RUN CHANNEL REPAIR PROJECT
MAY 2026 4
GENERAL NOTES FOR RIPRAP AND STREAM REPAIRS
SCALE
20100
IN EXISTING SCOUR HOLE
PLACE ROCK, CLASS R-7 AT SCOUR HOLE
ROCK, CLASS R-6
PLACE GROUTED
GRAVEL BAR
REMOVE
STREAM CHANNEL PLAN AND NOTES
CLASS R-7
GROUTED ROCK,
CLASS R-6
GROUTED ROCK,
LEGEND
GROUTED ROCK
REMOVE EXISTING
LEGENDLEGEND
WATERLINE
PROTECT EXISTING
LOCATE AND
WATERLINE
PROTECT EXISTING
LOCATE AND
CONSTR �
STREETS RUN
GRAVEL BAR REMOVAL
RUN AND MIFFLIN RUN AS WARM WATER FISHES (WWF) PROTECTED WATER USE.
STANDARDS CHAPTER 93, TITLE 25, OF THE PENNSYLVANIA CODE LISTS STREETS
STREETS RUN AND MIFFLIN RUN ARE PERENNIAL STREAMS. THE WATER QUALITY
ROCK RIPRAP, SIZE AS INDICATED
IS �0.25 FT, OR AS ALLOWABLE BY PADEP INSPECTION.
RIPRAP. LAYOUT RIPRAP SLOPES TO PROVIDE THE MINIMUM REQUIRED WIDTH OF STREAMBED AS INDICATED. TOLERANCE FOR STREAMBED WIDTH
LAYOUT EXCAVATION AND ROCK RIPRAP PLACEMENT TO NOT EXCEED EXISTING TOTAL WIDTH OF STREAM FROM TOP EDGES OF EXISTING ROCK
VICINITY OF STA 145+30 LT. ADJUST EXCAVATION AND ROCK PLACEMENT TO PREVENT DAMAGE.
TAKE CARE TO PREVENT DAMAGE TO WATERLINE IN THE VICINITY OF STA 145+15 LT/RT AND TELEPHONE POLE AND GUY WIRES IN THE
THE FULL DEPTH OF THE TOE. DO NOT ALLOW GROUT TO FLOW INTO STREAM BEYOND FRONT EDGE OF ROCK RIPRAP. REMOVE EXCESS GROUT.
GROUT NEW AND EXISTING ROCK IN THE FINISHED PLACEMENT. TAKE PARTICULAR CARE IN GROUTING THE ROCK IN THE TOE KEY TO PENETRATE
FIN ON THE SURFACE OF THE ROCK. DO NOT REUSE A MASS OF MULTIPLE ROCKS THAT ARE BONDED TOGETHER WITH GROUT.
LARGE MASS OF GROUT BONDED TO THE ROCK SUCH THAT IT CHANGES THE SIZE OF THE ROCK BY MORE THAN 10% OR CREATES A PROTRUSION OR
DETERMINED BY THE INSPECTOR TO BE OVERLY CONTAMINATED WITH GROUT. OVERLY CONTAMINATED ROCK IS DEFINED AS ROCK THAT HAS A
WITH APPROVAL, EXISTING EXCAVATED ROCK RIPRAP MAY BE RE-USED IN A NEW ROCK PLACEMENT IF IT RETAINS ITS GRADATION AND IS NOT
ROCK RIPRAP LEFT IN PLACE.
SLOPE. QUANTITIES ARE BASED ON THE FULL SECTION OF NEW ROCK AS SHOWN ON THE PLAN. NO COMPENASATION WILL BE MADE FOR EXISTING
WITH APPROVAL, EXISTING ROCK MAY REMAIN IN PLACE IF IT MEETS THE REQUIRED THICKNESS AND CONFORMS TO THE REQUIRED FINISHED
AND PADEP A 7 TO 10 DAYS PRIOR TO PLACING ROCK IN TOE EXCAVATIONS FOR APPROVAL OF THE EXCAVATED TOE.
IT IS IMPERATIVE THAT THE NEW ROCK RIPRAP TOE IS KEYED IN A MINIMUM OF 2'-0" BELOW THE EXISTING STREAMBED. INFORM THE CITY
SECTIONS - GABION / GROUTED ROCK
SECTION AT STA. 144+05
PLACE GROUTED ROCK CLASS R-6 AT SCOUR HOLE
UNKNOWN
FOOTING
EXISTING
DEPTH OF
SCOUR HOLE
ABUTMENT
EXISTING CONCRETE
FRONT FACE OF
SECTIONS - GABION / GROUTED ROCK
SECTION AT STA. 144+00
REMOVE GRAVEL BAR
UNKNOWN
FOOTING
EXISTING
DEPTH OF
GRAVEL BAR
ABUTMENT
EXISTING CONCRETE
FRONT FACE OF
(TO BE REMOVED)
LEGEND
SECTION AT STA. 145+50
REPAIR SCOUR HOLE
6'-0"
E
M O
V E
G
A V
L
B
R
M
N
EXISTING STREAMBED
ABUTMENT
EXISTING CONCRETE
FRONT FACE OF
REMOVAL OF GRAVEL BAR
STREAMBED AFTER
RIPRAP, GROUTED
CLASS R-6 ROCK
EXISTING STREAMBED
ABUTMENT
EXISTING CONCRETE
FRONT FACE OF
RETAINING WALL
EXISTING CONCRETE
EXISTING GROUND
WITH CLASS R-7 ROCK RIPRAP
FILL EXISTING SCOUR HOLE
1(MAX)
(LOOKING STA. AHEAD)
NTS
M I
N
NOTE:
TAPER WIDTH OF ROCK UPSTREAM ALONG
ABUTMENT AND BLEND WITH OTHER GROUTED R-6
ROCK DOWNSTREAM AS INDICATED ON THE PLANS
(LOOKING STA. AHEAD)
NTS
REMOVAL OF NON-NATIVE MATERIAL
ROCK RIPRAP, SIZE AS INDICATED
BALDWIN ROAD
(LOOKING STA. AHEAD)
NTS
\\svr-pgh-data-01\Data\Client\PGH_Client\20005-004-Streets_Run_CAP\CADD\Roadway\PSE\CNDET02.dgn 5/28/2026
SCALE
DATE
SHEET NO. ACCESSION NO.
CASE NO.
AS NOTED
CITY OF PITTSBURGH
OF 18
AND INFRASTRUCTURE
DEPARTMENT OF MOBILITY
PREPARED BY:
Consulting
SEAN GREGORY MCKEEVER
STREETS RUN CHANNEL REPAIR PROJECT
MAY 2026 5
STREAM CHANNEL SECTIONS
STA 144+50
I
N
MIN
2'-6"
M I N
R O C K
T H I C K N E S S
OF EXISTING ROCK
DO NOT EXCEED LIMIT
STREAMBED WIDTH (SEE SHEET 7)
SEE TABLE FOR MINIMUM REQUIRED
EXISTING GROUND
SOIL BACKFILL
EXISTING WALL
RIPRAP
OF EXISTING ROCK
STREAMBED AND EDGE
EXISTING EDGE OF
EXISTING STREAMBED (VARIES)(TYP)
VOID DUE TO EROSION
RIPRAP
TOP OF EXISTING GROUTED ROCK
RIPRAP, GROUTED
CLASS R-6 ROCK
1.1 (MIN)
RIPRAP
REPRESENTING STA 144+10 TO STA 144+60
(TO BE REMOVED)
(TO BE REMOVED)
\\svr-pgh-data-01\Data\Client\PGH_Client\20005-004-Streets_Run_CAP\CADD\Roadway\PSE\CNDET03.dgn 5/28/2026
SCALE
DATE
SHEET NO. ACCESSION NO.
CASE NO.
AS NOTED
CITY OF PITTSBURGH
OF 18
AND INFRASTRUCTURE
DEPARTMENT OF MOBILITY
PREPARED BY:
Consulting
SEAN GREGORY MCKEEVER
STREETS RUN CHANNEL REPAIR PROJECT
MAY 2026
STA 144+70
STREAM CHANNEL SECTIONS
M I
N
MIN
3'-0"
R
O C
K
T
H I C
K N E S S
M I
N
2'-6"
OF EXISTING ROCK
DO NOT EXCEED LIMIT
M I
N
R
O C
K
T
H I C
K N E S S
OF EXISTING ROCK
DO NOT EXCEED LIMIT
STREAMBED WIDTH (SEE SHEET 7)
SEE TABLE FOR MINIMUM REQUIRED
EXISTING STREAMBED WIDTH
FACE OF HOUSE FACE OF HOUSE
STREAMBED
EXISTING
SOIL BACKFILLSOIL BACKFILL
CORNER OF PORCH
(VARIES)(TYP)
VOID DUE TO EROSION
EXISTING GROUNDEXISTING GROUND RIPRAP
TOP OF EXISTING GROUTED ROCK
RIPRAP
TOP OF EXISTING GROUTED ROCK
ROCK RIPRAP
EXISTING GROUTED
RIPRAP, GROUTED
CLASS R-7 ROCK
RIPRAP, GROUTED
CLASS R-6 ROCK
1.3 �
REPRESENTING STA 144+60 TO STA 144+80
M I
N
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
\\svr-pgh-data-01\Data\Client\PGH_Client\20005-004-Streets_Run_CAP\CADD\Roadway\PSE\CNDET04.dgn 5/28/2026
SCALE
DATE
SHEET NO. ACCESSION NO.
CASE NO.
AS NOTED
CITY OF PITTSBURGH
OF 18
AND INFRASTRUCTURE
DEPARTMENT OF MOBILITY
PREPARED BY:
Consulting
SEAN GREGORY MCKEEVER
STREETS RUN CHANNEL REPAIR PROJECT
MAY 2026
STA 145+20
STA 145+00
LEGEND
STREAM CHANNEL SECTIONS
MIN
3'-0"
M I
N
2'-6"
M I
N
M I
N
R
O C
K
T
H I C
K N E S S
K
H I
C K
N E S S
STREAMBED WIDTH
SEE TABLE FOR MINIMUM REQUIRED
OF EXISTING ROCK
DO NOT EXCEED LIMIT
AT MINIMUM THICKNESS
M I
N
MIN
3'-0"
M I
N
R
O C
K
T
H I C
K N E S S
MIN
2'-6"
M I
N
R O C K
T H I C K N E S S
STREAMBED WIDTH
SEE TABLE FOR MINIMUM REQUIRED
9'-6" � [8'-11"] STA 145+00
8'-5" � [8'-0"] STA 144+90
OF EXISTING ROCK
DO NOT EXCEED LIMIT
2'-6" �
MATCH EXISTING ROCK
LENGTH AS REQ'D TO
GUY WIRE
EXISTING
EXISTING STREAMBED
SLOPE
MATCH EXISTING
CONDITION
TO MATCH EXISTING
ROCK OR SOIL BACKFILL
RIPRAP, GROUTED
CLASS R-7 ROCK
RIPRAP, GROUTED
CLASS R-6 ROCK
ROCK RIPRAP
TOP OF EXISTING
END OF WOOD FENCE
STREAMBED
EXISTING
FACE OF GARAGE
GUY WIRE
EXISTING
CONDITION
TO MATCH EXISTING
ROCK OR SOIL BACKFILL
(VARIES)(TYP)
VOID DUE TO EROSION
CLASS R-7 (TYP)
EXISTING GROUTED ROCK
(TO BE REMOVED)
RIPRAP, GROUTED
CLASS R-7 ROCK
RIPRAP, GROUTED
CLASS R-6 ROCK
1.3 �
REPRESENTING STA 145+10 TO STA 145+40
1.3 �
1.3 �
[ ] INDICATES DIMENSION
PERPENDICULAR TO
EXISTING GARAGE
REPRESENTING STA 144+80 TO STA 145+10
STREETS RUN STREAMBED WIDTHS
STATION EXISTING WIDTH MINIMUM REQUIRED WIDTH
144+30 12'-6" 15'-0"
144+40 14'-9" 14'-9"
144+50 16'-5" 16'-5"
144+60 15'-7" 15'-7"
144+70 14'-9" 15'-1"
144+80 14'-2" 16'-2"
144+90 12'-4" 17'-2"
145+00 12'-5" 15'-3"
145+10 15'-1" 16'-1"
145+20 16'-7" 18'-5"
145+30 17'-10" 21'-4"
NOTES FOR STREAMBED WIDTHS:
FROM BREAKPOINTS AT THE BOTTOM OF THE STREAMBANKS.
BED WIDTH THESE VALUES WERE MEASURED ACROSS THE STREAMBED
RIPRAP INSTALLATION, BUT ARE NOT LESS THAN EXISTING STREAM
2008 AND REPRESENT THE STREAM CONDITIONS PRIOR TO THE 2019
REQUIRED MINIMUM STREAMBED WIDTHS ARE BASED ON MAPPING FROM
GUIDE FOR MEETING THE MINIMUM REQUIRED WIDTHS.
EROSION OR DEPOSITION. THE LISTED VALUES ARE INTENDED AS A
DUE TO SUBSEQUENT HIGH WATER, FAST CURRENTS, AND ADDITIONAL
DIMENSIONS ARE SUBJECT TO VARIATION THAT MAY HAVE OCCURRED
JAGGED EXISTING ROCK RIPRAP, FIELD MEASUREMENT OF THESE
EXISTING RIPAP MATERIAL. DUE TO THE OCCURRENCE OF ERODED AND
POINTS WHERE THE STREAMBED MATERIAL MEETS THE BOTTOM OF
EXISTING WIDTHS WERE FIELD MEASURED IN SEPTEMBER 2021 AT
144+10
144+20 12'-5"
12'-6"
15'-8"
15'-8"
145+40 16'-2" 16'-2" TO 22'-6" (SKEWED)
P
R O
C K
R O
C K
STEPS
G R
A S
S
PORCH
STREETS RUN
PORCH
F R
A M
E
Y
F
O T
B R I
D G
E
STEPS
CONC WALL
CONC FOOTER
A S
P
D
W Y
G R
A S
S G
A B I
O N
S
C O
N C
F R
A M
GATE
WOOD FENCE
GRAVEL
ASPH SHDR
G A
R A
G E
B L
O C
K
BASEMENT DOORS
STEPS
3"PI
PE
W A
L L
SURVEYOR
LAND
REGISTERE
D
PROFESSIO
NAL
F O
HT
LAEWN
O M
M O
C
A I N
A V L Y S N
P SU-02239
8E
RAMESH B
. SHAH
BALDWIN RD
CALERA STCONC S'WALK
S
W A L
K
METAL FENCEBRIDGE
MAG 1
MAG 2
S
W A
L K
F H
F H
G u y n c h o r
G c h o r
G c h o r
G c h o r
G c h o r
G c h o r
P o s t
P o s t
P o s t
P o s t
C l o t h e s i n e
P o s t
P o s t
F l o w r a n g e r
S i g n
S t o p
S i g n
W r o g y
S i g n o f t r n
S t y
F r a m w t h
P a t i o B r i c k
P a d
B l o c k
P a d
S t y
F r a m e
Stone Ret. Wall
G a r a g e
C l o t h n e
P o s t
C o n c
P a d f o r
F l o w e r
P o t
S t y
F r a m e
Porch
Block Wall
S t i c k
Porch
B r i c k l k
C o n l k
C o n l l
S t y
F r a m e
Porch
C l o t h n e
P o s t
Mac. Curb
B l o l l
Wooden Fence Handr ail
Metal Handr ail
W o d l l
W o o d
F e n c e
Mac. Cu rb
Porch
C o n l k
S i g n
W r o y
S i g n g h r n
S t y
F r a m e
Porch
C o n l k
P o r c h
S t o l l
S t y
F r a m e
S t y
F r a m e
P o r c h
B l o l l
B i t h l u m i n u m
G a r a g e
B r i c k
P a d
ET&C
E
E
E
E
E
E
Streets Run
Streets Run
F .F .E
.1
F .F .E
.8
F .F .E
.0
F .F .E
.6
F .F .E
.1
J e r s r r i l l
S t o l l i l i n g
W o l k
C o n c
P a r a p e t
4" PVC
I n v e v
B r o k e n
P a r a p l l
W o l l
P a r a p l l
P I
E R
P I
E R
P I
E R
P I
E R
P I
E R
P I
E R
P I
E
RP
I
E R
P I
E
RP
I
E R
P
I n e
T p a e l e t
I n e
I n v e
I n v e
T a e
I n l e t
I n e
I n v e
I n v e
T a e l e t
R C P
P
P 8
P i c k
S t y
F r a a m e
S t y F r a m e
S t n o p y
F r a m e
S t a m e
S t o c k
S t a m e
S t o n
F e n c e
W a t h n l l
C o n
I n e
P o a i n
PILE
P O
O L
P O
O L
B R
ID
G E
P
WALL
BRICK WALL
BRICK
B
IR
T H
C O
N C
A n c h o r
G ig n
S ig n
Elev. = 751.87
Inv. Out d T
P 8 T
P d
749.30
Inv. Out Elev.
d T
P 9 T
P d d T
P
T P d dd T
P T
P
T P
T P dd
LEGEND
PIPE (EXIST.) EXISTING GUIDE RAIL
STREAM
WATER LINE
GAS LINE
ELETRIC,TELEPHONE
AND CABLE TV
PIER UTILITY POLE
STORM SEWER
ROCK, SIZE
AS INDICATED
GRAVEL BAR REMOVAL
141 142
SCALE
50 FEET250
STREETS R
UN R
OAD E
XIT R
AMP
BALDWIN ROAD
CALERA ST
S
R
I
D G
E
M I
F F
L
U
N
STREETS RUN
15 16
REPAIR.
DIMENSION) WITHIN LIMITS OF STREAM CHANNEL
NON-NATIVE MATERIAL (LARGER THAN 2' IN ANY
REMOVE CONCRETE SLABS, DEBRIS, AND 2.
STATIONS SHOWN FOR REFERENCE ONLY.1.
NOTES:
STREAM CHANNEL REPAIRS PLAN
CONSTR �
STREETS RUN
PROTECTED
REMAIN AND BE
FOOTBRIDGE TO
\\svr-pgh-data-01\Data\Client\PGH_Client\20005-004-Streets_Run_CAP\CADD\Roadway\PSE\CNPLN01.dgn 5/28/2026
SCALE
DATE
SHEET NO. ACCESSION NO.
CASE NO.
AS NOTED
CITY OF PITTSBURGH
OF 18
AND INFRASTRUCTURE
DEPARTMENT OF MOBILITY
PREPARED BY:
Consulting
SEAN GREGORY MCKEEVER
STREETS RUN CHANNEL REPAIR PROJECT
MAY 2026
WEIGHT LIMIT
12 TON POSTED
EXISTING BRIDGE
CAUTION:
WEIGHT LIMIT
12 TON POSTED
EXISTING BRIDGE
CAUTION:
ALLEGHENY
VALLEY
RAI
LROAD
SCOUR HOLE
EXISTING
CLASS R-7 IN
PLACE ROCK,
REPAIRS
STREAM CHANNEL
UPSTREAM LIMIT OF
AT SCOUR HOLE
ROCK, CLASS R-6
PLACE GROUTED
REMOVE GRAVEL BAR
REPAIRS
OF STREAM CHANNEL
DOWNSTREAM LIMIT
CLASS R-6
GROUTED ROCK,
CLASS R-7
GROUTED ROCK,
GROUTED ROCK
REMOVE EXISTING
EXISTING WATERLINE
LOCATE AND PROTECT
SCALE: 1 INCH = 5 FEET
Sheet No.Final Bk. No.Prelim. Bk. No.Sect.RouteCountyDist.
OF
CROSS SECTIONS
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION
10 20 30 40 50 60 70 801020304050607080 P
L O
T T
E p l i c a t i
R o u
O r i g i n a t t
O r i g i n e c k
T e m p l a
A r
F i n a a t t
F i n a e c k
A r
A r e c k
O P
E R
A T
O R
F I
M E s v r p g h d a t a
D a t a
C l i e n t
P G
H
C l i e n t
S t r e e t s
R u n
C A
P
C A
D D
S e c t i o n s
W o r k i n g
S e c t i o n s
P r o p o s e d d g n
S M
C K
E E
V E
R
01020304050607080 10 20 30 40 50 60 70 80
ALLEGHENY11 18
144+50
145+00
EXISTING GABION WALL
EXISTING GROUND
EXISTING GARAGE
EXISTING GROUND
ROCK, CLASS R-6
EXISTING GROUTED
ROCK, CLASS R-6
EXISTING GROUTED
EXISTING GROUND
ROCK, CLASS R-6
EXISTING GROUTED
752.9
NORMAL WSE
WSE 752.6
NORMAL
WSE 761.5�
100-YEAR
WSE 762.0�
100-YEAR
CONSTR �
STREETS RUN
CONSTR �
STREETS RUN
STREETS RUN
PROPOSED CONDITIONS
(TO BE REMOVED)
(TO BE REMOVED)
CLASS R-7 ROCK, GROUTED
CLASS R-6 ROCK, GROUTED
CLASS R-6 ROCK, GROUTED
(TO BE REMOVED)
(APPROX. STA 145+00 LT TO 145+25 RT)
LOCATE AND PROTECT EXISTING WATERLINE
(TO REMAIN)
16.5'
15.2'
STREAM CHANNEL CROSS SECTIONS
SCALE: 1 INCH = 5 FEET
Sheet No.Final Bk. No.Prelim. Bk. No.Sect.RouteCountyDist.
OF
CROSS SECTIONS
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION
10 20 30 40 50 60 70 801020304050607080 P
L O
T T
E p l i c a t i
R o u
O r i g i n a t t
O r i g i n e c k
T e m p l a
A r
F i n a a t t
F i n a e c k
A r
A r e c k
O P
E R
A T
O R
F I
M E s v r p g h d a t a
D a t a
C l i e n t
P G
H
C l i e n t
S t r e e t s
R u n
C A
P
C A
D D
S e c t i o n s
W o r k i n g
S e c t i o n s
P r o p o s e d d g n
S M
C K
E E
V E
R
01020304050607080 10 20 30 40 50 60 70 80
ALLEGHENY11 18
145+50
BALDWIN ROAD
EXISTING SCOUR HOLE
EXPOSED WALL FOOTING
RETAINING WALL
CONCRETE
EXISTING
GROUND
EXISTING
WSE 752.5
NORMAL
WSE 762.5�
100-YEAR
CONSTR �
STREETS RUN
STREETS RUN
PROPOSED CONDITIONS
(TO BE FILLED)
CLASS R-7 ROCK
STREAM CHANNEL CROSS SECTIONS
(TO REMAIN)
16.2'
TITLE SHEET & GENERAL NOTES
\\svr-pgh-data-01\Data\Client\PGH_Client\20005-004-Streets_Run_CAP\CADD\ES\Plan\ESGEN01.dgn 5/28/2026
SCALE
DATE
SHEET NO. ACCESSION NO.
CASE NO.
AS NOTED
OF 18
EROSION AND SEDIMENT POLLUTION CONTROL
CITY OF PITTSBURGH
AND INFRASTRUCTURE
DEPARTMENT OF MOBILITY
SEAN GREGORY MCKEEVER
STREETS RUN CHANNEL REPAIR PROJECT
PREPARED BY:
Consulting Engineers
1350PennAvenue,Suite 300,Pittsburgh, PA 15222-4211
MAY 2026
INDEX OF DRAWINGS
TO
TO
SEQUENCE OF CONSTRUCTION ACTIVITIES
SEQUENCE GENERAL NOTES
1-800-242-1776
CONSTRUCTION PHASE AND 10 WORKING
CALL BEFORE YOU DIG!
DAYS IN DESIGN STAGE-STOP CALL
Pennsylvania One Call System, Inc.
3 WORKING DAYS NOTICE FOR
PENNSYLVANIA LAW REQUIRES
OF EXISTING UNDERGROUND UTILITIES.
PENNSYLVANIA ONE CALL SYSTEM INC. AT 1-800-242-1776 FOR THE LOCATION
ACTIVITIES OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, NOTIFY THE
AT LEAST 3 BUSINESS DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE
EROSION AND SEDIMENT POLLUTION CONTROL GENERAL NOTES
TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS.
MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL
SEARCHES, REVIEW OF OWNERSHIP AND USE HISTORY OF PROPERTY, SANBORN
NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE
ENVIRONMENTAL DUE DILIGENCE - INVESTIGATIVE TECHNIQUES, INCLUDING, BUT
PER PA DEP MANAGEMENT OF FILL GUIDANCE.
DILIGENCE AND ENSURING ANY MATERIAL BROUGHT ON-SITE IS CLEAN FILL AS
THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING ENVIRONMENTAL DUE
CLEAN FILL/ENVIRONMENTAL DUE DILIGENCE
PROTECT EXISTING TREES WITHIN THE LIMIT OF DISTURBANCE WHERE POSSIBLE.
PLAN SHEET
SPECIAL DETAILS
TITLE SHEET, GENERAL NOTES, AND SOILS
REGIONAL OFFICE TO AN ON-SITE PRE-CONSTRUCTION MEETING.
COUNTY CONSERVATION DISTRICT, AND A REPRESENTATIVE FROM THE PA DEP
MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, A REPRESENTATIVE FROM THE
OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE
ACTIVITIES (INCLUDING CLEARING AND GRUBBING), THE OWNER AND/OR
AT LEAST 7 BUSINESS DAYS PRIOR TO STARTING ANY DISTURBANCE
DATES OF PHYSICAL CONSTRUCTION.
CONTRACTOR IS TO REFER TO CONTRACT DOCUMENTS FOR BEGINNING AND END
20251071733 - CITY OF PITTSBURGH
DESIGN SERIAL NO.
400 WATERFRONT DRIVE, PITTSBURGH, PA 15222-4745
PHONE NO. (412) 442-4000
SOUTHWEST REGIONAL OFFICE
PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION
33 TERMINAL WAY, SUITE 325B, PITTSBURGH, PA 15219
RIVER WALK CORPORATE CENTRE
PHONE NO. (412) 241-7645
ALLEGHENY COUNTY CONSERVATION DISTRICT
AGENCY CONTACT INFORMATION
ANTICIPATED GENERAL SEQUENCE OF CONSTRUCTION ACTIVITIES
WATER USE.
STREETS RUN AND MIFFLIN RUN AS WARM WATER FISHES (WWF) PROTECTED
STANDARDS CHAPTER 93, TITLE 25, OF THE PENNSYLVANIA CODE LISTS
STREETS RUN AND MIFFLIN RUN ARE PERENNIAL STREAMS. THE WATER QUALITY
DESCRIPTION SHEET
CONTROLLING EROSION.
EROSION AND SEDIMENT CONTROL MEASURES WILL STILL BE EFFECTIVE AT
AT THIS TIME, OR AT THE DIRECTION OF THE CITY OF PITTSBURGH, THE
UNABLE TO PROCEED WITH CONSTRUCTION IN THIS ORDER FOR REASONS UNKNOWN
STEPS PROCEEDING IN THIS ORDER. THEREFORE, SHOULD THE CONTRACTOR BE
SEDIMENT POLLUTION CONTROLS AS DESIGNED ARE NOT DEPENDENT ON THE
STEP BEGINS. HOWEVER, IT SHOULD BE NOTED THAT THE EROSION AND
THE SEQUENCE BELOW. ONE STEP SHOULD BE COMPLETED BEFORE THE NEXT
SEQUENCE IS INCLUDED ON THE E&S POLLUTION CONTROL PLAN AS LISTED IN
PRODUCTION OF EROSION AND SEDIMENT DURING CONSTRUCTION. THIS
AMOUNT OF EXPOSED AREAS AND THUS REDUCE, TO THE EXTENT POSSIBLE,
SEQUENCE FOR THIS PROJECT. THE GOAL OF THIS SEQUENCE IS TO LIMIT THE
THE FOLLOWING IS A DESCRIPTION OF THE ANTICIPATED CONSTRUCTION
FINISHED TEMPLATE, IF NEEDED.
FLEXIBLE LINING FOR CHANNELS, SWALES AND ROCK BARRIERS ON THE
TO CLEARING AND GRUBBING AND EARTHMOVING WITH THE EXCEPTION OF
ALL CONTROL FACILITIES IN THE GRADING AREAS WILL BE INSTALLED PRIOR
DISTRICT.
NOTIFICATION TO THE CITY OF PITTSBURGH OR AUTHORIZED CONSERVATION
DISTURBANCE ACTIVITIES, THE PERMITTEE OR CO-PERMITTEES SHALL PROVIDE
AND AT LEAST 3 BUSINESS DAYS PRIOR TO PROCEEDING WITH THE BULK EARTH
UPON INSTALLATION OR STABILIZATION OF ALL PERIMETER CONTROL BMPS
13 17
11 12
BMPS.
STABILIZE ALL AREAS DISTURBED DURING THE REMOVAL OR CONVERSION OF THE
E&S BMPS OR CONVERT THEM TO PERMANENT PCSM BMPS. IMMEDIATELY
AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, REMOVE TEMPORARY
DISTURBED AREAS.
FOUR (4) DAYS OR LONGER REQUIRES TEMPORARY STABILIZATION OF EXPOSED
OF THE EMBANKMENT/CUT SLOPE. CESSATION OF CONSTRUCTION ACTIVITY FOR
STABILIZATION OF THE SLOPE, THE CONTRACTOR MAY CONTINUE CONSTRUCTION
VERTICAL INTERVALS. SEED AND MULCH ALL FINISHED SOIL SLOPES. UPON
ALL EMBANKMENT/CUT SLOPES SHALL BE CONSTRUCTED AT A MAXIMUM 15-FOOT
FUNCTIONING AS DESCRIBED IN THIS E&S POLLUTION CONTROL PLAN.
BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE
ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE
SITE CLEARING, GRUBBING, AND TOPSOIL STRIPPING MAY NOT COMMENCE IN
AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL
CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE
GRUBBING OPERATIONS BEGIN.
THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING AND
OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS.
AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS
ON THE PLANS.
TEMPORARY PERIMETER EROSION AND SEDIMENT POLLUTION CONTROLS AS SHOWN
BEFORE GENERAL CLEARING AND GRUBBING OF THE SITE. INSTALL THE
INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WILL BE IMPLEMENTED
FOR EACH PROJECT AREA:
ACCOMPLISHED AS PART OF THE EROSION AND SEDIMENT POLLUTION CONTROL
EXCEPT WHERE NOTED. THE FOLLOWING GENERAL ACTIVITIES WILL BE
SEQUENCE SHALL BE COMPLETED BEFORE PROCEEDING TO THE NEXT STEP,
DISTRICT OR BY PA DEP PRIOR TO IMPLEMENTATION. EACH STEP OF THE
SEQUENCE REQUIRES WRITTEN APPROVAL BY THE COUNTY CONSERVATION
THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT
ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH
FINAL STABILIZATION / PERMIT COMPLIANCE CLOSEOUT
STAGE
CRITICAL
STAGE
CRITICAL
SOUTHWEST REGIONAL OFFICE FOR CLOSEOUT AND PERMIT COMPLIANCE CHECK.
CONSERVATION DISTRICT FOR A FINAL INSPECTION. CONTACT PADEP
AREAS, THE OWNER AND OPERATORS SHALL CONTACT THE ALLEGHENY
ALL TEMPORARY BMPS AND PERMANENT STABILIZATION OF ALL DISTURBED
UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES, REMOVAL OF 4.
SLIDING, OR OTHER MOVEMENTS.
SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING,
DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL
70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A
PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 3.
DURING THE GERMINATING SEASON.
REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL SHOULD BE DONE ONLY
REMOVAL SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID
EROSION AND SEDIMENT BMPS MUST BE REMOVED. AREAS DISTURBED DURING
AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY 2.
PRE-FINAL INSPECTION PRIOR TO THE REMOVAL OF THE BMP'S.
SHALL CONTACT THE ALLEGHENY COUNTY CONSERVATION DISTRICT FOR A
STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATORS
UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT 1.
PLAN PREPARER/ENGINEER
TELEPHONE: (412) 392-8727
CONTACT: SEAN G. MCKEEVER, PE
PITTSBURGH, PA 15222
1350 PENN AVENUE - SUITE 300
SAI CONSULTING ENGINEERS, INC.
CONSTRUCTION. REPEAT THE GENERAL SEQUENCE, AS NECESSARY.
ADJUST TRAFFIC CONTROL MEASURES AND RELOCATE TO THE NEXT PHASE OF 11.
ON THE PLAN.
WITH SEED, MULCH, AND ROLLED EROSION CONTROL PRODUCTS AS INDICATED
CONSTRUCTION ENTRANCES. IMMEDIATELY STABILIZE ALL DISTURBED AREAS
REMOVE THE CONCRETE WASHOUT, PUMPED WATER FILTER BAG, AND ROCK 10.
TEMPORARY STREAM BYPASS.
ONCE STREETS RUN IS STABILIZED, REMOVE ALL COMPONENTS OF THE 9.
GRAVEL BAR, AND PERFORM STREAM REPAIRS AS INDICATED.
PLACE OR REPAIR EXISTING ROCK (AND GROUT AS INDICATED), REMOVE 8.
EXCAVATED TOE PRIOR TO PLACING ROCK.
PRIOR TO PLACING ROCK IN TOE EXCAVATIONS FOR APPROVAL OF THE
GROUTED ROCK. NOTIFY PADEP (SWRO - 412-442-4000) A MINIMUM OF 7 DAYS
EXCAVATE AS REQUIRED TO REMOVE EXISTING GROUTED ROCK AND PLACE NEW 7.
INSTALL CONCRETE WASHOUT AS SHOWN ON THE PLANS.6.
PUMPED WATER FILTER BAG AS NECESSARY.
IN STREETS RUN/MIFFLIN RUN. PUMP SEDIMENT LADEN WATER THROUGH THE
BYPASS SYSTEM OR TEMPORARY STREAM DIVERSION TO CONVEY THE BASE FLOW
INSTALL THE TEMPORARY STREAM BYPASS UTILIZING EITHER PUMP WATER 5.
AND BRUSH ABOVE GROUND ELEVATION.
CLEAR AND GRUB AS REQUIRED, INCLUDING THE REMOVAL OF SMALL TREES 4.
SOCK.
INSTALL ROCK CONSTRUCTION ENTRANCES AND REMAINING COMPOST FILTER 3.
INSTALL PERIMETER CONTROLS NEEDED FOR CLEARING AND GRUBBING.
CLEARLY FLAG THE LOD AND CALL 811 PRIOR TO COMMENCING WORK. 2.
IMPLEMENT TRAFFIC CONTROL MEASURES AS REQUIRED.1.
UP TO $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.
IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND
STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY
BY THE PADEP AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN
IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED
IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT
LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE
FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT
WHEN EARTHMOVING ACTIVITIES HAVE CEASED FOR 4 DAYS.
SLOPES OR FLATTER. TEMPORARY STABILIZATION MEASURES MUST BE USED
TEMPORARY SEEDING, WITH A MAXIMUM HEIGHT OF 30' WITH 2:1 (H:V) SIDE
STABILIZE WASTE OR STOCKPILE AREAS USING PERIMETER CONTROLS OR
ACCORDANCE WITH PENNDOT PUBLICATION 408, 2026, SECTION 105.14.
OF PITTSBURGH PRIOR TO SUBMISSION. BORROW AND WASTE AREAS SHALL BE IN
THE RESPONSIBILITY OF THE CONTRACTOR AND MUST BE APPROVED BY THE CITY
PROJECT LIMITS. IF ANY PERMIT MODIFICATIONS ARE REQUIRED, THEY ARE
AREAS NOT DETAILED ON THE PLAN OR FOR UNEXPECTED WORK OUTSIDE THE
DEP FOR EACH SPOIL, BORROW, STAGING, OR STOCKPILE AREA FOR OTHER WORK
E&S POLLUTION CONTROL PLAN TO THE COUNTY CONSERVATION DISTRICT OR PA
THE CONTRACTOR IS RESPONSIBLE FOR THE CREATION AND SUBMISSION OF AN
ACTIVATING THE SITE.
PITTSBURGH PROJECT MANAGER AND FULLY IMPLEMENT PLAN PRIOR TO
APPROVAL. PROVIDE A COPY OF THE APPROVED PLAN TO THE CITY OF
CONSERVATION DISTRICT OR PA DEP SOUTHWEST REGIONAL OFFICE FOR
POLLUTION CONTROL PLAN FOR THE SITE MUST BE SUBMITTED TO THE COUNTY
BY THE CITY OF PITTSBURGH. AN ASSESSMENT FORM ALONG WITH AN E&S
IS NOT PERMITTED WITHOUT WRITTEN DIRECTION OF THE ENGINEER AND REVIEW
THE OFF-SITE DISPOSAL OF MATERIAL NOT TAKEN TO AN APPROVED LANDFILL
MATERIALS, WASTES, OR UNUSED BUILDING MATERIALS AT THE SITE.
ET. SEQ. DO NOT BURN, BURY, DUMP, OR DISCHARGE ANY BUILDING
REGULATIONS AT 25 PA CODE 260.1 ET. SEQ., 271.1 ET. SEQ., AND 287.1
OR DISPOSE OF IN ACCORDANCE WITH PA DEP'S SOLID WASTE MANAGEMENT
REMOVE ALL BUILDING MATERIALS AND WASTES FROM THE SITE AND RECYCLE
GROUNDWATER SYSTEMS.
ONSITE. DO NOT ALLOW WASH WATER TO ENTER ANY SURFACE WATERS OR
WATERWAYS OR WETLANDS. IF OFFSET CANNOT BE MET FUEL MAY NOT BE STORED
EQUIPMENT REFUELING SHALL BE LOCATED A MINIMUM OF 100 FEET FROM ANY
WATERS TO THE EXTENT PRACTICABLE AND ANY FUEL STORAGE TANKS AND
DEBRIS FROM CONSTRUCTION WILL BE PREVENTED FROM ENTERING SURFACE
MAINTAIN A POSITIVE FLOW DURING CONSTRUCTION.
KEEP ALL EXISTING AND CONSTRUCTED CHANNELS FREE OF OBSTRUCTIONS AND
CONSTRUCTION SITE.
SEDIMENT DEPOSITED ON PUBLIC ROADWAYS AND RETURN IT TO THE
PUBLIC ROADWAYS. AT THE END OF EACH CONSTRUCTION DAY, REMOVE ALL
TO PUBLIC ROADWAYS. DO NOT ALLOW MUD OR SEDIMENT TO BE TRACKED ONTO
CONSTRUCTION EQUIPMENT MAY NOT ENTER DIRECTLY FROM THE DISTURBED AREA
AT ALL LOCATIONS WHERE CONSTRUCTION EQUIPMENT ENTERS PUBLIC ROADWAYS.
CONSTRUCT A ROCK CONSTRUCTION ENTRANCE AS INDICATED IN THE DETAILS
CONTROL PLAN SHEETS.
LIMIT OF DISTURBANCE IS SHOWN ON THE EROSION AND SEDIMENT POLLUTION
PROJECT SITE AT ALL TIMES.
SIGNED, AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE
POLLUTION CONTROL PLAN. A COPY OF THE APPROVED DRAWINGS (STAMPED,
CUTS AND FILLS SHALL BE DONE IN ACCORDANCE WITH THE APPROVED E&S
ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS
APPROVAL.
OFFICE. THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR OBTAINING SUCH
APPROVAL FROM THE CITY OF PITTSBURGH AS WELL AS THE PA DEP REGIONAL
ANY VARIATION FROM THE APPROVED E&S POLLUTION CONTROL MUST RECEIVE
THE EXCAVATION, UNLESS OTHERWISE SPECIFIED.
RESPONSIBILITY OF THE CONTRACTOR AND WILL BE CONSIDERED INCIDENTAL TO
ADEQUATELY CONTROL EROSION AND SEDIMENT POLLUTION WILL BE THE
AND THE CITY OF PITTSBURGH. ANY ADDITIONAL REQUIREMENTS TO
FOR POLLUTION AND NOTIFY THE COUNTY CONSERVATION DISTRICT OR PA DEP
CONTACTOR SHALL IMPLEMENT APPROPRIATE BMPS TO MINIMIZE THE POTENTIAL
POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE
IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE
TO THE EXTENT POSSIBLE.
GRUBBING, SOIL COMPACTION, AND PROTECT EXISTING NATURAL SITE FEATURES
CONSTRUCTION EASEMENTS HAVE BEEN ESTABLISHED TO LIMIT CLEARING AND
MINIMIZING THE GENERATION OF INCREASED STORMWATER RUNOFF. TEMPORARY
FEATURES, SUCH AS WETLANDS AND STEAM CORRIDORS, WITH THE PURPOSE OF
STEEP SLOPES, AND RIPARIAN AREAS WHILE INCORPORATING EXISTING SITE
PROTECTING EXISTING NATURAL DRAINAGE FEATURES, VEGETATION AND SOIL,
BMPS. MINIMIZE THE EXTENT AND DURATION OF EARTH DISTURBANCE BY
PRACTICABLE, WITH THE INTENT OF MAXIMIZING THE USE OF NON-STRUCTURAL
EARTH DISTURBANCE ACTIVITIES SHALL BE IMPLEMENTED, TO THE EXTENT
STABILIZATION DURING CONSTRUCTION.
BE CONSTRUED IN WHOLE OR PART AS ADEQUATE FOR STREAM CONTROL AND SOIL
EROSION AND SEDIMENT POLLUTION UNDER NORMAL CONDITIONS, AND WILL NOT
SEDIMENT (E&S) POLLUTION CONTROL PROCEDURES TO MINIMIZE ACCELERATED
THE PURPOSE OF THIS PLAN IS TO PROVIDE EFFECTIVE EROSION AND
0.7 ACRES
0.6 ACRES
0.1 ACRESCHAPTER 102 LOD:
CHAPTER 105 AREA (FLOODPLAIN):
TOTAL LIMIT OF DISTURBANCE (LOD) AREA:
GENERAL NOTES & SOILS
\\svr-pgh-data-01\Data\Client\PGH_Client\20005-004-Streets_Run_CAP\CADD\ES\Plan\ESGEN02.dgn 5/28/2026
SCALE
DATE
SHEET NO. ACCESSION NO.
CASE NO.
SEAN GREGORY MCKEEVER
STREETS RUN CHANNEL REPAIR PROJECT
PREPARED BY:
Consulting Engineers
1350PennAvenue,Suite 300,Pittsburgh, PA 15222-4211
MAY 2026
DESCRIPTION OF PROJECT SOILS
THERMAL IMPACT ANALYSIS
WETLAND IMPACTS
WASHING OF THE ROADWAY WITH WATER IS NOT PERMITTED.
INCREMENTS UNTIL CONDITION IS ALLEVIATED OR INSTALL WASH RACK.
ROADWAY, EXTEND LENGTH OF CONSTRUCTION ENTRANCE BY 50 FOOT
IMMEDIATELY. IF EXCESS AMOUNTS OF SEDIMENTS ARE BEING DEPOSITED ON
ROADWAYS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE
MAINTAINED ON SITE FOR THIS PURPOSE. ALL SEDIMENT DEPOSITED ON PAVED
TO THE SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE SHALL BE
ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL CONSTANTLY BE MAINTAINED
ROCK CONSTRUCTION ENTRANCE1.
FOR BMP CONTROL FACILITIES
MAINTENANCE AND INSPECTION SCHEDULE
THE EXISTING AND PROPOSED FOOTPRINT REMAINS THE SAME.
THERMAL IMPACTS TO THE AMBIENT TEMPERATURE OF THE RECEIVING STREAM.
VEGETATED AREAS. THESE MEASURES WILL HELP AVOID THE POTENTIAL FOR
VEGETATION FOR SHADING, ENCOURAGING INFILTRATION AND INCORPORATING
MITIGATED, TO THE EXTENT PRACTICABLE, BY MAINTAINING NATURAL
THE POTENTIAL THERMAL IMPACTS WILL BE AVOIDED, MINIMIZED, OR
TRANSFER TO RUNOFF FROM IMPERVIOUS AREAS.
INCREASE OR DECREASE, LOSS OF VEGETATED OR RIPARIAN AREAS, AND HEAT
TO NEARBY STREAMS. THE MAIN FACTORS THAT MAY CAUSE A TEMPERATURE
PROJECT RUNOFF HAS THE POTENTIAL TO BE A SOURCE OF THERMAL IMPACTS
PERMANENT STABILIZATION SPECIFICATIONS.
WILL NOT BE REACTIVATED WITHIN ONE YEAR IN ACCORDANCE WITH THE
TEMPORARY STABILIZATION SPECIFICATIONS. STABILIZE THOSE AREAS THAT
WILL BE RE-ACTIVATED WITHIN ONE YEAR IN ACCORDANCE WITH THE
DESCRIBED IN THE PLAN. STABILIZE AREAS NOT AT FINISHED GRADE THAT
NON-GERMINATING MONTHS, APPLY MULCH OR PROTECTIVE BLANKETING AS
ACTIVITIES CEASE IN ANY AREA OR SUB-AREA OF THE PROJECT. DURING
STABILIZE ALL DISTURBED AREAS IMMEDIATELY AFTER EARTH DISTURBANCE
5. VEGETATIVE SURFACE STABILIZATION
CLEANING OF THE WASHOUT FACILITY.
REACH 50% CAPACITY. PLASTIC LINERS SHOULD BE REPLACED WITH EACH
IMMEDIATELY. ACCUMULATED MATERIALS SHOULD BE REMOVED WHEN THEY
OR LEAKING WASHOUTS SHOULD BE DEACTIVATED AND REPAIRED OR REPLACED
ALL CONCRETE WASHOUT FACILITIES SHOULD BE INSPECTED DAILY. DAMAGED
CONCRETE WASHOUT4.
ACHIEVED OVER THE ENTIRE AREA.
VEGETATIVE COVER OF EROSION RESISTANT PERENNIAL SPECIES HAS BEEN
SLOPE IS CONSIDERED PERMANENTLY STABILIZED WHEN A UNIFORM 70%
2026, SECTIONS 804 AND 805.
EXPOSED COMPOST MATERIAL IN ACCORDANCE WITH PENNDOT PUBLICATION 408,
PLACE, SLIT OPEN TO EXPOSE THE COMPOST MATERIAL. SEED AND MULCH
LEAVE FILTER SOCK IN PLACE. IF DIRECTED TO LEAVE FILTER SOCK IN
AT COMPLETION OF PROJECT, REMOVE FILTER SOCK OR, WHEN DIRECTED,
HEIGHT OF THE SOCK.
APPROVED UPLAND SITE WHEN IT REACHES ONE-THIRD (1/3) OF THE EXPOSED
REPLACE DAMAGED AREAS IMMEDIATELY. REMOVE ACCUMULATED SEDIMENT TO AN
DAMAGE THAT WOULD MAKE THE FILTER SOCK NON-FUNCTIONING. REPAIR OR
INSPECT THE COMPOST FILTER SOCK WEEKLY AND AFTER ANY RUNOFF EVENT FOR
MAINTAIN COMPOST FILTER SOCK UNTIL THE PROJECT HAS BEEN COMPLETED.
2. COMPOST FILTER SOCK
GILPIN-UPSHUR COMPLEX, VERY STEEP
URBAN LANDUB
GQF
UCD URBAN LAND-CULLEOKA COMPLEX, MODERATELY STEEP
UCD
UB
GQF
SYMBOL
MAP
URBAN LAND-CULLEOKA COMPLEX, MODERATELY STEEP
URBAN LAND
GILPIN-UPSHUR COMPLEX, VERY STEEP
C
GROUP
HYDROLOGIC
HYDRIC CRITERIA.
NONIRRIGATED LAND CAPABILITY CLASSIFICATION IS 7E. THIS SOIL DOES NOT MEET
THIS THIN ORGANIC HORIZON THE ORGANIC MATTER CONTENT IS ABOUT 2 PERCENT.
ORGANIC MATTER CONTENT IN THE SURFACE HORIZON IS ABOUT 69 PERCENT. BELOW
NOT PONDED. THERE IS NO ZONE OF WATER SATURATION WITHIN A DEPTH OF 72 INCHES.
IS MODERATE. SHRINK-SWELL POTENTIAL IS HIGH. THIS SOIL IS NOT FLOODED. IT IS
IS VERY LOW. AVAILABLE WATER TO A DEPTH OF 60 INCHES (OR RESTRICTED DEPTH)
DRAINAGE CLASS IS WELL DRAINED. WATER MOVEMENT IN THE MOST RESTRICTIVE LAYER
ROOT RESTRICTIVE LAYER, BEDROCK, LITHIC, IS 40 TO 70 INCHES. THE NATURAL
CONSISTS OF CLAYEY RESIDUUM WEATHERED FROM LIMESTONE AND SHALE. DEPTH TO A
75 PERCENT. THIS COMPONENT IS ON…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .