STERO PARTS ISC QUOTE.pdf
PDF 20 KB Posted
- Contract number
- 26-426DOC-SHAWN-P-96547
- Issued by
- Illinois
About this file
This is an estimate document from Industrial Supply Consultants, a supplier based in Springfield, Illinois, for Shawnee Correctional Center in Vienna, Illinois. The estimate is addressed to Whitney Whitehead at the correctional facility and was issued on May 18, 2026, with an expiration date of June 1, 2026.
The estimate covers two industrial parts for Hobart equipment: a Reed Switch Only (HPB104274) priced at $282.70 and a Magnet Assembly for Hobart Reed B10-4274 (HPA104275) priced at $152.00. The total estimated cost is $434.70, with a scheduled ship date of May 18, 2026 via FedEx. The document includes a restocking policy stating that materials accepted for return are subject to a minimum service or restocking charge of 25% of the billing invoice plus all transportation charges incurred by Industrial Supply Consultants. The estimate requires acceptance signatures from the recipient, though these have not yet been provided on the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SIGNED BOA 26SHA0918.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Industrial Supply Consultants
4015 Hazelbrook Dr Springfield, IL 62711-8120
USA
+12179714160 kray@iscorp.us
Estimate
ADDRESS
Whitney Whitehead Shawnee Correctional Center 6665 Illinois Route 146 East Vienna, IL 62995 US
SHIP TO
Whitney Whitehead Shawnee Correctional Center 6665 Illinois Route 146 East Vienna, IL 62995 US
ESTIMATE # 25987
DATE 05/18/2026
EXPIRATION DATE 06/01/2026
SHIP DATE SHIP VIA
05/18/2026 FEDEX
ACTIVITY QTY RATE AMOUNT
HPB104274
Stero - 0B-104274, Reed Switch Only
1 282.70 282.70
HPA104275
Stero - 0A-104275, Magnet Assy Hobart Reed B10-4274
1 152.00 152.00
Here is our quote, thanks again for considering us, Material accepted for return is subject to a minimum service or restocking charge of 25% of the billing invoice, plus all transportation charges incurred by Industrial Supply Consultants
TOTAL $434.70
Accepted By Accepted Date
File details come from the government source that posted it. Updated .