Statement of Work (SOW).pdf
PDF 284 KB Posted
- Attached to
- Ultrasonic Welding
- Solicitation number
- 4-B139-Q-00414-00
- Issued by
-
Department of Energy Office of Science
About this file
This document is a Statement of Work (SOW) for the development of ultrasonic welding techniques to fabricate thin-wall foil vacuum chambers. The SOW describes the initial development work required, including the vendor being tasked with producing test samples that yield flat, tensioned foils attached to a bulk copper substrate. The vendor will receive copper samples and foil stock from Argonne National Laboratory (ANL) and is responsible for fixturing and ultrasonically welding the foils to the copper samples, ensuring the foils are tensioned and wrinkle-free. The finished samples will be shipped to ANL for leak checking. The related federal contract opportunity is Solicitation Number 4-B139-Q-00414-00 for Ultrasonic Welding, issued by the Department of Energy Office of Science, which seeks to demonstrate ultrasonic welding as a viable fabrication technique for the thin-wall foil vacuum chambers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix A-71COM-12-FEB-2023.pdf | ||
| Reps and Certs ANL-70A.doc | DOC document | |
| ANL-70 Request for Quotation.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Foil Beam Chamber Assembly Development – Tensioned Foil Test Samples
Argonne National Laboratory (ANL) Point of Contact (POC): Joel Fuerst Period of Performance: TBD
Abstract – This document describes the initial development work required to demonstrate ultrasonic welding as a viable fabrication technique for thin-wall foil vacuum chambers. The vendor is tasked with producing test samples that yield flat, tensioned foils attached to a bulk copper substrate. Leak tightness will be evaluated by ANL upon delivery.
Table of Contents
Scope of Work
Background
ANL-Supplied Material
Deliverables
Production Strategy
Production Samples
Scope of Work
The scope of work to be performed by the vendor consists of the following:
1. Receipt and acceptance of ANL-supplied 110ETP copper bulk copper samples and foil stock.
2. Fixturing and ultrasonic welding of 100-micron thick 110ETP copper foils to top and bottom of the copper samples along both the length and width (full perimeter).
3. Foils shall be tensioned as required to maintain a flat, wrinkle-free foil surface after welding.
Revision Date Reason 0 01/31/2024 Original 1 04/08/2024 Revised bulk copper sample width from 1.5” to 3”
Statement of Work
SOW for Superconducting Undulator Magnet Assemblies
Background
In December of 2023, a series of tests were conducted at Branson using short (12”) copper frames and 0.004” (100 micron) foils of 110ETP copper (Figure 1). The purpose of these tests was to evaluate the leak tightness of the ultrasonic welds. No particular effort was made to tension or otherwise stretch the foils to achieve flat chamber surfaces.
Evaluation of the welded samples at ANL highlighted the importance of controlling foil flatness to achieve a useable result.
Figure 1: test frames (left), welding in progress (center), practice welds (right)
ANL-Supplied Material
ANL will provide machined 110ETP bulk copper samples and 110ETP copper foil 0.004” (100 micron) thick.
Samples are 6” x 0.75” x 3” with 1/8” dia rounds (Figure 2). Samples with and without a leak checking hole will be provided. Round size can be adjusted if required.
Fig. 2-Left: sample after welding Fig. 2-Right: welded sample drilled for leak checking (by ANL)
Deliverables
Production Strategy Branson will evaluate the scope and provide a work plan to achieve flat welded foils. The strategy should include an estimate of the number of bulk copper samples and foil length required to demonstrate success.
Production Samples Finished samples will be shipped to ANL for preparation (Fig. 2–Right) and leak check. Leak checking holes will be added to samples without this feature.