Statement of Work - RFQ.pdf
PDF 14 KB Posted
- Attached to
- TH16/19 Flooring Installation
- Solicitation number
- N0017821Q6758
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| N0017821Q6758 - SF18.pdf | ||
| Drawing.pdf | ||
| Dam Neck Map RFQ.pdf | ||
| SECNAV_ 5512_1.pdf | ||
| Floor Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TH16/19 FLOORING INSTALLATION
STATEMENT OF WORK (SOW)
1.0 BACKGROUND
The Naval Surface Warfare Center, Dahlgren Division (NSWCDD) Dam Neck Activity (DNA) requires hardware and technical services for the flooring installation located in TH16/19.
2.0 APPLICABLE DOCUMENTS
2.1 Original Equipment Manufacturer (OEM) Specifications
2.2 Occupational Safety and Health Administration (OSHA) Regulations;
2.3 All work shall comply with all applicable building codes including the following:
International Building Code, National Electric Code, National Fire Protection Association (NFPA)
101 Life Safety Code, current editions.
2.4 Room Drawing (attached for reference)
3.0 REQUIREMENTS
The contractor shall provide technical services, labor and material required to support rooms TH16
& TH19 upgrades.
3.1 The contractor shall provide each contractor employee with the personal protective equipment required to do their job safely and in compliance with all applicable regulations.
3.1.1 All contractor personnel shall maintain social distancing and wear a facemask at all times while onsite at the NSWCDD Dam Neck Activity spaces until notified otherwise by the government.
3.2 The contractor shall remove and replace the 25 existing raised floor tiles that are either damaged or unusable for the new configuration of the room. The tiles must be of the same type and be compatible with the support system currently installed.
3.3 The contractor shall tag-out 120-volt power panel and disconnect the existing electric power whips from old floor boxes.
3.4 The contractor shall remove all unused copper piping, wiring, and debris from below the raised floors and dispose of it.
3.5 The contractor shall install cable trays for all data cabling under the raised floors.
3.6 The contractor shall remove the two gang floor boxes and re-cut floor tile to accept the new 4 gang floor boxes (32 Each) (flush mount floor box for raised flooring with 2 power receptacles and at least 6 shielded RJ45 jacks). The contractor shall install new floor boxes in accordance with the attached room drawing.
3.7 The contractor shall reconnect the existing below deck power whip and wire the two each
20 amp duplex receptacles. All power for additional whips shall be pulled from the existing breaker panels located inside TH16.
3.8 The contractor shall install six RJ45 connections in each 4-gang floor box.
3.9 The contractor shall procure and install a new rack and patch panels to be used for the central patch panel. There must be 192 connections.
3.10 The contractor shall pull six shielded CAT6 network cables to each floor box to the central patch panel, and run the cabling through the installed cable trays. Terminate Test and connect all floor box RJ45 connections to a central network patch panel as shown in room drawing.
3.11 The contractor shall label and install four 48-port network patch panels.
3.12 The contractor shall replace one of the wall mounted Quad receptacles boxes with round plug (20 amp,125v rated, twist lock device ) at two of the 12 locations and add a 4x4 box with a
20 amp twist lock receptacle at the other 10 locations. All locations are indicated on the attached drawing.
3.13 The contractor shall replace the duplex receptacle located next to the sink with a ground fault protected outlet due to the wet location.
3.14 The contractor shall seal around all abandoned water lines under the floor with sealant foam.
3.15 The contractor shall install sealing door sweeps on both sets of double doors.
3.16 The contractor shall re-run the needed cables within the cable rack in the Northeast corner of the room. The contractor shall demolish the cable rack, pull and cut unused cables into the hallway overhead, install concrete block to seal the opening left behind by the cables being pulled back.
3.17 The contractor shall install new ceiling grid and ceiling tiles in areas opened up by the removal of the cable rack.
3.18 The contractor shall seal all openings greater than 96 square inches to allow for OSS certification of the space when completed. Bulkhead openings greater than 96 square inches will need bars or metal mesh covering (10-gauge minimum). Three main HVAC supply ducts penetrate the East wall of the room. These ducts will require man bars or all thread to be installed. All three of these ducts are asbestos wrapped so proper abatement will be required for the installation of the man bars/all thread.
3.19 The contractor shall remove and replace ceiling tiles and grid to accommodate the sealing of the wall openings.
3.20 The contractor shall replace any cove base that is damaged while replacing floor tiles.
3.21 The Contractor shall provide each Contractor employee with the personal protective equipment required to do their job safely and in compliance with all applicable regulations.
3.21.1 All Contractor personnel shall maintain social distancing and wear a facemask at all times while onsite at the NSWCDD base until notified otherwise by the government.
4.0 GOVERNMENT-FURNISHED PROPERTY/MATERIAL/INFORMATION
(GFP/GFM/GFI)
No GFM material will be provided with this installation.
5.0 SECURITY
5.1 All work that is to be performed under this contract is unclassified.
5.2 All Contractor personnel are required to be escorted at all times while performing on this
Contract.
6.0 TRAVEL
The contractor will be required to travel in performance of this contract. The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the technical point of contact. All travel shall be conducted in accordance with the Federal Travel Regulations (FTR). The following travel is anticipated: Seven (7) personnel for thirty (30) days to Virginia Beach, VA.