This solicitation requests quotes for rental services for two chill water systems in accordance with the attached statement of work. Interested vendors must provide two separate 60-ton minimum chillers, delivery, pickup, and all other equipment and services defined in the statement of work from April 25, 2023 to April 24, 2024 with an optional six month extension. Quotes are due by March 30, 2023 and must be submitted electronically to the specified Navy contracting officer. The award will be made to the lowest priced technically acceptable vendor. The solicitation incorporates various FAR and DFARS clauses and provisions and is issued as a request for quotes under FAR Part 13 simplified acquisition procedures.

View the file

Other files

File Type Posted
NNSY OPSEC Contract Requirements.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Job Order:

Total of two (2) systems required to support the USS from 04/25/2023 to 04/23/2024.

(Contract shall provide an option for one 6 month extension).

Contractor Supplied Equipment:

1. Only Fresh Water will be circulated through the QTY=2/EA cooling systems described below and shown in Figure (1).

2. Systems shall consist of two separate Sixty Ton (Minimum) Chillers.

3. Systems shall be able to allow isolation of each chiller separately to support varying chill water loads shipboard.

4. Each Chiller must be air cooled.

5. At a minimum, each chiller system shall have a pumping system capable of pumping at least 180 GPM at 100 feet of head pressure. Pumps do NOT have to be integral to the chiller units.

6. Each unit must have supply and return manifolds with a quantity of three (3) 2-1/2” MNPT supply connections and a quantity of three (3) 2-1/2” MNPT return connections. All manifold connections shall have isolation globe valves installed.

7. Within each cooling loop there must be a reservoir capable of holding at least 250 gallons of cooling water or as required to support system design. Reservoir is required to account for small leaks. Reservoir must be transparent in order to visibly verify the water level within the tank.

8. Each system shall include a bypass line in order to flow water when no services are connected to the contractor supplied supply and return manifolds. This bypass line shall include globe valves so the flow can be throttled as required to suit Ship’s demand and to keep the chiller units running under low flow / pressure conditions.

9. Desired output water temperature range is 45° F - 55° F for each system.

10. Each system must be operable on a single 460/480(V), 400 Amp Breaker (MAXIMUM).

11. Each system must be provided with a male 500 mcm Camlock electrical connection.

12. Systems must have necessary equipment to prevent freezing recirculating water with no cooling load at 0° F.

13. CRITICAL SYSTEM SUPPORT: Units must be capable of operating twenty-four (24) hours a day, seven (7) days a week.

14. Contractor is to provide all equipment from the return manifold to the supply manifold. Systems shall be complete units. If pumps or tanks are separate, vendor will provide and install (if requested) all piping/valves/fittings as required to couple pumps to the Chill Water Units. Vendor is to provide extra fittings and hoses to support installation. If the systems require assembly, the systems shall be assembled in such a way that they do not cause tripping hazards by minimizing the lengths of hoses between components. If lengths of hoses are longer than needed, it should be able to be coiled and put somewhere out of the way of normal foot traffic. Hoses shall be routed in a way that does not cause the hose to kink and reduce flowrate.

15. Chiller Units must be capable of operating in an industrial environment where dust, dirt and sea air are present.

16. Chiller Units to be equipped with operational Inlet and Outlet Temperature Gauges.

17. Chiller Units to be equipped with operational Inlet and Outlet Pressure Gauges.

18. Systems are to include operational pressure gauges on the contractor provided supply and discharge manifolds.

19. Units shall have an electronic monitoring system that monitors inlet and outlet temperatures, pressures and flow rates. The systems shall be able to notify NNSY personnel when the monitored parameters fall outside of a set range.

20. If chiller systems each hold 55 gallons or more of fuel or oil or similar fluid, provide environmental catch tanks capable of holding at least 110% of the capacity of the fuel, oil and other fluids required to operate the rental units.

21. Evaporators must be capable of delivering a supply temperature of less than 45° F.

22. Condensers must be capable of operating in a wide ambient temperature range (0-125° F).

23. Units must be affixed with metal tags designating the supplying company, a POC responsible for repairs and maintenance, and a phone number for the POC who is responsible for repairs and maintenance.

24. Contractor to adhere the rigging requirements as outlined below in “Rigging Sketch Requirements” for contractor equipment at Norfolk Naval Shipyard.

25. The gross weight of the units shall be clearly marked on the outside of each unit as outlined in “Rigging Sketch

Requirements.” If the unit is not a complete unit, the gross weight of each component shall be clearly marked on each component.

PTank

Bypass Line

Chiller

Figure (1) - Line Diagram of Proposed Systems

Note: Freeze protection is not shown in Figure (1). A freeze protection method shall be included for the system in the event there is no cooling load on the system.

Contractor Responsibility:

1. Equipment delivery, setup and removal is to be at no cost to the government.

2. If the units require assembly, the contractor shall assemble the units at no cost to the government.

3. Provide all parts requiring repair or replacement under circumstances of normal equipment wear and tear at no additional charge.

4. Contractor is responsible for ensuring that all preventative maintenance is performed on equipment prior to delivery to the government as well as performing preventative maintenance as specified by the equipment’s manufacturer preventative maintenance schedule during the term of the rental period with the government.

Contractor is responsible for all travel associated with preventative maintenance. Contractor is responsible for providing service technicians that are able to meet the badging and security requirements of Norfolk Naval Shipyard.

5. Post contact information for service/repair of equipment directly on the rental equipment. Contact information must be packaged to withstand being located in an outdoor environment.

6. The contractor shall dispatch a representative in response to a service request to repair and/or replace a chill water unit within four (4) hours of notification by NNSY at no additional charge, regardless if request is placed during normal business hours. Contractor is responsible for travel associated with repair of equipment.

Contractor is responsible for providing service technicians that are able to meet the badging and security replacements of Norfolk Naval Shipyard.

7. “Per FAR 22.102-1(a) entitled ‘Safety’, Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements and Norfolk Naval Shipyard OSHE Program Manual, NAVSHIPYDNORINST P5090.2, requirements or safety requirements for site specific location of the contract.”

a. Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard (NNSY) cognizance must adhere to Federal OSHA requirements for Hazardous Energy Control IAW 29 CFR 1915.89 and must follow Hazardous Energy Controls (HEC) procedures as identified in NAVSEA’s Occupational, Safety, Health and Environment Corporate Manual (OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract. All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Points of Contact (TPOCs) and/or Contracting Officer’s Representatives (CORs) be notified of the HEC scope of work prior to starting work. Any changes or deviations in the initial scope of HEC work requires the NNSY TPOCs and/or CORs be informed of the change/deviation. Appendix 250.B-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags-Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use.

The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the

HEC lock(s) and a point of contact telephone number. HEC lock name labels and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use of machinery, equipment, or systems (MES) cannot be locked out. OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.

b. Contractors and NNGA’s may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the OSHA 1915.89 web site by using the following link to NNSY’s public access website:

http://www.navsea.navy.mil/shipyards/norfolk/default.aspx.

c. Names and contact information for NNSY LOTCs and/or the Facility Custodian will be provided by NNSY TPOC and/or CORs set forth elsewhere in this award document.

8. When the equipment is required to be removed to the contractor’s facility for repair or replacement, the contractor shall be responsible for loss or damage from the time it leaves the government site until it is returned to the government.

9. Provide start up training of equipment to the government. Contractor is responsible for all travel associated with providing startup training of equipment to the government.

10. Clean the chill water unit(s) prior to delivery to the following requirements:

a. Chill water units shall be cleaned to a degree of cleanliness that results in a surface free of grease, oil, flux, scale, dirt, loose particles and any other matter foreign to the base metal. Adherent, light, superficial rust on steel surfaces, caused by short time exposure to the atmosphere, is acceptable.

b. For uncoated surfaces: Adherent corrosion products typical on surfaces of the material type being considered (e.g. flash rust on steel) are acceptable. Loose corrosion products are not acceptable and must be removed.

Defense Biometric Identification Systems (DBIDS) for Installation Access Any new contractor, vendor or supplier requesting base access AFTER 31 May 2017 will be required to obtain a DBIDS credential. NCACS credentials will no longer be issued. Only DBIDS credentials will be issued to ALL contractors, vendors, and suppliers seeking base access AFTER 14 August 2017.

Defense Biometric Identification System (DBIDS) increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions. The system provides a continuous vetting anytime the DBIDS card is scanned at an installation entry point.

If you currently have a Navy Commercial Access Control System (NCACS) card, the following is required to get a DBIDS credential:

• Present your NCACS Card and a completed copy of the SECNAV FORM 5512/1 to the base Visitor Control Center Representative.

• The VCC will pull up your information in the computer, ensuring all information is current and correct.

• Once your information is validated, a temporary DBIDS credential is provided.

• Your temporary credential will have an expiration date, prior to which you will need to obtain your permanent DBIDS credential (~90 days).

• For each additional U.S. Navy installation to which you need access, the first time you visit you only need to bring your DBIDS credential and statement of purpose for base access when arriving at the Visitor Control Center.

• The representative will enter base access authorization and then you may proceed to work.

If you do NOT have an NCACS Card, the following is required to obtain a DBIDS credential:

• Present a letter or official document from your Government sponsoring organization that provides the purpose for your access.

• Present valid identification, such as a passport or Real ID Act-compliant state driver’s license.

• Present a completed copy of the SECNAV 5512/1 form to obtain your background check.

• Upon completion of the background check, the Visitor Control Center Representative will complete the

DBIDS enrollment process, which includes your photo, fingerprints, base restrictions, and several other assessments; after all this is done, you will be provided with your new DBIDS credential.

• You may now proceed to work.

FOR ADDITIONAL QUESTIONS ABOUT OBTAINING A DBIDS CARD, CONTACT YOUR LOCAL BASE

VISITOR CONTROL CENTER. INFORMATION IS ALSO PROVIDED AT: www.cnic navy.mil/om/dbids.html One Day Passes: Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the Contractor’s personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

Portable Electronic Devices (PEDs) In accordance with COMSUBLANT/COMSUBPACINST 2075.1C, the use of Portable Electronic Devices (PEDs) while in or on Department of Navy Submarine spaces are prohibited. A portable electronic device (PED) is defined as any non-stationary electronic apparatus with singular or multiple capabilities of, but not limited to, recording, storing, and/or transmitting data, voice, video, or photo images (e.g. cell phones, laptops, tablets and wearable devices such as fitness bands and smart watches).

Afterhours Access Contractors are to go to Gate 15 and let the guards know they are to provide services/support via contract N42158_______. It would be helpful for them to have a copy of the contract. The guards at the gate will then call the Base Precinct and subsequently be escorted to Bldg. 1618 to have a badge made.

Authorization of Additional Work Any additional work outside the scope of this contract/purchase order shall have written authorization from the Contracting Officer prior to executing any additional work. Any work performed without the written authorization of the Contracting Officer shall be considered “At-Risk” and the government will have no legal obligation to pay for the work performed. Pursuant to 13.004(b), once you have initiated performance of the work, this shall constitute your acceptance of the purchase order.

Government Responsibility:

1. Provide operators.

2. Perform basic maintenance.

a. Monitor all gauges.

3. Equipment movements within the shipyard.

4. Lost items and equipment damage beyond normal wear and tear.

NOTES:

1. New or used equipment may be provided. NNSY reserves the right to inspect the proposed equipment prior to contract award.

2. The chill water unit will be exposed to everyday weather and saltwater air. It is the contractor’s responsibility to provide any protective coverings for the unit.

3. The government reserves the right to return the rental unit at any time prior to the expiration of the rental period. The contractor agrees to prorate costs for the time the units are in use by NNSY only. The government agrees to give the contractor twenty-four (24) hours’ notice for return of units prior to expiration of rental period.

Requirements for Lifting of Equipment

1. The equipment shall be outfitted with suitable attachments for overhead lifting.

a. For multiple lift point lifts, each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength. For single point lifts, the lifting attachment shall be capable of supporting the gross weight of the equipment with a design factor of five to one based on ultimate strength.

b. For multiple point lifts, each lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-1271D, Type IVA) which is capable of supporting one half the gross weight of the equipment. For single point lifts the lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, Type IVA) which is capable of supporting the gross weight of the equipment.

c. Design of the lifting attachments shall be such that the attachments and shackles are not side loaded more than 10° out of the plane. Lifting attachments shall be located such that the lifting slings do not contact the equipment, or alternatively a spreader beam certified to NAVFAC P-307 shall be provided. Whenever practical, the lifting attachments shall be located above the center of gravity, and such that the lifting slings do not contact the equipment housings.

d. Each lifting attachment shall be conspicuously marked in a contrasting color “Lift Here.” Letters shall have a minimum height of 1”.

2. The equipment shall be marked in a prominent location with the gross weight. Sand hoppers, tubs, or other containers that may contain material shall be marked with the empty and full weight (or alternatively the empty weight and working load limit). Marking shall be upper case letters of a contrasting color, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”, etc.).

3. The equipment shall be provided with a lifting sketch / rigging diagram that meets the requirements of enclosure (1).

a. The lifting sketch shall detail any specific requirements and / or configurations that must be met prior to lifting (i.e. “engage swing lock”, “Tilt mast back fully”, “Rotate lifting basket over side”, “Utilize 10’ minimum length slings”, “Spreader beam required”, etc.).

b. The lifting sketch shall include the location of the center of gravity on the equipment (full fuel, hydraulic tanks, etc.), equipment model/manufacturer, and gross weight.

c. A copy of the lifting sketch shall be permanently posted on the equipment, and a copy shall be forwarded to Code 714 (396-3345, 3346).

4. If specialized handling gear other than shackles, standard slings, or chainfalls (i.e. spreader beams, special lift rigs, etc.) is required, the contractor shall furnish it. This handling gear shall be provided certified in accordance with NAVFAC P-307, with written documentation of proof testing.

Rigging Sketch Requirements:

Rigging sketches, as a minimum, shall identify the following:

1. The weight of the load.

2. The location of the center of gravity.

3. The minimum crane capacity.

4. The minimum capacity / length of slings.

5. The minimum capacity of other standard rigging gear.

6. The attachment (lifting) points for the load.

a. The attachment points for multiple leg lifts shall be sized that each attachment point can support half the loads weight at the anticipated lift angle.

b. The attachment point for single leg lifts shall be sized such that the attachment point can support th entire load’s weight.

7. Limitations on allowable orientations for any parts making up the lifting assembly.

8. For single leg vertical lifts using twisted rope (wire or synthetic), two parallel ropes each capable of supporting the entire load alone shall be required unless a method is used to prevent unlaying the rope.

9. A minimum D / d ratio of one shall be required where wire rope slings pass over any object, or in the eyes of wire rope slings. A minimum D / d ratio of two shall be required where synthetic rope slings pass over any object, or in the eyes of synthetic rope slings.

a. “D” represents the diameter of the object the sling passes over.

b. “d” represents the diameter of the sling.

c. Table 14-3 of NAVFAC P-307 lists efficiency factors as various D / d ratios.

10. Components in each handling assembly shall be sized based on the worst case distribution of loads.

a. When making a two, three or four point lift, the handling gear shall be sized so that two legs can support the load without exceeding the safe working load (SWL) at the lift angle expected, unless an equalizing method is used.

11. When nonstandard gear is required (i.e. round stock lifting bars) written instructions shall be provided that ensures:

a. The proper material is being used.

b. The item is certified IAW NAVFAC P-307.

c. Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e.

eccentricity of the bearing points).