Statement of Work - Giant Voice Solar Panel Replacement Batteries.pdf
PDF 79 KB Posted
- Attached to
- Buckley SFB - SBD2/Command Post - Giant Voice Solar Panel Installation, Battery Replacement, & Upgrades
- Solicitation number
- FA254326Q0024
About this file
Statement of Work Summary
This Statement of Work (SOW) describes the delivery and installation of Whelen replacement and supplemental parts for the existing Giant Voice outdoor Emergency Mass Warning Notification System (EMNS) at Buckley Space Force Base (BSFB). The contractor must provide a detailed document of part information at the time of quote. Required products include two Solar Package SBC280 units (panels, brackets, cabling, and Whelen solar regulator), twenty 31-MHD replacement batteries, one WPS 10A battery charger with adapter harness, two 400-watt driver assemblies, one 400-watt power amplifier (tone only) for WPS 2900 upgrade, and all other installation requirements including fittings and heavy equipment for one job.
All replacement parts must be Whelen brand and interchangeable/interoperable with the existing Whelen Giant Voice system. The Giant Voice system must be capable of projecting 120 dB of sound (peak) at ±1 dB at least 100 feet measured on-axis from each of the six existing poles (approximately 60 feet tall). The contractor must be Whelen-certified and responsible for procuring and operating a bucket truck or lift truck. All work will be conducted between 0800-1600, Monday through Thursday, excluding holidays and installation downdays, under escort by the OL MSG/LMR manager. Delivery and installation must occur no more than 30 days after receipt of order unless delayed by verifiable supply chain shortages. The contractor must pass a background check for base access. The government will accept work only once all items are delivered, installed, and fully operational, with the contractor responsible for troubleshooting any operational issues.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
SBD 2
Giant Voice System Solar Panel Installation, Battery Replacement & Upgrades 3 August 2026
1. SCOPE: The government requires the delivery and installation of Whelen replacement & supplemental parts for the existing Giant Voice outdoor Emergency Mass Warning Notification System (EMNS) at Buckley Space Force Base (BSFB).
Contractors must provide a detailed document of part information at the time of their quote.
2. REQUIREMENT:
Product
Quantity
Solar Package SBC280; panels, brackets, cabling and Whelen solar regulator installed to existing WPS charging panel
2 ea
31-MHD Replacement Batteries for existing towers 20 ea
WPS 10A Battery charger & adapter harness for the WPS Siren System
1 ea
Assembly 400 Watt Driver 2 ea
400 Watt Power Amplifier Tone Only for WPS 2900 Upgrade 1 ea
All other installation requirements/fittings/heavy equipment etc
1 job
3. SPECIFICATIONS:
• All replacement parts must be WHELEN brand and interchangeable/ interoperable with existing WHELEN Giant Voice system.
• The replacement parts must ensure the Giant Voice system is capable of providing clear tones and articulated voice instructions that can be heard across the entire installation. Specifically, each pole must be capable of projecting 120 dB of sound (peak) (+/- 1 dB) at least 100 ft measured on axis.
4. INSTALLATION REQUIREMENTS:
• The contractor must be certified to provide and install Whelen products.
• The contractor shall deliver and install all components on the six (6) existing poles identified after award. Each pole stands approximately 60 ft in the air.
• A bucket truck, or other lift truck, will be required and is the responsibility of the contractor to procure/operate.
• All work will be conducted between 0800 -1600, Monday through Thursday excluding holidays and installation ‘down days’/Family Days.
• The contractor will be escorted by the OL MSG/LMR manager while performing the work.
• Once installation is complete, functionality tests will be performed to ensure operability before the government will accept the work.
• If the system is not operational following installation, the contractor will troubleshoot until the problem is resolved and the system is operational.
• The government will accept the work once all items are delivered, installed and fully operational.
5. DELIVERY: Base access is required, and vendor must pass a background check to access base. The contractor shall deliver and install the items listed in paragraph 2 no more than 30 days after receipt of the order unless delayed by verifiable supply chain shortages. Delivery address is Buckley Space Force Base and a more specific address will be provided upon award.
File details come from the government source that posted it. Updated .