Statement_of_Work_Fontenelle_Dam.pdf

PDF 168 KB Posted

Attached to
Fontenelle Garbage Removal Option- 2023-MODIFIED
Solicitation number
140R4023Q0053
Issued by

About this file

This performance work statement outlines refuse collection service requirements for the Bureau of Reclamation's Fontenelle Dam facility. The contractor will provide twice monthly collection of a four-yard dumpster located at the Fontenelle Camp compound from October 2023 through March 2029, with the option to extend. The contractor must dispose of refuse at a certified landfill and provide original receipts for reimbursement of dumping fees. The contractor is responsible for obtaining necessary permits and licenses and complying with applicable laws and regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

pg. 1

PERFORMANCE WORK STATEMENT

REFUSE COLLECTION SERVICE

FONTENELLE DAM

FORWARD

The Bureau of Reclamation, Fontenelle Dam, is located 35 miles Northeast of Kemmerer, Wyoming, just off State Highway 372.

The contractor shall furnish refuse disposal service for the Bureau of Reclamation, Fontenelle Dam.

1. GENERAL STATEMENT OF WORK

A. THE PURPOSE: To provide refuse collection for Fontenelle Dam and Camp.

B. THE SERVICE: Fontenelle will require one dumpster/bin located at the Fontenelle Camp compound for refuse disposal service. The Contractor shall collect the dumpster/bin twice a month and replace it with an empty dumpster/bin. There shall always be a dumpster/bin at the collection station.

The dumpster or bin shall be equivalent to a four-yard dumpster.

C. EQUIPMENT: Refuse disposal service shall include labor, materials, and supplies necessary for the collection, hauling and disposal of the refuse, garbage, rubbish, rubble, etc., from the designated collection station.

The contractor may use open trucks, provided such trucks are covered with canvas or equivalent to prevent loss of refuse during collection and between collection points and disposal area.

D. COLLECTION STATION: The collection station for one dumpster/bin is located at the Fontenelle Camp.

E. COLLECTION: One dumpster shall be provided and empty twice a month.

F. DISPOSAL OF REFUSE: It will be the responsibility of the contractor to dispose of refuse at a certified landfill. The Bureau of Reclamation will only pay actual dumping fees. The Contractor shall be required to submit original receipt from certified landfill to be reimbursed for dumping fees with the monthly invoice to the Government.

G. PERMITS AND RESPONSIBILITY: The contractor shall procure, at their own expense, all necessary Federal, State, and Local licenses and permits, and

pg. 2 shall conform to all laws, regulations and ordinances applicable to operations under this contract.

The contractor and their employees shall be subject to all regulations of the community at any time they are within its boundaries.

The contractor is responsible for damage caused by contractor employees or subcontractor employees.

H. SAFE AND SANITARY WORKING CONDITIONS: The contractor or subcontractor shall not permit any part of the services called for by this contract to be performed in buildings or surroundings or under working conditions provided by or under the control or supervision of the contractor or subcontractor which are unsanitary or hazardous or dangerous to the health or safety of employees engaged to furnish these services. The contractor and any subcontractors shall comply with the safety and health standards applied under 29 CFR Part 1925, Service Contract Act.

2. PERFORMANCE PERIOD: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years with a possible six-month extension. The Period of Performance reads as follows:

Base Year Oct 1, 2023 to Sept 30, 2024

Option Year I Oct 1, 2024 to Sept 30, 2025

Option Year II Oct 1, 2025 to Sept 30, 2026

Option Year III Oct 1, 2026 to Sept 30, 2027

Option Year IV Oct 1, 2027 to Sept 30, 2028

Six Month extension Oct 1, 2028 to March 31, 2029.

File details come from the government source that posted it. Updated .